Some oil and gas wells are completed in unconsolidated formations that contain loose fines and sand. When fluids are produced from these wells, the loose fines and sand can migrate with the produced fluids and can damage equipment, such electric submersible pumps (ESP) and other systems. For this reason, completions can require screens for sand control.
Horizontal wells that require sand control are typically open hole completions. In the past, stand-alone sand screens have been used predominately in these horizontal open holes. However, operators have also been using gravel packing in these horizontal open holes to deal with sand control issues. The gravel is a specially sized particulate material, such as graded sand or proppant, which is packed around the sand screen in the annulus of the borehole. The gravel acts as a filter to keep any fines and sand of the formation from migrating with produced fluids.
A prior art gravel pack assembly 20 illustrated in
Initially, operators position a wash pipe 40 into a screen 25 and pump the slurry of fluid and gravel down an inner work string 45. The slurry passes through a port 32 in a crossover tool 30 and into the annulus between the screen 25 and the borehole 10. As shown, the crossover tool 30 positions immediately downhole from the gravel pack packer 14 and uphole from the screen 25. The crossover port 32 diverts the flow of the slurry from the inner work string 45 to the annulus downhole from the packer 14. At the same time, another crossover port 34 diverts the flow of returns from the wash pipe 40 to the casing's annulus uphole from the packer 14.
As the operation commences, the slurry moves out the crossover port 32 and into the annulus. The carrying fluid in the slurry then leaks off through the formation and/or through the screen 25. However, the screen 25 prevents the gravel in the slurry from flowing into the screen 25. The fluids passing alone through the screen 25 can then return through the crossover port 34 and into the annulus above the packer 14.
As the fluid leaks off, the gravel drops out of the slurry and first packs along the low side of the borehole's annulus. The gravel collects in stages 16a, 16b, etc., which progress from the heel to the toe in what is termed an alpha wave. Because the borehole 10 is horizontal, gravitational forces dominate the formation of the alpha wave, and the gravel settles along the low side at an equilibrium height along the screen 25.
When the alpha wave of the gravel pack operation is done, the gravel then begins to collect in stages (not shown) of a beta wave. This forms along the upper side of the screen 25 starting from the toe and progressing to the heel of the screen 25. Again, the fluid carrying the gravel can pass through the screen 25 and up the wash pipe 40. To complete the beta wave, the gravel pack operation must have enough fluid velocity to maintain turbulent flow and move the gravel along the topside of the annulus. To recirculate after this point, operators have to mechanically reconfigure the crossover tool 30 to be able to washdown the pipe 40.
Although the alpha-beta technique can be economical due to the low-viscosity carrier fluid and regular types of screens that can be used, some situations may require a viscous fluid packing technique that uses an alternate path. In this technique, shunts disposed on the screen divert pumped packing slurry along the outside of the screen.
Prior art gravel pack assemblies 20 for both techniques of
To deal with gravel packing in some openhole wells, a Reverse-Port Uphill Openhole Gravel Pack system has been developed as described in SPE 122765, entitled “World's First Reverse-Port Uphill Openhole Gravel Pack with Swellable Packers” (Jensen et al. 2009). This system allows an uphill openhole to be gravel packed using a port disposed toward the toe of the hole.
The subject matter of the present disclosure is directed to overcoming, or at least reducing the effects of, one or more of the problems set forth above.
A gravel pack assembly gravel packs a borehole, which can be a horizontal, deviated, or other type of borehole. Operators can initially washdown the borehole using a tool in a first position by flowing fluid from the tool through the assembly's toe, which has a toe port. (Gravel packing can also be initiated through the toe port if desired.) After washing down, operators move the tool to a first flow port between a screen and the toe to begin gravel packing. Slurry flows into the borehole from the first flow port, and returns from the borehole through the screen. The gravel in the slurry can pack the borehole in an alpha-beta wave or some variation thereof from toe to heel.
When the tool has a sleeve, operators can break bridges that may have developed by shifting the sleeve on the tool. This allows a reverse flow of fluid to pass from the passage of the assembly into the tool. In another condition, operators can move the tool to a second flow port on the assembly to continue gravel packing or to evacuate excess gravel from the tool. For example, slurry can flow into to the borehole through an alternate path device or shunt extending from the second flow port. This flow of slurry can pack part of the annulus of the borehole and can be done to get ride of excess gravel in the tool downhole. Meanwhile, returns can flow from the borehole through a bypass in the assembly.
In one arrangement, a gravel pack assembly has a screen disposed on the assembly that communicates the passage in the assembly with the annulus of a surrounding borehole. A float shoe on the toe of the assembly controls fluid flow from the passage through a first port defined in the toe. A tool movably disposes in the screen and has a sleeve movably disposed thereon. The sleeve has a port movable relative to the port of the assembly and to the open end of the string.
In another arrangement, a gravel pack assembly has a service tool assembly, a packer, and a screen assembly. The service tool assembly has a hydraulic setting tool that makes up to the packer and has an inner work string made up to the bottom of the setting tool. The inner work string runs inside the screen assembly and can seal at the bottom of the assembly.
After the packer is set and when it is desired to move the inner work string into a gravel pack position, the service tool assembly and inner work string are moved to locate to a point in the screen assembly for delivering sand slurry into the annulus around the screen. To accomplish this delivery, the inner work string has seal subs located on either side of a ported housing. When fluid is pumped through the inner work string, the exit point for the slurry is aligned with a ported housing on the screen assembly. Thus, pumped fluid can exit into the annulus around the screen assembly at multiple selective points.
The disclosed gravel pack assembly eliminates the complexity associated with conventional crossover tool mechanisms that can cause problems. The assembly can be used for either alpha-beta wave, alternative path, or other style of gravel pack operation. Preferably, the assembly uses only a single string of pipe run as the inner work string, although concentric strings of pipe could also be used.
Along the length of the assembly, multiple ported housings may be installed between screens. The ported housing start at the bottom the assembly and are then interspersed along the length of the assembly. This provides the assembly with multiple slurry packing points that can be useful for packing long zones.
For washing down, the end of this inner work string can seal off and direct fluid flow through a check valve on the float shoe on the end of the assembly. Pumped fluids travel down the inner work string and exit through the valve. For gravel packing, the port on the work string locates in one of the gravel pack ported housings to deliver slurry into the screen annulus at desired locations. For example, each ported housing of the assembly can direct the slurry directly into the annulus. Alternatively, the ported housing can direct the slurry into shunts.
Because the assembly may have a single string of pipe for the inner work string (as opposed to running two concentric strings), reversing out excess sand slurry in the inner work string can cause pressure applied to the casing to transmit to the exposed open hole interval through the screen assembly. After achieving ‘sandout’ during the gravel pack operation, for example, operators typically remove any gravel remaining in the work string as a standard practice so that the gravel does not plug the work string or fall into the well.
To deal with these issues, the assembly preferably allows operators to evacuate excess slurry (e.g., gravel) from the work string. At the end of the gravel pack operation, the interior space inside the shoe track as well as the exterior space outside the track provides a volumetric space for disposing of any gravel remaining in the work string. In one arrangement, the excess gravel can be placed inside and/or outside the shoe track. Alternatively, the excess gravel can be pumped above the sand column in the annulus using shunts or other alternate path devices.
The foregoing summary is not intended to summarize each potential embodiment or every aspect of the present disclosure.
A gravel pack assembly 100 in
The assembly 100 has a screen section 130 with a shoe track 140 and float shoe 150 on its distal end. Internally, an inner work string or tool 110 for the assembly disposes through the screen section 130 and into the shoe track 140. The screen section 130 has one or more screens 132, which can include wire-wrapped screens, pre-packed screens, direct-wrapped screens, meshes, etc. The shoe track 140 has one or more body or flow ports 142.
The inner work string 110 has an extension or sleeve 120, and a retainer 126 connects the sleeve 120 onto the inner work string 110. (The retainer 126 can be a C-ring or other type of retainer.) The sleeve 120 has a catch 122 on the end thereof. If needed, a safety release can be provided on the distal end on the work string 110 so the inner work string 110 can detach from the sleeve 120. For example, the safety release can be provided at the retainer 126.
The inner work string 110 has a passage 112 with an open end or string port 114 for entry and exit of fluid. The sleeve 120 is movably disposed on the inner work string 110 and seals against the open end 114. Depending on the sleeve's position, intermediate or sleeve ports 124 on the sleeve 120 may or may not communicate with the open end 114 of the inner work string 110 and any body or flow ports 142 on the shoe track 140. In any event, seats or seals 144/146 on the inside of the housing 140 can sealably engage the inner work string 110 and can isolate the external flow ports 142 in the shoe track 140. Additionally, a sliding sleeve 148 disposed in the shoe track 140 can engage the inner work string 110 and can move relative to the external flow ports 142.
As shown in
After this initial stage, the assembly 100 is transitioned for gravel packing through flow ports 142. As shown in
Operators then pump slurry having a carrying fluid (e.g., completion brine) and particulate material (e.g., sand, proppant, gravel, etc.) down the inner work string 110. The pumped slurry no longer passes through the shoe 150 and instead passes through the open ports 124/142. On the outside of the shoe track 140, a skirt 143 can surround the external flow ports 142. This skirt 143 acts to prevent erosion of the borehole 10 as the slurry exits the shoe track 140 into the surrounding annulus.
As the slurry is pumped through the open assembly 100, the slurry flows into the annulus surrounding the sand screen 132 from the toe up to the heel of the assembly 100. As the slurry moves out the port 142 and into the annulus, the carrying fluid in the slurry then leaks off through the formation and/or through the screen 132. However, the screen 132 prevents the gravel in the slurry from flowing through the screen 132 so the carrying fluid returns alone through the annulus above the packer 14.
As the fluid leaks off, the gravel drops out of the slurry and packs the annulus. As described herein, the gravel can pack the annulus in an alpha-beta wave, although other variations can be used. For example, the gravel can generally pack along the low side of the annulus first and can collect in stages that progress from the toe (near the shoe track 140) to the heel in an alpha wave. Gravitational forces dominate the formation of the alpha wave, and the gravel settles along the low side at an equilibrium height along the screen section 130.
When the alpha wave of the gravel pack operation is done, the gravel then begins to collect in a beta wave along the upper side of the screen section 130 starting from the heel (near the packer 14) and progressing to the toe of the assembly 100. Again, the fluid carrying the gravel can leak through the screen section 130 and up the annulus between the inner work string 110 and screen 132.
After the gravel pack operation is done, operators preferably evacuate the inner work string 110 of excess slurry remaining therein. The circulation path for removing excess slurry is down the inner work string 110 and into the interior and/or exterior of the shoe track 140. To do this, the slurry can exit the end 114 of the inner work string 110. The slurry can fill the annulus around the shoe track 140 via toe port 154 and/or fill the interior of the shoe track 140.
If needed, the gravel pack assembly 100 can be optionally transitioned to a reverse bridge breaking condition as shown in
For a gravel pack operation in an open hole, the assembly 100 of
Each of the ported housings 230A-B has body or flow ports 232A-B for diverting flow. Internally, each of the ported housings 230A-B has seats 234 defined above and below the outlet ports 232A-B for sealing with the distal end of the inner work string 210 as discussed below. To prevent erosion, the flow ports 232A-B on the ported housings 230A-B can have a skirt, such as the skirt 236 for the flow ports 232A on the ported housings 230A.
The flow ports 232B on an upper one of the ported housings 230B communicate with alternate path devices 250 disposed along the length of the lower screen section 240A. These alternate path devices 250 can be shunts, tubes, concentrically mounted tubing, or other devices known in the art for providing an alternate path for slurry. For the purposes of the present disclosure, however, the alternate path devices 250 are referred to as shunts herein for simplicity. In general, the shunts 250 communicate from the flow ports 232B to side ports 222 toward the distal end of the assembly 200 or other directions for use during steps of the operation.
As shown in
On its distal end, the inner work string 210 has outlet ports 212 isolated by seals 214. When running in, one of the seals 214 seal the end of the inner work string 210 inside the shoe track 220 as shown in
During the gravel pack operations, however, the outlet ports 212 can locate and seal by the seals 214 in the ported housings 230A-B disposed between each of the screen sections 240A-B. In particular, seals 214 located on either side of the string's outlet ports 212 seal inside seats 234 on the ported housings 230A-B. The seals 214 can use elastomeric or other types of seals disposed on the inner work string 210, and the seats 234 can be polished seats or surfaces inside the housings 230A-B to engage the seals 214. Although shown with this configuration, the reverse arrangement can be used with seals on the inside of the housings 230A-B and with seats on the inner work string 210.
When fluid is pumped through the inner work string 210, pumped fluid exits from the string 210 and through the flow ports 232A-B on the ported housings 230A-B depending on the location of the string 210 to the flow ports 232A-B. In this arrangement, the flow ports 232A in the lower ported housing 230A direct the slurry directly into the annulus, whereas the flow ports 232B in the upper ported housing 230B directs the slurry into shunts 250 as discussed below. Other similar arrangements can be used. In any event, this selective location and sealing between the string 210 and housings 230A-B changes fluid paths for the delivery of slurry into the annulus around the screen sections 240A-B during the gravel pack operations discussed in more detail below.
As shown in
As shown in
Once the packer 14 is set and tested, operators begin the gravel pack operation. As shown in
When manipulating the inner work string 210, operators are preferably given an indication at surface that the outlet ports 212 are located at an intended position, whether it is a blank position, a slurry circulating position, or an evacuating position. One way to accomplish this is by measuring tension or compression at the surface to determine the position of the inner work string 210 relative to the ported housings 230A-B and seats 234. This and other procedures known in the art can be used.
With the ports 212/232A isolated by engaged seals 214 and seats 234, operators pump the slurry of carrying fluid and gravel down the inner work string 210 in a first direction to the string's ports 212. The slurry passes out of the pipe's ports 212 and through the housing's ports 232A to the open hole annulus. As before, the carrying fluid in the slurry then leaks off through the formation and/or through the screen sections 240A-B along the length of the assembly 200. However, the screen sections 240A-B prevent the gravel in the slurry from flowing into the assembly 200. Therefore, the fluid passes alone through the screen sections 240A-B and returns through the casing annulus above the packer 14.
As described herein, the gravel can pack the annulus in an alpha-beta wave, although other variations can be used. As the fluid leaks off, for example, the gravel drops out of the slurry and first packs along the low side of the annulus in the borehole 10. The gravel collects in stages that progress from the toe (near housing 230A) to the heel in an alpha wave. As before, gravitational forces dominate the formation of the alpha wave, and the gravel settles along the low side at an equilibrium height along the screen sections 240A-B. After the alpha wave, the borehole 10 fills in a beta wave along the assembly 200 as discussed previously.
Eventually, the operators reach a desired state while pumping slurry at the ports 232A in this ported housing 230A. This desired state can be determined by a particular rise in the pressure levels and may be termed as “sand out” in some contexts. At this stage, operators raise the inner work string 210 again as shown in
In general, the slurry can flow out of the ports 232B and into the surrounding annulus if desired. This is possible if one or more of the ports 232B communicate directly with the annulus and do not communicate with one of the alternate path devices or shunt 250. All the same, the slurry can flow out of the ports 232B and into the alternate path devices or shunts 250 for placement elsewhere in the surrounding annulus. Although shunts 250 are depicted in a certain way, any desirable arrangement and number of transport and packing devices for an alternate path can be used to feed and deliver the slurry.
Depending on the implementation, this second stage of pumping slurry may be used to further gravel pack the borehole. Yet, as shown in the current implementation, pumping the slurry through the shunts 250 enables operators to evacuate excess slurry from the string 210 to the borehole without reversing flow in the string from the first flow direction (i.e., toward the string's port 212). This is in contrast to the reverse direction of flowing fluid down the annulus between the string 210 and the housings 230A-B/screens 240A-B to evacuate excess slurry from the string 210.
As shown in
At some point, operation may reach a “sand out” condition or a pressure increase while pumping slurry at ports 232B. At this point, a valve, rupture disc, or other closure device 256 in the shunts 250 can open so the gravel in the slurry can then fill inside the shoe track 220 after evacuating the excess around the shoe track 220. In this way, operators can evacuate excess gravel inside the shoe track 220. As this occurs, fluid returns can pass out the lower screen section 240A, through the packed gravel, and back through upper screen section 240B to travel uphole. In other arrangements, the lower ported housing 230A can have a bypass, another shunt, or the like (not shown), which can be used to deliver fluid returns past the seals 214 and seats 234 and uphole.
The previous assembly 200 filled the open hole annulus with an alpha-beta type wave and then filled the annulus around the toe with an alternate path. As shown in
When operators raise the inner work string 210 to locate in the gravel pack position shown in
As can be seen in
Moreover, the inner work string 210 can be used to pump treatments of different types into a surrounding zone. For example, the assembly 200 of
In a frac packing arrangement, the disclosed assembly 200 can deliver the frac treatment and gravel slurry through the multiple ported housing 230A-B into the annulus around the screen sections 240A-B. Dispersing the frac treatment and slurry through the multiple ports 232A-B can provide more even distribution across a greater area. For the fracturing part of the process, the frac treatment can exit from the lower ported housing 230A and return through the screen section 240B adjacent to the casing annulus until the fracture is complete. Afterwards, the inner work string 210 can be moved to the upper ported housing 230B so that gravel slurry can flow through shunts 250 and/or 260 to gravel pack the annulus. A reverse operation could be done in which frac treatment can exit upper housing 230B so that gravel packing can be done primarily at lower housing 230A.
When used for frac/gravel packing, the assembly 200 may reduce the chances of sticking. Because the assembly 200 can have a smaller volumetric area around the exit points, there may be less of a chance for proppant sticking around the gravel pack ports 212. As slurry exits near the end of the inner work string 210, only a short length of pipe has to travel upward through remaining slurry or dehydrated sand that may be left. If sticking does occur around the gravel pack ports 212, a shear type disconnect (not shown) can be incorporated into the inner work string 210 so that the lower part of the inner work string 210 can disconnect from an upper part of the inner work string 210. This allows for the eventual removal of the inner work string 210.
Expanding on the versatility of the disclosed assembly,
The hydraulic packers 360 provide more immediate zone isolation when set in the borehole 10 to stop the progression of the gravel pack operations in the isolated zones. For their part, the swellable packers 370 can be used for long-term zone isolation. The hydraulic packers 360 can be set hydraulically with the inner work string 310 and its packoff arrangement 314, or the packers 360 can be set by shifting sleeves (not shown) in the packers 360 with a shifting tool (not shown) on the inner work string 310.
Each gravel pack section 302A-C can be similar to the gravel pack assemblies 200 as discussed above in
The foregoing description of preferred and other embodiments is not intended to limit or restrict the scope or applicability of the inventive concepts conceived of by the Applicants. It will be appreciated with the benefit of the present disclosure that elements of one embodiment can be combined with or exchanged for components of other embodiments disclosed herein. As one example, the extendable sleeve 120 and other features of the embodiment of
In exchange for disclosing the inventive concepts contained herein, the Applicants desire all patent rights afforded by the appended claims. Therefore, it is intended that the appended claims include all modifications and alterations to the full extent that they come within the scope of the following claims or the equivalents thereof.
Number | Name | Date | Kind |
---|---|---|---|
3134439 | Shields, Jr. | May 1964 | A |
4105069 | Baker | Aug 1978 | A |
4440218 | Farley | Apr 1984 | A |
4474239 | Colomb et al. | Oct 1984 | A |
5113935 | Jones et al. | May 1992 | A |
5269375 | Schroeder, Jr. | Dec 1993 | A |
5934376 | Nguyen et al. | Aug 1999 | A |
6003600 | Nguyen et al. | Dec 1999 | A |
6253851 | Schroeder, Jr. et al. | Jul 2001 | B1 |
6371210 | Bode et al. | Apr 2002 | B1 |
6446722 | Nguyen et al. | Sep 2002 | B2 |
6588507 | Dusterhoft et al. | Jul 2003 | B2 |
6601646 | Streich et al. | Aug 2003 | B2 |
6675891 | Hailey, Jr. et al. | Jan 2004 | B2 |
6749023 | Nguyen et al. | Jun 2004 | B2 |
6857476 | Richards | Feb 2005 | B2 |
6983795 | Zuklic et al. | Jan 2006 | B2 |
7017664 | Walker et al. | Mar 2006 | B2 |
7331388 | Vilela et al. | Feb 2008 | B2 |
7367395 | Vidrine et al. | May 2008 | B2 |
7472750 | Walker et al. | Jan 2009 | B2 |
8267173 | Clarkson et al. | Sep 2012 | B2 |
20030000702 | Streich | Jan 2003 | A1 |
20030037925 | Walker et al. | Feb 2003 | A1 |
20040134656 | Richards | Jul 2004 | A1 |
20040211559 | Nguyen et al. | Oct 2004 | A1 |
20070187095 | Walker et al. | Aug 2007 | A1 |
20080099194 | Clem | May 2008 | A1 |
20090095471 | Guignard et al. | Apr 2009 | A1 |
20090133875 | Tibbles et al. | May 2009 | A1 |
20100096130 | Parlar et al. | Apr 2010 | A1 |
20100263864 | Chay et al. | Oct 2010 | A1 |
20100294495 | Clarkson et al. | Nov 2010 | A1 |
Number | Date | Country |
---|---|---|
2387401 | Oct 2003 | GB |
1191563 | Nov 1985 | RU |
1810500 | Apr 1993 | RU |
2374431 | Aug 2008 | RU |
1191563 | Nov 1985 | SU |
2005049954 | Jun 2005 | WO |
2007126496 | Nov 2007 | WO |
Entry |
---|
First Office Action in counterpart Russian Appl. No. 2011143515, dated Nov. 26, 2012. |
Extended Search Report received in counterpart European Appl. No. 12184724.8, dated Jan. 9, 2013. |
Decision on Grant in counterpart Russian Appl. No. 2011143515, dated Mar. 7, 2013. |
First Office Action received in counterpart Canadian Appl. No. 2,755,623, dated Jun. 14, 2013. |
First Office Action received in counterpart Australian Appl. No. 2011236063, dated May 21, 2013. |
Schlumberger, “Alternate Path Screens,” obtained from www.slb.com/oilfield, dated Jan. 2004, 4 pages. |
Schlumberger, “FloRite—Inflow control device,” obtained from www.slb.com/transcend, (c) 2009, 2 pages. |
Halliburton, “Sand Control: Horizon Low Density, Lightweight Gravel,” obtained from www.halliburton.com, (c) 2006, 2 pages. |
Edment, Brian, et al., “Improvements in Horizontal Gravel Packing,” Oilfield Review, Spring 2005, pp. 50-60. |
Synopsis of SPE 38640 by Jones, L.G., et al., “Shunts Help Gravel Pack Horizontal Wellbores with Leakoff Problems,” Journal of Petroleum Technology, Mar. 1998, pp. 68-69. |
Coronado, Martin, et al., “Completing extended-reach, open-hole, horizontal well,” obtained from http://www.offshore-mag.com/index/article-tools-template, generated on May 12, 2010, 5 pages. |
Schlumberger, “ResFlow Inflow Control Devices and MudSolv Filtercake Removal Equalize Inflow and Restart Wells,” obtained from www.slb.com/sandcontrol, (c) 2010, 2 pages. |
Jensen, Rene, et al., “World's First Reverse-Port Uphill Openhole Gravel Pack with Swellable Packers,” SPE 122765, 15 pages, Copyright 2009. |
Weatherford, “Model 4P Retrievable Seal-Bore Packer Gravel-Pack System,” obtained from www.weatherford.com, (c) 2005-2009, 2 pages. |
Brannon, D.H., et al., “A Single-Trip, Dual-Zone Gravel Pack System Successfully Gravel Packs Green Canyon Area Wells, Gulf of Mexico,” SPE 21670, (c) 1991, 7 pages. |
Weatherford, “Hydraulic-Release Hookup Nipple Circulating Gravel-Pack System,” obtained from www.weatherford.com, (c) 2005, 2 pages. |
Weatherford, “Conventional Well Screens,” obtained from www.weatherford.com, (c) 2004-2009, 16 pages. |
Weatherford, “Model WFX Setting Tools,” obtained from www.weatherford.com, (c) 2007-2008, 2 pages. |
Weatherford, “Model WFX Crossover Tool,” obtained from www.weatherford.com, (c) 2007-2008, 2 pages. |
Weatherford, “Real Results: Completion Package Eliminates Sand Production, Enhances Reliability in Siberian Oil-Production Well,” obtained from www.weatherford.com, (c) 2009, 1 page. |
Patent Examination Report No. 2 received in corresponding Australian application No. 2011236063, dated Dec. 20, 2013. |
Number | Date | Country | |
---|---|---|---|
20120103606 A1 | May 2012 | US |