The present invention relates to a gas turbine power generator, and more particularly to a gas turbine power generator suitable for the case of employing a regenerative heat exchanger in the power generator.
Recently, as an independent power plant with capacity of from several tens to several hundreds kilowatts, a gas turbine power generator has been studied which employs a gas turbine to operate a generator and which includes a regenerative heat exchanger. In such a gas turbine power generator, the number of rotations N and a fuel flow rate MF are adjusted to hold the number of rotations N at a minimum in the range satisfying a demanded load while referring to a turbine outlet temperature TOT and a regenerative heat exchanger outlet temperature TRO, thereby holding the combustion temperature as high as possible and increasing the efficiency of power generation.
In the gas turbine power generator described above, however, when an air flow rate MA reduces with a decrease of the power generation output, a thermal drop in a turbine is reduced and the turbine outlet temperature TOT reaches a turbine outlet setting temperature TOTT prior to the regenerative heat exchanger outlet temperature TRO. Hence, the regenerative heat exchanger outlet temperature TRO cannot be held at a sufficiently high value, thus resulting in a problem that the regenerative heat exchange amount cannot be ensured at a sufficient level and the efficiency of power generation under a partial load is reduced.
Also, when a load variation occurs frequently, the frequency of a variation in the number of rotations caused by the load variation is increased, and the operation of increasing and decreasing the number of rotations N is repeated until the turbine outlet temperature TOT will be equal to the turbine outlet setting temperature TOTT or the regenerative heat exchanger outlet temperature TRO will be equal to or higher than a regenerative-heat-exchanger outlet setting temperature TROT. This leads to another problem that high-cycle thermal fatigue caused by a variation in the number of rotations of the turbine is noticeable.
An object of the present invention is to provide a gas turbine power generator capable of increasing the power generation efficiency in partial load operation and decreasing a variation in the number of rotations caused by a variation in power generation load.
To achieve the above object, the present invention provides a gas turbine power generator comprising a compressor for compressing air; a combustor for burning the compressed air and fuel; a turbine driven by combustion gas produced in the combustor and driving the compressor and a generator; and a regenerative heat exchanger for exchanging heat between exhaust gas from the turbine and the compressed air led into the combustor, wherein the gas turbine power generator further comprises humidifying and cooling means for humidifying and cooling intake air flown into the regenerative heat exchanger. With that construction, by humidifying and cooling the intake air supplied to the combustor, it is possible to increase the power generation efficiency in partial load operation and to decrease a variation in the number of rotations caused by a variation in power generation load.
The construction and operation of a gas turbine power generator according to a first embodiment of the present invention will be described below with reference to
A description is first made of overall construction of the gas turbine power generator according to this embodiment with reference to
The gas turbine power generator according to this embodiment primarily comprises an intake air sprayer 1, a compressor 2, a humidifier 3, a regenerative heat exchanger 4, a combustor 5, a turbine 6, a generator 7, a rectifier 8, a capacitor 9, an inverter 10, an output transformer 11, a supply water treating unit 12, a waste heat recovering unit 13, and a control unit 100. The gas turbine power generator of this embodiment is particularly featured in including working fluid humidifying means, such as the intake air sprayer 1 and the humidifier 3, and associated accessory equipment, such as the supply water treating unit 12. The control unit 100 executes not only control executed in a known gas turbine power generator, but also control of the working fluid humidifying means, such as the intake air sprayer 1 and the humidifier 3.
The intake air sprayer 1 is disposed on the inlet side of the compressor 2 and is capable of humidifying and cooling sucked air 21 with a water spray depending on the ambient environment and the operation state. On the inlet side of the intake air sprayer 1, there are disposed an ambient air temperature means 41 for detecting an ambient air temperature around the sucked air 21, an atmosphere pressure measuring means 51 for detecting an atmosphere pressure around the sucked air 21, and a flow rate measuring means 14 for measuring a flow rate of the sucked air 21. A compressor inlet differential-pressure measuring means 59 disposed in association with the flow rate measuring means 14 measures a differential pressure at an inlet of the compressor. Values measured by the ambient air temperature measuring means 41, the atmosphere pressure measuring means 51, the flow rate measuring means 14, and the compressor inlet differential-pressure measuring means 59 are taken into the control unit 100.
The air 21 sucked into the inlet side of the compressor 2 is humidified and cooled by the intake air sprayer 1. Treated supply water 24 is supplied to the intake air sprayer 1 from the supply water treating unit 12. The supply water treating unit 12 carries out treatment of water 23 supplied to it, such as dust removal and softening. The treated supply water 24 is pressurized by an intake-air cooling water ejection pump 34, and its flow rate is adjusted by an intake-air cooling water flow adjusting valve 35. Then, the treated supply water 24 turns to intake-air spraying water 25 to humidify the sucked air 21 in the intake air sprayer 1. The intake-air cooling water flow adjusting valve 35 is controlled by the control unit 100. The amount of water 28 drained from the intake air sprayer 1 is measured by a drained-water flow measuring means 60 and discharged through a drained-water discharge valve 38.
The air humidified and cooled by the intake air sprayer 1 is compressed by the compressor 2 and introduced to the humidifier 3. On the inlet side of the compressor 2, there are disposed a compressor inlet temperature measuring means 42 for measuring an inlet temperature of the compressor and a compressor inlet pressure measuring means 52 for measuring an inlet pressure of the compressor. Also, on the delivery side of the compressor 2, there are disposed a compressor delivery temperature measuring means 43 for measuring a delivery temperature of the compressor and a compressor delivery pressure measuring means 53 for measuring a delivery pressure of the compressor. Values measured by the compressor inlet temperature measuring means 42, the compressor inlet pressure measuring means 52, the compressor delivery temperature measuring means 43, and the compressor delivery pressure measuring means 53 are taken into the control unit 100.
The humidifier 3 is able to humidify the intake air by ejecting a required amount of water, warm water or water vapor depending on the operation state, such as a power demand. The treated supply water 24 having been treated by the supply water treating unit 12 is pressurized by a humidifying water ejection pump 36 and its flow rate is adjusted by a humidifying water flow adjusting valve 37. Then, the treated supply water 24 turns to humidifying water 26 to humidify the intake air in the humidifier 3. The humidifying water flow adjusting valve 37 is controlled by the control unit 100.
The intake air having flown out of the humidifier 3 is preheated in the regenerative heat exchanger 4 by heat recovered from exhaust discharged from the turbine 6. On the inlet side of the regenerative heat exchanger 4, there are disposed an inlet temperature measuring means 44 for measuring an inlet temperature of the regenerative heat exchanger and a regenerative-heat-exchanger inlet pressure measuring means 54 for measuring an inlet pressure of the regenerative heat exchanger. Also, on the outlet side of the regenerative heat exchanger 4, there are disposed a regenerative-heat-exchanger outlet temperature measuring means 46 for measuring an outlet temperature of the regenerative heat exchanger and a regenerative-heat-exchanger outlet pressure measuring means 55 for measuring an outlet pressure of the regenerative heat exchanger. Values measured by the regenerative-heat-exchanger inlet temperature measuring means 44, the regenerative-heat-exchanger inlet pressure measuring means 54, the regenerative-heat-exchanger outlet temperature measuring means 46, and the regenerative-heat-exchanger outlet pressure measuring means 55 are taken into the control unit 100.
The combustor 5 mixes and burns the intake air preheated by the regenerative heat exchanger 4 and fuel 22 introduced at a flow rate adjusted by a fuel flow adjusting valve 32. High-temperature gas resulting from the combustion flows into the turbine 6. A fuel cutoff valve 31 for cutting off fuel supply is disposed downstream of the fuel flow adjusting valve 32. The fuel cutoff valve 31 and the fuel flow adjusting valve 32 are controlled by the control unit 100.
In the turbine 6, the high-temperature gas supplied from the combustor 5 is expanded to perform work and produces power. The compressor 2 and the generator 7 are driven with the produced power. On the inlet side of the turbine 6, there are disposed an inlet temperature measuring means 47 for measuring an inlet temperature of the turbine and a turbine inlet pressure measuring means 56 for measuring an inlet pressure of the turbine. Also, on the outlet side of the turbine 6, there are disposed a turbine outlet temperature measuring means 48 for measuring an outlet temperature of the turbine and a turbine outlet pressure measuring means 57 for measuring an outlet pressure of the turbine. Values measured by the turbine inlet temperature measuring means 47, the turbine inlet pressure measuring means 56, the turbine outlet temperature measuring means 48, and the turbine outlet pressure measuring means 57 are taken into the control unit 100.
Electric power generated from the generator 7 driven by the turbine 6 is rectified by the rectifier 8 and its frequency is converted by the inverter 10 into a desired one depending on a customer. The electric power is then supplied to a load. At this time, a generator output voltage is converted by the output transformer 11 as required. The output voltage and current of the generator 7 are measured respectively by a generator output voltage measuring means 64 and a generator output current measuring means 65. A voltage between terminals of the capacitor 9 is measured by a capacitor inter-terminal voltage measuring means 66. An output voltage of the output transformer 11 is measured by a load-terminal output voltage measuring means 63. An output current is measured by a load-terminal output current measuring means 62, and an output power is measured by a load-terminal output power measuring means 61. Values measured by the generator output voltage measuring means 64, the generator output current measuring means 65, the capacitor inter-terminal voltage measuring means 66, the load-terminal output voltage measuring means 63, the load-terminal output current measuring means 62, and the load-terminal output power measuring means 61 are taken into the control unit 100.
After recovery of heat in the regenerative heat exchanger 4, the exhaust from the turbine 6 is discharged as a gas-turbine exhaust gas 27 to the outside of a plant. On the exhaust side of the regenerative heat exchanger 4, there are disposed an exhaust temperature measuring means 49 for measuring a temperature of the exhaust gas 27 and an exhaust pressure measuring means 58 for measuring a pressure of the exhaust gas 27. Values measured by the exhaust temperature measuring means 49 and the exhaust pressure measuring means 58 are taken into the control unit 100. As an alternative, the exhaust gas 27 may be introduced to a waste heat recovering unit 13, such as a refrigerator or a boiler, for further recovery of heat, and then finally discharged as the exhaust gas 27 from the waste heat recovering unit to the outside of the plant.
In the above arrangement, instead of the treated supply water 24, warm water or water vapor obtained from the waste heat recovering unit 13 may be supplied to the humidifier 3. Also, instead of the treated supply water 24, cooled water obtained from the waste heat recovering unit 13 may be supplied to the intake air sprayer 1. Additionally, the supply water treating unit 12 is constructed to be adaptable for, in addition to externally supplied water, condensed water, etc. discharged and recovered from, e.g., an air conditioner of the customer.
A method of operating the gas turbine power generator according to this embodiment will be described below with reference to
The method of operating the gas turbine power generator according to this embodiment is processed and executed by the control unit 100, and is primarily made up of a load satisfaction loop s108, an optimization loop s205, a misfire detection loop s123, and a burnout detection loop s111. The load satisfaction loop s108, the optimization loop s205, and the misfire detection loop s123 are executed in parallel at the same time.
First, in step s101, the control unit 100 reads a load demand (demanded load power PD).
Then, in step s102, the control unit 100 sets the number of rotations N corresponding to the demanded load by referring to a lookup table 103 which stores memory data such as the number of rotations N corresponding to the demanded load. In parallel to the setting of the number of rotations N in step s102, the load satisfaction loop s108 for continuing fuel supply at a flow rate satisfying the demanded load is executed, whereby the demanded load is always satisfied. Further, the optimization loop s205 and the misfire detection loop s123 are executed in parallel so that the set number of rotations N is obtained. The number of rotations N is adjusted by measuring an output of the generator output voltage measuring means 64 or an output of the capacitor inter-terminal voltage measuring means 66, for example, which is in proportion to the number of rotations N, and by controlling the measured voltage.
The load satisfaction loop s108 is first described. The load satisfaction loop s108 is executed in parallel to the setting of the number of rotations N and functions to continue fuel supply at the fuel flow rate MF satisfying the demanded load. By keeping the load satisfaction loop s108 under execution, the load demand 101 is always satisfied.
In step s104, the control unit 100 determines the state of a load terminal output power PGO measured by the load-terminal output power measuring means 61. If the load terminal output power PGO is larger than the demanded load power PD (PGO>PD), the control unit 100 issues a command for decreasing the fuel flow rate MF and controls the fuel flow adjusting valve 32 in step s105, thereby decreasing the fuel flow rate supplied to the combustor 5. If the load terminal output power PGO is equal to the demanded load power PD (PGO=PD), the control unit 100 issues a command for holding the fuel flow rate MF and controls the fuel flow adjusting valve 32 in step s106, thereby holding the fuel flow rate supplied to the combustor 5. If the load terminal output power PGO is smaller than the demanded load power PD (PGO<PD), the control unit 100 issues a command for increasing the fuel flow rate MF and controls the fuel flow adjusting valve 32 in step s107, thereby increasing the fuel flow rate supplied to the combustor 5.
Thus, in the load satisfaction loop s108, the demanded load power PD and the load terminal output power PGO are compared with each other, and feedback control is performed so that both the powers coincide with each other. To achieve more efficient operating conditions while always satisfying the load demand with the load satisfaction loop s108, the optimization loop s205 is executed in parallel.
The optimization loop s205 is now described. The optimization loop s205 is a loop constructed based on the concept of keeping the combustion temperature as high as possible and increasing the power generation efficiency by holding the number of rotations N at minimum within the range satisfying the demanded load while referring to a turbine outlet temperature TOT and a regenerative heat exchanger outlet temperature TRO.
The optimization loop s205 executes control such that, after setting a flow rate Mw of the humidifying water to a value resulting from multiplying an air flow rate MA by a constant α, the flow rate Mw of the humidifying water is gradually reduced to an optimum flow rate Mopw of the humidifying water. The air flow rate MA is measured by the flow rate measuring unit 14. Alternatively, the air flow rate MA may be calculated from the temperature and pressure at the inlet of the gas turbine power generator, the number of rotations N, and a compressor performance curve. Also, the constant α is decided, for example, by dividing a flow rate MwMin of the humidifying water in the minimum load operation within the range in which the flow rate Mw of the humidifying water is adjustable and combustion stability is not impaired, by the air flow rate MA at that time. As an alternative, the constant α may be calculated from a maximum water vapor concentration at which combustion performance, such as combustion stability and unburnt emissions, can be ensured in the combustor 5.
In step s201, the control unit 100 sets, as the flow rate Mw of the humidifying water, the value resulting from multiplying the air flow rate MA by the constant α.
Then, in step s112, the control unit 100 remains standby until the operation state will be steady.
Then, in step s113, the control unit 100 compares the turbine outlet temperature TOT with the turbine outlet setting temperature TOTT. In this respect, the turbine outlet setting temperature TOTT is decided as follows. A turbine outlet maximum setting temperature TOTTH during the operation is determined from a turbine performance curve by using the ambient air temperature and the atmosphere pressure measured respectively by the ambient air temperature measuring means 41 and the atmosphere pressure measuring means 51 during the operation, the air flow rate MA at the rated number of rotations NS, and a rated turbine inlet temperature TITS. A lower one of the turbine outlet maximum setting temperature TOTTH and a regenerative heat exchanger allowable temperature TRMAX is set as the turbine outlet setting temperature TOTT. In a district where a variation in temperature of open air is small or in a district where an annual highest atmospheric temperature is relatively low, the turbine outlet maximum setting temperature TOTTH and a regenerative heat exchanger allowable temperature TRMAX decided using the above-described method at a standard ambient air temperature and atmosphere pressure can be set as the turbine outlet setting temperature TOTT and used thoroughly. Instead of comparing the turbine outlet temperature TOT with the turbine outlet setting temperature TOTT, the turbine inlet temperature TIT may be compared with a turbine inlet setting temperature TITT. Here, the turbine inlet setting temperature TITT means a maximum value of the turbine inlet temperature TIT that is allowable for the turbine.
As a result of comparing the turbine outlet temperature TOT with the turbine outlet setting temperature TOTT, if the turbine outlet temperature TOT is higher than the turbine outlet setting temperature TOTT (TOT>TOTT), the control unit 100 issues an interlock control start command in step s114. Interlock control is executed to avoid a trouble, such as burnout of the turbine 6 or the combustor 5, when the turbine outlet temperature TOT is higher than the turbine outlet setting temperature TOTT. Details of the interlock control will be described later with reference to
If the turbine outlet temperature TOT is equal to the turbine outlet setting temperature TOTT (TOT=TOTT), the control unit 100 issues a command for exiting the optimization loop in step s115. Then, in step s202, a command is issued to hold the flow rate Mw of the humidifying water and the number of rotations N at the same values as those set at that time. The load is thereby satisfied in step s117.
If the turbine outlet temperature TOT is lower than the turbine outlet setting temperature TOTT (TOT<TOTT), the control unit 100 compares the regenerative heat exchanger outlet temperature TRO with the regenerative-heat-exchanger outlet setting temperature TROT in step s118.
As a result of comparing the regenerative heat exchanger outlet temperature TRO with the regenerative-heat-exchanger outlet setting temperature TROT, if the regenerative heat exchanger outlet temperature TRO is not lower than the regenerative-heat-exchanger outlet setting temperature TROT (TRO≧TROT), the control unit 100 issues the command for exiting the optimization loop in step s115. Then, in step s202, the control unit 100 issues the command for holding the flow rate Mw of the humidifying water and the number of rotations N at the same values as those set at that time.
If the regenerative heat exchanger outlet temperature TRO is lower than the regenerative-heat-exchanger outlet setting temperature TROT in (TRO<TROT), the control unit 100 compares the flow rate Mw of the humidifying water with the optimum flow rate MOpw of the humidifying water in step s203.
As a result of comparing the flow rate Mw of the humidifying water with the optimum flow rate MOpw of the humidifying water, if the flow rate Mw of the humidifying water is larger than the optimum flow rate MOpw of the humidifying water (Mw>MOpw), the control unit 100 issues a command for decreasing the flow rate Mw of the humidifying water in step s204. When setting a decrease amount of the flow rate Mw of the humidifying water in this step, the decrease amount is set to, for example, the least possible value within a flow rate adjustable range.
After decreasing the flow rate Mw of the humidifying water, the control unit 100 remains standby in step s112 until the operation state will be steady, and then repeats in step s113 a sequence of control loop for comparing again the turbine outlet temperature TOT with the turbine outlet setting temperature TOTT.
If the flow rate Mw of the humidifying water is not larger than the optimum flow rate MOpw of the humidifying water (Mw≦MOpw), the control unit 100 issues a command for decreasing the number of rotations N in step s119. When setting a decrease amount of the number of rotations N in this step, a change amount of the number of rotations is set to, for example, the minimum number of rotations that is significantly changeable by means for controlling the number of rotations.
After decreasing the number of rotations N, the control unit 100 sets, in step s201, the flow rate Mw of the humidifying water to the value resulting from multiplying the air flow rate MA by the constant α. Subsequently, the control unit 100 remains standby in step s112 until the operation state will be steady, and then repeats in step s113 a sequence of control loop for comparing again the turbine outlet temperature TOT with the turbine outlet setting temperature TOTT.
Herein, the optimum flow rate MOpw of the humidifying water means the flow rate Mw of the humidifying water which is required for making the intake air temperature coincident with the saturation vapor temperature at the inlet of the regenerative heat exchanger 4. The optimum flow rate MOpw of the humidifying water can be decided by measuring the pressure and temperature at the inlet of the regenerative heat exchanger 4 and determining a value of the optimum flow rate MOpw from a saturation temperature formula. As an alternative, the saturation temperature may be calculated in advance, and the optimum flow rate MOpw of the humidifying water corresponding to required ranges of pressure and temperature at the inlet of the regenerative heat exchanger 4 may be stored as memory data in a lookup table. Further, instead of measuring the pressure and temperature at the inlet of the regenerative heat exchanger 4, the pressure and temperature at the inlet of the regenerative heat exchanger may be calculated by measuring the air flow rate and the pressure and temperature at the inlet of the compressor, and determining the compressor efficiency and compression ratio from a measured value of the number of rotations N and a performance curve approximation formula for the compressor. In addition, when deciding the optimum flow rate MOpw of the humidifying water by the above-described method, it is also possible to employ the pressure and temperature on the delivery side of the compressor instead of the pressure and temperature at the inlet of the regenerative heat exchanger.
In parallel to the load satisfaction loop s108 and the optimization loop s120 described above, the temperature excessive rise (burnout) detection loop s111 and the misfire detection loop s123 are always executed.
In the temperature excessive rise detection loop s111, the control unit 100 compares, in step s109, the turbine outlet temperature TOT measured by the turbine outlet temperature measuring means 48 with a turbine outlet upper-limit temperature TOTHL. If the turbine outlet temperature TOT is not lower than the turbine outlet upper-limit temperature TOTHL, this means a large possibility of risk of device burnout. In step s110, therefore, the control unit 100 operates the fuel cutoff valve 31 at once to cut off the supply of the fuel 22 and to stop the power generation. At this time, when the turbine outlet temperature exceeds a predetermined alarm setting temperature, an alarm is issued to avoid the temperature of the turbine 6 from rising excessively. The alarm setting temperature is set to a higher value depending on a rise of the open air temperature.
In the misfire detection loop s123, the control unit 100 determines the state of the number of rotations N in step s121. If the number of rotations N is not lower than the number of rotations NMIN at the time of ignition and is not higher than the number of rotations NMAX at the time of maximum output (NMIN≦N≦NMAX), the control unit 100 determines the turbine outlet temperature TOT in step s122. If the turbine outlet temperature TOT is not higher than a turbine outlet lower-limit temperature TOTL (TOT≦TOTL), the control unit 100 operates, in step s110, the fuel cutoff valve 31 at once to cut off the supply of the fuel 22 and to stop the power generation.
An interlock control sequence for use in the method of operating the gas turbine power generator according to this embodiment will be described below with reference to
In the interlock control sequence, if the turbine outlet temperature TOT is not lower than the turbine outlet upper-limit temperature TOTHL, this means a large possibility of risk of device burnout. Therefore, the control unit operates the fuel cutoff valve 31 at once to cut off the supply of the fuel 22 and to stop the power generation.
When an interlock control start command is issued in step s114, the control unit 100 compares, in step s206, the turbine outlet temperature TOT measured by the turbine outlet temperature measuring means 48 with both a turbine outlet higher setting temperature TOTH and the turbine outlet upper-limit temperature TOTHL.
If the turbine outlet temperature TOT is not lower than the turbine outlet upper-limit temperature TOTHL (TOT≧TOTHL), this means a large possibility of risk of device burnout. I step s110, therefore, the control unit 100 operates the fuel cutoff valve 31 at once to cut off the supply of the fuel 22 and to stop the power generation.
If the turbine outlet temperature TOT is higher than the turbine outlet setting temperature TOTT and is lower than the turbine outlet higher setting temperature TOTH (TOTT<TOT<TOTH), the control unit 100 issues, in step s202, the command for holding the flow rate Mw of the humidifying water and the number of rotations N at the same values as those set at that time.
If the turbine outlet temperature TOT is not lower than the turbine outlet higher setting temperature TOTH and is lower than the turbine outlet upper-limit temperature TOTHL (TOTH≦TOT<TOTHL), the control unit 100 issues, in step s208, a command for increasing the flow rate Mw of the humidifying water so as to provide the operation state with a lower possibility of risk. When setting an increase amount of the flow rate Mw of the humidifying water, the increase amount is preferably set, for example, to be equal to the decrease amount of the flow rate Mw of the humidifying water, which is obtained with the command issued in step s204 for decreasing the flow rate Mw of the humidifying water.
After increasing the flow rate Mw of the humidifying water, the control unit 100 remains standby in step s112 until the operation state will be steady, and then compares in step s207 the turbine outlet temperature TOT with each of the turbine outlet setting temperature TOTT, the turbine outlet higher setting temperature TOTH, the turbine outlet upper-limit temperature TOTHL, and the turbine outlet lower-limit temperature TOTL.
As a comparison result, if the turbine outlet temperature TOT is not lower than the turbine outlet upper-limit temperature TOTHL (TOT≧TOTHL), this means a large possibility of risk of device burnout. In step s110, therefore, the control unit 100 operates the fuel cutoff valve 31 at once to cut off the supply of the fuel 22 and to stop the power generation. Further, if the increase amount of the flow rate Mw of the humidifying water is too large, there is a possibility of misfire. Accordingly, if the turbine outlet temperature TOT is not higher than the turbine outlet lower-limit temperature TOTL (TOT≦TOTL), the control unit 100 also operates, in step s110, the fuel cutoff valve 31 at once to cut off the supply of the fuel 22 and to stop the power generation.
If the turbine outlet temperature TOT is higher than the turbine outlet setting temperature TOTT and is lower than the turbine outlet higher setting temperature TOTH (TOTT<TOT<TOTH), the control unit 100 issues, in step s202, the command for holding the flow rate Mw of the humidifying water and the number of rotations N at the same values as those set at that time.
If the turbine outlet temperature TOT is still not lower than the turbine outlet higher setting temperature TOTH and is lower than the turbine outlet upper-limit temperature TOTHL (TOTH≦TOT<TOTHL) , the control unit 100 issues, in step s208, a command for increasing the flow rate Mw of the humidifying water again so as to provide the operation state with a lower possibility of risk.
If the turbine outlet temperature TOT is higher than the turbine outlet setting temperature TOTT and is lower than the turbine outlet higher setting temperature TOTH (TOTT<TOT<TOTH), the control unit 100 issues, in step s202, the command for holding the flow rate Mw of the humidifying water and the number of rotations N at the same values as those set at that time.
If the turbine outlet temperature TOT is not higher than the turbine outlet setting temperature TOTT (TOT≦TOTT), the control unit 100 issues, in step s127, a command for returning to the optimization loop. Then, in step s113 of the optimization loop s205 shown in
With the gas turbine power generator according to this embodiment, as described above, the power generation output and the power generation efficiency can be increased by applying a spray of intake air to a gas turbine and humidifying the intake air on the delivery side of the compressor.
The power generation output and the power generation efficiency achieved with the method of operating the gas turbine power generator according to this embodiment will be described below with reference to
It is here assumed that the gas turbine power generator of this embodiment and the known gas turbine power generator have the same pressure ratio, the turbine inlet temperature and the number of rotations under rated conditions, and component units, such as a turbine, a compressor, a generator and a regenerative heat exchanger, have characteristics substantially identical to each other. However, the gas turbine power generator of this embodiment has a regenerative heat exchanger capacity and a turbine capacity both increased in consideration of an increase in amount of a working fluid caused by the humidification.
Also, the gas turbine power generator of this embodiment is a 100-kW class gas turbine power generator designed to have a pressure ratio of 3.5 and a turbine inlet temperature of 970° C. under the conditions of an ambient air temperature of 15° C. and a relative humidity of 30%. Furthermore, in the gas turbine power generator of this embodiment, the air is always cooled at the compressor inlet with the intake air sprayer 1 by using 0.2 weight percent of humidifying water with respect to the air mass flow rate.
With reference to
In the gas turbine power generator of this embodiment, the humidification on the delivery side of the compressor is not performed at the power generation load of not larger than 73% because the flow rate resulting from multiplying the air flow rate MA by the constant α becomes lower than the controllable flow rate. In the range of power generation load from 73% to 90%, the humidification is performed at the optimum flow rate MOpw of the humidifying water in accordance with the operation control method shown in
A solid line A1 indicates the turbine inlet temperature with respect to the power generation load in the gas turbine power generator of this embodiment, and a solid line A2 indicates the turbine outlet temperature with respect to the power generation load in the gas turbine power generator of this embodiment. On the other hand, a broken line B1 indicates the turbine inlet temperature with respect to the power generation load in the known gas turbine power generator, and a broken line B2 indicates the turbine outlet temperature with respect to the power generation load in the known gas turbine power generator.
At any power generation load, there is no significant difference in the turbine inlet and outlet temperature between the gas turbine power generator of this embodiment and the known gas turbine power generator.
A solid line A3 indicates the regenerative heat exchanger outlet temperature with respect to the power generation load in the gas turbine power generator of this embodiment, and a broken line B3 indicates the regenerative heat exchanger outlet temperature with respect to the power generation load in the known gas turbine power generator. As seen from the comparing, with the operation control according to this embodiment, the regenerative heat exchanger outlet temperature can be consistently held higher than that in the known gas turbine power generator.
Further, a solid line A4 indicates the regenerative heat exchanger inlet temperature with respect to the power generation load in the gas turbine power generator of this embodiment, and a broken line B4 indicates the regenerative heat exchanger inlet temperature with respect to the power generation load in the known gas turbine power generator. As seen from the comparison, the regenerative heat exchanger outlet temperature lowers in the range of power generation load not lower than 90% in which the flow rate Mw of the humidifying water exceeds the optimum flow rate, but it is still higher than the regenerative heat exchanger outlet temperature in the known gas turbine power generator.
In the range of power generation load not lower than 73% in which the humidification is performed with the humidifier 3, the regenerative heat exchanger inlet temperature is reduced to a value substantially coincident with the saturation temperature at the regenerative heat exchanger inlet pressure by carrying out the operation control in accordance with this embodiment. Thus, the temperature of turbine exhaust as a high-temperature side fluid flowing into the regenerative heat exchanger is almost the same in both the gas turbine power generators of this embodiment and of the known type, and the temperature of air delivered as a low-temperature side fluid from the compressor is lower in the gas turbine power generator of this embodiment than in the known gas turbine power generator. Hence, the regenerative heat exchange amount is greatly increased.
With reference to
A solid line A5 indicates the regenerative heat exchange amount with respect to the power generation load in the gas turbine power generator of this embodiment, and a broken line B5 indicates the regenerative heat exchange amount with respect to the power generation load in the known gas turbine power generator.
At any power generation load, the regenerative heat exchange amount in the gas turbine power generator of this embodiment is 15% or more larger than that in the known gas turbine power generator. In the range of power generation load not lower than 73%, particularly, the regenerative heat exchange amount increases with respect to the power generation load at a greater gradient in the gas turbine power generator of this embodiment than in the known gas turbine power generator. The reason is that, in addition to an increase of the capacity of the regenerative heat exchanger, the intake air is in the saturation state at the inlet of the regenerative heat exchanger as a result of the humidification on the delivery side of the compressor, whereby the humidified intake air has the specific heat and the heat transfer rate larger than those of not-humidified air, and the regenerative heat exchanger inlet temperature is reduced to provide a larger temperature difference between the inlet and the outlet of the regenerative heat exchanger.
With reference to
A solid line A6 indicates the power generation efficiency with respect to the power generation load in the gas turbine power generator of this embodiment, and a broken line B6 indicates the power generation efficiency with respect to the power generation load in the known gas turbine power generator.
At any power generation load, the power generation efficiency is higher in the gas turbine power generator of this embodiment than in the known gas turbine power generator. Also, while the power generation efficiency in the known gas turbine power generator reduces as the power generation load decreases, the power generation efficiency in the gas turbine power generator of this embodiment moderately increases in the range of power generation load from 100% to 90% and is substantially constant in the range of the power generation load not larger than 90%.
Such a moderate increase of the power generation efficiency in the range of power generation load from 100% to 90% is attributable to that the operation state following the power generation load is achieved just by regulating the flow rate Mw of the humidifying water in the state in which it exceeds the optimum flow rate MOpw of the humidifying water, and the flow rate Mw of the humidifying water becomes closer to the optimum flow rate MOpw as the load decreases.
With reference to
A solid line A7 indicates the number of rotations with respect to the power generation load in the gas turbine power generator of this embodiment, and a broken line B7 indicates the number of rotations with respect to the power generation load in the known gas turbine power generator.
As is apparent from
With this embodiment, as described above, it is possible to increase the power generation efficiency in the partial load operation and to decrease a variation in the number of rotations caused by a variation in the power generation load.
Next, the construction and operation of a gas turbine power generator according to a second embodiment of the present invention will be described below with reference to
The following description is therefore made of a method of operating the gas turbine power generator according to this embodiment with reference to
Since basic control procedures of the operating method are the same as those shown in
In step s209, the control unit 100 compares intake-air specific heat CP at the inlet of the regenerative heat exchanger with intake-air specific heat CPT in the saturation state. As a result of comparing the intake-air specific heat CP with the intake-air specific heat CPT in the saturation state, if the intake-air specific heat CP is larger than the intake-air specific heat CPT in the saturation state (CP>CPT), the control unit 100 issues, in step s204, the command for decreasing the flow rate Mw of the humidifying water. If the intake-air specific heat CP is not larger than the intake-air specific heat CPT in the saturation state (CP≦CPT), the control unit 100 issues, in step s119, the command for decreasing the number of rotations N.
Here, the intake-air specific heat CP is decided from the following intake-air specific heat calculation formula (1) derived on condition that the heat exchange amount on the compressor delivery air side and the heat exchange amount on the turbine exhaust gas side are equal to each other for the regenerative heat exchanger 4;
CP=CPG(MA+MF/MA)((TOT−TEX/(TRO−TRI) (1)
where CP: intake-air specific heat, CPG: fuel gas specific heat, MA: air flow rate, MF: fuel flow rate, TRI: regenerative heat exchanger inlet temperature, TRO: regenerative heat exchanger outlet temperature, TOT: turbine outlet temperature, and TEX: exhaust temperature.
The intake-air specific heat CPT in the saturation state can be decided by determining the saturation water vapor temperature using a saturation-water-vapor temperature calculation formula from the pressure and temperature of the intake air on the delivery side of the compressor 2, and by employing a specific heat calculation formula for a gas mixture from the water vapor specific heat and the water vapor partial pressure in that condition, as well as from the pressure and specific heat of the intake air on the delivery side of the compressor 2. As an alternative, values of the intake-air specific heat CPT in the saturation state with respect to pressure and temperature over ranges possibly occurred on the delivery side of the compressor may be stored as memory data in a lookup table 210 beforehand and used when deciding the intake-air specific heat CPT in the saturation state. Further, instead of measuring the pressure and temperature at the inlet of the regenerative heat exchanger, the pressure and temperature at the inlet of the regenerative heat exchanger may be calculated by measuring the intake-air flow rate and the pressure and temperature at the inlet of the compressor, and determining the compressor efficiency and compression ratio from a measured value of the number of rotations N and a performance curve approximation formula for the compressor.
In practical use, for example, when the gas turbine power generator of this embodiment is coupled to a line system or when it is used in combination with an electricity storage plant, the gas turbine power generator is not always required to satisfy all of the load demand by itself alone because deficiency of the load terminal output power PGO with respect to the demanded load power PD can be compensated by purchasing power from the line system or by supplying power from the electricity storage plant. In that case, it is also possible to employ a method of determining respective values of a target flow rate MwT of the humidifying water, the target number of rotations NT and a target fuel flow rate MFT which are required to realize the operation state satisfying the load demand and maximizing the power generation efficiency, and carrying out steady operation with the determined values set to control target values. The respective values of the target flow rate MwT of the humidifying water, the target number of rotations NT and the target fuel flow rate MFT can be determined, for example, by calculating respective values of the intake-air specific heat CP, the air flow rate MA and the fuel flow rate MF at which the regenerative heat exchanger outlet temperature TRO in the right side of the formula (1) is maximized.
Thus, this embodiment can eliminate the necessity of changing the control target values depending on the operation state, and can minimize a variation in the number of rotations. In some cases, however, the load terminal output power PGO may become insufficient with respect to the demanded load power PD until the operation state reaches the steady condition.
With this embodiment, as described above, it is possible to increase the power generation efficiency in the partial load operation, and to decrease a variation in the number of rotations caused by a variation in the power generation load. Further, the necessity of changing the control target values depending on the operation state is eliminated, and a variation in the number of rotations can be minimized.
Next, the construction and operation of a gas turbine power generator according to a third embodiment of the present invention will be described below with reference to
The following description is therefore made of a method of operating the gas turbine power generator according to this embodiment with reference to
Since basic control procedures of the operating method are the same as those shown in
In step s212, the control unit 100 compares a regenerative heat exchanger temperature gradient ΔTRO-RI/LR, which is resulted from dividing a temperature difference ΔTRO-RI between the inlet and the outlet of the regenerative heat exchanger 4 by a flow passage length LR inside the regenerative heat exchanger, with a reference temperature gradient (ΔTRO-RI/LR)T in the regenerative heat exchanger.
As a result of comparing the regenerative heat exchanger temperature gradient ΔTRO-RI/LR with the reference temperature gradient (ΔTRO-RI/LR)T, if the regenerative heat exchanger temperature ΔTRO-RI/LR is lower than the reference temperature gradient (ΔTRO-RI/LR) T ((ΔTRO-RI/LR)<((ΔTRO-RI/LR) T)) the control unit 100 issues, in step s204, the command for decreasing the flow rate Mw of the humidifying water.
If the regenerative heat exchanger temperature gradient ΔTRO-RI/LR is not lower than the reference temperature gradient (ΔTRO-RI/LR)T ((ΔTRO-RI/LR) ≧((ΔTRO-RI/LR)T)), the control unit 100 issues, in step s119, the command for decreasing the number of rotations N.
Here, the regenerative heat exchanger temperature gradient ΔTRO-RI/LR is decided from measured values of the inlet and outlet temperatures of the regenerative heat exchanger 4, and the reference temperature gradient (ΔTRO-RI/LR)T is decided based on a thermal balance calculation. As an alternative, values of the reference temperature gradient (ΔTRO-RI/LR)T with respect to pressure and temperature at the inlet of the regenerative heat exchanger over necessary ranges may be stored as memory data in a lookup table beforehand. Further, instead of measuring the pressure and temperature at the inlet of the regenerative heat exchanger, the pressure and temperature at the inlet of the regenerative heat exchanger may be calculated by measuring the intake-air flow rate and the pressure and temperature at the inlet of the compressor, and determining the compressor efficiency and compression ratio from a measured value of the number of rotations N and a performance curve approximation formula for the compressor.
With reference to
A solid line C1 indicates the case of humidifying the intake air just at the optimum flow rate MOpw of the humidifying water. A broken line C2 indicates the case of humidifying the intake air at the flow rate Mw4 of the humidifying water smaller than the optimum flow rate MOpw. A two-dot-chain line C3, a one-dot-chain line C4 and a dotted line C5 indicate respectively the cases of humidifying the intake air at the flow rates Mw3, Mw2 and Mw1 of the humidifying water larger than the optimum flow rate MOpw. Those flow rates of the humidifying water meet a condition of Mw4<MOpw<Mw1<Mw2<Mw3.
In the case of humidifying the intake air at the flow rate smaller than the optimum flow rate MOpw of the humidifying water (broken line C2), the regenerative heat exchanger temperature gradient ΔTRO-RI/LR is larger than in the case of humidifying the intake air just at the optimum flow rate MOpw of the humidifying water (solid line C1).
Further, as is apparent from
Additionally, as is apparent from
With this embodiment, as described above, it is possible to increase the power generation efficiency in the partial load operation, and to decrease a variation in the number of rotations caused by a variation in the power generation load. Further, an optimum regenerative heat exchanger temperature gradient can be obtained by adjusting the flow rate Mw of the humidifying water based on the regenerative heat exchanger temperature gradient ΔTRO-RI/LR.
Next, the construction and operation of a gas turbine power generator according to a fourth embodiment of the present invention will be described below with reference to
This embodiment includes neither the intake-air sprayer 1 nor the associated accessory equipment, which are provided in the gas turbine power generator shown in
This embodiment is applicable to, for example, a district where a variation in temperature of open air is small or a district where an annual highest atmospheric temperature is relatively low, and humidifies the intake-air by the humidifier 3 alone without employing the intake-air sprayer 1. Because moisture tends to more easily saturate at the inlet of the compressor 2, the outlet temperature of the compressor 2 is reduced by humidifying the intake-air with the humidifier 3 so that easier humidification is realized and the power generation efficiency is increased.
With this embodiment, as described above, it is possible to increase the power generation efficiency in the partial load operation, and to decrease a variation in the number of rotations caused by a variation in the power generation load.
Next, the construction and operation of a gas turbine power generator according to a fifth embodiment of the present invention will be described below with reference to
This embodiment includes neither the humidifier 3 nor the associated accessory equipment, which are provided in the gas turbine power generator shown in
With this embodiment, as described above, it is possible to increase the power generation efficiency in the partial load operation, and to decrease a variation in the number of rotations caused by a variation in the power generation load.
Next, the construction and operation of a gas turbine power generator according to a sixth embodiment of the present invention will be described below with reference to
This embodiment includes a regenerative-heat-exchanger inner temperature measuring means 45 capable of measuring temperatures inside the regenerative heat exchanger 4 at multiple points.
A method of operating the gas turbine power generator according to this embodiment will be described below with reference to
Since basic control procedures of the operating method are the same as those shown in
If the turbine outlet temperature TOT is lower than the turbine outlet setting temperature TOTT, a control unit 100C compares a temperature TRM1 inside the regenerative heat exchanger at a position closest to the inlet with the regenerative heat exchanger inlet temperature TRI in step s214.
As a result of the comparison, if the temperature TRM1 inside the regenerative heat exchanger at the position closest to the inlet is equal to the regenerative heat exchanger inlet temperature TRI (TRM1=TRI), the control unit 100C issues the command for decreasing the flow rate Mw of the humidifying water in step s204.
If the temperature TRM1 inside the regenerative heat exchanger at the position closest to the inlet is higher than the regenerative heat exchanger inlet temperature TRI (TRM1>TRI), the control unit 100C compares the regenerative heat exchanger outlet temperature TRO with the regenerative-heat-exchanger inlet setting temperature TROT in step s118.
As a result of comparing the regenerative heat exchanger outlet temperature TRO with the regenerative-heat-exchanger outlet setting temperature TROT, if the regenerative heat exchanger outlet temperature TRO is not lower than the regenerative-heat-exchanger inlet setting temperature TROT (TRO≧TROT), the control unit 100C issues the command for exiting the optimization loop in step s115. Then, in step s202, the control unit 100C issues the command for holding the flow rate Mw of the humidifying water and the number of rotations N at the same values as those set at that time.
If the regenerative heat exchanger outlet temperature TRO is lower than the regenerative-heat-exchanger inlet setting temperature TROT in (TRO<TROT), the control unit 100C issues the command for decreasing the number of rotations N in step s119.
With this embodiment, as described above, it is possible to increase the power generation efficiency in the partial load operation, and to decrease a variation in the number of rotations caused by a variation in the power generation load.
In each of the embodiments described above, since cooled water is supplied to the intake-air sprayer 1 through the intake-air cooling water ejection pump 34 and the intake-air is humidified and cooled with the intake-air spraying water 25, the power required for the compressor can be reduced and the power generation terminal output and the power generation efficiency can be increased.
Even with a very small flow rate of about 0.01 weight percent of the air mass flow rate, the intake-air spraying water 25 is effective in reducing the compressor power through change in the specific heat ratio resulting from the humidification. In order to positively evaporate the intake-air spraying water and quickly humidify the intake air, however, a flow rate of about 0.4 weight percent of the air mass flow rate is appropriate. In this respect, among droplets of the intake-air spraying water which did not evaporate, large-sized droplets are discharged and recovered as the drained water 28, while small-sized droplets are delivered from the compressor together with the intake air and then evaporate on the delivery side of the compressor, thereby developing a similar effect to that obtainable with the case of slightly humidifying the intake air by the humidifier 3.
When carrying out spray cooling of the intake air, therefore, the flow rate set in step s201 by multiplying the air flow rate MA by the constant α is set to a value that is resulted from reducing the amount of the drained water per unit time from the flow rate of the intake-air spraying water.
According to the present invention, it is possible to increase the power generation efficiency in the partial load operation, and to decrease a variation in the number of rotations caused by a variation in the power generation load.
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/JP01/03044 | 4/9/2001 | WO | 00 | 2/12/2004 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO02/084091 | 10/24/2002 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
4248039 | Cheng | Feb 1981 | A |
4448018 | Sayama et al. | May 1984 | A |
4753068 | El-Masri | Jun 1988 | A |
5417053 | Uji | May 1995 | A |
6205768 | Dibble et al. | Mar 2001 | B1 |
6247302 | Tsukamoto et al. | Jun 2001 | B1 |
6269626 | Kim | Aug 2001 | B1 |
6351935 | Bronicki et al. | Mar 2002 | B1 |
6389799 | Hatamiya et al. | May 2002 | B1 |
6397578 | Tsukamoto et al. | Jun 2002 | B2 |
6530210 | Horii et al. | Mar 2003 | B2 |
6578354 | Hatamiya et al. | Jun 2003 | B2 |
6584776 | Mittricker et al. | Jul 2003 | B2 |
6634165 | Tomlinson et al. | Oct 2003 | B2 |
6718750 | Shibata et al. | Apr 2004 | B2 |
6745574 | Dettmer | Jun 2004 | B1 |
6763662 | Hendriks | Jul 2004 | B2 |
20010042381 | Dodo et al. | Nov 2001 | A1 |
20020007624 | Mittricker et al. | Jan 2002 | A1 |
20040103637 | Maisotsenko et al. | Jun 2004 | A1 |
Number | Date | Country |
---|---|---|
0 889 212 | Jul 1999 | EP |
0 959 235 | Nov 1999 | EP |
1-173431 | Dec 1989 | JP |
11-72029 | Mar 1999 | JP |
11-324710 | Nov 1999 | JP |
2000-54857 | Feb 2000 | JP |
Number | Date | Country | |
---|---|---|---|
20040112037 A1 | Jun 2004 | US |