This invention relates to the construction, transportation, installation and recovery of heavy subsea structures, particularly subsea processing centres for use in oil and gas field developments.
The invention facilitates the use of subsea processing centres, which are a new generation of submerged offshore units for pre-processing, conditioning or otherwise processing production fluid flowing from subsea wellheads. Such centres are key elements of ‘subsea factories’ that aim to provide processed production fluid from oil and gas fields with minimal surface processing operations. Indeed, potentially, there need be no surface processing operations at all before the subsea-processed production fluid is ready for onward transportation to its destination.
To put the invention in its proper context, subsea processing centres are to be distinguished from templates, which are designed specifically for supporting and guiding drilling equipment on the seabed. For example, U.S. Pat. No. 4,784,527 describes a lightweight modular drilling template. Templates do not carry permanent oil or gas processing equipment, which equipment typically comprises at least a water separator for removing water from the production fluid. Consequently, whilst templates can be bulky, they are much lighter than subsea processing centres. Subsea processing centres therefore present distinct problems that the present invention seeks specifically to address.
In subsea processing centres, equipment and related piping are packaged and mounted on a common frame to ease installation. Advantageously, grouping the equipment and piping on the same frame in this way also allows pre-testing of the system and its components onshore or in sheltered water, before installation.
Subsea processing centres are examples of large, heavy structures that are used with increasing frequency in subsea installations. The size and weight of such structures is increasing sharply as their required functionality similarly increases. This presents major challenges for transportation and installation.
It is well known for a large subsea structure or the equipment that it supports to be divided into smaller packages that are lifted and lowered individually and coupled on the seabed. Examples of this technique are disclosed in U.S. Pat. No. 4,625,805 and WO 2011/037477. However, a multi-step piece-by-piece construction approach has significant drawbacks. It takes a lot of valuable time, which ties up extremely expensive vessels and requires a prolonged weather window. It also loses the advantage of pre-testing the assembled system before installation and hence risks unreliability.
Multiple lifting operations increase risk and require very accurate positioning each time, thus requiring the use of an installation vessel fitted with a dynamic positioning (DP) system and a sophisticated heave-compensated lifting system. The DP system of such a vessel must be to the highest specification, namely Level III, which requires an emergency back-up DP system in the event that the main DP system is ever disabled.
For these reasons, it may be preferred to install a large subsea structure in a single lowering operation, where that is practical, rather than to install an equivalent structure piece-by-piece in multiple lowering operations.
Traditionally, large subsea structures have been installed at an installation site by lifting them from a surface vessel such as a barge and lowering them into the water with a crane, or by launching them into the water from a surface vessel and then lowering them with a winch. As subsea loads have grown, the mindset of the industry has been to adopt larger cranes and larger winches. However, the capital cost of vessels fitted with such cranes and winches is becoming prohibitive and the global availability of such vessels is a logistical challenge.
Oil and gas resources are being exploited in deeper waters in which not just the weight of the structure but also the weight of very long lifting cables must be taken into account. Yet, the capacity of available cranes and winches remains limited. There is also a limit on the size of structure that available vessels can accommodate. For example, U.S. Pat. No. 8,141,643 teaches the use of a support frame connected to a subsea structure and suspended underneath an installation vessel. The size of the subsea structure remains limited by the size of the vessel: in particular, the width of the subsea structure cannot be much greater than the beam of the vessel.
In view of these challenges, wet towing has been adopted as another approach to the installation of large subsea structures. This involves towing the structure through the water to an installation site and lowering it there to the seabed using a winch or a crane. Towing avoids size and weight restrictions arising from the limited deck space and lifting capacity of available vessels and cranes.
By way of example, a wet towing method known in the art as the Controlled Depth Tow Method or ‘CDTM’ has been used for the installation of bundled pipelines. It is described in EP 0069446 and also used in WO 2014/095942. The towed pipeline is slightly negatively buoyant at a given water depth but it stabilises at that depth due to drag forces experienced during towing. A significant challenge of this method is the underwater stability of the towed structure, which is addressed by fine management of buoyancy using ballast tanks. In this respect, however, the stability of an elongate structure such as a pipeline is much easier to manage than the stability of a structure that has concentrated weight and buoyancy, such as a subsea processing centre.
Another technique for controlling the stability and/or depth of a subsea structure during towing is the use of adjustable fins, as described in U.S. Pat. No. 3,368,515.
Installation of subsea structures is not the only challenge: dismantling of such structures also has to be taken into account because eventually the structures have to be recovered. For example, recovery of a subsea structure such as a subsea processing centre will be necessary upon decommissioning a field. Also, in a modular approach, a subsea processing centre could be moved from a depleted field to another field for continued processing of production fluids there. As during installation, it is similarly demanding to recover or to move the structure as a whole; or similarly prolonged to recover or to move the structure piece-by-piece.
U.S. Pat. No. 4,120,362 describes a typical multi-purpose subsea frame. It is installed by being suspended from a string of pipes from a drilling rig. This is not relevant for the installation of heavy structures in deep water because a long string of pipes of the requisite strength would be far too heavy.
U.S. Pat. No. 3,987,638 describes a subsea structure designed for installation by a launching and lowering method. Various structural members of the structure define hollow, closed volumes that are used for ballasting. Thus, the closed volumes are initially filled with a gas or air to impart positive buoyancy to the structure so that it floats when launched. Subsequently, the closed volumes are flooded with water to establish negative buoyancy so that the structure can be lowered toward the seabed. GB 2205123 also describes lowering a subsea installation to the seabed by flooding buoyancy tanks provided on the subsea installation.
The main drawback of the ballasting technique described in U.S. Pat. No. 3,987,638 is that structural members that are dimensioned appropriately for their structural duties will not, by themselves, provide sufficient ballast volume to confer positive buoyancy upon a heavy structure. In this respect, U.S. Pat. No. 3,987,638 discloses a drilling template which, as noted above, does not carry permanent oil or gas processing equipment and so is much lighter than a subsea processing centre. Even in that less demanding case, the structural members used for ballasting are much enlarged in relation to their structural duty.
It is well known to those skilled in the art that releasable buoys or deflatable airbags may be attached to a negatively-buoyant structure to achieve positive buoyancy before lowering. Releasing buoys or deflating airbags to reduce buoyancy for lowering adds complexity to the lowering operation and does not facilitate fine control of buoyancy. In addition, once a buoy has been released or an airbag has been deflated, its ballasting effect is lost permanently from that point in the process onwards.
U.S. Pat. No. 3,713,411 discloses a submersible catamaran for transporting a load across water and subsequently lowering that load to the bottom. The submersible catamaran is stated to be suitable for loads of up to five tons in depths of up to fifty meters. It is therefore unsuitable for use in the much deeper waters now being exploited by the oil and gas industry, or for delivering loads as heavy as subsea processing centres that may weigh thousands of tons.
Another known approach is to lower a positively buoyant structure before stabilising it on the seabed. In GB 2277949, for example, a positively buoyant structure is pulled down by wires and anchored to the seabed. This approach has drawbacks including a lack of stability because the anchored structure can still move relative to the seabed. In addition, if an anchoring wire ever ruptured or pulled away from its foundation, the structure could shoot upwards through the water column and potentially strike a vessel on the surface. GB 2464714 also describes lowering a positively buoyant assembly to the seabed, in that case using a weight.
In WO 2010/046686, chain counterweights confer negative buoyancy on a subsea structure such that the weighted structure remains negatively buoyant throughout installation. The counterweights also provide stability on the seabed but can be removed after the installation of additional equipment packages if required.
WO 2014/108631 describes a submersible barge and frame to transport heavy and bulky equipment to an installation site in a surface tow operation and then to lower that equipment to the seabed. The frame comprises a rectangular structure with two lateral ballast tanks and two transverse trusses. A system of winches suspends the frame from buoys for the purpose of stabilisation. There is no suggestion of installing a load as heavy as an all-in-one subsea processing plant. WO 2010/144187 describes a method of transporting and lowering a processing facility to a subsea installation location. The method comprises surface towing the processing facility followed by sinking the processing facility to the seabed. Neither of these documents teaches sub-surface towing or ballast management.
WO 2014/130320 describes a modular transportation and installation system for subsea processing equipment. Equipment modules each carry one or more items of subsea equipment and have individual buoyancy whereby individual modules may be detached from the subsea installation after use and floated to the surface for maintenance or replacement.
On first installation, the modules are tested, towed across the surface to an installation site and then lowered for attachment underwater to a template pre-installed on the seabed. Modules can be attached to each other or to a sub-platform base to form a module assembly before towing. Alternatively, modules can be attached to each other on the pre-installed template when at the seabed.
Surface towing of the modules or module assemblies in WO 2014/130320 is performed within a moonpool of a barge, from which the module or assembly is deployed to the seabed using winches on the barge or a crane wire extending through the moonpool. Alternatively a surface vessel such as a barge can surface-tow modules or module assemblies behind or alongside. Surface-towing the module or assembly in these ways will cause fatigue to its structure, which could affect the reliability of the processing system. Indeed, there is a risk of the module or assembly being subjected to large slamming loads during transport across rough seas and a risk of injury to personnel on the barge during installation. Also, there is no backup solution in the event that the sea state deteriorates rapidly when the barge is far from a safe haven.
The modules disclosed in WO 2014/130320 have various regular flat-sided shapes to fit together like building blocks. Consequently, both the production/processing equipment and the structure of a module assembly are divided by the multiple interfaces between adjacent pairs of modules. These divisions introduce undesirable failure points in terms of structural strength and reliability. Thus, the risk of fatigue or other failure is heightened by the modular nature of the assembly.
Like U.S. Pat. No. 4,625,805 and WO 2011/037477 acknowledged above, WO 2014/130320 employs a multi-step piece-by-piece construction approach that involves installing seabed foundations and then installing a template on the foundations before modules or module assemblies are installed on the template. Then, in some instances, modules are assembled subsea on top of the template to complete the subsea plant. If modules are assembled subsea, clearly only individual modules and not the entire system can be tested onshore.
When an individual module of WO 2014/130320 is detached from the subsea installation and floated to the surface, all items of equipment on the module must be disconnected from the system even if only one of those items actually needs attention. Also, it is not just the items of equipment on the module that are separated from the system: as the module is structural, a part of the structure itself is separated from the system. This weakens the remaining structure and increases the risk of failure.
GB 2457784 describes a subsea seawater injection system positionable on the seabed. WO 01/71158 and US 2006/0118310 describe subsea systems installed on the seabed.
It is against this background that the invention has been devised.
The invention proposes a complete buoyant structure comprising an integrated protection structure and a complete production or processing system. The invention provides a protective, readily transportable structure on which the elements of a processing plant may be assembled and tested onshore or near shore. The structure transports the processing plant to a seabed installation site by mid-water towing and then protects the plant when on the seabed.
In one sense, the invention resides in a method for transporting and installing a subsea structure, which structure is a subsea processing centre comprising: a frame; production fluid processing equipment supported by the frame; and pipework in fluid communication with the production fluid processing equipment. The method comprises: with the structure in water at a pre-towing location, ballasting to make the structure neutrally buoyant at or near to the water surface;
for towing to an installation location, controlledly flooding at least one ballast tank attached to the frame or incorporated into the frame, to an extent that the structure becomes negatively buoyant at a pre-determined towing depth;
towing the negatively-buoyant structure at the towing depth by the Controlled Depth Towing Method; and
after towing to the installation location:
Conveniently, the equipment may be tested when the structure is in the water at the pre-towing location, or is onshore before being supported in the water.
Preferably, the method further comprises stabilising the structure when on the seabed by at least partially flooding hollow structural members of the frame.
The method may also comprise detaching at least one ballast tank from the structure when the structure is on the seabed and recovering that ballast tank to the surface.
Another advantageous possibility is to level the production fluid processing equipment supported by the frame by levelling adjustment of the equipment relative to the frame, in the event that the structure lands on an inclined or irregular seabed. Thus, a tilt-compensating mounting may act between the equipment and the frame for levelling the equipment relative to the frame.
The method of may further comprise recovering the structure from the seabed by: controlledly de-ballasting the or each ballast tank to the extent that the structure is slightly negatively buoyant at a pre-determined towing depth; towing the negatively-buoyant structure at the towing depth by the Controlled Depth Towing Method; and after towing, raising the structure to the surface.
This recovery technique may also be expressed independently within the inventive concept as a method of recovering a subsea structure from the seabed to the surface, comprising: controlledly de-ballasting at least one ballast tank attached to a frame of the structure or incorporated into the frame, to an extent that the structure is negatively buoyant at a pre-determined towing depth; lifting the structure from the seabed to the towing depth; towing the negatively-buoyant structure at the towing depth by the Controlled Depth Towing Method; and after towing, raising the structure to the surface.
Recovery of the structure may be preceded by attaching at least one ballast tank to the structure on the seabed.
In accordance with the invention, buoyancy and/or trim of the structure may be controlled before or during towing, by adjusting the buoyancy of the or each ballast tank or by controlledly flooding hollow structural members of the frame. As part of this control, gas may be injected under pressure to displace water from the or each ballast tank or from one or more hollow structural members of the frame.
Advantageously, trim may be adjusted by individually controlling buoyancy of ballast tanks distributed longitudinally and/or laterally with respect to the frame.
Buoyancy and/or trim are suitably controlled in response to signals from a depth sensor, an accelerometer, an inclinometer and/or a transponder carried by the structure.
Some embodiments of the invention envisage controlling yaw, roll or pitch of the structure during towing by moving hydrodynamic control surfaces that act on the structure.
The inventive concept also embraces corresponding apparatus, namely a subsea processing centre that comprises: a towable frame; production fluid processing equipment supported by the frame; pipework in fluid communication with the production fluid processing equipment; at least one ballast tank attached to the frame or incorporated into the frame; flooding and filling valves for, respectively, flooding the or each ballast tank for ballasting or injecting gas into the or each ballast tank for de-ballasting; and a buoyancy control system that acts on the flooding and filling valves and is configured to control buoyancy and/or trim of the subsea processing centre before or during towing.
The or each ballast tank is preferably incorporated into a recoverable module that is separably attachable to the frame.
At least one pressurised gas vessel may be connected pneumatically to the or each ballast tank via the filling valve.
For adjustment of trim, ballast tanks are preferably distributed longitudinally and/or laterally with respect to the frame and the buoyancy control system is configured to adjust the buoyancy of each ballast tank individually.
The frame suitably comprises hollow structural members, in which case at least some of those members may be that are floodable under control of the buoyancy control system to control the buoyancy and/or trim of the structure.
Equipment supported by the frame may comprise any of: a pump, a valve, a flowmeter, a pressure sensor, a temperature sensor a liquid/gas separator or a water separator.
Thus, briefly, the invention provides a method for transporting and installing a heavy subsea structure such as a subsea processing centre for produced crude oil or natural gas. The invention also provides a apparatus in the form of a subsea processing centre that is adapted to perform the method. The method comprises: controlledly flooding at least one ballast tank attached to or incorporated into the structure, to the extent that the structure becomes negatively buoyant at a pre-determined towing depth; towing the negatively-buoyant structure at the towing depth by the Controlled Depth Towing Method (CDTM); and, after towing to the installation location, further flooding the ballast tank to lower the structure onto the seabed. At the seabed, a fluid transportation pipe of a subsea production installation may be coupled to pipework of the structure.
By applying the principle of variable buoyancy, the invention allows for the use of any existing qualified subsea equipment on a submersible platform provided by a buoyant subsea unit. On that platform, equipment providers can install their qualified units in a similar way to a regular offshore platform module. The unit provides deck space sufficient for a process plant to be fitted on top of the unit or preferably protected inside the unit. The unit suitably comprises a manifold system for import of well streams and for export of produced water for re-injection in an oil or gas reservoir.
Any regular processing units qualified for subsea use can be configured into a processing system that is suitable for the characteristics of a particular field. An onboard piping system connects the processing units together to form the processing system. The various units of the processing plant are surrounded by a lifting and transport frame or hull that interfaces with a vertical sliding system of the platform for installation and recovery of the individual processing units. Processing units are connected to the onboard piping system using standardised ROV-operable connectors that enable release and recovery of the units during operation. Having assembled the processing system onto the platform, the complete system can be tested before towing to an installation site.
The hull structure of the unit balances the weight, and ballast tanks are used to trim the submerged unit as an underwater vessel in a manner similar to a submarine. Trimming the unit is performed by controlling variable ballast tanks by operating gas valves between gas ‘quads’—being multiple pressurised cylinders stacked in a supporting protective frame—and the ballast tanks, and venting valves between the variable ballast tanks and the surrounding sea.
When trimmed slightly negative, the submerged processing unit is towed by the Controlled Depth Tow Method to field and installed by tug boats. At the seabed, the main ballast tanks are flooded to make the unit sufficiently stable. The unit will remain stable on the seabed until it is recovered by reversing the installation process. In this way, the system can be refurbished and/or modified before being reused at an alternative field location. This may be an important cost saving for many field developments, and particularly for marginal field developments.
For deepwater and/or ultra-deep water solutions, ballast tanks may be pre-pressurised to an elevated pressure to reduce the full effect of the external water depth.
The hull shape ensures protection of connectors for incoming or outgoing lines and provides the unit with overtrawlable features.
The engineering concept behind the invention is to use buoyancy, gravity and/or hydrodynamic forces in ways comparable to jackets, diving bells, pipeline bundles or buoyant riser systems, although hydrostatic and/or hydrodynamic control is more comparable to a submarine having variable buoyancy. A control system is used to trim the submerged unit by controlling valves in flooding tanks during trimming. This makes the vessel flexible enough to suit most fabrication yards and harbours, and allows the assembled system to be fully function-tested before it is deployed into the sea. The trim system will adjust the nearly fully submerged vessel before the tow or loadout to a heavy-lift vessel commences. In this way, differences between various configurations of processing equipment are accounted for.
By applying the CDTM, the functionality of the variable buoyancy control system does not need to be as complex as that used in submarines. In addition, the cost of a simple towing operation is dramatically lower than that of building a subsea processing plant at the seabed using a construction support vessel for regular lifting operations, or alternatively using a heavy-lift vessel capable of lifting a structure that may, for example, weigh 1500 to 3000 tons.
In order that the invention may be more readily understood, reference will now be made, by way of example, to the accompanying drawings in which:
Referring firstly to
As best seen from underneath as in
The upper longitudinal beams 26 are joined by an array of spaced parallel upper cross-members 32 that extend orthogonally with respect to the upper longitudinal beams 26. Each of the upper cross-members 32 is aligned with a buttress 28 and/or with a column 30 and is supported by inclined braces 34 that splay downwardly to join the lower longitudinal beams 20. A central longitudinal spine member 36 joins the upper cross-members 32 and extends down the wedge-shaped ends 18 to join the outermost lower cross-members 22 at the ends of the frame 12.
Oblong grille panels 38 close the spaces between the upper longitudinal beams 26, the upper cross-members 32 and the central spine member 36 on the top of the frame 12. Additional oblong grille panels 38 close the spaces between the outermost upper cross-members 32, the outermost lower cross-members 22 and the central spine member 36 at the ends of the frame 12.
The frame 12 is arranged to give protection against trawling when installed on the seabed. In particular, the subsea processing centre 10 is overtrawlable by virtue of the wedge-shaped ends 18 and the grille panels 38 that fit substantially flush to the frame 12.
The subsea processing centre 10 is designed to house and support equipment generally indicated at 40 on the deck 24 and within the frame 12. The equipment 40 comprises various items of processing apparatus for processing production fluid flowing from a subsea oil or gas well, or for processing other fluids used in production.
In general, the equipment that can be anything that interacts with the fluid flowing through pipework of the subsea processing centre 10, including production fluid processing apparatus.
The equipment 40 also comprises other items of apparatus for powering and controlling the processing apparatus, and optionally also for controlling the buoyancy and stability of the subsea processing centre 10 when it is being towed underwater. Other equipment 40 may be included for subsea power generation, transmission or distribution.
Typically, apparatus for processing production fluid will comprise at least a water separator for removing water from the production fluid. More generally, processing apparatus housed by the subsea processing centre 10 may perform a variety of tasks including any of: gas/liquid separation; subsea boosting; subsea gas compression; gas treatment including dewpoint control; pipeline heating; seawater treatment and injection; and/or injection of chemicals. Chemicals may also be stored in the subsea processing centre 10, ready for injection.
The grille panels 38 may be moved or removed for access from above to install or remove individual items of equipment 40 supported by the deck 24 within the frame 12. The sides of the frame 12 may be left open as shown, providing access to the equipment 40 for routine maintenance and other operations by subsea intervention, for example using an ROV.
As a non-limiting example, the frame 12 shown in
Turning now to
A pipeline 44 for production fluid extends through the lower cross-member 22 generally parallel to the lower longitudinal beam 20. Production fluid in the pipeline 40 may be processed or otherwise modified by one or more items of processing apparatus shown here schematically as a box 46 supported by the deck 24.
A buoyancy module 48 is attached to a side of the subsea processing centre 10 outboard of the frame 12. Rigid attachment of the buoyancy module 48 to the frame 12 is effected by fastenings 50 defining attachment points. Preferably the fastenings 50 are latches that are releasable remotely or by subsea intervention, for example using an ROV, to allow the buoyancy module 48 to be separated from the frame 12. A similar buoyancy module 48 is similarly attached to the other side of the subsea processing centre 10 but is not shown in
Each buoyancy module 48 comprises one or more ballast tanks 52. The ballast tanks 52 are suitably of a rigid polymer material such as fibre-reinforced plastics. Each ballast tank 52 has a flooding valve 54 for admitting water as air or other gas is expelled from the tank 52 through a suitable vent or outlet port. Each ballast tank 52 also has a filling valve 56 for admitting high-pressure air or other gas into the tank from a suitable source 58, either to displace water for increasing buoyancy or to resist collapse of the tank 52 under hydrostatic pressure.
The flooding valve 54 and a valve controlling ingress of air or other gas into the filling valve 56 may be operable remotely or by subsea intervention, for example using an ROV. Preferably, those valves are controlled by a buoyancy control system provided onboard the subsea processing centre 10 or on a surface vessel that tows the subsea processing centre 10 to an installation site, as will be explained. The buoyancy control system suitably comprises a stability module that takes input from a depth sensor, an accelerometer, an inclinometer and/or a transponder, to adjust the buoyancy of the ballast tank preferably automatically.
The buoyancy module 48 comprises a hollow free-flooding structure 60 that surrounds and supports the ballast tanks 52. The structure 60 of the buoyancy module 48 is suitably skinned with glass-reinforced plastics. The lower outer wall 62 of that structure 60 flares downwardly and outwardly to the seabed 64 as shown in
The ballast tanks 52 are preferably non-structural in relation to the frame 12 as shown. However, any or all of the longitudinal beams 20, 26, the cross-members 22, 32, the buttresses 28, the braces 34 and the columns 30 of the frame 12 may define closed chambers. Air trapped in those chambers adds buoyancy to the frame 12 when required, as upon launching the subsea processing centre 10. When less buoyancy is required, as upon lowering or landing the frame 12 on the seabed 64 for example, the trapped air may be allowed to escape as water floods in. For this purpose, a flooding valve 66 is shown in
In general, any of the hollow members of the frame 12 may have similar flooding valves or may be interconnected for fluid communication to fill or to flood together. It is also possible for any of the hollow frame members to have similar filling valves for admitting high-pressure air or other gas to increase buoyancy or to resist collapse under hydrostatic pressure.
In practice, the source 58 of the high-pressure air or other gas used internally to pressurise a ballast tank 52 or a hollow frame 12 member may be a downline from the surface or an onboard gas supply carried by the subsea processing centre 10. Gas may be supplied by compressors or by quads.
The box 46 identified in
a, 10b, 10c and 11 are schematic side views that show the subsea processing centre 10 in combination with a simplified example of the buoyancy module 48 shown in
Cross-hatch shading is used to show where the ballast tank 52 contains mainly air to impart strongly positive buoyancy to the subsea processing centre 10 to which the buoyancy module 48 is attached (no shading); mainly water to impart strongly negative buoyancy to the subsea processing centre 10 (full shading); or is partially filled with water and with air to impart near-neutral or slightly negative buoyancy to the subsea processing centre 10 (half shading).
Specifically,
A dry dock is not the only assembly and launching option. In principle, it would be possible instead to assemble and then to lift or to launch the assembled subsea processing centre 10 from the quayside or a slipway into the water 76.
Subsequently, the crane 78 will lift buoyancy modules 48 onto the frame 12.
Advantageously, testing the equipment and systems of the subsea processing centre 10 may be performed on-shore as in
The CDTM principle involves transportation of the prefabricated and fully-tested subsea processing centre 10 suspended on towing lines 84 between surface vessels 86 fore and aft as shown in
As described in EP 0069446 and OTC 6430, CDTM is applied to the installation of very long pipeline bundles. Drag chains are used for ballasting and depth control. Such chains are unnecessary or, at most, optional in the CDTM proposed by the present invention, which instead prefers fine control of ballasting tanks to control the depth and trim of the subsea processing unit 10 during towing.
As the shading in
At the desired towing depth, the subsea processing centre 10 is held safely clear of the seabed 64 but also beneath the influence of wave action near the surface 80. Even if the sea state deteriorates dramatically during the tow, the subsea processing centre 10 can be lowered to the seabed 64 to await better weather conditions.
When the subsea processing centre 10 reaches the installation site, it is lowered toward the seabed 64 by more fully flooding the ballast tanks 52 of the buoyancy modules 48 to increase its negative buoyancy. Meanwhile, the towing lines 84 are paid out from the surface vessels 86. The subsea processing centre 10 then settles on the seabed 64 in the predetermined gap 88 as shown in
By dark shading,
Notably, the structural integrity of the subsea processing centre 10 relies upon the frame 12 and so is unaffected by removing items of equipment 70 supported by that frame 12, unlike modular systems of the prior art that divide not just their equipment but also their structure between modules.
Longitudinally-distributed ballast tanks 100A to 100D like those shown in
To illustrate this principle, the subsea processing centre 10 of
It will be apparent to the skilled reader that ballast tanks may similarly be distributed laterally across the width of the subsea processing centre 10 to compensate for weight imbalances of equipment in the widthwise direction. It would also be possible to adjust buoyancy of individual ballast tanks continuously and dynamically during towing to respond to dynamic forces acting on the subsea processing centre 10, particularly such forces as may induce oscillation in pitch or roll. Similarly, different hollow members of the frame 12 may also be flooded with water or emptied of water individually or selectively to adjust trim or to respond to dynamic forces acting on the subsea processing centre 10.
Another option with distributed ballast tanks is to choose differently-sized ballast tanks for different locations, to suit the expected weight distribution arising from a particular configuration of the equipment on the deck.
It is possible to combine two or more subsea processing centres 10 of the invention to make a larger or more capable subsea factory with additional processing or production functionality. In this respect,
In
Two of the items of equipment 108 shown in
Conversely, the third item of equipment 110 shown in
Those skilled in the art will know of various active or passive tilt-compensating or levelling mountings such as gimbals. As a simple example of such a mounting,
Finally,
Many other variations are possible within the inventive concept. For example, whilst
If a subsea processing centre is to be scrapped and recycled after use, it may simply be raised to the surface and towed from there to a shore facility. Some damage or fatigue of the subsea processing centre caused by wave action will not then be a concern. However if the subsea processing centre is to be refurbished and reused, a reverse CDTM process may be employed. In that case, injection of de-ballasting gas is controlled to achieve slightly neutral buoyancy at a desired towing depth, whereupon CDTM towing takes place in the water column with controlled depth and buoyancy. Finally, the subsea processing centre is raised to the surface in shallower, sheltered water near shore to be refurbished for reuse. In essence, this is the reverse of the process shown in
Yet more variations are possible within the inventive concept. For example, ballast tanks or any of the hollow members of the frame could be pre-pressurised at the surface to above-ambient pressure. This reduces gas consumption when increasing buoyancy in deeper water and increases the resistance of the ballast tanks or hollow members to collapse under hydrostatic pressure.
It would, of course, be possible to lay other elements of a subsea production system after landing the subsea processing centre, hence avoiding the requirement to aim the subsea processing centre into a predetermined gap between pre-laid elements of the subsea production system.
Number | Date | Country | Kind |
---|---|---|---|
1419709.9 | Nov 2014 | GB | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/EP2015/075863 | 11/5/2015 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2016/071471 | 5/12/2016 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
3368515 | Endo et al. | Feb 1968 | A |
3713411 | Bordessoule et al. | Jan 1973 | A |
3987638 | Burkhardt et al. | Oct 1976 | A |
4015553 | Middleton | Apr 1977 | A |
4108101 | Schirtzinger | Aug 1978 | A |
4120362 | Chateau et al. | Oct 1978 | A |
4192383 | Kirkland | Mar 1980 | A |
4350111 | Boyce, II | Sep 1982 | A |
4625805 | Ladecky | Dec 1986 | A |
4784527 | Hunter et al. | Nov 1988 | A |
5215410 | Karal | Jun 1993 | A |
8141643 | Fowkes | Mar 2012 | B2 |
20050152748 | Tangen | Jul 2005 | A1 |
20060118310 | Euphemio et al. | Jun 2006 | A1 |
20110206465 | Howard | Aug 2011 | A1 |
20120275865 | Hayman | Nov 2012 | A1 |
Number | Date | Country |
---|---|---|
1042673 | Nov 1978 | CA |
0 069 446 | Jan 1983 | EP |
0 260 143 | Mar 1988 | EP |
2 205 123 | Nov 1988 | GB |
2 277 949 | Nov 1994 | GB |
2 279 098 | Dec 1994 | GB |
2 457 784 | Sep 2009 | GB |
2 464 714 | Apr 2010 | GB |
2 509 165 | Jun 2014 | GB |
WO 0171158 | Sep 2001 | WO |
WO 2010046686 | Apr 2010 | WO |
WO 2010144187 | Dec 2010 | WO |
WO 2011037477 | Mar 2011 | WO |
WO 2014095942 | Jun 2014 | WO |
WO 2014108631 | Jul 2014 | WO |
WO 2014130320 | Aug 2014 | WO |
Entry |
---|
Den Boer et al., An Integrated Towed Flowline Bundle Production System for Subsea Developments, May 7-10, 1990, Offshore Technology Conference, All Pages (Year: 1990). |
Den Boer, A.S. et al., “An Integrated Towed Flowline Bundle Production System for Subsea Developments,” OCT-6430-MS, Offshore Technology Conference, May 10, 1990, Houston, Texas. |
Number | Date | Country | |
---|---|---|---|
20170314366 A1 | Nov 2017 | US |