The present invention relates to a hauling vehicle and a vehicle control system and especially relates to a hauling vehicle and a vehicle control system applied to, for example, a strip mine.
The present application claims priority from Japanese patent application JP 2021-053395 filed on Mar. 26, 2021, the entire content of which is hereby incorporated by reference into this application.
In a strip mine and the like, there has been known a vehicle control system that includes an unmanned vehicle (hauling vehicle) that performs autonomous travel without ride of an operator and a control station that communicates with an unmanned vehicle via a wireless communication line. Generally, the unmanned vehicle employs a series hybrid method in which an electric motor receives electric power generated by an engine (power generator) to drive wheels. In the method, the power generator is controlled such that an amount of power generation is suppressed to be low during deceleration and vehicle stops and suppresses fuel consumption to improve fuel efficiency. However, in a case where speed control that detects an accelerator operation and starts generating electric power required for acceleration is performed, time is required until sufficient acceleration performance can be provided. In view of this, the acceleration performance is poor during acceleration after deceleration or at starting up, and this causes a problem of a decrease in productivity.
To solve the problem, for example, application of a motor output control device for a motor four-wheel drive vehicle described in Patent Literature 1 to the unmanned vehicle is examined. When an acceleration operation by an operator is predicted, the motor output control device described in Patent Literature 1 sets a power generator to be in a state in which electric generation output can be performed, and when the acceleration operation is detected, electric power supply to the electric motor starts. Therefore, for example, when the operator detects release of a brake, the power generator is caused to standby in the state in which electric generation output can be performed, and when the acceleration operation by the operator is detected, electric power is supplied to the electric motor, thus allowing improving the acceleration performance at starting up.
Patent Literature 1: JP 3891176 B
However, in the motor output control device described in Patent Literature 1, since the electric generation time depends on the operation by the operator, the following problem additionally occurs. That is, for example, in a situation where a timing at which the unmanned vehicle starts up cannot be grasped until an instruction is issued from a hydraulic excavator as in a loading operation to the unmanned vehicle by the hydraulic excavator (loading machine), or in a situation where a preceding vehicle in stop is present ahead of the unmanned vehicle and a timing at which the unmanned vehicle starts up cannot be grasped until the preceding vehicle starts up, since the electric generation time until sufficient acceleration performance can be provided cannot be ensured, and therefore it is difficult to achieve improvement in acceleration performance.
The present invention has been made to solve the technical problem, and an object of the present invention is to provide a hauling vehicle and a vehicle control system that allow achieving improvement in acceleration performance.
A hauling vehicle according to the present invention is a hauling vehicle that drives an electric motor by electric power generated in a power generator to travel by driving of the electric motor. The hauling vehicle comprises a position detection device, a speed detection device, and a vehicle control device. The position detection device detects a position of the hauling vehicle. The speed detection device detects a speed of the hauling vehicle. The vehicle control device controls the hauling vehicle based on map information set in advance. The vehicle control device: calculates a work progression of a loading operation to the hauling vehicle by a loading machine or a work progression of a preceding vehicle that travels ahead of the hauling vehicle based on the position of the hauling vehicle verified with the map information and detected by the position detection device and the speed of the hauling vehicle detected by the speed detection device; calculates a period from a predicted time at which the work progression exceeds a predetermined proportion until a predicted time at which the hauling vehicle starts acceleration based on the calculated work progression as an acceleration preparation time; and drives the power generator to generate electricity during the acceleration preparation time based on the calculated acceleration preparation time.
In the hauling vehicle according to the present invention, when the acceleration start of the hauling vehicle is affected by the work progression of the loading operation to the hauling vehicle by the loading machine or the work progression of the preceding vehicle, based on the position of the hauling vehicle verified with the map information and detected by the position detection device and the speed of the hauling vehicle detected by the speed detection device, the vehicle control device calculates the work progression of the loading operation or the work progression of the preceding vehicle, calculates the acceleration preparation time based on the calculated work progression, and drives the power generator to generate electricity during the calculated acceleration preparation time. Thus, since electric generation time until the electric motor reaches an output where the sufficient acceleration performance can be provided can be ensured, when acceleration starts, start-up or acceleration of the hauling vehicle can be performed quickly. As a result, improvement in acceleration performance of the hauling vehicle can be achieved.
The present invention allows achieving improvement in acceleration performance of the hauling vehicle.
The following describes embodiments of a hauling vehicle and a vehicle control system according to the present invention with reference to the drawings. The following description shows specific examples of the content of the present invention, the present invention is not limited to the description, and various changes and modifications by those skilled in the art can be made within the scope of the technical ideas disclosed in the Description. In all the drawings for describing the present invention, same reference numerals are attached to those having the same functions, and their repeated descriptions will be omitted in some cases.
[Hauling Vehicle]
First, an embodiment of the hauling vehicle according to the present invention will be described. In the following description, an example of an unmanned vehicle as a hauling vehicle that can perform autonomous travel in a work site (see
As illustrated in
Additionally, a traveling section 13 illustrated in
For the loading machine 30, an example of a hydraulic excavator that includes a front work implement turnably disposed in a vertical direction with respect to a body of the loading machine is shown, but the loading machine 30 is not limited to the hydraulic excavator and, for example, may be a wheel loader.
The loading machine 30 includes a start-up instruction input device 300 and a wireless communication device 310 as a hardware configuration. The start-up instruction input device 300 is, for example, a switch that issues a start-up instruction from the loading machine 30 to the unmanned vehicle 20 and is actuated by the operation by the operator of the loading machine 30. The start-up instruction may transmit a signal from the loading machine 30 to the unmanned vehicle 20 via the wireless communication line 40 and may be horn rumbling of the loading machine 30. The wireless communication device 310 is, for example, a radio for connecting to the wireless communication line 40. The loading machine 30 transmits/receives information to/from the unmanned vehicle 20 via the wireless communication device 310.
The unmanned vehicle 20 is, for example, a dump truck that can perform autonomous travel, and includes a vehicle body, a right and left pair of front wheels mounted on the front side of the vehicle body, a right and left pair of rear wheels mounted on the rear side of the vehicle body, and a load body supported to the vehicle body such that the load body can rise and fall. The rear wheel is, for example, a driving wheel, and is driven by a traveling motor (electric motor) mounted on the rear wheel. The traveling motor is, for example, controlled by an inverter, and rotates by receiving electric power generated in a power generator (an engine in this embodiment) built into the vehicle body. Note that the driving wheel may be the front wheel.
Additionally, as illustrated in
The storage device 200 is a non-volatile storage medium that allows reading and writing information, and stores an Operating System (OS), various control programs, an application program, a database, and the like. The storage device 200 includes a map information storage section 201. The map information storage section 201 stores, for example, a table of the map information.
The table of the map information at least describes, for example, as illustrated in
The wireless communication device 210 is, for example, a radio for connecting to the wireless communication line 40. The unmanned vehicle 20 transmits/receives information to/from the loading machine 30 via the wireless communication device 210.
The vehicle control device 220 controls the entire vehicle of the unmanned vehicle 20. The vehicle control device 220 is configured of a computer formed by, for example, combining a Central Processing Unit (CPU) that performs an operation, a Read Only Memory (ROM) as secondary storage device that records programs for operations, and a Random Access Memory (RAM) as a temporary storage device that stores progression of the operation and a temporal control variable. By executing the stored programs, the respective controls regarding, for example, the traveling and the operation of the unmanned vehicle 20 are performed.
As illustrated in
The control target generation section 222 generates a control target based on at least the map information and the acceleration preparation time calculated by the acceleration preparation time calculation section 221. The generated control target at least includes a speed target value and an electric generation output target value. For example, the control target generation section 222 generates the speed target value based on the map information, the position of the unmanned vehicle 20 and the speed of the unmanned vehicle 20, and generates a power generator control speed target value based on the generated speed target value and the acceleration preparation time calculated by the acceleration preparation time calculation section 221. Further, the control target generation section 222 generates the electric generation output target value based on the generated power generator control speed target value and the map information.
The autonomous travel control section 223 generates a control command causing the unmanned vehicle 20 to perform autonomous travel based on the control target generated by the control target generation section 222. The generated control command includes at least one of a brake pedal manipulated variable, an accelerator pedal manipulated variable, a steering angle manipulated variable, or a power generator manipulated variable. For example, the autonomous travel control section 223 generates a power generator manipulated variable to drive the power generator to generate electricity during the acceleration preparation time such that the electric generation output target value can be achieved based on the electric generation output target value generated by the control target generation section 222.
In accordance with the control command generated by the autonomous travel control section 223, the vehicle body drive section 224 performs, for example, a brake operation for braking the unmanned vehicle 20 and an actuation of a steering motor for changing a steering angle of the unmanned vehicle 20, a traveling motor for traveling the unmanned vehicle 20, and the power generator that generates electric power consumed by the traveling motor to cause the unmanned vehicle 20 to travel.
The loading sensor 230 is a device that detects a loaded amount of the unmanned vehicle 20. For example, the loading sensor 230 measures, for example, a load acting on a suspension of the unmanned vehicle 20 and a pressure of hydraulic oil in a hydraulic cylinder to detect the loaded amount of the unmanned vehicle 20.
The position sensor 240 is, for example, a Global Positioning System (GPS) device and detects the position of the unmanned vehicle 20. The detected position of the unmanned vehicle 20 is verified with the map information set in advance.
The speed sensor 250 is, for example, a wheel speed sensor and detects the speed of the unmanned vehicle 20. Here, instead of the speed sensor 250, for example, the vehicle speed may be detected based on a time change in vehicle location information obtained by the GPS device.
The distance sensor 260 detects a distance between the unmanned vehicle 20 and an object (for example, the preceding vehicle) around the unmanned vehicle 20, and may be, for example, a millimeter-wave radar, and may be Light Detection And Ranging (LIDAR). Additionally, instead of the millimeter-wave radar and the LIDAR, the distance may be detected from an image acquired with a stereo camera.
The following will describe the process content of the acceleration preparation time calculation section 221 based on
As depicted in
Subsequently, the acceleration preparation time calculation section 221 acquires the node ID of the node 12 assigned to the unmanned vehicle 20 based on the acquired map information, position of the unmanned vehicle 20, and speed of the unmanned vehicle 20 and acquires the work content of the unmanned vehicle 20 based on the acquired node ID (Step S13). The node ID may be the node ID of the node 12 closest from the position of the unmanned vehicle 20 or may be the node ID of the closest node 12 among the plurality of nodes 12 ahead of the traveling direction of the unmanned vehicle 20. As the work content, the work content associated with the node ID may be acquired, or the work content may be acquired based on the speed of the unmanned vehicle 20. When the work content is acquired based on the speed of the unmanned vehicle 20, for example, in a case where the speed of the unmanned vehicle 20 is not 0, “hauling” is acquired, and in a case where the speed of the unmanned vehicle 20 is 0 and the work content associated with the node ID is “standby,” “standby” is acquired.
Subsequently, the acceleration preparation time calculation section 221 determines whether the work content is “standby” (Step S14). When the work content is determined as “standby,” the acceleration preparation time calculation section 221 calculates the acceleration preparation time during standby (Step S15). On the other hand, when the work content is determined as not “standby,” the acceleration preparation time calculation section 221 calculates the acceleration preparation time during hauling (Step S16). When Step S15 or S16 ends, the acceleration preparation time calculation section 221 outputs the calculated acceleration preparation time (acceleration preparation time during standby or acceleration preparation time during hauling) to the control target generation section 222 (Step S17). Thus, a sequence of the processes are terminated.
Next, using
As depicted in
The acceleration preparation time calculation section 221 calculates the following formula (1) with a time taken from the start of loading until the maximum load capacity (that is, the maximum load capacity in design) m of the unmanned vehicle 20 is reached as a loading operation time τ based on a time t from the first loading until the second loading and a first loading amount w to estimate the loading operation time.
Subsequently, the acceleration preparation time calculation section 221 calculates the work progression of the loading operation time based on the estimated loading operation time (Step S152). Specifically, the acceleration preparation time calculation section 221 calculates the proportion obtained by dividing the elapsed time after the loading starts by the estimated loading operation time as the work progression of the loading machine 30.
Subsequently, the acceleration preparation time calculation section 221 calculates the acceleration preparation time based on the calculated work progression (Step S153). Specifically, the acceleration preparation time calculation section 221, for example, calculates an advance rate of the work progression based on the current time and the calculated work progression. Afterwards, the acceleration preparation time calculation section 221 calculates the period from the predicted time at which the work progression exceeds a predetermined proportion (for example, 90%) until the predicted time at which the unmanned vehicle 20 starts acceleration based on the calculated advance rate as the acceleration preparation time. The proportion here is set based on, for example, an accumulated empirical value. The predicted time at which the unmanned vehicle 20 starts acceleration is, for example, calculated based on the current time and the above-described estimated loading operation time τ.
Note that, in Step S151, the acceleration preparation time calculation section 221 may calculate the loading operation time τ using the average value of the loaded amounts when the start-up instruction is received from the loading machine 30 instead of the maximum load capacity m. Additionally, the acceleration preparation time calculation section 221 may use the average value of the elapsed periods from the start of loading until the start-up instruction is received from the loading machine 30 as the loading operation time.
The average value of the loaded amounts when the start-up instruction is received from the loading machine 30 and the average value of the elapsed periods from the start of loading until the start-up instruction is received from the loading machine 30 are, for example, calculated based on the data of the loaded amount or the elapsed time accumulated in the storage device 200, respectively. Note that, to reduce the data amount accumulated in the storage device 200, not all of the data of the loaded amount or the elapsed time for each of the number of hauling is stored, but each of the average value of the loaded amounts and the average value of the elapsed times is calculated at every predetermined period (for example, one day), only the calculated average value data at the predetermined period may be accumulated in the storage device 200, and the average value may be calculated using the accumulated average value.
Additionally, in Step S152, the acceleration preparation time calculation section 221 may use a ratio of the loaded amount to the maximum load capacity as the work progression of the loading operation, and a ratio of the loaded amount to the average value of the loaded amounts when the start-up instruction is received from the loading machine 30 may be used.
Next, using
In the situation illustrated in
As depicted in
Subsequently, the acceleration preparation time calculation section 221 acquires the node ID assigned to the preceding vehicle based on the calculated preceding vehicle position and the map information acquired in Step S10 (Step S162). The node ID may be the node ID of the node 12 closest from the preceding vehicle position, and may be the node ID of the node 12 closest among the plurality of nodes 12 ahead of the preceding vehicle in the traveling direction.
Subsequently, the acceleration preparation time calculation section 221 acquires node information in the traveling section 13-2 where the preceding vehicle is located based on the acquired node ID and the map information acquired in Step S10 (Step S163). At this time, the acceleration preparation time calculation section 221 acquires the node information of all of the nodes 12 having the traveling section IDs corresponding to the acquired node IDs.
Subsequently, the acceleration preparation time calculation section 221 calculates a traveling section path length of the preceding vehicle based on the acquired node information (Step S164). Specifically, as illustrated in
Subsequently, the acceleration preparation time calculation section 221 calculates a relative speed between the unmanned vehicle and the preceding vehicle based on the vehicle-to-vehicle distance acquired in Step S160 (Step S165). Specifically, the acceleration preparation time calculation section 221 calculates the relative speed between the unmanned vehicle 20 and the preceding vehicle based on the time change of the vehicle-to-vehicle distance.
Subsequently, the acceleration preparation time calculation section 221 calculates a preceding vehicle speed based on the calculated relative speed and a speed of the unmanned vehicle 20 acquired in Step S12 (Step S166).
Subsequently, the acceleration preparation time calculation section 221 calculates the work progression of the preceding vehicle based on the preceding vehicle position calculated in Step S161 and the traveling section path length calculated in Step S164 (Step S167). Specifically, first, as illustrated in
Subsequently, the acceleration preparation time calculation section 221 calculates an advance rate of the work progression of the preceding vehicle based on the preceding vehicle speed calculated in Step S166 and the traveling section path length calculated in Step S164 (Step S168). Specifically, the acceleration preparation time calculation section 221 calculates the value found by dividing the preceding vehicle speed by the traveling section path length as the advance rate of the work progression.
Subsequently, the acceleration preparation time calculation section 221 calculates the period from the predicted time at which the work progression exceeds a predetermined proportion (for example, 90%) until the predicted time at which the unmanned vehicle 20 starts acceleration as the acceleration preparation time based on the work progression calculated in Step S167 and the advance rate of the work progression calculated in Step S168 (Step S169). The proportion here is set based on, for example, an accumulated empirical value. That is, the predicted time at which the unmanned vehicle 20 starts acceleration is the time when the preceding vehicle exits the traveling section 13-2 ahead of the unmanned vehicle 20, and, for example, is calculated based on the current time and the above-described preceding vehicle speed and traveling section path length.
Note that, in Step S166, the acceleration preparation time calculation section 221 may use a speed limit corresponding to the node 12 assigned to the preceding vehicle as the preceding vehicle speed. Additionally, in Step S169, the acceleration preparation time calculation section 221 may calculate the time when the preceding vehicle exits the traveling section 13-2 ahead of the unmanned vehicle 20 as the acceleration preparation time.
Next, the process content of the control target generation section 222 will be described using
As depicted in
Subsequently, the control target generation section 222 acquires the acceleration preparation time (the acceleration preparation time during standby or the acceleration preparation time during hauling) from the acceleration preparation time calculation section 221 (Step S203).
Subsequently, the control target generation section 222 acquires the node ID of the node 12 assigned to the unmanned vehicle 20 based on the acquired map information, position of the unmanned vehicle 20, and speed of the unmanned vehicle 20 and acquires the work content of the unmanned vehicle 20 based on the acquired node ID (Step S204). The node ID may be the node ID of the node 12 closest from the position of the unmanned vehicle 20 or may be the node ID of the closest node 12 among the plurality of nodes 12 ahead of the traveling direction of the unmanned vehicle 20. As the work content, the work content associated with the node ID may be acquired, or the work content may be acquired based on the speed of the unmanned vehicle 20. When the work content is acquired based on the speed of the unmanned vehicle 20, for example, in a case where the speed of the unmanned vehicle 20 is not 0, “hauling” is acquired, and in a case where the speed of the unmanned vehicle 20 is 0 and the work content associated with the node ID is “standby,” “standby” is acquired.
Subsequently, the control target generation section 222 acquires the next traveling section node based on the map information acquired in Step S200 and the position of the unmanned vehicle 20 acquired in Step S201 (Step S205). Specifically, as illustrated in
Subsequently, the control target generation section 222 calculates the traveling distance in the traveling section based on the acquired next traveling section node and the position of the unmanned vehicle 20 acquired in Step S201 (Step S206). Specifically, the control target generation section 222 calculates the distance from the position of the unmanned vehicle 20 and the next traveling section node (that is, the node 12-1) as the traveling distance in the traveling section.
Subsequently, the control target generation section 222 determines whether the work content is “standby” (Step S207). When the work content is determined as “standby” and before the reception of the start-up instruction from the loading machine 30, the control target generation section 222 generates a speed target value at which the speed of the unmanned vehicle 20 is maintained at 0 (Step S208). Note that when the work content is determined as “standby” and after the reception of the start-up instruction from the loading machine 30, the control target generation section 222 generates the speed limit corresponding to the next traveling section node as the speed target value.
On the other hand, when the work content is determined as not “standby,” the control target generation section 222 generates the speed target value based on the speed of the unmanned vehicle 20 acquired in Step S202 and the traveling distance in the traveling section calculated in Step S206 (Step S209). Specifically, when the preceding vehicle is present in the next traveling section, the control target generation section 222 generates the speed target value at which deceleration to stop is performed such that the speed becomes 0 at the time at which the traveling distance in the traveling section is reached using the relationship between the speed when the speed target value is generated and the time illustrated in
In
When Step S208 or S209 ends, the control target generation section 222 generates the power generator control speed target value based on the generated speed target value and the acceleration preparation time acquired in Step S203 (Step S210). Specifically, as indicated by the thick dashed line in
Subsequently, the control target generation section 222 calculates a wheel torque based on the generated power generator control speed target value and the map information acquired in Step S200 (Step S211). Specifically, the control target generation section 222 calculates the wheel torque based on the generated power generator control speed target value and the inclination of the feed path 10 included in the map information.
Subsequently, the control target generation section 222 generates the electric generation output target value based on the calculated wheel torque (Step S212). Specifically, the control target generation section 222 generates the electric generation output target value at which sufficient acceleration performance can be provided even when speed control for accelerating the unmanned vehicle 20 is actually performed at the predicted time at which the unmanned vehicle 20 starts acceleration based on the wheel torque and a resistance of the traveling motor.
Subsequently, the control target generation section 222 outputs the speed target value and the electric generation output target value to the autonomous travel control section 223 (Step S213). Thus, a sequence of the processes are terminated.
The autonomous travel control section 223 generates the power generator manipulated variable to drive the power generator to generate electricity during the acceleration preparation time such that the electric generation output target value can be achieved with respect to the electric generation output target value output from the control target generation section 222. For example, the autonomous travel control section 223 provides a stepped power generator manipulated variable at 3T seconds before the time at which the electric generation output target value rises using a time constant T when a response characteristic of the power generator is modeled with a transfer function of the first-order lag. With the transfer function of a first-order lag, the output reaches a value 90% of a steady value after a lapse of 3T seconds from a step input, and therefore the sufficient electric generation output target value can be generated until the predicted time at which the acceleration starts by providing the power generator manipulated variable at 3T seconds before in advance.
In the unmanned vehicle 20 of this embodiment, when the acceleration start of the unmanned vehicle 20 is affected by the work progression of the loading operation to the unmanned vehicle 20 by the loading machine 30 or the work progression of the preceding vehicle, based on the position of the unmanned vehicle 20 verified with the map information set in advance and detected by the position sensor 240 and the speed of the unmanned vehicle 20 detected by the speed sensor 250, the vehicle control device 220 calculates the work progression of the loading operation or the work progression of the preceding vehicle, calculates the acceleration preparation time based on the calculated work progression, and drives the power generator to generate electricity during the calculated acceleration preparation time. Thus, since electric generation time until the electric motor reaches an output where the sufficient acceleration performance can be provided can be ensured, when the unmanned vehicle 20 starts acceleration, start-up or acceleration of the unmanned vehicle 20 can be performed quickly. As a result, improvement in acceleration performance of the unmanned vehicle 20 can be achieved.
[Vehicle Control System]
The following describes an embodiment of the vehicle control system according to the present invention based on
The unmanned vehicle 20A of this embodiment differs from the above-described unmanned vehicle 20 in that a vehicle control device 220A does not include the acceleration preparation time calculation section 221. On the other hand, the server 50 has an acceleration preparation time calculation function. That is, the vehicle control system 1 of this embodiment is a system in which the function of the above-described acceleration preparation time calculation section 221 of the unmanned vehicle 20 is provided with the server 50.
Specifically, as illustrated in
The server 50 is, for example, configured by a microcomputer formed by combining a Central Processing Unit (CPU) that executes an operation, a Read Only Memory (ROM) as a secondary storage device recording a program for the operation, and a Random Access Memory (RAM) as a primary storage device storing progress of the operation and a temporal control variable. By executing the stored program, each control regarding, for example, management of the unmanned vehicle 20A and the loading machine 30 is performed.
The server 50 includes a wireless communication device 510 and an acceleration preparation time calculation device 500. The wireless communication device 510 is, for example, a radio for connecting to the wireless communication line 40. The server 50 transmits/receives information to/from the unmanned vehicle 20A or the loading machine 30 via the wireless communication device 510. For example, the server 50 receives each piece of the information transmitted from the unmanned vehicle 20A and each piece of the information transmitted from the loading machine 30 via the wireless communication device 510 and aggregates them. Additionally, the server 50 transmits, for example, an instruction to the unmanned vehicle 20A and an instruction to the loading machine 30 via the wireless communication device 510.
The acceleration preparation time calculation device 500 has a structure and a function similar to those of the above-described acceleration preparation time calculation section 221. That is, similarly to the above-described acceleration preparation time calculation section 221, the acceleration preparation time calculation device 500 calculates the work progression of the loading operation to the unmanned vehicle 20A by the loading machine 30 or the work progression of the preceding vehicle that travels ahead of the unmanned vehicle 20A based on the position of the unmanned vehicle 20A and the speed of the unmanned vehicle 20A. Based on the calculated work progression, the acceleration preparation time calculation device 500 calculates the period from the predicted time at which the work progression exceeds the predetermined proportion until predicted time at which the unmanned vehicle 20A starts acceleration as the acceleration preparation time. The acceleration preparation time calculation device 500 transmits the calculated acceleration preparation time to the control target generation section 222 of the unmanned vehicle 20A via the wireless communication device 510.
The vehicle control system 1 according to this embodiment obtains the operational advantages similar to the above-described unmanned vehicle 20 and also aggregates the information from a plurality of the unmanned vehicles 20A and the loading machines 30, and calculates the acceleration preparation time based on the aggregated information. Accordingly, compared with the case where the acceleration preparation time is calculated based on the information acquired by the unmanned vehicle 20 alone, the calculation accuracy of the acceleration preparation time can be further enhanced.
Note that, in this embodiment, when the work progression of the loading operation to the unmanned vehicle 20A by the loading machine 30 and the acceleration preparation time during standby are calculated, the acceleration preparation time calculation device 500 may use posture information and loading amount information transmitted from the loading machine 30 instead of the loaded amount detected by the loading sensor 230 of the unmanned vehicle 20A, or the posture information and the loading amount information transmitted from the loading machine 30 may be used further in addition to the loaded amount detected by the loading sensor 230 of the unmanned vehicle 20A. In this case, while the loaded amount acquired by the loading sensor 230 of the unmanned vehicle 20A is discrete information, the loaded amount acquired by the sensor of the loading machine 30 is continuous information, and therefore the accuracy of the calculated work progression can be enhanced. As a result, since the acceleration preparation time can be calculated with further high accuracy, the effect of improving acceleration performance can be further enhanced.
Additionally, when the work progression of the preceding vehicle traveling ahead of the unmanned vehicle 20A and the acceleration preparation time during hauling are calculated, the acceleration preparation time calculation device 500 preferably calculates the work progression based on the information detected by the position sensor 240 and the speed sensor 250 of the preceding vehicle instead of the vehicle-to-vehicle distance detected by the distance sensor 260 of the unmanned vehicle 20A. Accordingly, the acceleration preparation time can be further promptly calculated and the electric generation time can be easily ensured, and therefore improvement in acceleration performance can be achieved with more certainty.
While the embodiments of the present invention have been described in detail above, the present invention is not limited thereto, and can be subjected to various kinds of changes in design without departing from the spirit of the present invention described in the claims.
Number | Date | Country | Kind |
---|---|---|---|
2021-053395 | Mar 2021 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2022/002543 | 1/25/2022 | WO |