Cost savings programs for manufacturing systems are continuously striving to minimize waste and improve the quality of product given to the consumer. For example, a statistical control model such as disclosed in commonly owned U.S. Pat. No. 6,260,188 enables the setup and control of a process to optimize process and product quality and efficiency. Existing manufacturing systems have evolved over time such that most easy-to-find, intuitive, or obvious opportunities to minimize waste and improve productivity have long been fixed or are effectively managed. Efforts to improve productivity often require fundamental changes in equipment capability and/or reliability to remove technical liabilities that are experienced during production operation.
A previous analysis tool presents cull waste results from a machine chronology built from data obtained during the manufacturing process. However, this tool analyzes and presents results on a univariate basis or pools results across time to the shift level of resolution (e.g., 12-hour blocks). Pooling and tabulating production data results in a loss of event/time order and fails to define interrelations describing cause and effect (e.g., identifying driving events). In addition, the speed, complexity, and size of modern manufacturing systems make it difficult to determine causal relationships without knowledge of the process flow.
Accordingly, existing systems and methods fail to provide a fast, convenient, standardized means of obtaining detailed process reliability information for a particular asset and period of operation.
Aspects of the invention identify events or time periods in a production sequence that correspond to a high probability of failure. Embodiments of the present invention define machine section performance to identify improvement opportunities comprehended from the basis of a detailed production chronology. In one example, a reliability analysis system (RAS) retrieves information from a database populated with data from an event-based manufacturing process. The retrieved data is used to create a process chronology that facilitates the evaluation of process reliability in detail. In general, the invention tests for correlations over a large event space to identify those events within a specified event window that may be responsible for adverse events by consulting process flow information. Combining delay, waste, and material usage tables into a process chronology permits examination of both spatial and temporal aspects of efficiency. Evaluation of process reliability includes understanding the performance of the entire converting machine or any section (e.g., unit or component operation) within the machine.
Further, an analysis tool according to an embodiment of the invention allows a user to allocate stop events to high-risk periods of operation such as raw material splice and start-up events. This permits improvement efforts to define and focus on discrete periods of production operation, where improvement will provide the maximum gain for the overall production.
In one form, a method analyzes reliability of a manufacturing system. The method includes receiving an event chronology having a plurality of chronologically ordered event records. Each of the plurality of chronologically ordered event records has a machine section value associated therewith. The method also includes identifying an adverse event record in the received event chronology. The method includes determining a relationship between the adverse event record and a previous event record in the event chronology by comparing the machine section value of the identified adverse event record and the machine section value of the previous event record. The method further includes incrementing a value representative of a correlation between the identified adverse event record and the previous event record as a function of the determined relationship.
In another form, one or more computer-readable media have computer-executable components for analyzing reliability of a manufacturing process. The components include an interface component for receiving an event chronology having a plurality of chronologically ordered event records. Each of the plurality of chronologically ordered event records has a machine section value associated therewith. The components also include a process flow component for identifying a causal relationship between the event records in the event chronology received by the interface component by identifying an adverse event record in the event chronology and determining if the machine section value of the identified adverse event record and the machine section value of a previous event record in the event chronology are related. The components also include a display component that displays the identified causal relationship to a user.
In yet another form, a system analyzes the reliability of a manufacturing process that has one or more machine sections. The system includes an event chronology that has a plurality of chronologically ordered event records. Each of the plurality of chronologically ordered event records has a machine section value associated therewith. The system also includes a memory area for storing process flow information identifying at least one relationship between machine section values. The system also includes a processor configured to execute computer-executable instructions for identifying a causal relationship between at least two of the event records in the event chronology by accessing the process flow information stored in the memory area.
In still another form, in a computer system that has a user interface including a display and a user interface selection device, a method enables a reliability analysis of a production sequence. The method includes displaying the user interface to a user on the display. The user interface defines a time interval form and a target location form. The method also includes receiving from the user via the user interface selection device a time interval value from the time interval form. The method also includes receiving from the user via the user interface selection device a target location value from the target location form. The method also includes receiving an extraction command from the user via the user interface selection device. The method also includes extracting, in response to the received extraction command, delay data and raw material usage data from one or more data tables as a function of the received time interval value and the received target location value. The method also includes merging the extracted delay data and raw material usage data into an event chronology. The event chronology includes a plurality of chronologically ordered event records. Each of the plurality of chronologically ordered event records has a machine section associated therewith. The method also includes identifying an adverse event record in the event chronology. If the machine section of the identified adverse event record and the machine section of a previous event record in the event chronology are related, the method increments a value on the display. The value represents a correlation between the identified adverse event record and the previous event record.
In another form, a user interface enables a reliability analysis of a production sequence. The user interface has a display and provides a report and a data set used to generate the report. The user interface includes a start-up reliability portion for displaying on the display a tabulation of start-up failure events for a target machine during a time interval. The user interface includes an efficiency portion for displaying on the display splice efficiency data for the target machine during the time interval.
In yet another form, a user interface enables a reliability analysis of a production sequence. The user interface has a display and provides a report and a data set used to generate the report. The user interface includes a first field for displaying classification information on the display. The classification information specifies a target machine and a time interval. The user interface also includes a second field for displaying on the display a data set summary for the target machine during the time interval. The user interface also includes a third field for displaying on the display a plurality of delay events for the target machine during the time interval categorized by process location. The user interface also includes a fourth field for displaying on the display a tabulation of start-up failure events for the target machine during the time interval. The user interface also includes a fifth field for displaying on the display splice efficiency data for the target machine during the time interval.
In still another form, a computer-readable medium stores a data structure that represents process flow information in an event-based manufacturing process. The data structure includes a first field storing a value identifying a machine section. The data structure also includes a second field storing a plurality of values representing a list of machine sections related in the manufacturing process to the machine section identified in the first field.
In another form, a system enables a reliability analysis for a production sequence. The system includes a chronology tool for building an event chronology from data collected from an event-based manufacturing system. The event chronology includes a chronologically ordered sequence of event records pertaining to delay data and material usage data. The system also includes a reliability analysis tool for producing a report from the event chronology built by the chronology tool. The report includes the event chronology. The report further includes a plurality of dimensions. The dimensions include a measure of reliability during machine start, a measure of reliability of a running operation, and a measure of reliability per asset in the production sequence and per time frame.
This summary is provided to introduce a selection of concepts in a simplified form that are further described below in the Detailed Description. This Summary is not intended to identify key features or essential features of the claimed subject matter, nor is it intended to be used as an aid in determining the scope of the claimed subject matter.
Other features will be in part apparent and in part pointed out hereinafter.
TABLE 1 illustrates various levels of process information availability.
TABLE 2 illustrates exemplary variables common to material usage, delay and waste tables.
TABLE 3 illustrates a merged dataset for event chronology indicating a leg elastic start-up failure.
TABLE 4 illustrates an example of a post-splice failure event for a containment flap system.
TABLE 5 illustrates an example of a pre-splice failure event for a containment flap system.
TABLE 6 illustrates the results of a delay and material extraction.
TABLE 7 illustrates the results of a delay and waste extraction.
TABLE 8A illustrates the results of a subsection report conducted for the ear machine section.
TABLE 8B illustrates the results of a SATO subsection report conducted for the ear machine section.
TABLE 9 illustrates a column explanation for an exemplary RAS report.
TABLES A1-A4 illustrate an exemplary RAS report.
Corresponding reference characters indicate corresponding parts throughout the drawings.
Personal care absorbent articles such as disposable diapers, training pants, other infant care products, other child care products, feminine napkins, panty liners, interlabial pads, other feminine care products, incontinence articles, and other adult care products are typically manufactured using high-speed processing machines which convert a stabilized web or ribbon of a fibrous absorbent material into an article. Each web is pre-formed and provided to the machine as a wound roll or coil. To prevent interruption of the processing machine a trailing end of each coil is spliced to a leading end of the next coil. The resulting interconnected web has sufficient tensile strength so that it may be provided to the machine and processed without breaking at the splice.
However, breaks at splices and other adverse events do occur during the manufacturing process. Aspects of the invention include a system for analyzing the reliability of the machine and the process by studying and relating event records in a chronologically ordered sequence of event records representing an event chronology. Generally, an event record is a collection, in any form, of data identifying, defining, or otherwise describing an event.
Existing reliability analysis systems support needs at a relatively high level (e.g., Levels I and II in Table 1 below). Most of the existing web-based systems summarize data only by process location. With these existing systems, the data lose time-order and other “relational structure” or sequential aspects of potential interest by being summarized over the span of production under investigation. This results in the loss of ability to define or correlate waste or delay events with specific periods of converting that contain the root causes of the technical issues. While time-order resolution is typically not needed for analyses based on data sets taken across several machines, such detail is useful when interpreting the specific failure modes and sequences occurring within a given converting line.
In an embodiment, the invention includes enabling an analysis of reliability per asset and per time interval in a manufacturing system. In particular, embodiments of the invention include building an event chronology from production data to identify time periods in a production sequence that correspond to a high probability of machine failure. Opportunities for improving reliability may be identified and comprehended by mining production data across a considerable span of production history. Volumes of process data are converted into useful information (e.g., at Levels III and IV in Table 1), and the information is further judged to produce technical insights. In one example, the invention provides a means for measuring diaper machine reliability based upon an allocation of stop occurrences to specific operational locations and sequences within the unit operations of the system. In another embodiment, stop events are allocated to specific operational sequences within a unit operation. The contrasting basis for categorization is built from detailed information about the materials (e.g., webs) used in converting at that point in time.
Developing relational assessments through production history (e.g., time) includes comparing certain quantitative criteria in a current data record to temporally subsequent data records within a specified time interval. For example, a reliability analysis for a machine or machine section may be based upon relations existing between variables representing spatial and temporal aspects of reliability. Spatial aspects of reliability include, for example, unit operations or locations in the converting system incurring waste or delay events and material consumption events. A temporal aspect of reliability includes, for example, the computed quantity of cuts (products) run between such data records. Formulae facilitate the comparisons by operating on a cleansed (e.g., filtered) table having merged delay and material usage data.
The means for measuring reliability includes any software or hardware methods for producing analyses and tabular presentations of data. For example, “MICROSOFT” brand software such as Access or programming languages such as FORTRAN constitute the means for measuring reliability, and more specifically, constitute a means for displaying an event chronology or event chronology record and a reliability analysis to a user. In another embodiment, the means for measuring reliability or displaying the event chronology includes the “MICROSOFT” brand software such as Excel or other spreadsheet application programs. The spreadsheet program incorporates one or more macros to develop the relational aspects of the stored process data. The means for measuring reliability and the means for displaying the event chronology and event chronology record, however, are not limited to a spreadsheet. For example, the means for measuring reliability also includes a database program, a visual programming environment, or any other platform that provides a user interface and an analysis engine.
Event Data
In an embodiment, systems and methods of the invention build an event chronology from data obtained by an intelligent, event-based manufacturing system for tracking production information from one or more manufacturing facilities. For example, aspects of the invention is operable with systems including the PIPE/STORM systems disclosed in commonly owned U.S. patent application Ser. No. 10/306,794, “Communication Between Machines and Feed-Forward Control in Event-Based Product Manufacturing,” filed Nov. 27, 2002 by Markham et al., U.S. patent application Ser. No. 10/306,868, “Quality Management and Intelligent Manufacturing with Labels and Smart Tags in Event-Based Product Manufacturing,” filed Nov. 27, 2002 by Markham et al., and U.S. patent application Ser. No. ______, “User Interface for Reporting Event-Based Production Information in Product Manufacturing,” filed Nov. 27, 2002 by Pokorny et al., all of which are herein incorporated by reference. PIPE collects, stores, and reports production information such as converting machine productivity, waste, and delay information on an event basis. In this system, machine data from sensors and other control means are continually monitored for events related to productivity and/or product quality, such as product waste, machine down time, machine slow downs, production line maintenance, product maintenance, machine failure, etc.
An “event,” as used herein, refers to any discrete occurrence during the manufacturing process. For example, an event includes an incident that may affect the productivity of a process or machine in use to produce a product, or that may adversely affect the quality of the product being produced. However, an event is not necessarily adverse. Generally, adverse events are adverse relative to the other events in the event chronology (e.g., from a productivity or quality perspective). Adverse events include any events negatively affect any aspect of the manufacturing process. For example, events that adversely affect the productivity of a process or machine by increasing delay are “adverse productivity events.” Productivity events that lead to waste are “waste events,” while those that cause delay are “delay events.” Events that adversely affect the quality of a product are “adverse quality events.” As used herein, “intermediate events” may refer to incidents during a first process for the production of an intermediate product to be used as a raw material (starting material) in a second process for the production of a finished product (or another intermediate product or product component), wherein the incident in the first process may affect the productivity of the second process or adversely affect the quality of the product of the second process. Thus, an intermediate event in a first process may lead to an adverse productivity event or an adverse quality event in a second process. An adverse quality event may also refer to incidents that may adversely affect the quality of an intermediate product, such that the risk of rejection of the product by a subsequent user (including an industrial user) is increased. The PIPE system may be used to track any or all types of events, including events from multiple machines and processes wherein intermediate products from early processes or machines are used as raw materials in later processes or machines, and optionally wherein the event data for the intermediate products are used by operators or process control equipment to properly execute the subsequent processes based on the events associated with the intermediate product or, in general, with the quality and property attributes of the intermediate product as recorded at least in part with a system such as PIPE.
Examples of adverse and non-adverse events include, but are not limited to, a web break, a component failure in a machine, a loss of manpower (e.g., inadequate employees present during a shift), a loss of power, a fire, machine shutdown to change a grade (“changeover”) or perform routine maintenance, unacceptable quality in raw materials, market curtailment (e.g., inadequate orders or excess inventory), an experimental run, a startup, the splicing in of a raw material, the culling of an individual article, web shifting past a critical point, and the like.
As used herein, “production information” includes waste data, delay data, machine speed data, product code, and any other data related to production. In some systems, production information is segregated from waste and delay data, even though waste and delay data are considered production information. In general, embodiments of the invention are operable with any form of waste data, delay data, or other production information or event data. For example, production information includes raw material usage information. Raw material usage information includes, but is not limited to, a raw material lot number, an amount of material in the roll, a time the roll was spliced on or off, a number of products produced from the roll of material, a supplier of the material, a specific location or lane of production for the material roll from within the lot and batch produced on the parent machine (e.g., deckle position), and the date the material was produced.
In general, waste and delay information, as well as other productivity parameters, may be automatically captured for a raw material during a process on an event basis and stored in a database or other memory area for further processing. The captured information describing events includes electronic data in time series form about production defects may be available that may be of value for a process control system and for evaluation by an operator or administrator. For example, data in the PIPE database is used to evaluate process reliability in considerable detail whether the task is to understand the performance of the entire converting machine, or any section (e.g., unit or component operation) within the machine. Combining the PIPE delay and material usage tables into an event or process chronology permits examination of both spatial and temporal aspects of reliability.
For example, an exemplary event chronology tool in an embodiment of the invention represents a convenient means of obtaining a clean (e.g., filtered), chronologically ordered data set for further statistical analysis. Multiple data extraction/combining options are available in the tool based on the event chronology data set. The tool summarizes and reports structured information (e.g., chronologically ordered) from the event chronology data set (e.g., reports) and includes the data set in the report. This is an advantage over other “enterprise information systems” which provide various reports of extracted results but do not provide the data sets for examination of curious values or other statistical properties which often are of interest to the investigator. The event chronology tool of an embodiment of the invention enables the user to conduct further exploration and/or analysis of the individual data values that were used to produce the report.
Constructing a Machine Chronology From Event Data
Construction of a machine chronology from event data sets such as delay and material usage data to represent causal events that affect converting reliability involves several considerations. Merging data sets from a large scale, multi-purpose system with numerous tables, numerous variables within each table, and differing table nomenclature is difficult. Corrective formulae and/or data filters included in the automated tools in embodiments of the invention aid in preventing erroneous values from contaminating and invalidating quantitative analytical results. The formulae and filters described herein are merely exemplary. Other formulae and filters that reduce the introduction or propagation of errors are within the scope of embodiments of the invention.
Delay record times are typically incremental and do not reflect whether the machine is running or stopped. Irrelevant delay data may result from capturing delay time charges when the process is stopped as well as delay occurrences that stop the process when it is running. As such, in one embodiment, constructing a machine chronology includes filtering the delay data to retain only running failures. This means eliminating the event records that are time charges and are not related to process reliability faults. Only the event records that occurred during machine run and are related to process reliability are included (e.g., not time charges while the machine was down). A run duration (e.g., the difference between legitimate delay records based on cut count) is computed from cut count for each reliability event.
Constructing the machine chronology further includes filtering the material usage data to retain only time-stamped records. Material consumption events logged to shift without time and cut-stamp information are generally not useful for the examination of process events.
In one embodiment, commercially available software tools associated with database application programs may filter the delay data and the material usage data. However, any computer-executable instructions or other software that performs the filtering is within the scope of embodiments of the invention.
Constructing the machine chronology further includes computing the event duration based on the difference in cut count between relevant data records to provide the fundamental basis for evaluating event windows and constructing causal relations.
Building an event chronology from data tables includes the definition of variables to permit data from different tables to be correctly merged or re-constituted into another larger, more comprehensive table. To accomplish this, variables in the targeted tables are scrutinized for commonality. Some variables have the same name. Other variables have the same key characteristic, but do not have the same name. Exemplary variables for tables storing material usage, delay, and waste data are shown below in Table 2.
The filtered data are merged into a single “process event chronology” based on time stamps (gs_event_dt, delay_event_dt, splice_on_dt, waste_event_dt) and cut count (current_cut_count, cuts_on). A process event duration is computed by differencing the records in the chronology table. This permits evaluation of process events within “windows” specified at the cut-count level of resolution. Computation of the event duration also enables quantitative statistical analysis of various capability or reliability events on the unbiased basis of cuts run. Efforts which analyze such relations based on differences in time stamps are subject to serious bias based on differences in machine speeds and the like.
The completed, cleansed (e.g., filtered) machine chronology table is further analyzed for the specified relations and results are fed to a report page as provided by the various tools. A particular embodiment for building the event chronology is next described.
Referring first to
An analysis of machine productivity concerned with production sequence and probable “driving events” evaluates periods of transient upset. Some of these transients are well known and are primarily related to the machine stop/start cycle, and material consumption events (splicing). Although machine stops and starts and raw material splices are known to be drivers of adverse events, embodiment of the invention test for correlations of any transient event that is recorded in the process database record. Relevant periods of operation are defined to permit the data records to be classified as either within or not within the transient period of operation. Such “event windows” are determined based on differences in cut count between data records. The actual computation of run duration and event duration (e.g., differences among cut counts in chronologically ordered data records) is performed with an awareness of the technology upon which the data are based.
Additionally, cut count is taken from a per-product incrementing counter that contains the finite range of values from 1 to 10,000,000. When the upper limit of 10,000,000 is reached the counter “rolls over” to 1. Consequently, to provide accurate run and event durations in view of the opportunity for cut count rollovers, a roll over correction is applied in the differencing formula. To ensure some combination of time stamp error and cut count roll over changes never result in the generation of “ridiculous data values”, an absolute filter is applied to restrict records to only those cases where run duration and event duration are below a realistic specified upper limit. For example, this value may be specified to be 400,000 cuts.
For the machine stop/start cycle, the standard event window for ramp-up is defined as existing from 1 through 1500 cuts after run enable. The computation of run duration from delay and other event records in the chronological dataset makes detailed description and analysis of the individual values possible. In one example, the standard window for machine start-up is 1500 cuts. The event window length of 1500 cuts is an exemplary event duration. In one embodiment, software of aspects of the invention allows the window length to be changed to a user-defined value for exploratory analyses. In general, the window length value ranges from 0 to 3000 cuts to evaluate various scenarios affecting process reliability. Table 3 below presents an example of a start-up failure (see row 6, Column 2 =leg elastic, Column 6=Run Duration). Note the run duration and event duration for this record are equal and the value is less than 1500 cuts. In Table 3 below, a diaper sausage refers to an assembly of materials, typically still continuous webs (e.g., comprising most of the elements required for a finished product) at an intermediate point in the converting operation prior to being cut into discrete products. The term “sausage” is used because the web composites typically hold absorbent materials and other “stuffing” between the outer most (cover) and inner most (body side liner) layers of webs.
In one embodiment, if a failure occurs during start-up, it is counted as such even if a splice is active within the event window (e.g., joint events are not counted in one embodiment).
At least two types of failure events are contemplated to capture the converting liabilities associated with the material consumption transient: post-splice failures and pre-splice failures. Both are easily identified structural relations within the event chronology.
In an exemplary event chronology, the material consumption record precedes the delay record, the associated event duration is greater than zero (e.g., indicating the splice was not made with the machine stopped), the next record has a run duration greater than 1500 (e.g., indicating the stop did not occur during a start-up event window), and the event duration for the stop is less than 1500 cuts (e.g., indicating the splice occurred within the specified range.
An example of a post-splice failure event is provided as Table 4. Note the consumption event occurring in row 2 is code 69 (Containment Flap Unwind - B Spindle), the next record occurring in row 3 is a delay event charged to containment flap, the run duration (since the prior stop) is 4893 cuts and the event duration (cuts run since the splice record) is 34 cuts.
Festoon fill refers to the process of providing web length in a material storage device (e.g., a festoon) that permits supply to a running converting line during a zero speed splicing event. The festoon is filled (e.g., expanded) then collapses to supply material to the running converting operation during the process of decelerating the expiring roll to stop, executing the splice (e.g., attachment of expiring to replenishing roll) at zero speed, then accelerating the replenishing roll to full run speed. A pre-splice failure event situation occurs when web issues during festoon fill fail the process before the consumption event occurs. Therefore, the delay record precedes the consumption record, and the event duration between delay and consumption equals zero cuts. An example of this is shown in Table 5 below. Note row 2 shows a delay event for Containment Flap and row 3 shows a material consumption event for Containment Flap on the B-Spindle. The event duration is zero cuts between the delay and matching consumption event, indicating a pre-splice failure situation.
Exemplary User Interface for the Event Chronology Tool
In an exemplary event chronology tool workbook, options are accessed from the toolbar by clicking on the event chronology tool item (e.g., on the right side of the bar). This provides a drop down box of items for which extraction, conditioning, and presentation may be accomplished. Current options include creating individual event chronologies of delay, waste, and raw material events, or any combination of the three (e.g., a delay and material merged dataset, a material and waste merged dataset, or a delay and waste merged dataset). Machine speed change events may also be incorporated into the chronology.
Referring next to
Table 6 below shows results of a delay and material extraction. The left portion of the worksheet displays delay records (e.g., delay time, delay problem, delay subsection, machine section), the center of the worksheet displays the event chronology data used for merging the tables (e.g., event timestamp, cut count, calculated event duration), and the right portion of the worksheet displays a portion of the material consumption data table pertaining to the specifics of the material source and process location executing the splice event. Not all fields from the tables are included in the extracted information. Modification of the data query used to create the report enables the display of different data fields in various embodiments.
Table 7 below shows results of a delay and waste extraction. The method and resulting table are similar for a material and waste extraction.
Reliability Analysis Tool
A reliability analysis system (RAS) tool using event chronology data suggests locations and specific periods of operation where detailed technical diagnostics should be conducted to measure and understand the behavior of limiting factors. In one embodiment, the RAS tool receives the event chronology from the event chronology tool in embodiments of the invention or from another source. Furthermore, RAS provides a comprehensive overview of asset reliability. The RAS report is different than the perspectives provided by other tools in that all periods of converting and unit operations are summarized and simultaneously judged. Other available analysis tools focus on specific periods of operation and discount all other functions and unit operations in the process.
RAS enables a user to determine where and when (e.g., with respect to other events) an operation fails. In this manner, RAS provides detailed information in support of efforts to improve specific unit operations so as to not stop the converting system once it is running, and also provides detailed information in support of efforts to improve specific unit operations to permit the process to re-start consistently once the system has stopped.
Measuring the reliability of each unit operation during machine start is one key dimension of understanding reliability improvement opportunities. Similarly, measuring the reliability of the converting system during splice event transients helps sustain the running operation. This evaluation also includes identification of splice-induced failures in subsequent machine sections. These reliability interdependencies are included in the RAS report and permit identification of reliability issues that go undiscovered when viewed from the perspective of other enterprise information systems.
The RAS tool provides a fast, convenient, standardized means for obtaining detailed process reliability information for a particular asset and period of operation. In one embodiment, RAS and ECT operate off a macro- or query-based front end. In one embodiment, RAS functions are obtained by clicking on various toolbar options. Many items are provided as built-in menu options.
Referring again to
Software in embodiments of the invention processes the event chronology to identify causal relationships between events in the event chronology. During any given time frame, there may be many different events that occur on the machine, such as diaper culls (for any number of different reasons), raw material splices, machine speed changes, machine section stops, etc. A particular event may potentially cause an adverse event in certain machine sections (including the one in which it originated) but not in others. For example, a diaper containment flap raw material splice may cause a containment flap elastic break. That same raw material splice, though, will not be able to cause a stop in the fluff forming section, because the flap raw material process is downstream from the fluff forming section, and hence not in its process flow. If only events that occur within a certain event window are tested without regard to process flow, false positives may result for events that occurred because of coincidence only.
To avoid reporting correlated events that cannot in any way be causal, aspects of the invention incorporate knowledge of the process flow into the reliability analysis. This is performed by linking each machine section with a list of other sections it may conceivably affect. For example, events that occur in Section B may cause adverse events in Sections B, C, D, F, G, and H, but not Sections A and E. In another example, events that occur in Section C may cause adverse events in Sections C, D, E, and H. The reliability analysis software consults lists such as these explicitly. The above exemplary lists of related machine sections represent process flow information that may be stored in a lookup table, a database, a flat file, or other memory area. Each event in the event chronology has a machine section associated therewith. When the event chronology is analyzed by aspects of the invention, events are compared to adverse events that occur within the event window (e.g., 1500 cuts) and that are in the process flow (e.g., by comparing the machine sections associated with the event records being compared). If both of these conditions are satisfied, then a counter is incremented in the appropriate location in the reliability analysis summary report.
Referring next to
In one embodiment, the method illustrated in
Once the query and reporting procedures are complete, further detailed reliability analysis may be conducted by executing a subsection drill-down report. This analysis is specific to a given machine section or subset of sections, and, in one embodiment, provides a material converting report which represents a cross-tabulation of stops events by subsection for given periods of operation (e.g., start-up, splice, etc.). This feature identifies the specific locations (e.g., delay subsections or material identifiers) within the unit operation that account for the stop events in that machine section or subset of sections. For example, the subsection report is used to determine the percentage of stops that occur at the unwind subsection within the splice event window for a given machine section.
Referring next to
Table 8A and Table 8B below show the results of a subsection report conducted for the ear machine section. This is a cross-tabulation analysis that details the counts and percentages of stop events by their specific subsection and period of operation for the occurrences that were charged to the specified machine section. The data in Table 8B is merely exemplary. Results may be reported in any number of ways including by raw occurrence numbers or normalized by shift, day, uptime, etc.
Alternatively or in addition to the subsection capability, any data mining algorithms known in the art may be applied to the event chronology to determine relationships between events. The determined relationships provide a measure or analysis of the reliability of the one or more machines associated with the event chronology.
RAS also provides the complete dataset (e.g., the event chronology) as a second worksheet in the spreadsheet. This is the raw data from which the report and any subsequent drill-down analyses are constructed. The data includes the full process event chronology based on the delay and material usage tables. Common variables used to merge the tables include gs_event_dt (shift synchronizer in both tables), delay_event_dt and its analog splice_on_dt (timestamp synchronizers), and the cut synchronizers current_cut_count and cuts_on. Response variables from the delay table include delay_time, machine_section, delay_subsection, and delay_problem. Only one response variable is taken from the material usage table, as cons_loc_code may be utilized to provide definition of unwind and spindle for any of the spliced materials. The computed values of Run Duration (delay events) and Event Duration (process chronology) are included as columns in the merged dataset.
The merged data are useful for further in-depth analysis. This may be conducted in the spreadsheet environment within the RAS workbook, or exported to other analytical environments for further analysis. Statistical packages including JMP, StatGraphics, MiniTab, and the like effortlessly import the merged data sheet for further graphical, empirical, or inferential analysis.
Exemplary User Interface for the RAS Report
The RAS report shows the results of the query performed and summarizes several aspects of converting process reliability for a given asset and time frame. This comprehensive overview contains many elements, and, depending upon the use of the report, each may be important to understanding reliability. In one embodiment, the machine, time range, total days, and uptime are listed in the top left hand corner. An explanation for each column of an exemplary RAS report is shown in Table 9.
Referring next to
The RAS report also provides a categorization of delay events by process location at 506 (e.g., a third field). Common measures of delay performance are provided such as a quantity of stop events, a percentage of stops and SATO (stops per actual time operated on a twenty-four hour basis). This portion of RAS defines the location of delay occurrences for the asset and period of record, but does not identify their relation to production sequences that may contain the root cause of the problem.
The report section (e.g., a fourth field) shown in
In another embodiment, changing the order of processing the data set (e.g., changing the computer program that conducts the analysis) enables the complete and accurate determination of repeat failures by processing the delay occurrences and material consumption records for each unit operation separately (e.g., as their own system) prior to combining such records for construction of the comprehensive machine chronology.
A splice efficiency section 510 (e.g., a fifth field) of the RAS report provides a table by machine section of the number of splices (e.g., material consumption events), number of process failures, and the computed efficiency ratio of the two. The splice efficiency section of the RAS report includes summary of splicing efficiency when including direct charges and interactions within the event window (cuts).
In one embodiment RAS considers splice efficiency across a 1500 cut process event window, and includes failures in machine sections other than the ones containing the splicing device (e.g., executing the material consumption event). This is a broad-based evaluation where reliability is computed in view of interdependence. The splice transient is assigned responsibility for generating a stop occurrence if the delay occurs within a specified subset of downstream, different machine sections. For example, during the manufacturing of diapers, it is not uncommon to attach elastics onto a nonwoven web before attaching onto the diaper. During the transients that occur when a new roll of nonwoven material is spliced onto the machine, there is an increased probability of an elastic strand break. While the overall failure rate of elastic strands is useful, this section of RAS quantifies the failure rate of elastic strands to the nonwoven material splice event (or any other event that is deemed relevant). This both identifies an area of opportunity, as well as allows a researcher to calculate, for example, the positive impact on productivity if larger rolls of the nonwoven material were to be used, resulting in less splices.
A machine section or splice interaction 512 matrix used to compute splice efficiencies is interpreted vertically (e.g., columnar format). Each column provides the count of failures experienced in a machine section (e.g., stop events by splice type). Direct material consumption-machine section relations or the interdependent relations (material consumption-downstream machine section failure) are identified in the splice interaction section 512 (e.g., by shading those cells).
Tables A1-A4 in Appendix A illustrate an exemplary RAS report. The RAS report may be provided as one or more separate tables as shown in Appendix A. Alternatively, the RAS report may be provided as a single report combining one or more of Tables A1-A4. Further, the RAS report according to embodiments of the invention may include various visual styles to enhance the readability of the report and convey various statistics. For example, bold text may indicate machine sections that execute running slices, italic text may indicate machine sections that require a stop to replenish expired materials, and shaded machine sections may indicate machine sections that have greater than five percent of the total qualified stops. Further, lightly shaded splice reliability data may indicate stops in machine sections containing materials spliced while running. Lightly shaded splice interaction stops data may indicate a count of probable interactions between a material splice and a delay charged to a machine section. Dark shaded splice interaction stops may indicate direct linkage between material splicing and a delay in a machine section (e.g., liner splice to liner unwind).
Remarks
It is to be understood that the order of execution or performance of the methods and techniques illustrated and described herein is exemplary and not essential, unless otherwise specified. That is, elements of the methods may be executed or performed in any order, unless otherwise specified, and that the methods may include more or less elements than those disclosed herein. For example, it is contemplated that executing or performing a particular element before, contemporaneously with, or after another element is within the scope of embodiments of the invention.
Any computing devices such as those known in the art are suitable for use with embodiments of the invention. A user may enter commands and information into the computing device through input devices or user interface selection devices well known in the art such as a keyboard and a pointing device (e.g., a mouse, trackball, pen, or touch pad).
The computing device typically has at least some form of computer readable media. Computer readable media, which include both volatile and nonvolatile media, removable and non-removable media, may be any available medium that may be accessed by the computing device. Generally, computer readable media include memory areas for storing data. By way of example and not limitation, computer readable media comprise computer storage media and communication media. Computer storage media include volatile and nonvolatile, removable and non-removable media implemented in any method or technology for storage of information such as computer readable instructions, data structures, program modules or other data, as is well known in the art. Communication media typically embody computer readable instructions, data structures, program modules, or other data in a modulated data signal such as a carrier wave or other transport mechanism and include any information delivery media. Those skilled in the art are familiar with the modulated data signal, which has one or more of its characteristics set or changed in such a manner as to encode information in the signal. Wired media, such as a wired network or direct-wired connection, and wireless media, such as acoustic, RF, infrared, and other wireless media, are examples of communication media. Combinations of any of the above are also included within the scope of computer readable media. Aspects of the invention also include the computing device itself when programmed according to the methods and techniques described herein.
Aspects of the invention may be described in the general context of computer-executable instructions, such as program modules, executed by one or more computers or other devices. Generally, program modules include, but are not limited to, routines, programs, objects, components, and data structures that perform particular tasks or implement particular abstract data types. For purposes of illustration, programs and other executable program components, such as the operating system, are illustrated herein as discrete blocks. It is recognized, however, that such programs and components reside at various times in different storage components of the computer, and are executed by the data processor(s) of the computer. Aspects of the invention may also be practiced in distributed computing environments where tasks are performed by remote processing devices that are linked through a communications network. In a distributed computing environment, program modules may be located in both local and remote computer storage media including memory storage devices.
When introducing elements of the present invention or the embodiment(s) thereof, the articles “a,” “an,” “the,” and “said” are intended to mean that there are one or more of the elements. The terms “comprising,” “including,” and “having” are intended to be inclusive and mean that there may be additional elements other than the listed elements.
As various changes could be made in the above constructions, products, and methods without departing from the scope of embodiments of the invention, it is intended that all matter contained in the above description and shown in the accompanying drawings shall be interpreted as illustrative and not in a limiting sense.
This application is a divisional of U.S. patent application Ser. No. 10/868,137 (now U.S. Pat. No. 7,221,987), filed Jun. 15, 2004, which is hereby incorporated by reference herein for all purposes.
Number | Date | Country | |
---|---|---|---|
Parent | 10868137 | Jun 2004 | US |
Child | 11752077 | May 2007 | US |