This invention is directed to a grid deck with shear-resisting plates, wherein the shear-resisting plates are pre-cast in the grid deck and partly protrude from the side thereof.
In the construction techniques, a pre-casting method is usually adopted in order to save construction time. In the pre-casting method, the components, such as beams, columns, and decks, are pre-casted off the construction site and are then transported to the construction site for subsequent assembling and grouting. Accordingly, the space at the construction site would be less taken up and support frames used for construction would be greatly reduced. Therefore, the working flow line would be much better. The on-site construction time would be significantly reduced. Since the beams, columns, and decks are produced in the workshop, away from the construction site, the production rate, precision and quality thereof can easily be monitored and reach the expected level, Accordingly, the pre-casting method has become the mainstream for the current construction technology.
Grid decks are widely used in the construction of plants, particularly, those for a wafer factory. Grid decks can be produced on-site through grouting or in a pre-casting workshop. The grid decks contain rebar, which reinforces the strength thereof. The grid decks also have hollow portions which effectively reduce the weight thereof.
When building a plant, the pre-cast grid decks are laid over the pre-cast columns in a suitable span so that on-site construction is simplified, and thus the construction time is significantly reduced.
A normal grid deck assembly is shown in
The gaps between grid decks 70, 80 can be too small so that the overlap length between the lap-joint bars 91 and connecting bar 71 or 81 can be too short and the strength created by the lap joint can be insufficient after the grout is cured. Although the strength can be increased when more connecting bars and lap-joint bars are provided or the width of the gap between the I-beam is used, these two methods will cause an inconvenience to the on-site construction and pre-cast production and make the costs higher. To overcome these problems. an improved method is provided, in which a recess 24, 34 is created on each of the grid decks 20, 30 to be connected as shown in
The grid decks with a recess still have the problem of insufficient depth of the recess in some occasions, and when the width of the I-beams is small, there is also a problem of insufficient gap width between the grid decks, which thus causes insufficient connection strength between the grid decks. Accordingly, there is a need to improve the connection of the grid decks.
The objective of the present invention is to overcome the problem of insufficient strength of the connection between grid decks.
When grid decks are paved, they are laid on top of the beams. Accordingly, the bottom surface of the grid decks contacts the top surface of the beams. For each beam, each of the two edges of the top surface of the beam contacts one grid deck. Accordingly, the gap between the grid decks is limited by the width of the beam. The insufficient width of the gap will result in insufficient strength of the connection of the grid decks.
In the present invention, the grid decks contain shear-resisting plates pre-cast therein. The shear-resisting plates protrude from the sides of a grid deck. When grid decks are laid on the beams, it is the shear-resisting plates that contact the beams. In other words, the grid decks do not directly contact the beams. Accordingly, if two grid decks need a wider gap, appropriate shear-resisting plates can be selected to pre-cast in the grid decks so that the width of the gap between two grid decks will not be limited by the width of the beams and will have a larger width and, moreover, the strength of the connection between grid decks will be increased.
Conventional grid decks are generally of rectangular shape. Their side surfaces are provided with connecting bars 71, 81, and lap-joint bars 91 (shown in
The grid deck 2 with shear-resisting plates 4 can be connected with another grid deck 2 with shear-resisting plates 4 to form a continuous floor. As described above, the connecting bars, lap-joint bars, and shear-resisting plates 4 protruding into the gap between grid decks 2 will securely fix two grid decks after grout is filled into the gap and cured.
As shown in
From the foregoing, it will be appreciated that, although specific embodiments of the invention have been described herein for purposes of illustration, various modifications may be made without departing from the spirit and scope of the embodiments described herein.
Number | Date | Country | Kind |
---|---|---|---|
106213265 | Sep 2017 | TW | national |