The present invention relates to the technical field of pipe-jacking construction, in particular to a guiding type miniature pipe-jacking construction method.
With development of urban construction, in particular, acceleration of reconstruction of old city, various small pipe diameter pipeline burying projects are increased continuously. Conventional slotting construction is increasingly inadaptive to construction requirements as a road is destroyed, the traffic is affected, the environment is polluted and the like, and pipe-jacking construction may solve the problem effectively.
However, the current pipe-jacking construction precision remains to be improved and the construction cost is high, so that it is necessary to design a guiding type miniature pipe-jacking construction method for improving the construction precision and lowering the construction cost.
In order to solve the technical scheme, the present invention aims to provide a guiding type miniature pipe-jacking cons ruction method. In order to solve the technical scheme, the present invention is realized by adopting the following technical scheme.
A guiding type miniature pipe-jacking construction the method includes the following steps:
S1, in an originating well, perforating an operation hole in an inner wall of the originating well with a trepanning apparatus, and meanwhile, guniting and fixing a soil mass in the periphery of the operation hole;
S2, mounting a laser orientation instrument and a thrusting apparatus in the originating well, the laser orientation instrument and a laser guided drill bit being connected wirelessly, the laser guided drill bit being connected with one end of one of guide bars, driving the guide bar connected with the laser guided drill bit into the opened operation hole with the thrusting apparatus, and then driving more than two guide bars successively into the operation hole with the thrusting apparatus until one end of one of the guide bars enters a receiving well;
S3, mounting a funnel-shaped pushing head at one end of a mud discharging pipe, jacking the mud discharging pipe provided with the pushing head following the guide bar in the soil mass with the thrusting apparatus, the pushing head leaning against one end of one of the guide bars, and then jacking more than two mud discharging pipes following the mud discharging pipe provided with the pushing head into the soil mass with the thrusting apparatus until all the guide bars are jacked out into the receiving well, and moving all the guide bars entering the receiving well out of the receiving well;
S4, when one of the mud discharging pipes enters the receiving well, jacking more than two mud discharging screw rods into the mud discharging pipes with the thrusting apparatus until one of the mud discharging screw rods enters the receiving well;
S5, jacking a pipe-jacking machine head following the mud discharging pipe at the tail end into the hole with the thrusting apparatus, a cutter head arranged at one end of the pipe-jacking machine head rotating to drive all the mud discharging screw rods to rotate, the cutter head cutting the soil mass, the cut soil mass entering a soil pressure cabin arranged at the other end of the pipe-jacking machine head, and the soil mass in the soil pressure cabin being discharged to the originating well or the receiving well via the mud discharging screw rods and the mud discharging pipes; and
S6, jacking more than two prefabricated pipe joints following the pipe-jacking machine head into the soil mass with the thrusting apparatus until all the mud discharging screw rods, the guide bars and the pipe-jacking machine head are jacked out into the receiving well to complete laying of an underground pipeline.
Beneficially, one end of each of the guide bars in the S2 is provided with a loosening agent spraying apparatus, and when the guide bar is driven into the soil mass, the loosening agent spraying apparatus sprays a loosening agent to soil.
Beneficially, the laser orientation instrument is independently mounted on concrete at the bottom of the originating well.
Beneficially, the pipe-jacking machine head is a tunneling cutting type pipe-jacking machine head.
Beneficially, the pipe-jacking machine head is an extrusion type pipe-jacking machine head.
Beneficially, in the S5, when the cutter head rotates towards a direction, the soil mass in the soil pressure cabin is discharged to the originating well via the mud discharging screw rods and the mud discharging pipes.
Beneficially, in the S5, when the cutter head rotates towards a direction, the soil mass in the soil pressure cabin is discharged to the receiving well via the mud discharging screw rods and the mud discharging pipes.
The present invention has the beneficial effects that the thrusting apparatus of the present invention is small in size, light in weight, convenient to operate and high in construction efficiency, may perform construction in a narrow roadway space, may perform construction in a working well with a diameter of 1800 mm, and is suitable for a pipeline project with a relatively small diameter; wide stratums, for example various soil layers such as flow plastic clay, soft clay, hard pan, a sand bed, a gravel bed with a diameter smaller than 50 mm, may be suitable for the construction method of the present invention; the rotating direction of the cutter head may be controlled according to an actual condition, so that the soil mass is controlled to be discharged to the originating well or the receiving well, it is convenient to process the abandoned soil or mud, and the slurry disposal cost is lowered; and the construction quality is excellent; as guided by an advanced laser guiding drill bit, a straightness error of a guide bar is +/−2.5 cm; after construction of the pipeline, the straightness is high without disjoint and water leakage, water leakage between joints due to excessive balanced deviation rectification of mud and water is avoided, and a strict requirement on a gravity flow is met fully.
Further description of the present invention is made by drawings and the embodiments in the drawings do not constitute limitation to the present invention. Those of ordinary skill in the art further may obtain other drawings according to the drawings without creative efforts.
Marks of drawings: soil mass 1, originating well 2, receiving well 3, thrusting apparatus 4, guide bar 5, laser guided drill bit 51, mud discharging pipe 6, thrusting head 61, mud discharging screw rod 7, pipe-jacking machine head 8, cutter head 81, soil pressure cabin 82, prefabricated pipe joint 9.
Clear and intact description will be made on technical scheme in the embodiment of the present invention below in combination with drawings in the embodiment of the present invention. The described embodiments are merely a part of embodiments of the present invention and are not all the embodiments. On a basis of the embodiments in the present invention, all other embodiments obtained by those skilled in the technical field without creative efforts fall into the scope of protection of the present invention.
In description of the present invention, it is to be noted that orientation or position relationships indicated by terms: ‘vertical’, ‘upper’, ‘lower’, ‘horizontal’ and the like are orientation or position relationships indicated by the drawings and are only to describe the application and simplify the description rather than indicates or implies that the indicated device or components must have specific orientations and are configured and operated in the specific orientations. Therefore, it cannot be construed as limitations to the present invention. In addition, the terms ‘first’, ‘second’, ‘third’ and ‘fourth’ are only used for a description purpose rather than being construed to indicate or imply relative importance.
In the description of the present invention, it is to be further noted that unless otherwise specified and defined, terms ‘arranging’, ‘mounting’, and ‘connecting’, ‘connection’ should be understood in a broad sense, for example, arranging’, ‘mounting’, and ‘connecting’, ‘connection’ can be either fixed connection or detachable connection or integrated connection; can be either mechanical connection, electric connection or direct connection and can be either connection via an intermediation or internal communication of two components. Those skilled in the art can understand specific meaning of the terms in the present invention under specific circumstances.
As shown in
S1, in an originating well 2, an operation hole is perforated in an inner wall of the originating well 2 with a trepanning apparatus, and meanwhile, a soil mass 1 in the periphery of the operation hole is gunited and fixed;
S2, a laser orientation instrument and a thrusting apparatus 4 are mounted in the originating well 2, the laser orientation instrument and a laser guided drill bit 51 being connected wirelessly, the laser guided drill bit 51 being connected with one end of one of guide bars 5, driving the guide bar 5 connected with the laser guided drill bit 51 into the opened operation hole with the thrusting apparatus 4, and then driving more than two guide bars 5 successively into the operation hole with the thrusting apparatus 4 until one end of one of the guide bars enters a receiving well;
S3, a funnel-shaped pushing head 61 is mounted at one end of a mud discharging pipe 6, the mud discharging pipe 6 provided with the pushing head 61 following the guide bar 5 is jacked into the soil mass 1 with the thrusting apparatus 4, the pushing head 61 leaning against one end of one of the guide bars 5, and then more than two mud discharging pipes 6 following the mud discharging pipe 6 provided with the pushing head 61 are jacked into the soil mass 1 with the thrusting apparatus 4 until all the guide bars 5 are jacked out into the receiving well 3, and moving all the guide bars 5 entering the receiving well 3 out of the receiving well 3;
S4, when one of the mud discharging pipes 6 enters the receiving well 3, more than two mud discharging screw rods 7 are jacked into the mud discharging pipes 6 with the thrusting apparatus 4 until one of the mud discharging screw rods 7 enters the receiving well 3;
S5, a pipe-jacking machine head 8 following the mud discharging pipe 6 at the tail end is jacked into the hole with the thrusting apparatus 4, a cutter head 81 arranged at one end of the pipe-jacking machine head 8 rotating to drive all the mud discharging screw rods 7 to rotate, the cutter head 81 cutting the soil mass 1, the cut soil mass 1 entering a soil pressure cabin 82 arranged at the other end of the pipe-jacking machine head 8, and the soil mass 1 in the soil pressure cabin 82 being discharged to the originating well 2 or the receiving well 3 via the mud discharging screw rods 7 and the mud discharging pipes 6; and
S6, more than two prefabricated pipe joints 9 following the pipe-jacking machine head 8 are jacked into the soil mass 1 with the thrusting apparatus 4 until all the mud discharging screw rods 7, the guide bars 5 and the pipe-jacking machine head 8 are jacked out into the receiving well 3 to complete laying of an underground pipeline.
According to an optional implementation mode of the present invention, one end of each of the guide bars 5 in the S2 is provided with a loosening agent spraying apparatus, and when the guide bar 5 is driven into the soil mass 1, the loosening agent spraying apparatus sprays a loosening agent to soil.
According to an optional implementation mode of the present invention, the laser orientation instrument is independently mounted on concrete at the bottom of the originating well 2.
According to an optional implementation mode of the present invention, the pipe-jacking machine head 8 is a tunneling cutting type pipe-jacking machine head 8.
According to an optional implementation mode of the present invention, the pipe-jacking machine head 8 is an extrusion type pipe-jacking machine head 8.
According to an optional implementation mode of the present invention, in the S5, when the cutter head 81 rotates towards a direction, the soil mass 1 in the soil pressure cabin 82 is discharged to the originating well 2 via the mud discharging screw rods 7 and the mud discharging pipes 6.
According to an optional implementation mode of the present invention, in the S5, when the cutter head 81 rotates towards a direction, the soil mass 1 in the soil pressure cabin 82 is discharged to the receiving well 3 via the mud discharging screw rods 7 and the mud discharging pipes 6.
The thrusting apparatus 4 of the present invention is small in size, light in weight, convenient to operate and high in construction efficiency, may perform construction in a narrow roadway space, may perform construction in a working well with a diameter of 1800 mm, and is suitable for a pipeline project with a relatively small diameter; wide stratums, for example various soil layers such as flow plastic clay, soft clay, hard pan, a sand bed, a gravel bed with a diameter smaller than 50 mm, may be suitable for the construction method of the present invention; the rotating direction of the cutter head 81 may be controlled according to an actual condition, so that the soil mass 1 is controlled to be discharged to the originating well 2 or the receiving well 3, it is convenient to process the abandoned soil or mud, and the slurry disposal cost is lowered; and the construction quality is excellent; as guided by an advanced laser guiding drill bit 51, a straightness error of the guide bar 5 is +/−2.5 cm; after construction of the pipeline, the straightness is high without disjoint and water leakage, water leakage between joints due to excessive balanced deviation rectification of mud and water is avoided, and a strict requirement on a gravity flow is met fully.
Components, structures of which are not described in detail, in the present invention are universal standard components or components known to those skilled in the art, and their structures or principles may be known by those skilled in the art via technical manuals or acquired by conventional experimental methods.
Finally, it is to be noted that the above embodiments are merely used to explain the technical scheme of the present invention rather than limiting the protection scope of the present invention. Despite reference to the preferred embodiments to make a detailed description for the present invention, it will be understood by those skilled in the art that they still can modify the technical scheme of the present invention or make equivalent substitutions on the technical scheme without departing the substance and scope of the technical scheme of the present invention.
Number | Date | Country | Kind |
---|---|---|---|
202110888004.8 | Aug 2021 | CN | national |
Number | Name | Date | Kind |
---|---|---|---|
1879683 | Henderson | Sep 1932 | A |
2325565 | Williams | Jul 1943 | A |
4020641 | Takada | May 1977 | A |
4024721 | Takada | May 1977 | A |
4116011 | Girault | Sep 1978 | A |
4403890 | Miyanagi | Sep 1983 | A |
5165490 | Nosaka | Nov 1992 | A |
5314267 | Osadchuk | May 1994 | A |
5482404 | Tenbusch, II | Jan 1996 | A |
5484232 | Hayashi | Jan 1996 | A |
5505558 | Brown | Apr 1996 | A |
5597045 | Sass | Jan 1997 | A |
5597046 | Fisk | Jan 1997 | A |
5628585 | Parish, II | May 1997 | A |
5979574 | Osadchuk | Nov 1999 | A |
6082471 | Osadchuk | Jul 2000 | A |
7070359 | Richardson | Jul 2006 | B2 |
7389831 | Mullins | Jun 2008 | B2 |
7753140 | Barbera | Jul 2010 | B2 |
7779938 | Barbera | Aug 2010 | B2 |
8011449 | Roth | Sep 2011 | B2 |
8113741 | Vidovic | Feb 2012 | B1 |
8210774 | Vidovic | Jul 2012 | B1 |
20110079469 | Tjader | Apr 2011 | A1 |