Heat engine and heat to electricity systems and methods with working fluid mass management control

Information

  • Patent Grant
  • 9458738
  • Patent Number
    9,458,738
  • Date Filed
    Wednesday, December 11, 2013
    10 years ago
  • Date Issued
    Tuesday, October 4, 2016
    8 years ago
Abstract
Aspects of the disclosure generally provide a heat engine system and a method for regulating a pressure and an amount of a working fluid in a working fluid circuit during a thermodynamic cycle. A mass management system may be employed to regulate the working fluid circulating throughout the working fluid circuit. The mass management systems may have a mass control tank fluidly coupled to the working fluid circuit at one or more strategically-located tie-in points. A heat exchanger coil may be used in conjunction with the mass control tank to regulate the temperature of the fluid within the mass control tank, and thereby determine whether working fluid is either extracted from or injected into the working fluid circuit. Regulating the pressure and amount of working fluid in the working fluid circuit selectively increases or decreases the suction pressure of the pump to increase system efficiency.
Description
BACKGROUND

Heat is often created as a byproduct of industrial processes where flowing streams of liquids, solids or gasses that contain heat must be exhausted into the environment or removed in some way in an effort to maintain the operating temperatures of the industrial process equipment. Sometimes the industrial process can use heat exchanger devices to capture the heat and recycle it back into the process via other process streams. Other times it is not feasible to capture and recycle this heat because it is either too high in temperature or it may contain insufficient mass flow. This heat is referred to as “waste” heat and is typically discharged directly into the environment or indirectly through a cooling medium, such as water.


Waste heat can be utilized by turbine generator systems that employ well-known thermodynamic methods, such as the Rankine cycle, to convert the heat into useful work. Typically, this method is a steam-based process where the waste heat is used to generate steam in a boiler in order to drive a turbine. The steam-based Rankine cycle, however, is not always practical because it requires heat source streams that are relatively high in temperature (e.g., 600° F. or higher) or are large in overall heat content. Moreover, the complexity of boiling water at multiple pressures/temperatures to capture heat at multiple temperature levels as the heat source stream is cooled, is costly in both equipment cost and operating labor. Consequently, the steam-based Rankine cycle is not a realistic option for streams of small flow rate and/or low temperature.


The organic Rankine cycle (ORC) addresses some of these issues by replacing water with a lower boiling-point fluid, such as a light hydrocarbon like propane or butane, or a HFC (e.g., R245fa) fluid. However, the boiling heat transfer restrictions remain, and new issues such as thermal instability, toxicity or flammability of the fluid are added.


There exists a need in the art for a system that can efficiently and effectively produce power from not only waste heat but also from a wide range of thermal sources.


SUMMARY

Embodiments of the disclosure may provide a heat engine system for converting thermal energy into mechanical energy. The heat engine may include a working fluid circuit that circulates a working fluid through a high pressure side and a low pressure side of the working fluid circuit, and a mass management system fluidly coupled to the working fluid circuit and configured to regulate a pressure and an amount of working fluid within the working fluid circuit. The working fluid circuit may include a first heat exchanger in thermal communication with a heat source to transfer thermal energy to the working fluid, a first expander in fluid communication with the first heat exchanger and fluidly arranged between the high and low pressure sides, and a first recuperator fluidly coupled to the first expander and configured to transfer thermal energy between the high and low pressure sides. The working fluid circuit may also include a cooler in fluid communication with the first recuperator and configured to control a temperature of the working fluid in the low pressure side, and a first pump fluidly coupled to the cooler and configured to circulate the working fluid through the working fluid circuit. The mass management system may include a mass control tank fluidly coupled to the high pressure side at a first tie-in point located upstream from the first expansion device and to the low pressure side at a second tie-in point located upstream from an inlet of the pump, and a control system communicably coupled to the working fluid circuit at a first sensor set arranged before the inlet of the pump and at a second sensor set arranged after an outlet of the pump, and communicably coupled to the mass control tank at a third sensor set arranged either within or adjacent the mass control tank.


Embodiments of the disclosure may further provide a method for regulating a pressure and an amount of a working fluid in a thermodynamic cycle. The method may include placing a thermal energy source in thermal communication with a heat exchanger arranged within a working fluid circuit, the working fluid circuit having a high pressure side and a low pressure side, and circulating the working fluid through the working fluid circuit with a pump. The method may also include expanding the working fluid in an expander to generate mechanical energy, and sensing operating parameters of the working fluid circuit with first and second sensor sets communicably coupled to a control system, the first sensor set being arranged adjacent an inlet of the pump and the second sensor set being arranged adjacent an outlet of the pump. The method may further include extracting working fluid from the working fluid circuit at a first tie-in point arranged upstream from the expander in the high pressure side, the first tie-in point being fluidly coupled to a mass control tank, and injecting working fluid from the mass control tank into the working fluid circuit via a second tie-in point arranged upstream from an inlet of the pump to increase a suction pressure of the pump.


Embodiments of the disclosure may further provide another method for regulating a pressure and an amount of a working fluid in a thermodynamic cycle. The method may include placing a thermal energy source in thermal communication with a heat exchanger arranged within a working fluid circuit, the working fluid circuit having a high pressure side and a low pressure side, and circulating the working fluid through the working fluid circuit with a pump. The method may also include expanding the working fluid in an expander to generate mechanical energy, and extracting working fluid from the working fluid circuit and into a mass control tank by transferring thermal energy from working fluid in the mass control tank to a heat exchanger coil, the working fluid being extracted from the working fluid circuit at a first tie-in point arranged upstream from the expander in the high pressure side and being fluidly coupled to the mass control tank. The method may further include injecting working fluid from the mass control tank to the working fluid circuit via a second tie-in point by transferring thermal energy from the heat exchanger coil to the working fluid in the mass control tank.


Embodiments of the disclosure may further provide a mass management system. The mass management system may include a mass control tank fluidly coupled to a low pressure side of a working fluid circuit that has a pump configured to circulate a working fluid throughout the working fluid circuit, the mass control tank being coupled to the low pressure side at a tie-in point located upstream from an inlet of the pump. The mass management system may also include a heat exchanger configured to transfer heat to and from the mass control tank to either draw in working fluid from the working fluid circuit and to the mass control tank via the tie-in point or inject working fluid into the working fluid circuit from the mass control tank via the tie-in point. The mass management system may further include a control system communicably coupled to the working fluid circuit at a first sensor set arranged adjacent the inlet of the pump and a second sensor set arranged adjacent an outlet of the pump, and communicably coupled to the mass control tank at a third sensor set arranged either within or adjacent the mass control tank.





BRIEF DESCRIPTION OF THE DRAWINGS

The present disclosure is best understood from the following detailed description when read with the accompanying Figures. It is emphasized that, in accordance with the standard practice in the industry, various features are not drawn to scale. In fact, the dimensions of the various features may be arbitrarily increased or reduced for clarity of discussion.



FIG. 1A schematically illustrates a heat to electricity engine system including a working fluid circuit, according to one or more embodiments disclosed.



FIGS. 1B-1D illustrate various conduit arrangements and working fluid flow directions for a mass management circuit fluidly coupled to the working fluid circuit of FIG. 1A, according to one or more embodiments disclosed.



FIG. 2 is a pressure-enthalpy diagram for carbon dioxide.



FIGS. 3-6 schematically illustrate various cascade thermodynamic waste heat recovery cycles that a mass management system may supplement, according to one or more embodiments disclosed.



FIG. 7 schematically illustrates a mass management system which can be implemented with heat engine cycles, according to one or more embodiments disclosed.



FIG. 8 schematically illustrates another mass management system that can be implemented with heat engine cycles, according to one or more embodiments disclosed.



FIGS. 9-14 schematically illustrate various parallel heat engine cycles, according to one or more embodiments disclosed.





DETAILED DESCRIPTION

It is to be understood that the following disclosure describes several exemplary embodiments for implementing different features, structures, or functions of the invention. Exemplary embodiments of components, arrangements, and configurations are described below to simplify the present disclosure; however, these exemplary embodiments are provided merely as examples and are not intended to limit the scope of the invention. Additionally, the present disclosure may repeat reference numerals and/or letters in the various exemplary embodiments and across the Figures provided herein. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various exemplary embodiments and/or configurations discussed in the various Figures. Moreover, the formation of a first feature over or on a second feature in the description that follows may include embodiments in which the first and second features are formed in direct contact, and may also include embodiments in which additional features may be formed interposing the first and second features, such that the first and second features may not be in direct contact. Finally, the exemplary embodiments presented below may be combined in any combination of ways, i.e., any element from one exemplary embodiment may be used in any other exemplary embodiment, without departing from the scope of the disclosure.


Additionally, certain terms are used throughout the following description and claims to refer to particular components. As one skilled in the art will appreciate, various entities may refer to the same component by different names, and as such, the naming convention for the elements described herein is not intended to limit the scope of the invention, unless otherwise specifically defined herein. Further, the naming convention used herein is not intended to distinguish between components that differ in name but not function. Additionally, in the following discussion and in the claims, the terms “including” and “comprising” are used in an open-ended fashion, and thus should be interpreted to mean “including, but not limited to.” All numerical values in this disclosure may be exact or approximate values unless otherwise specifically stated. Accordingly, various embodiments of the disclosure may deviate from the numbers, values, and ranges disclosed herein without departing from the intended scope. Furthermore, as it is used in the claims or specification, the term “or” is intended to encompass both exclusive and inclusive cases, i.e., “A or B” is intended to be synonymous with “at least one of A and B,” unless otherwise expressly specified herein.



FIG. 1A illustrates an exemplary heat engine system 100, according to one or more embodiments described. The heat engine system 100 may also be referred to as a thermal engine, a power generation device, a heat or waste heat recovery system, and/or a heat to electricity system. The heat engine system 100 may encompass one or more elements of a Rankine thermodynamic cycle configured to circulate a working fluid through a working fluid circuit to produce power from a wide range of thermal sources. The terms “thermal engine” or “heat engine” as used herein generally refer to the equipment set that executes the thermodynamic cycles described herein. The term “heat recovery system” generally refers to the thermal engine in cooperation with other equipment to deliver/remove heat to and from the thermal engine.


As will be described in greater detail below, the thermodynamic cycle may operate as a closed-loop cycle, where a working fluid circuit has a flow path defined by a variety of conduits adapted to interconnect the various components of the heat engine system 100. Although the heat engine system 100 may be characterized as a closed-loop cycle, the heat engine system 100 as a whole may or may not be hermetically-sealed such that no amount of working fluid is leaked into the surrounding environment.


As illustrated, the heat engine system 100 may include a waste heat exchanger 5 in thermal communication with a waste heat source 101 via connection points 19 and 20. The waste heat source 101 may be a waste heat stream such as, but not limited to, gas turbine exhaust, process stream exhaust, or other combustion product exhaust streams, such as furnace or boiler exhaust streams. In other embodiments, the waste heat source 101 may include renewable sources of thermal energy, such as heat from the sun or geothermal sources. Accordingly, waste heat is transformed into electricity for applications ranging from bottom cycling in gas turbines, stationary diesel engine gensets, industrial waste heat recovery (e.g., in refineries and compression stations), solar thermal, geothermal, and hybrid alternatives to the internal combustion engine.


A turbine or expander 3 may be arranged downstream from the waste heat exchanger 5 and be configured to receive and expand a heated working fluid discharged from the heat exchanger 5 to generate power. To this end, the expander 3 may be coupled to an alternator 2 adapted to receive mechanical work from the expander 3 and convert that work into electrical power. The alternator 2 may be operably connected to power electronics 1 configured to convert the electrical power into useful electricity. In one embodiment, the alternator 2 may be in fluid communication with a cooling loop 112 having a radiator 4 and a pump 27 for circulating a cooling fluid such as water, thermal oils, and/or other suitable refrigerants. The cooling loop 112 may be configured to regulate the temperature of the alternator 2 and power electronics 1 by circulating the cooling fluid.


A recuperator 6 may be fluidly coupled to the expander 3 and configured to remove at least a portion of the thermal energy in the working fluid discharged from the expander 3. The recuperator 6 may transmit the removed thermal energy to the working fluid proceeding toward the waste heat exchanger 5. A condenser or cooler 12 may be fluidly coupled to the recuperator 6 and configured to reduce the temperature of the working fluid even more. The recuperator 6 and cooler 12 may be any device adapted to reduce the temperature of the working fluid such as, but not limited to, a direct contact heat exchanger, a trim cooler, a mechanical refrigeration unit, and/or any combination thereof. In at least one embodiment, the waste heat exchanger 5, recuperator 6, and/or the cooler 12 may include or employ one or more printed circuit heat exchange panels. Such heat exchangers and/or panels are known in the art, and are described in U.S. Pat. Nos. 6,921,518; 7,022,294; and 7,033,553, the contents of which are hereby incorporated by reference to the extent consistent with the present disclosure.


The cooler 12 may be fluidly coupled to a pump 9 that receives the cooled working fluid and pressurizes the fluid circuit to re-circulate the working fluid back to the waste heat exchanger 5. In one embodiment, the pump 9 may be driven by a motor 10 via a common rotatable shaft. The speed of the motor 10, and therefore the pump 9, may be regulated using a variable frequency drive 11. As can be appreciated, the speed of the pump 9 may control the mass flow rate of the working fluid in the fluid circuit of the heat engine system 100.


In other embodiments, the pump 9 may be powered externally by another device, such as an auxiliary expansion device 13. The auxiliary expansion device 13 may be an expander or turbine configured to expand a working fluid and provide mechanical rotation to the pump 9. In at least one embodiment, the auxiliary expansion device 13 may expand a portion of the working fluid circulating in the working fluid circuit.


As indicated, the working fluid may be circulated through a “high pressure” side of the fluid circuit of the heat engine system 100 and a “low pressure” side thereof. The high pressure side generally encompasses the conduits and related components of the heat engine system 100 extending from the outlet of the pump 9 to the inlet of the turbine 3. The low pressure side of the heat engine system 100 generally encompasses the conduits and related components of the heat engine system 100 extending from the outlet of the expander 3 to the inlet of the pump 9.


In one or more embodiments, the working fluid used in the heat engine system 100 may be carbon dioxide (CO2). It should be noted that the use of the term carbon dioxide is not intended to be limited to CO2 of any particular type, purity, or grade. For example, industrial grade CO2 may be used without departing from the scope of the disclosure. Carbon dioxide is a neutral working fluid that offers benefits such as non-toxicity, non-flammability, easy availability, thermal stability, and low price.


In other embodiments, the working fluid may be a binary, ternary, or other working fluid blend. The working fluid combination can be selected for the unique attributes possessed by the fluid combination within a heat recovery system, as described herein. For example, one such fluid combination includes a liquid absorbent and CO2 mixture enabling the combined fluid to be pumped in a liquid state to high pressure with less energy input than required to compress CO2. In another embodiment, the working fluid may be a combination of CO2 and one or more other miscible fluids. In other embodiments, the working fluid may be a combination of CO2 and propane, or CO2 and ammonia, without departing from the scope of the disclosure.


Moreover, the term “working fluid” is not intended to limit the state or phase of matter that the working fluid is in. For example, the working fluid may be in a fluid phase, a gas phase, a supercritical phase, a subcritical state or any other phase or state at any one or more points within the heat engine system 100 or thermodynamic cycle. In one or more embodiments, the working fluid is in a supercritical state over certain portions of the heat engine system 100 (i.e., the “high pressure side”), and in a subcritical state at other portions of the heat engine system 100 (i.e., the “low pressure side”). In other embodiments, the entire thermodynamic cycle, including both the high and low pressure sides, may be operated such that the working fluid is maintained in a supercritical or subcritical state throughout the entire working fluid circuit of the heat engine system 100.


The thermodynamic cycle(s) executed by the heat engine system 100 may be described with reference to a pressure-enthalpy diagram 200 for a selected working fluid. For example, the diagram 200 in FIG. 2 provides the general pressure versus enthalpy for carbon dioxide. At point A, the working fluid exhibits its lowest pressure and lowest enthalpy relative to its state at any other point during the cycle. As the working fluid is compressed or otherwise pumped to a higher pressure, its state moves to point B on the diagram 200. As thermal energy is introduced to the working fluid, both the temperature and enthalpy of the working fluid increase until reaching point C on the diagram 200. The working fluid is then expanded through one or more mechanical processes to point D. As the working fluid discharges heat, its temperature and enthalpy are simultaneously reduced until returning to point A.


As will be appreciated, each process (i.e., A-B, B-C, C-D, D-A) need not occur as shown on the exemplary diagram 200, instead each step of the cycle could be achieved via a variety of ways. For example, those skilled in the art will recognize that it is possible to achieve a variety of different coordinates on the diagram 200 without departing from the scope of the disclosure. Similarly, each point on the diagram 200 may vary dynamically over time as variables within and external to the heat engine system 100 (FIG. 1A) change, i.e., ambient temperature, waste heat temperature, amount of mass (i.e., working fluid) in the system, combinations thereof, etc.


In one embodiment, the thermodynamic cycle is executed during normal, steady state operation such that the low pressure side of the heat engine system 100 (points A and D in the diagram 200) falls between about 400 psia and about 1500 psia, and the high pressure side of the heat engine system 100 (points B and C in the diagram 200) falls between about 2,500 psia and about 4,500 psia. Those skilled in the art will also readily recognize that either or both higher or lower pressures could be selected for each or all points A-D. In at least one embodiment, the working fluid may transition from a supercritical state to a subcritical state (i.e., a transcritical cycle) between points C and D. In other embodiments, however, the pressures at points C and D may be selected or otherwise configured such that the working fluid remains in a supercritical state throughout the entire cycle. It should be noted that representative operative temperatures, pressures, and flow rates as indicated in any of the Figures or otherwise defined or described herein are by way of example only and are not in any way to be considered as limiting the scope of the disclosure.


Referring again to FIG. 1A, the use of CO2 as the working fluid in thermodynamic cycles, such as in the disclosed heat engine system 100, requires particular attention to the inlet pressure of the pump 9 which has a direct influence on the overall efficiency of the heat engine system 100 and, therefore, the amount of power ultimately generated. Because of the thermo-physical properties of CO2, it is beneficial to control the inlet pressure of the pump 9 as the inlet temperature of the pump 9 rises. For example, one key thermo-physical property of CO2 is its near-ambient critical temperature which requires the suction pressure of the pump 9 to be controlled both above and below the critical pressure (e.g., subcritical and supercritical operation) of the CO2. Another key thermo-physical property of CO2 to be considered is its relatively high compressibility and low overall pressure ratio, which makes the volumetric and overall efficiency of the pump 9 more sensitive to the suction pressure margin than would otherwise be achieved with other working fluids.


In order to minimize or otherwise regulate the suction pressure of the pump 9, the heat engine system 100 may incorporate the use of a mass management system (“MMS”) 110. The MMS 110 may be configured to control the inlet pressure of the pump 9 by regulating the amount of working fluid entering and/or exiting the heat engine system 100 at strategic locations in the working fluid circuit, such as at tie-in points A, B, and C. Consequently, the heat engine system 100 becomes more efficient by manipulating the suction and discharge pressures for the pump 9, and thereby increasing the pressure ratio across the turbine 3 to its maximum possible extent.


It will be appreciated that any of the various embodiments of cycles and/or working fluid circuits described herein can be considered as closed-loop fluid circuits of defined volume, wherein the amount of mass can be selectively varied both within the cycle or circuit and within the discrete portions within the cycle or circuit (e.g., between the waste heat exchanger 5 and the turbine 3 or between the cooler 12 and the pump 9). In normal operation, the working fluid mass in the high pressure side of the cycle is essentially set by the fluid flow rate and heat input. The mass contained within the low pressure side of the cycle, on the other hand, is coupled to the low-side pressure, and a means is necessary to provide optimal control of both sides. Conventional Rankine cycles (both steam and organic) use other control methods, such a vapor-liquid equilibrium to control low side pressure. In the case of a system which must operate with low-side pressures that range above and below the critical pressure, this option is not possible. Thus, actively controlling the injection and withdrawal of mass from the closed-loop fluid circuit is necessary for the proper functioning and control of a practical ScCO2 system. As described below, this can be accomplished through the use of the MMS 110 and variations of the same.


As illustrated, the MMS 110 may include a plurality of valves and/or connection points 14, 15, 16, 17, 18, 21, 22, and 23, and a mass control tank 7. The valves and connection points 14, 15, 16, 17, 18, 21, 22, and 23 may be characterized as termination points where the MMS 110 is operatively connected to the heat engine system 100, provided with additional working fluid from an external source, or provided with an outlet for flaring excess working fluid or pressures. Particularly, a first valve 14 may fluidly couple the MMS 110 to the heat engine system 100 at or near tie-in point A. At tie-in point A, the working fluid may be heated and pressurized after being discharged from the waste heat exchanger 5. A second valve 15 may fluidly couple the MMS 110 to the system at or near tie-in point C. Tie-in point C may be arranged adjacent the inlet to the pump 9 where the working fluid circulating through the heat engine system 100 is generally at a low temperature and pressure. It will be appreciated, however, that tie-in point C may be arranged anywhere on the low pressure side of the heat engine system 100, without departing from the scope of the disclosure.


The mass control tank 7 may be configured as a localized storage for additional working fluid that may be added to the fluid circuit when needed in order to regulate the pressure or temperature of the working fluid within the fluid circuit. The MMS 110 may pressurize the mass control tank 7 by opening the first valve 14 to allow high-temperature, high-pressure working fluid to flow to the mass control tank 7 from tie-in point A. The first valve 14 may remain in its open position until the pressure within the mass control tank 7 is sufficient to inject working fluid back into the fluid circuit via the second valve 15 and tie-in point C. In one embodiment, the second valve 15 may be fluidly coupled to the bottom of the mass control tank 7, whereby the densest working fluid from the mass control tank 7 is injected back into the fluid circuit at or near tie-in point C. Accordingly, adjusting the position of the second valve 15 may serve to regulate the inlet pressure of the pump 9.


A third valve 16 may fluidly couple the MMS 110 to the fluid circuit at or near tie-in point B. The working fluid at tie-in point B may be more dense and at a higher pressure relative to the density and pressure on the low pressure side of the heat engine system 100, for example adjacent tie-in point C. The third valve 16 may be opened to remove working fluid from the fluid circuit at tie-in point B and deliver the removed working fluid to the mass control tank 7. By controlling the operation of the valves 14, 15, 16, the MMS 110 adds and/or removes working fluid mass to/from the heat engine system 100 without the need of a pump, thereby reducing system cost, complexity, and maintenance.


The working fluid within the mass control tank 7 may be in liquid phase, vapor phase, or both. In other embodiments, the working fluid within the mass control tank 7 may be in a supercritical state. Where the working fluid is in both vapor and liquid phases, the working fluid will tend to stratify and a phase boundary may separate the two phases, whereby the more dense working fluid will tend to settle to the bottom of the mass control tank 7 and the less dense working fluid will advance toward the top of the tank 7. Consequently, the second valve 15 will be able to deliver back to the fluid circuit the densest working fluid available in the mass control tank 7.


The MMS 110 may be configured to operate with the heat engine system 100 semi-passively. To accomplish this, the heat engine system 100 may further include first, second, and third sets of sensors 102, 104, and 106, respectively. As depicted, the first set of sensors 102 may be arranged at or adjacent the suction inlet of the pump 9, and the second set of sensors 104 may be arranged at or adjacent the outlet of the pump 9. The first and second sets of sensors 102, 104 monitor and report the working fluid pressure and temperature within the low and high pressure sides of the fluid circuit adjacent the pump 9. The third set of sensors 106 may be arranged either inside or adjacent the mass control tank 7 and be configured to measure and report the pressure and temperature of the working fluid within the tank 7.


The heat engine system 100 may further include a control system 108 that is communicable (wired or wirelessly) with each sensor 102, 104, 106 in order to process the measured and reported temperatures, pressures, and mass flow rates of the working fluid at predetermined or designated points within the heat engine system 100. The control system 108 may also communicate with external sensors (not shown) or other devices that provide ambient or environmental conditions around the heat engine system 100. In response to the reported temperatures, pressures, and mass flow rates provided by the sensors 102, 104, 106, and also to ambient and/or environmental conditions, the control system 108 may be able to adjust the general disposition of each of the valves 14, 15, 16. The control system 108 may be operatively coupled (wired or wirelessly) to each valve 14, 15, 16 and configured to activate one or more actuators, servos, or other mechanical or hydraulic devices capable of opening or closing the valves 14, 15, 16. Accordingly, the control system 108 may receive the measurement communications from each set of sensors 102, 104, 106 and selectively adjust each valve 14, 15, 16 in order to maximize operation of the heat engine system 100. As will be appreciated, control of the various valves 14, 15, 16 and related equipment may be automated or semi-automated.


In one embodiment, the control system 108 may be in communication (via wires, RF signal, etc.) with each of the sensors 102, 104, 106, etc. in the heat engine system 100 and configured to control the operation of each of the valves (e.g., 14, 15, 16) in accordance with a control software, algorithm, or other predetermined control mechanism. This may prove advantageous for being able to actively control the temperature and pressure of the working fluid at the inlet of the first pump 9, thereby selectively increasing the suction pressure of the first pump 9 by decreasing compressibility of the working fluid. Doing so may avoid damage to the pump 9 as well as increase the overall pressure ratio of the thermodynamic cycle, which improves the efficiency and power output of the heat engine system 100. Doing so may also raise the volumetric efficiency of the pump 9, thus allowing operation of the pump 9 at lower speeds.


In one embodiment, the control system 108 may include one or more proportional-integral-derivative (PID) controllers as a control loop feedback system. In another embodiment, the control system 108 may be any microprocessor-based system capable of storing a control program and executing the control program to receive sensor inputs and generate control signals in accordance with a predetermined algorithm or table. For example, the control system 108 may be a microprocessor-based computer running a control software program stored on a computer-readable medium. The software program may be configured to receive sensor inputs from the various pressure, temperature, flow rate, etc. sensors (e.g., sensors 102, 104, and 106) positioned throughout the working fluid circuit and generate control signals therefrom, wherein the control signals are configured to optimize and/or selectively control the operation of the working fluid circuit.


Exemplary control systems 108 that may be compatible with the embodiments of this disclosure may be further described and illustrated in U.S. application Ser. No. 12/880,428, filed on Sep. 13, 2010, and issued as U.S. Pat. No. 8,281,593, which is hereby incorporated by reference to the extent not inconsistent with the disclosure.


The MMS 110 may also include delivery points 17 and 18, where delivery point 17 may be used to vent working fluid from the MMS 110. Connection point 21 may be a location where additional working fluid may be added to the mass management system 110 from an external source, such as a fluid fill system (not shown). Embodiments of an exemplary fluid fill system that may be fluidly coupled to the connection point 21 to provide additional working fluid to the mass management system 110 are also described in U.S. Pat. No. 8,281,593, incorporated by reference above. The remaining connection points 22, 23 may be used in a variety of operating conditions such as start up, charging, and shut-down of the waste heat recovery system. For example, point 22 may be a pressure relief valve.


One method of controlling the pressure of the working fluid in the low side of the heat engine system 100 is by controlling the temperature of the mass control tank 7 which feeds the low-pressure side via tie-in point C. Those skilled in the art will recognize that a desirable requirement is to maintain the suction pressure of the pump 9 above the boiling pressure of the working fluid. This can be accomplished by maintaining the temperature of the mass control tank 7 at a higher level than at the inlet of the pump 9.


Referring to FIGS. 1B-1D, illustrated are various configurations of the mass management system 110 that may be adapted to control the pressure and/or temperature of the working fluid in the mass control tank 7, and thereby increase or decrease the suction pressure at the pump 9. Numerals and tie-in points shown in FIGS. 1B-1D correspond to like components described in FIG. 1A and therefore will not be described again in detail. Temperature control of the mass control tank 7 may be accomplished by either direct or indirect heat, such as by the use of a heat exchanger coil 114, or external heater (electrical or otherwise). The control system 108 (FIG. 1A) may be further communicably coupled to the heat exchanger coil 114 and configured to selectively engage, cease, or otherwise regulate its operation.


In FIG. 1B, the heat exchanger coil 114 may be arranged without the mass control tank 7 and provide thermal energy via convection. In other embodiments, the coil 114 may be wrapped around the tank 7 and thereby provide thermal energy via conduction. Depending on the application, the coil 114 may be a refrigeration coil adapted to cool the tank 7 or a heater coil adapted to heat the tank 7. In other embodiments, the coil 114 may serve as both a refrigerator and heater, depending on the thermal fluid circulating therein and thereby being able to selectively alter the temperature of the tank 7 according to the requirements of the heat engine system 100.


As illustrated, the mass control tank 7 may be fluidly coupled to the working fluid circuit at tie-in point C. Via tie-in point C, working fluid may be added to or extracted from the working fluid circuit, depending on the temperature of the working fluid within the tank 7. For example, heating the working fluid in the tank 7 will pressurize the tank and tend to force working fluid into the working fluid circuit from the tank 7, thereby effectively raising the suction pressure of the pump 9. Conversely, cooling the working fluid in the tank 7 will tend to withdraw working fluid from the working fluid circuit at tie-in point C and inject that working fluid into the tank 7, thereby reducing the suction pressure of the pump 9. Accordingly, working fluid mass moves either in or out of the tank 7 via tie-in point C depending on the average density of the working fluid therein.


In FIG. 1C, the coil 114 may be disposed within the mass control tank 7 in order to directly heat or cool the working fluid in the tank 7. In this embodiment, the coil 114 may be fluidly coupled to the cooler 12 and use a portion of the thermal fluid 116 circulating in the cooler 12 to heat or cool the tank 7. In one embodiment, the thermal fluid 116 in the cooler 12 may be water. In other embodiments, the thermal fluid may be a type of glycol and water, or any other thermal fluid known in the art. In yet other embodiments, the thermal fluid may be a portion of the working fluid tapped from the heat engine system 100.


In FIG. 1D, the coil 114 may again be disposed within the mass control tank 7, but may be fluidly coupled to the discharge of the pump 9 via tie-in point B. In other words, the coil 114 may be adapted to circulate working fluid that is extracted from the working fluid circuit at tie-in point B in order to heat or cool the working fluid in the tank 7, depending on the discharge temperature of the pump 9. After passing through the coil 114, the extracted working fluid may be injected back into the working fluid circuit at point 118, which may be arranged downstream from the recuperator 6. A valve 120 may be arranged in the conduit leading to point 118 for restriction or regulation of the working fluid as it re-enters the working fluid circuit.


Depending on the temperature of the working fluid extracted at tie-in point B and the amount of cooling and/or heating realized by the coil 114 in the tank 7, the mass control tank 7 may be adapted to either inject fluid into the working fluid circuit at tie-in point C or extract working fluid at tie-in point C. Consequently, the suction pressure of the pump 9 may be selectively managed to increase the efficiency of the heat engine system 100.


Referring now to FIGS. 7 and 8, illustrated are other exemplary mass management systems 700 and 800, respectively, which may be used in conjunction with the heat engine system 100 of FIG. 1A to regulate the amount of working fluid in the fluid circuit. In one or more embodiments, the MMS 700, 800 may be similar in several respects to the MMS 110 described above and may, in one or more embodiments, entirely replace the MMS 110 without departing from the scope of the disclosure. For example, the system tie-in points A, B, and C, as indicated in FIGS. 7 and 8 (points A and C only shown in FIG. 8), correspond to the system tie-in points A, B, and C shown in FIG. 1A. Accordingly, each MMS 700, 800 may be best understood with reference to FIGS. 1A-1D, wherein like numerals represent like elements that will not be described again in detail.


The exemplary MMS 700 may be configured to store working fluid in the mass control tank 7 at or near ambient temperature. In exemplary operation, the mass control tank 7 may be pressurized by tapping working fluid from the working fluid circuit via the first valve 14 fluidly coupled to tie-in point A. The third valve 16 may be opened to permit relatively cooler, pressurized working fluid to enter the mass control tank 7 via tie-in point B. As briefly described above, extracting additional fluid from the working fluid circuit may decrease the inlet or suction pressure of the pump 9 (FIGS. 1A-1D).


When required, working fluid may be returned to the working fluid circuit by opening the second valve 15 fluidly coupled to the bottom of the mass control tank 7 and allowing the additional working fluid to flow through the third tie-in point C and into the working fluid circuit upstream from the pump 9 (FIGS. 1A-1D). In at least one embodiment, the MMS 700 may further include a transfer pump 710 configured to draw working fluid from the tank 7 and inject it into the working fluid circuit via tie-in point C. Adding working fluid back to the circuit at tie-in point C increases the suction pressure of the pump 9.


The MMS 800 in FIG. 8 may be configured to store working fluid at relatively low temperatures (e.g., sub-ambient) and therefore exhibiting low pressures. As shown, the MMS 800 may include only two system tie-ins or interface points A and C. Tie-in point A may be used to pre-pressurize the working fluid circuit with vapor so that the temperature of the circuit remains above a minimum threshold during fill. As shown, the tie-in A may be controlled using the first valve 14. The valve-controlled interface A, however, may not generally be used during the control phase, powered by the control logic defined above for moving mass into and out of the system. The vaporizer prevents the injection of liquid working fluid into the heat engine system 100 which would boil and potentially refrigerate or cool the heat engine system 100 below allowable material temperatures. Instead, the vaporizer facilitates the injection of vapor working fluid into the heat engine system 100.


In operation, when it is desired to increase the suction pressure of the pump 9 (FIGS. 1A-1D), the second valve 15 may be opened and working fluid may be selectively added to the working fluid circuit via tie-in point C. In one embodiment, the working fluid is added with the help of a transfer pump 802. When it is desired to reduce the suction pressure of the pump 9, working fluid may be selectively extracted from the system also via tie-in point C, or one of several other ports (not shown) on the low pressure storage tank 7, and subsequently expanded through one or more valves 804 and 806. The valves 804, 806 may be configured to reduce the pressure of the working fluid derived from tie-in point C to the relatively low storage pressure of the mass control tank 7.


Under most conditions, the expanded fluid following the valves 804, 806 will be two-phase fluid (i.e., vapor+liquid). To prevent the pressure in the mass control tank 7 from exceeding its normal operating limits, a small vapor compression refrigeration cycle 807 including a vapor compressor 808 and accompanying condenser 810 may be used. The refrigeration cycle 807 may be configured to decrease the temperature of the working fluid and condense the vapor in order to maintain the pressure of the mass control tank 7 at its design condition. In one embodiment, the vapor compression refrigeration cycle 807 forms an integral part of the MMS 800, as illustrated. In other embodiments, however, the vapor compression refrigeration cycle 807 may be a stand-alone vapor compression cycle with an independent refrigerant loop.


The control system 108 shown in each of the MMS 700, 800 may be configured to monitor and/or control the conditions of the working fluid and surrounding cycle environment, including temperature, pressure, flow rate and flow direction. The various components of each MMS 700, 800 may be communicably coupled to the control system 108 (wired or wirelessly) such that control of the various valves 14, 15, 16 and other components described herein is automated or semi-automated in response to system performance data obtained via the various sensors (e.g., 102, 104, 106 in FIG. 1A).


In one or more embodiments, it may prove advantageous to maintain the suction pressure of the pump 9 above the boiling pressure of the working fluid. The pressure of the working fluid in the low side of the working fluid circuit can be controlled by regulating the temperature of the working fluid in the mass control tank 7, such that the temperature of the working fluid in the mass control tank 7 is maintained at a higher level than the temperature at the inlet of the pump 9. To accomplish this, the MMS 700 may include a heater and/or a coil 714 arranged within or about the tank 7 to provide direct electric heat. The coil 714 may be similar in some respects to the coil 114 described above with reference to FIGS. 1B-1D. Accordingly, the coil 714 may be configured to add or remove heat from the fluid/vapor within the tank 7.


The exemplary mass management systems 110, 700, 800 described above may be applicable to different variations or embodiments of thermodynamic cycles having different variations or embodiments of working fluid circuits. Accordingly, the thermodynamic cycle shown in and described with reference to FIG. 1A may be replaced with other thermodynamic, power-generating cycles that may also be regulated or otherwise managed using any one of the MMS 110, 700, or 800. For example, illustrated in FIGS. 3-6 are various embodiments of cascade-type thermodynamic, power-generating cycles that may accommodate any one of the MMS 110, 700, or 800 to fluidly communicate therewith via the system tie-ins points A, B, and C, and thereby increase system performance of the respective working fluid circuits. Reference numbers shown in FIGS. 3-6 that are similar to those referred to in FIGS. 1A-1D, 7, and 8 correspond to similar components that will not be described again in detail.



FIG. 3 schematically illustrates an exemplary “cascade” thermodynamic cycle in which the residual thermal energy of a first portion of the working fluid m1 following expansion in a first power turbine 302 (i.e., adjacent state 51) is used to preheat a second portion of the working fluid m2 before being expanded through a second power turbine 304 (i.e., adjacent state 52). More specifically, the first portion of working fluid m1 is discharged from the first turbine 302 and subsequently cooled at a recuperator RC1. The recuperator RC1 may provide additional thermal energy for the second portion of the working fluid m2 before the second portion of the working fluid m2 is expanded in the second turbine 304.


Following expansion in the second turbine 304, the second portion of the working fluid m2 may be cooled in a second recuperator RC2 which also serves to pre-heat a combined working fluid flow m1+m2 after it is discharged from the pump 9. The combined working fluid m1+m2 may be formed by merging the working fluid portions m1 and m2 discharged from both recuperators RC1, RC2, respectively. A condenser 312 may be configured to receive the combined working fluid m1+m2 and reduce its temperature prior to being pumped through the fluid circuit again with the pump 9. Depending upon the achievable temperature at the suction inlet of the pump 9, and based on the available cooling supply temperature and performance of the condenser 312, the suction pressure at the pump 9 may be either subcritical or supercritical. Moreover, any one of the MMS 110, 700, or 800 described herein may fluidly communicate with the thermodynamic cycle shown in FIG. 3 via the system tie-in points A, B, and/or C, to thereby regulate or otherwise increase system performance as generally described above.


The first power turbine 302 may be coupled to and provide mechanical rotation to a first work-producing device 306, and the second power turbine may be adapted to drive a second work-producing device 308. In one embodiment, the work-producing devices 306, 308 may be electrical generators, either coupled by a gearbox or directly driving corresponding high-speed alternators. It is also contemplated herein to connect the output of the second power turbine 304 with the second work-producing device 308, or another generator that is driven by the first turbine 302. In other embodiments, the first and second power turbines 302, 304 may be integrated into a single piece of turbomachinery, such as a multiple-stage turbine using separate blades/disks on a common shaft, or as separate stages of a radial turbine driving a bull gear using separate pinions for each radial turbine.


By using multiple turbines 302, 304 at similar pressure ratios, a larger fraction of the available heat source from the waste heat exchanger 5 is utilized and residual heat from the turbines 302, 304 is recuperated via the cascaded recuperators RC1, RC2. Consequently, additional heat is extracted from the waste heat source through multiple temperature expansions. In one embodiment, the recuperators RC1, RC2 may be similar to the waste heat exchanger 5 and include or employ one or more printed circuit heat exchange panels. Also, the condenser 312 may be substantially similar to the cooler 12 shown and described above with reference to FIG. 1A.


In any of the cascade embodiments disclosed herein, the arrangement or general disposition of the recuperators RC1, RC2 can be optimized in conjunction with the waste heat exchanger 5 to maximize power output of the multiple temperature expansion stages. Also, both sides of each recuperator RC1, RC2 can be balanced, for example, by matching heat capacity rates and selectively merging the various flows in the working fluid circuits through waste heat exchangers and recuperators; C=m·cp, where C is the heat capacity rate, m is the mass flow rate of the working fluid, and cp is the constant pressure specific heat. As appreciated by those skilled in the art, balancing each side of the recuperators RC1, RC2 provides a higher overall cycle performance by improving the effectiveness of the recuperators RC1, RC2 for a given available heat exchange surface area.



FIG. 4 is similar to FIG. 3, but with one key exception in that the second power turbine 304 may be coupled to the pump 9 either directly or through a gearbox. The motor 10 that drives the pump 9 may still be used to provide power during system startup, and may provide a fraction of the drive load for the pump 9 under some conditions. In other embodiments, however, it is possible to utilize the motor 10 as a generator, particularly if the second power turbine 304 is able to produce more power than the pump 9 requires for system operation. Likewise, any one of the MMS 110, 700, or 800 may fluidly communicate with the thermodynamic cycle shown in FIG. 4 via the system tie-in points A, B, and C, and thereby regulate or otherwise increase the system performance.



FIG. 5 is a variation of the system described in FIG. 4, whereby the motor-driven pump 9 is replaced by or operatively connected to a high-speed, direct-drive turbopump 510. As illustrated, a small “starter pump” 512 or other auxiliary pumping device may be used during system startup, but once the turbopump 510 generates sufficient power to “bootstrap” itself into steady-state operation, the starter pump 512 can be shut down. The starter pump 512 may be driven by a separate motor 514 or other auxiliary driver known in the art.


Additional control valves CV1 and CV2 may be included to facilitate operation of the turbopump 510 under varying load conditions. The control valves CV1, CV2 may also be used to channel thermal energy into the turbopump 510 before the first power turbine 302 is able to operate at steady-state. For example, at system startup the shut off valve SOV1 may be closed and the first control valve CV1 opened such that the heated working fluid discharged from the waste heat exchanger 5 may be directed to the turbopump 510 in order to drive the main system pump 9 until achieving steady-state operation. Once at steady-state operation, the control valve CV1 may be closed and the shut off valve SOV1 may be simultaneously opened in order to direct heated working fluid from the waste heat exchanger 5 to the power turbine 302.


As with FIGS. 3 and 4, any one of the MMS 110,700, or 800 may be able to fluidly communicate with the thermodynamic cycle shown in FIG. 5 via the system tie-in points A, B, and C, and thereby regulate or otherwise increase the system performance.



FIG. 6 schematically illustrates another exemplary cascade thermodynamic cycle that may be supplemented or otherwise regulated by the implementation of any one of the MMS 110,700, or 800 described herein. Specifically, FIG. 6 depicts a dual cascade heat engine cycle. Following the pump 9, the working fluid may be separated at point 502 into a first portion m1 and a second portion m2. The first portion m1 may be directed to the waste heat exchanger 5 and subsequently expanded in the first stage power turbine 302. Residual thermal energy in the exhausted first portion m1 following the first stage power turbine 302 (e.g., at state 5) may be used to preheat the second portion m2 in a second recuperator (Recup2) prior to being expanded in a second-stage power turbine 304.


In one embodiment, the second recuperator Recup2 may be configured to preheat the second portion m2 to a temperature within approximately 5 to 10° C. of the exhausted first portion m1 fluid at state 5. After expansion in the second-stage power turbine 304, the second portion m2 may be re-combined with the first portion m1 at point 504. The re-combined working fluid m1+m2 may then transfer initial thermal energy to the second portion m2 via a first recuperator Recup1 prior to the second portion m2 passing through the second recuperator Recup2, as described above. The combined working fluid m1+m2 is cooled via the first recuperator Recup1 and subsequently directed to the condenser 312 (e.g., state 6) for additional cooling, after which it ultimately enters the working fluid pump 9 (e.g., state 1) where the cycle starts anew.


Referring now to FIGS. 9-14, the exemplary mass management systems 110, 700, 800 described herein may also be applicable to parallel-type thermodynamic cycles, and fluidly coupled thereto via the tie-in points A, B, and/or C to increase system performance. As with the cascade cycles shown in FIGS. 3-6, some reference numbers shown in FIGS. 9-14 may be similar to those in FIGS. 1A-1D, 7, and 8 to indicate similar components that will not be described again in detail.


Referring to FIG. 9, an exemplary parallel thermodynamic cycle 900 is shown and may be used to convert thermal energy to work by thermal expansion of the working fluid flowing through a working fluid circuit 910. As with prior-disclosed embodiments, the working fluid circulated in the working fluid circuit 910, and the other exemplary circuits described below, may be carbon dioxide (CO2). The cycle 900 may be characterized as a Rankine cycle implemented as a heat engine device including multiple heat exchangers that are in fluid communication with a waste heat source 101. Moreover, the cycle 900 may further include multiple turbines for power generation and/or pump driving power, and multiple recuperators located downstream of and fluidly coupled to the turbine(s).


Specifically, the working fluid circuit 910 may be in thermal communication with the waste heat source 101 via a first heat exchanger 902 and a second heat exchanger 904. The first and second heat exchangers 902, 904 may correspond generally to the heat exchanger 5 described above with reference to FIG. 1A. It will be appreciated that any number of heat exchangers may be utilized in conjunction with one or more heat sources. The first and second heat exchangers 902, 904 may be waste heat exchangers. In at least one embodiment, the first and second heat exchangers 902, 904 may be first and second stages, respectively, of a single or combined waste heat exchanger.


The first heat exchanger 902 may serve as a high temperature heat exchanger (e.g., high temperature with respect to the second heat exchanger 904) adapted to receive an initial or primary flow of thermal energy from the heat source 101. In various embodiments, the initial temperature of the heat source 101 entering the cycle 900 may range from about 400° F. to greater than about 1,200° F. (i.e., about 204° C. to greater than about 650° C.). In the illustrated embodiment, the initial flow of the heat source 101 may have a temperature of about 500° C. or higher. The second heat exchanger 904 may then receive the heat source 101 via a serial connection 908 downstream from the first heat exchanger 902. In one embodiment, the temperature of the heat source 101 provided to the second heat exchanger 904 may be reduced to about 250-300° C.


The heat exchangers 902, 904 are arranged in series in the heat source 101, but in parallel in the working fluid circuit 910. The first heat exchanger 902 may be fluidly coupled to a first turbine 912 and the second heat exchanger 904 may be fluidly coupled to a second turbine 914. In turn, the first turbine 912 may also be fluidly coupled to a first recuperator 916 and the second turbine 914 may also be fluidly coupled to a second recuperator 918. One or both of the turbines 912, 914 may be a power turbine configured to provide electrical power to auxiliary systems or processes. The recuperators 916, 918 may be arranged in series on a low temperature side of the circuit 910 and in parallel on a high temperature side of the circuit 910.


The pump 9 may circulate the working fluid throughout the circuit 910 and a second, starter pump 922 may also be in fluid communication with the components of the fluid circuit 910. The first and second pumps 9, 922 may be turbopumps, motor-driven pumps, or combinations thereof. In one embodiment, the first pump 9 may be used to circulate the working fluid during normal operation of the cycle 900 while the second pump 922 may be nominally driven and used generally for starting the cycle 900. In at least one embodiment, the second turbine 914 may be used to drive the first pump 9, but in other embodiments the first turbine 912 may be used to drive the first pump 9, or the first pump 9 may be nominally driven by an external or auxiliary machine (not shown).


The first turbine 912 may operate at a higher relative temperature (e.g., higher turbine inlet temperature) than the second turbine 914, due to the temperature drop of the heat source 101 experienced across the first heat exchanger 902. In one or more embodiments, however, each turbine 912, 914 may be configured to operate at the same or substantially the same inlet pressure. This may be accomplished by design and control of the circuit 910, including but not limited to the control of the first and second pumps 9, 922 and/or the use of multiple-stage pumps to optimize the inlet pressures of each turbine 912, 914 for corresponding inlet temperatures of the circuit 910. This is also accomplished through the use of one of the exemplary MMS 110, 700, or 800 that may be fluidly coupled to the circuit 910 at tie-in points A, B, and/or C, whereby the MMS 110, 700, or 800 regulates the working fluid pressure in order to maximize power outputs.


The working fluid circuit 910 may further include a condenser 924 in fluid communication with the first and second recuperators 916, 918. The low-pressure discharge working fluid flow exiting each recuperator 916, 918 may be directed through the condenser 924 to be cooled for return to the low temperature side of the circuit 910 and to either the first or second pumps 9, 922.


In operation, the working fluid is separated at point 926 in the working fluid circuit 910 into a first mass flow m1 and a second mass flow m2. The first mass flow m1 is directed through the first heat exchanger 902 and subsequently expanded in the first turbine 912. Following the first turbine 912, the first mass flow m1 passes through the first recuperator 916 in order to transfer residual heat back to the first mass flow m1 as it is directed toward the first heat exchanger 902. The second mass flow m2 may be directed through the second heat exchanger 904 and subsequently expanded in the second turbine 914. Following the second turbine 914, the second mass flow m2 passes through the second recuperator 918 to transfer residual heat back to the second mass flow m2 as it is directed toward the second heat exchanger 904. The second mass flow m2 is then re-combined with the first mass flow m1 at point 928 to generate a combined mass flow m1+m2. The combined mass flow m1+m2 may be cooled in the condenser 924 and subsequently directed back to the pump 9 to commence the fluid loop anew.



FIG. 10 illustrates another exemplary parallel thermodynamic cycle 1000, according to one or more embodiments, where one of the MMS 110, 700, and/or 800 may be fluidly coupled thereto via tie-in points A, B, and/or C to regulate working fluid pressure for maximizing power outputs. The cycle 1000 may be similar in some respects to the thermodynamic cycle 900 described above with reference to FIG. 9. Accordingly, the thermodynamic cycle 1000 may be best understood with reference to FIG. 9, where like numerals correspond to like elements that will not be described again in detail. The cycle 1000 includes the first and second heat exchangers 902, 904 again arranged in series in thermal communication with the heat source 101, and arranged in parallel within a working fluid circuit 1010.


In the circuit 1010, the working fluid is separated into a first mass flow m1 and a second mass flow m2 at a point 1002. The first mass flow m1 is eventually directed through the first heat exchanger 902 and subsequently expanded in the first turbine 912. The first mass flow m1 then passes through the first recuperator 916 to transfer residual thermal energy back to the first mass flow m1 that is coursing past state 25 and into the first recuperator 916. The second mass flow m2 may be directed through the second heat exchanger 904 and subsequently expanded in the second turbine 914. Following the second turbine 914, the second mass flow m2 is merged with the first mass flow m1 at point 1004 to generate the combined mass flow m1+m2. The combined mass flow m1+m2 may be directed through the second recuperator 918 to transfer residual thermal energy to the first mass flow m1 as it passes through the second recuperator 918 on its way to the first recuperator 916.


The arrangement of the recuperators 916, 918 allows the residual thermal energy in the combined mass flow m1+m2 to be transferred to the first mass flow m1 in the second recuperator 918 prior to the combined mass flow m1+m2 reaching the condenser 924. As can be appreciated, this may increase the thermal efficiency of the working fluid circuit 1010 by providing better matching of the heat capacity rates, as defined above.


In one embodiment, the second turbine 914 may be used to drive (shown as dashed line) the first or main working fluid pump 9. In other embodiments, however, the first turbine 912 may be used to drive the pump 9. The first and second turbines 912, 914 may be operated at common turbine inlet pressures or different turbine inlet pressures by management of the respective mass flow rates at the corresponding states 41 and 42.



FIG. 11 illustrates another embodiment of a parallel thermodynamic cycle 1100, according to one or more embodiments, where one of the MMS 110, 700, and/or 800 may be fluidly coupled thereto via tie-in points A, B, and/or C to regulate working fluid pressure for maximizing power outputs. The cycle 1100 may be similar in some respects to the thermodynamic cycles 900 and 1000 and therefore may be best understood with reference to FIGS. 9 and 10, where like numerals correspond to like elements that will not be described again. The thermodynamic cycle 1100 may include a working fluid circuit 1110 utilizing a third heat exchanger 1102 in thermal communication with the heat source 101. The third heat exchanger 1102 may similar to the first and second heat exchangers 902, 904, as described above.


The heat exchangers 902, 904, 1102 may be arranged in series in thermal communication with the heat source 101, and arranged in parallel within the working fluid circuit 1110. The corresponding first and second recuperators 916, 918 are arranged in series on the low temperature side of the circuit 1110 with the condenser 924, and in parallel on the high temperature side of the circuit 1110. After the working fluid is separated into first and second mass flows m1, m2 at point 1104, the third heat exchanger 1102 may be configured to receive the first mass flow m1 and transfer thermal energy from the heat source 101 to the first mass flow m1. Accordingly, the third heat exchanger 1102 may be adapted to initiate the high temperature side of the circuit 1110 before the first mass flow m1 reaches the first heat exchanger 902 and the first turbine 912 for expansion therein. Following expansion in the first turbine 912, the first mass flow m1 is directed through the first recuperator 916 to transfer residual thermal energy to the first mass flow m1 discharged from the third heat exchanger 1102 and coursing toward the first heat exchanger 902.


The second mass flow m2 is directed through the second heat exchanger 904 and subsequently expanded in the second turbine 914. Following the second turbine 914, the second mass flow m2 is merged with the first mass flow m1 at point 1106 to generate the combined mass flow m1+m2 which provides residual thermal energy to the second mass flow m2 in the second recuperator 918 as the second mass flow m2 courses toward the second heat exchanger 904. The working fluid circuit 1110 may also include a throttle valve 1108, such as a pump-drive throttle valve, and a shutoff valve 1112 to manage the flow of the working fluid.



FIG. 12 illustrates another embodiment of a parallel thermodynamic cycle 1200, according to one or more embodiments disclosed, where one of the MMS 110, 700, and/or 800 may be fluidly coupled thereto via tie-in points A, B, and/or C to regulate working fluid pressure for maximizing power outputs. The cycle 1200 may be similar in some respects to the thermodynamic cycles 900, 1000, and 1100, and as such, the cycle 1200 may be best understood with reference to FIGS. 9-11 where like numerals correspond to like elements that will not be described again. The thermodynamic cycle 1200 may include a working fluid circuit 1210 where the first and second recuperators 916, 918 are combined into or otherwise replaced with a single, combined recuperator 1202. The recuperator 1202 may be of a similar type as the recuperators 916, 918 described herein, or may be another type of recuperator or heat exchanger known in the art.


As illustrated, the combined recuperator 1202 may be configured to transfer heat to the first mass flow m1 before it enters the first heat exchanger 902 and receive heat from the first mass flow m1 after it is discharged from the first turbine 912. The combined recuperator 1202 may also transfer heat to the second mass flow m2 before it enters the second heat exchanger 904 and also receive heat from the second mass flow m2 after it is discharged from the second turbine 914. The combined mass flow m1+m2 flows out of the recuperator 1202 and to the condenser 924 for cooling.


As indicated by the dashed lines extending from the recuperator 1202, the recuperator 1202 may be enlarged or otherwise adapted to accommodate additional mass flows for thermal transfer. For example, the recuperator 1202 may be adapted to receive the first mass flow m1 before entering and after exiting the third heat exchanger 1102. Consequently, additional thermal energy may be extracted from the recuperator 1202 and directed to the third heat exchanger 1102 to increase the temperature of the first mass flow m1.



FIG. 13 illustrates another embodiment of a parallel thermodynamic cycle 1300 according to the disclosure, where one of the MMS 110, 700, and/or 800 may be fluidly coupled thereto via tie-in points A, B, and/or C to regulate working fluid pressure for maximizing power outputs. The cycle 1300 may be similar in some respects to the thermodynamic cycle 900, and as such, may be best understood with reference to FIG. 9 above where like numerals correspond to like elements that will not be described again in detail. The thermodynamic cycle 1300 may have a working fluid circuit 1310 substantially similar to the working fluid circuit 910 of FIG. 9 but with a different arrangement of the first and second pumps 9, 922.



FIG. 14 illustrates another embodiment of a parallel thermodynamic cycle 1400 according to the disclosure, where one of the MMS 110, 700, and/or 800 may be fluidly coupled thereto via tie-in points A, B, and/or C to regulate working fluid pressure for maximizing power outputs. The cycle 1400 may be similar in some respects to the thermodynamic cycle 1100, and as such, may be best understood with reference to FIG. 11 above where like numerals correspond to like elements that will not be described again. The thermodynamic cycle 1400 may have a working fluid circuit 1410 substantially similar to the working fluid circuit 1110 of FIG. 11 but with the addition of a third recuperator 1402 adapted to extract additional thermal energy from the combined mass flow m1+m2 discharged from the second recuperator 918. Accordingly, the temperature of the first mass flow m1 entering the third heat exchanger 1102 may be preheated prior to receiving residual thermal energy transferred from the heat source 101.


As illustrated, the recuperators 916, 918, 1402 may operate as separate heat exchanging devices. In other embodiments, however, the recuperators 916, 918, 1402 may be combined into a single recuperator, similar to the recuperator 1202 described above with reference to FIG. 12.


Each of the described cycles 900-1400 from FIGS. 9-14 may be implemented in a variety of physical embodiments, including but not limited to fixed or integrated installations, or as a self-contained device such as a portable waste heat engine “skid.” The exemplary waste heat engine skid may arrange each working fluid circuit 910-1410 and related components (i.e., turbines 912, 914, recuperators 916, 918, 1202, 1402, condensers 924, pumps 9, 922, etc.) into a consolidated, single unit. An exemplary waste heat engine skid is described and illustrated in U.S. application Ser. No. 12/631,412, entitled “Thermal Energy Conversion Device,” filed on Dec. 9, 2009, and published as U.S. Pub. No. 2011-0185729, the contents of which are hereby incorporated by reference to the extent not inconsistent with the present disclosure.


The mass management systems 110, 700, and 800 described herein provide and enable: i) independent control suction margin at the inlet of the pump 9, which enables the use of a low-cost, high-efficiency centrifugal pump, through a cost effective set of components; ii) mass of working fluid of different densities to be either injected or withdrawn (or both) from the system at different locations in the cycle based on system performance; and iii) centralized control by a mass management system operated by control software with inputs from sensors in the cycle and functional control over the flow of mass into and out of the system.


The foregoing has outlined features of several embodiments so that those skilled in the art may better understand the present disclosure. Those skilled in the art should appreciate that they may readily use the present disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. Those skilled in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the present disclosure, and that they may make various changes, substitutions and alterations herein without departing from the spirit and scope of the present disclosure.

Claims
  • 1. A heat engine system, comprising: a working fluid circuit configured to circulate a working fluid through a high pressure side and a low pressure side of the working fluid circuit;a first heat exchanger fluidly coupled to the working fluid circuit, configured to be fluidly coupled to and in thermal communication with a heat source, and configured to transfer thermal energy from the heat source to the working fluid within the high pressure side of the working fluid circuit;a second heat exchanger fluidly coupled to the working fluid circuit, configured to be fluidly coupled to and in thermal communication with the heat source, and configured to transfer thermal energy from the heat source to the working fluid within the high pressure side of the working fluid circuit;an expander fluidly coupled to the working fluid circuit between the low pressure side and the high pressure side and disposed downstream of the first heat exchanger or the second heat exchanger in the working fluid circuit;a recuperator fluidly coupled to the low pressure side and the high pressure side of the working fluid circuit and configured to transfer thermal energy between the low pressure side and the high pressure side;a cooler fluidly coupled to the working fluid circuit, disposed downstream of the recuperator, and configured to control a temperature of the working fluid in the low pressure side;a pump fluidly coupled to the working fluid circuit between the low pressure side and the high pressure side, disposed downstream of the cooler, and configured to circulate the working fluid through the working fluid circuit; anda mass management system fluidly coupled to the working fluid circuit and configured to regulate a pressure and an amount of the working fluid within the working fluid circuit, the mass management system further comprises: a mass control tank fluidly coupled to the working fluid circuit at one or more tie-in points on the working fluid circuit; anda control system communicably coupled to the working fluid circuit at a first sensor disposed upstream of an inlet of the pump and at a second sensor disposed downstream of an outlet of the pump, and communicably coupled to the mass control tank at a third sensor disposed either within or adjacent the mass control tank.
  • 2. The heat engine system of claim 1, wherein the working fluid comprises carbon dioxide.
  • 3. The heat engine system of claim 1, wherein the mass management system further comprises a heat exchanger coil configured to transfer heat to and from the mass control tank.
  • 4. The heat engine system of claim 1, wherein the recuperator is configured to transfer thermal energy from the working fluid in the low pressure side to the working fluid in the high pressure side.
  • 5. The heat engine system of claim 1, wherein at least one of the tie-in points is disposed upstream of the inlet of the pump on the low pressure side of the working fluid circuit.
  • 6. The heat engine system of claim 1, wherein the one or more tie-in points on the working fluid circuit further comprises: a first tie-in point disposed on the working fluid circuit, fluidly coupled to the mass control tank, and configured to flow the working fluid from the working fluid circuit to the mass control tank; anda second tie-in point disposed on the working fluid circuit, fluidly coupled to the mass control tank, and configured to flow the working fluid from the mass control tank to the working fluid circuit.
  • 7. The heat engine system of claim 3, wherein the heat exchanger coil is disposed within the mass control tank.
  • 8. The heat engine system of claim 3, wherein the heat exchanger coil is fluidly coupled to the cooler and configured to use thermal fluid derived from the cooler to heat or cool the working fluid in the mass control tank.
  • 9. The heat engine system of claim 3, wherein the heat exchanger coil is fluidly coupled to the working fluid circuit downstream of the pump and configured to use the working fluid discharged from the pump to heat or cool the working fluid in the mass control tank.
  • 10. The heat engine system of claim 6, wherein the second tie-in point is disposed upstream of the inlet of the pump on the low pressure side of the working fluid circuit.
  • 11. The heat engine system of claim 6, further comprising: a first valve disposed between the mass control tank and the first tie-in point; anda second valve disposed between the mass control tank and the second tie-in point.
  • 12. The heat engine system of claim 11, wherein the control system is operatively coupled to and configured to selectively actuate the first valve and the second valve in response to operating parameters derived from the first sensor, the second sensor, or the third sensor.
  • 13. The heat engine system of claim 11, wherein the mass control tank is further fluidly coupled to the high pressure side of the working fluid circuit at a third tie-in point disposed downstream of the pump, a third valve is disposed between the mass control tank and the third tie-in point, and the control system is operatively coupled to and configured to selectively actuate the third valve in response to operating parameters derived from the first sensor, the second sensor, or the third sensor.
  • 14. The heat engine system of claim 11, wherein the mass management system further comprises a transfer pump disposed between the mass control tank and the second tie-in point, wherein the transfer pump is configured to transfer the working fluid from the mass control tank and into the working fluid circuit via the second tie-in point.
  • 15. A heat engine system, comprising: a working fluid circuit configured to circulate a working fluid through a high pressure side and a low pressure side of the working fluid circuit, wherein the working fluid comprises carbon dioxide;a heat exchanger fluidly coupled to the working fluid circuit, configured to be fluidly coupled to and in thermal communication with a heat source, and configured to transfer thermal energy from the heat source to the working fluid within the high pressure side of the working fluid circuit;an expander fluidly coupled to the working fluid circuit between the low pressure side and the high pressure side and disposed downstream of the heat exchanger in the working fluid circuit;a recuperator fluidly coupled to the low pressure side and the high pressure side of the working fluid circuit and configured to transfer thermal energy between the low pressure side and the high pressure side;a cooler fluidly coupled to the working fluid circuit, disposed downstream of the recuperator, and configured to control a temperature of the working fluid in the low pressure side;a pump fluidly coupled to the working fluid circuit between the low pressure side and the high pressure side, disposed downstream of the cooler, and configured to circulate the working fluid through the working fluid circuit; anda mass management system fluidly coupled to the working fluid circuit and configured to regulate a pressure and an amount of the working fluid within the working fluid circuit, the mass management system further comprises: a mass control tank fluidly coupled to the working fluid circuit; anda control system communicably coupled to the working fluid circuit at a first sensor disposed upstream of an inlet of the pump and at a second sensor disposed downstream of an outlet of the pump, and communicably coupled to the mass control tank at a third sensor disposed either within or adjacent the mass control tank.
  • 16. A method for regulating a pressure and an amount of a working fluid in a thermodynamic cycle, comprising: placing a thermal energy source in thermal communication with a heat exchanger disposed within a working fluid circuit, the working fluid circuit containing the working fluid and having a high pressure side and a low pressure side, and the working fluid comprises carbon dioxide;circulating the working fluid through the working fluid circuit with a pump;expanding the working fluid in an expander to generate mechanical energy;sensing operating parameters of the working fluid circuit with first and second sensor sets communicably coupled to a control system, wherein the first sensor set is configured to sense at least one of an inlet pressure and an inlet temperature proximate an inlet of the pump, and the second sensor set is configured to sense at least one of an outlet pressure and an outlet temperature proximate an outlet of the pump;extracting the working fluid from the working fluid circuit at a first tie-in point on the working fluid circuit and transferring the working fluid to a mass control tank fluidly coupled to the first tie-in point; andinjecting the working fluid from the mass control tank into the working fluid circuit via a second tie-in point on the working fluid circuit while increasing a suction pressure of the pump.
  • 17. The method of claim 16, further comprising extracting additional working fluid from the working fluid circuit at a third tie-in point disposed between the pump and the heat exchanger.
  • 18. The method of claim 16, wherein injecting the working fluid from the mass control tank into the working fluid circuit via the second tie-in point further comprises transferring the working fluid into the working fluid circuit with a transfer pump disposed between the second tie-in point and the mass control tank.
  • 19. The method of claim 16, further comprising sensing operating parameters of the mass control tank with a third sensor set configured to sense at least one of a pressure and a temperature either within or adjacent the mass control tank, wherein the third sensor set is communicably coupled to the control system.
  • 20. The method of claim 16, further comprising cooling the working fluid within the mass control tank with a vapor compression refrigeration cycle having a vapor compressor and a condenser fluidly coupled to the mass control tank.
CROSS-REFERENCE TO RELATED APPLICATIONS

This application is a continuation of U.S. application Ser. No. 13/278,705, entitled “Heat Engine and Heat to Electricity Systems and Methods with Working Fluid Mass Management Control,” and filed Oct. 21, 2011, which is a continuation-in-part of U.S. application Ser. No. 12/631,379, entitled “Heat Engine and Heat to Electricity Systems and Methods,” and filed Dec. 4, 2009, now issued as U.S. Pat. No. 8,096,128, which claims benefit of U.S. Prov. Appl. No. 61/243,200, filed on Sep. 17, 2009, the contents of which are hereby incorporated by reference to the extent not inconsistent with the present disclosure.

US Referenced Citations (397)
Number Name Date Kind
2575478 Wilson Nov 1951 A
2634375 Guimbal Apr 1953 A
2691280 Albert Oct 1954 A
3095274 Crawford Jun 1963 A
3105748 Stahl Oct 1963 A
3237403 Feher Mar 1966 A
3277955 Laszlo Oct 1966 A
3401277 Larson Sep 1968 A
3622767 Koepcke Nov 1971 A
3630022 Jubb Dec 1971 A
3736745 Karig Jun 1973 A
3772879 Engdahl Nov 1973 A
3791137 Jubb Feb 1974 A
3830062 Morgan et al. Aug 1974 A
3939328 Davis Feb 1976 A
3971211 Wethe Jul 1976 A
3982379 Gilli Sep 1976 A
3998058 Park Dec 1976 A
4009575 Hartman, Jr. Mar 1977 A
4029255 Heiser Jun 1977 A
4030312 Wallin Jun 1977 A
4049407 Bottum Sep 1977 A
4070870 Bahel Jan 1978 A
4099381 Rappoport Jul 1978 A
4119140 Cates Oct 1978 A
4150547 Hobson Apr 1979 A
4152901 Munters May 1979 A
4164848 Gilli Aug 1979 A
4164849 Mangus Aug 1979 A
4170435 Swearingen Oct 1979 A
4182960 Reuyl Jan 1980 A
4183220 Shaw Jan 1980 A
4198827 Terry Apr 1980 A
4208882 Lopes Jun 1980 A
4221185 Scholes Sep 1980 A
4233085 Roderick Nov 1980 A
4236869 Laurello Dec 1980 A
4248049 Briley Feb 1981 A
4257232 Bell Mar 1981 A
4287430 Guido Sep 1981 A
4336692 Ecker Jun 1982 A
4347711 Noe Sep 1982 A
4347714 Kinsell Sep 1982 A
4372125 Dickenson Feb 1983 A
4384568 Palmatier May 1983 A
4391101 Labbe Jul 1983 A
4420947 Yoshino Dec 1983 A
4428190 Bronicki Jan 1984 A
4433554 Rojey Feb 1984 A
4439687 Wood Mar 1984 A
4439994 Briley Apr 1984 A
4448033 Briccetti May 1984 A
4450363 Russell May 1984 A
4455836 Binstock Jun 1984 A
4467609 Loomis Aug 1984 A
4467621 O'Brien Aug 1984 A
4475353 Lazare Oct 1984 A
4489562 Snyder Dec 1984 A
4489563 Kalina Dec 1984 A
4498289 Osgerby Feb 1985 A
4516403 Tanaka May 1985 A
4538960 Iino et al. Sep 1985 A
4549401 Spliethoff Oct 1985 A
4555905 Endou Dec 1985 A
4558228 Larjola Dec 1985 A
4573321 Knaebel Mar 1986 A
4578953 Krieger Apr 1986 A
4589255 Martens May 1986 A
4636578 Feinberg Jan 1987 A
4674297 Vobach Jun 1987 A
4694189 Haraguchi Sep 1987 A
4697981 Brown Oct 1987 A
4700543 Krieger Oct 1987 A
4730977 Haaser Mar 1988 A
4756162 Dayan Jul 1988 A
4765143 Crawford Aug 1988 A
4773212 Griffin Sep 1988 A
4798056 Franklin Jan 1989 A
4813242 Wicks Mar 1989 A
4821514 Schmidt Apr 1989 A
4867633 Gravelle Sep 1989 A
4892459 Guelich Jan 1990 A
4986071 Voss Jan 1991 A
4993483 Harris Feb 1991 A
5000003 Wicks Mar 1991 A
5050375 Dickinson Sep 1991 A
5083425 Hendriks et al. Jan 1992 A
5098194 Kuo et al. Mar 1992 A
5102295 Pope Apr 1992 A
5104284 Hustak, Jr. Apr 1992 A
5164020 Wagner Nov 1992 A
5176321 Doherty Jan 1993 A
5203159 Koizumi et al. Apr 1993 A
5228310 Vandenberg Jul 1993 A
5291960 Brandenburg Mar 1994 A
5320482 Palmer et al. Jun 1994 A
5335510 Rockenfeller Aug 1994 A
5358378 Holscher Oct 1994 A
5360057 Rockenfeller Nov 1994 A
5392606 Labinov Feb 1995 A
5440882 Kalina Aug 1995 A
5444972 Moore Aug 1995 A
5483797 Rigal Jan 1996 A
5488828 Brossard Feb 1996 A
5490386 Keller Feb 1996 A
5503222 Dunne Apr 1996 A
5531073 Bronicki Jul 1996 A
5538564 Kaschmitter Jul 1996 A
5542203 Luoma Aug 1996 A
5570578 Saujet Nov 1996 A
5588298 Kalina Dec 1996 A
5600967 Meckler Feb 1997 A
5634340 Grennan Jun 1997 A
5647221 Garris, Jr. Jul 1997 A
5649426 Kalina Jul 1997 A
5676382 Dahlheimer Oct 1997 A
5680753 Hollinger Oct 1997 A
5738164 Hildebrand Apr 1998 A
5754613 Hashiguchi May 1998 A
5771700 Cochran Jun 1998 A
5789822 Calistrat Aug 1998 A
5813215 Weisser Sep 1998 A
5833876 Schnur Nov 1998 A
5862666 Liu Jan 1999 A
5873260 Linhardt Feb 1999 A
5874039 Edelson Feb 1999 A
5894836 Wu Apr 1999 A
5899067 Hageman May 1999 A
5903060 Norton May 1999 A
5918460 Connell Jul 1999 A
5941238 Tracy Aug 1999 A
5943869 Cheng Aug 1999 A
5946931 Lomax Sep 1999 A
5973050 Johnson Oct 1999 A
6037683 Lulay Mar 2000 A
6041604 Nicodemus Mar 2000 A
6058930 Shingleton May 2000 A
6062815 Holt May 2000 A
6065280 Ranasinghe May 2000 A
6066797 Toyomura May 2000 A
6070405 Jerye Jun 2000 A
6082110 Rosenblatt Jul 2000 A
6105368 Hansen Aug 2000 A
6112547 Spauschus Sep 2000 A
6129507 Ganelin Oct 2000 A
6158237 Riffat Dec 2000 A
6164655 Bothien Dec 2000 A
6202782 Hatanaka Mar 2001 B1
6223846 Schechter May 2001 B1
6233938 Nicodemus May 2001 B1
6282900 Bell Sep 2001 B1
6282917 Mongan Sep 2001 B1
6295818 Ansley Oct 2001 B1
6299690 Mongeon Oct 2001 B1
6341781 Matz Jan 2002 B1
6374630 Jones Apr 2002 B1
6393851 Wightman May 2002 B1
6432320 Bonsignore Aug 2002 B1
6434955 Ng Aug 2002 B1
6442951 Maeda Sep 2002 B1
6446425 Lawlor Sep 2002 B1
6446465 Dubar Sep 2002 B1
6463730 Keller Oct 2002 B1
6484490 Olsen Nov 2002 B1
6539720 Rouse Apr 2003 B2
6539728 Korin Apr 2003 B2
6571548 Bronicki Jun 2003 B1
6581384 Benson Jun 2003 B1
6598397 Hanna Jul 2003 B2
6644062 Hays Nov 2003 B1
6657849 Andresakis Dec 2003 B1
6668554 Brown Dec 2003 B1
6684625 Kline Feb 2004 B2
6695974 Withers Feb 2004 B2
6715294 Anderson Apr 2004 B2
6734585 Tornquist May 2004 B2
6735948 Kalina May 2004 B1
6739142 Korin May 2004 B2
6751959 McClanahan et al. Jun 2004 B1
6769256 Kalina Aug 2004 B1
6799892 Leuthold Oct 2004 B2
6808179 Bhattacharyya Oct 2004 B1
6810335 Lysaght Oct 2004 B2
6817185 Coney Nov 2004 B2
6857268 Stinger Feb 2005 B2
6910334 Kalina Jun 2005 B2
6918254 Baker Jul 2005 B2
6921518 Johnston Jul 2005 B2
6941757 Kalina Sep 2005 B2
6960839 Zimron Nov 2005 B2
6960840 Willis Nov 2005 B2
6962054 Linney Nov 2005 B1
6964168 Pierson Nov 2005 B1
6968690 Kalina Nov 2005 B2
6986251 Radcliff Jan 2006 B2
7013205 Hafner et al. Mar 2006 B1
7021060 Kalina Apr 2006 B1
7022294 Johnston Apr 2006 B2
7033553 Johnston et al. Apr 2006 B2
7036315 Kang May 2006 B2
7041272 Keefer May 2006 B2
7047744 Robertson May 2006 B1
7048782 Couch May 2006 B1
7062913 Christensen Jun 2006 B2
7096665 Stinger Aug 2006 B2
7096679 Manole Aug 2006 B2
7124587 Linney Oct 2006 B1
7174715 Armitage Feb 2007 B2
7194863 Ganev Mar 2007 B2
7197876 Kalina Apr 2007 B1
7200996 Cogswell Apr 2007 B2
7234314 Wiggs Jun 2007 B1
7249588 Russell Jul 2007 B2
7278267 Yamada Oct 2007 B2
7279800 Bassett Oct 2007 B2
7287381 Pierson Oct 2007 B1
7305829 Mirolli Dec 2007 B2
7313926 Gurin Jan 2008 B2
7340894 Miyahara et al. Mar 2008 B2
7340897 Zimron Mar 2008 B2
7406830 Valentian Aug 2008 B2
7416137 Hagen et al. Aug 2008 B2
7453242 Ichinose Nov 2008 B2
7458217 Kalina Dec 2008 B2
7458218 Kalina Dec 2008 B2
7464551 Althaus et al. Dec 2008 B2
7469542 Kalina Dec 2008 B2
7516619 Pelletier Apr 2009 B2
7600394 Kalina Oct 2009 B2
7621133 Tomlinson Nov 2009 B2
7654354 Otterstrom Feb 2010 B1
7665291 Anand Feb 2010 B2
7665304 Sundel Feb 2010 B2
7685821 Kalina Mar 2010 B2
7730713 Nakano Jun 2010 B2
7735335 Uno Jun 2010 B2
7770376 Brostmeyer Aug 2010 B1
7775758 Legare Aug 2010 B2
7827791 Pierson Nov 2010 B2
7838470 Shaw Nov 2010 B2
7841179 Kalina Nov 2010 B2
7841306 Myers Nov 2010 B2
7854587 Ito Dec 2010 B2
7866157 Ernst Jan 2011 B2
7900450 Gurin Mar 2011 B2
7950230 Nishikawa May 2011 B2
7950243 Gurin May 2011 B2
7972529 Machado Jul 2011 B2
7997076 Ernst Aug 2011 B2
8096128 Held Jan 2012 B2
8099198 Gurin Jan 2012 B2
8146360 Myers Apr 2012 B2
8281593 Held Oct 2012 B2
8419936 Berger et al. Apr 2013 B2
20010015061 Viteri et al. Aug 2001 A1
20010020444 Johnston Sep 2001 A1
20010030952 Roy Oct 2001 A1
20020029558 Tamaro Mar 2002 A1
20020066270 Rouse et al. Jun 2002 A1
20020078696 Korin Jun 2002 A1
20020078697 Lifson Jun 2002 A1
20020082747 Kramer Jun 2002 A1
20030000213 Christensen Jan 2003 A1
20030061823 Alden Apr 2003 A1
20030154718 Nayar Aug 2003 A1
20030182946 Sami Oct 2003 A1
20030213246 Coll et al. Nov 2003 A1
20030221438 Rane et al. Dec 2003 A1
20040011038 Stinger Jan 2004 A1
20040011039 Stinger et al. Jan 2004 A1
20040020185 Brouillette et al. Feb 2004 A1
20040020206 Sullivan et al. Feb 2004 A1
20040021182 Green et al. Feb 2004 A1
20040035117 Rosen Feb 2004 A1
20040083731 Lasker May 2004 A1
20040083732 Hanna et al. May 2004 A1
20040088992 Brasz et al. May 2004 A1
20040097388 Brask et al. May 2004 A1
20040105980 Sudarshan et al. Jun 2004 A1
20040107700 McClanahan et al. Jun 2004 A1
20040159110 Janssen Aug 2004 A1
20040211182 Gould Oct 2004 A1
20050022963 Garrabrant et al. Feb 2005 A1
20050056001 Frutschi et al. Mar 2005 A1
20050096676 Gifford et al. May 2005 A1
20050109387 Marshall May 2005 A1
20050137777 Kolavennu et al. Jun 2005 A1
20050162018 Realmuto et al. Jul 2005 A1
20050167169 Gering et al. Aug 2005 A1
20050183421 Vaynberg et al. Aug 2005 A1
20050196676 Singh et al. Sep 2005 A1
20050198959 Schubert Sep 2005 A1
20050227187 Schilling Oct 2005 A1
20050252235 Critoph et al. Nov 2005 A1
20050257812 Wright et al. Nov 2005 A1
20060010868 Smith Jan 2006 A1
20060060333 Chordia et al. Mar 2006 A1
20060066113 Ebrahim et al. Mar 2006 A1
20060080960 Rajendran et al. Apr 2006 A1
20060112693 Sundel Jun 2006 A1
20060182680 Keefer et al. Aug 2006 A1
20060211871 Dai et al. Sep 2006 A1
20060213218 Uno et al. Sep 2006 A1
20060225421 Yamanaka et al. Oct 2006 A1
20060225459 Meyer Oct 2006 A1
20060249020 Tonkovich et al. Nov 2006 A1
20060254281 Badeer et al. Nov 2006 A1
20070001766 Ripley et al. Jan 2007 A1
20070017192 Bednarek et al. Jan 2007 A1
20070019708 Shiflett et al. Jan 2007 A1
20070027038 Kamimura et al. Feb 2007 A1
20070056290 Dahm Mar 2007 A1
20070089449 Gurin Apr 2007 A1
20070108200 McKinzie et al. May 2007 A1
20070119175 Ruggieri et al. May 2007 A1
20070130952 Copen Jun 2007 A1
20070151244 Gurin Jul 2007 A1
20070161095 Gurin Jul 2007 A1
20070163261 Strathman Jul 2007 A1
20070195152 Kawai et al. Aug 2007 A1
20070204620 Pronske et al. Sep 2007 A1
20070227472 Takeuchi et al. Oct 2007 A1
20070234722 Kalina Oct 2007 A1
20070245733 Pierson et al. Oct 2007 A1
20070246206 Gong et al. Oct 2007 A1
20080000225 Kalina Jan 2008 A1
20080006040 Peterson et al. Jan 2008 A1
20080010967 Griffin et al. Jan 2008 A1
20080023666 Gurin Jan 2008 A1
20080053095 Kalina Mar 2008 A1
20080066470 MacKnight Mar 2008 A1
20080135253 Vinegar et al. Jun 2008 A1
20080163625 O'Brien Jul 2008 A1
20080173450 Goldberg et al. Jul 2008 A1
20080211230 Gurin Sep 2008 A1
20080250789 Myers et al. Oct 2008 A1
20080252078 Myers Oct 2008 A1
20090021251 Simon Jan 2009 A1
20090085709 Meinke Apr 2009 A1
20090107144 Moghtaderi et al. Apr 2009 A1
20090139234 Gurin Jun 2009 A1
20090139781 Straubel Jun 2009 A1
20090173337 Tamaura et al. Jul 2009 A1
20090173486 Copeland Jul 2009 A1
20090180903 Martin et al. Jul 2009 A1
20090205892 Jensen Aug 2009 A1
20090211251 Petersen et al. Aug 2009 A1
20090211253 Radcliff et al. Aug 2009 A1
20090266075 Westmeier et al. Oct 2009 A1
20090293503 Vandor Dec 2009 A1
20100024421 Litwin Feb 2010 A1
20100077792 Gurin Apr 2010 A1
20100083662 Kalina Apr 2010 A1
20100102008 Hedberg Apr 2010 A1
20100122533 Kalina May 2010 A1
20100146949 Stobart Jun 2010 A1
20100146973 Kalina Jun 2010 A1
20100156112 Held Jun 2010 A1
20100162721 Welch Jul 2010 A1
20100205962 Kalina Aug 2010 A1
20100218513 Vaisman Sep 2010 A1
20100218930 Proeschel Sep 2010 A1
20100263380 Biederman et al. Oct 2010 A1
20100287934 Glynn et al. Nov 2010 A1
20100300093 Doty Dec 2010 A1
20100326076 Ast Dec 2010 A1
20110027064 Pal et al. Feb 2011 A1
20110030404 Gurin Feb 2011 A1
20110048012 Ernst Mar 2011 A1
20110061384 Held et al. Mar 2011 A1
20110061387 Held et al. Mar 2011 A1
20110088399 Briesch Apr 2011 A1
20110179799 Allam Jul 2011 A1
20110185729 Held Aug 2011 A1
20110192163 Kasuya Aug 2011 A1
20110203278 Kopecek et al. Aug 2011 A1
20110259010 Bronicki et al. Oct 2011 A1
20110299972 Morris et al. Dec 2011 A1
20110308253 Ritter Dec 2011 A1
20120047892 Held et al. Mar 2012 A1
20120067055 Held Mar 2012 A1
20120128463 Held May 2012 A1
20120131918 Held May 2012 A1
20120131919 Held May 2012 A1
20120131920 Held May 2012 A1
20120131921 Held May 2012 A1
20120159922 Gurin Jun 2012 A1
20120159956 Gurin Jun 2012 A1
20120174558 Gurin Jul 2012 A1
20120186219 Gurin Jul 2012 A1
20120247134 Gurin Oct 2012 A1
20120247455 Gurin Oct 2012 A1
20120261090 Durmaz et al. Oct 2012 A1
20130019597 Kalina Jan 2013 A1
20130033037 Held et al. Feb 2013 A1
20130036736 Hart et al. Feb 2013 A1
20130113221 Held May 2013 A1
Foreign Referenced Citations (91)
Number Date Country
2794150 Nov 2011 CA
1165238 Nov 1997 CN
1432102 Jul 2003 CN
101614139 Dec 2009 CN
202055876 Nov 2011 CN
202544943 Nov 2012 CN
202718721 Feb 2013 CN
2632777 Feb 1977 DE
19906087 Aug 2000 DE
10052993 May 2002 DE
1977174 Oct 2008 EP
1998013 Dec 2008 EP
2419621 Feb 2012 EP
2446122 May 2012 EP
2478201 Jul 2012 EP
2500530 Sep 2012 EP
2550436 Jan 2013 EP
856985 Dec 1960 GB
2010974 Jul 1979 GB
2075608 Nov 1981 GB
58-193051 Nov 1983 JP
60-040707 Mar 1985 JP
61-152914 Jul 1986 JP
01-240705 Sep 1989 JP
05-321612 Dec 1993 JP
06-331225 Nov 1994 JP
08-028805 Feb 1996 JP
09-100702 Apr 1997 JP
2641581 May 1997 JP
09-209716 Aug 1997 JP
2858750 Dec 1998 JP
H11-270352 May 1999 JP
2000-257407 Sep 2000 JP
2001-193419 Jul 2001 JP
2002-097965 Apr 2002 JP
2003-529715 Oct 2003 JP
2004-239250 Aug 2004 JP
2004-332626 Nov 2004 JP
2005-030727 Feb 2005 JP
2005-533972 Nov 2005 JP
2006-037760 Feb 2006 JP
2006-177266 Jul 2006 JP
2007-198200 Sep 2007 JP
4343738 Oct 2009 JP
2011-017268 Jan 2011 JP
10-0191080 Jun 1999 KR
10-20070086244 Aug 2007 KR
10-0766101 Oct 2007 KR
10-0844634 Jul 2008 KR
10-20100067927 Jun 2010 KR
10-20110018769 Feb 2011 KR
1069914 Sep 2011 KR
1103549 Jan 2012 KR
10-20120058582 Jun 2012 KR
2012-0068670 Jun 2012 KR
2012-0128753 Nov 2012 KR
2012-0128755 Nov 2012 KR
91-005145 Apr 1991 WO
96-009500 Mar 1996 WO
00-71944 Nov 2000 WO
01-44658 Jun 2001 WO
2006-060253 Jun 2006 WO
2006-137957 Dec 2006 WO
2007-056241 May 2007 WO
2007-079245 Jul 2007 WO
2007-082103 Jul 2007 WO
2007-112090 Oct 2007 WO
2008-039725 Apr 2008 WO
2008-101711 Aug 2008 WO
2009-045196 Apr 2009 WO
2009-058992 May 2009 WO
2010-074173 Jul 2010 WO
2010-083198 Jul 2010 WO
2010-121255 Oct 2010 WO
2010-126980 Nov 2010 WO
2010-151560 Dec 2010 WO
2011-017450 Feb 2011 WO
2011-017476 Feb 2011 WO
2011-017599 Feb 2011 WO
2011-034984 Mar 2011 WO
2011-094294 Aug 2011 WO
2011-119650 Sep 2011 WO
2012-074905 Jun 2012 WO
2012-074907 Jun 2012 WO
2012-074911 Jun 2012 WO
2012-074940 Jun 2012 WO
2013-055391 Apr 2013 WO
2013-059687 Apr 2013 WO
2013-059695 Apr 2013 WO
2013-070249 May 2013 WO
2013-074907 May 2013 WO
Non-Patent Literature Citations (89)
Entry
PCT/US2010/044681—International Search Report and Written Opinion dated Oct. 7, 2010, 10 pages.
PCT/US2010/044681—International Preliminary Report on Patentability dated Feb. 16, 2012, 9 pages.
PCT/US2010/049042—International Search Report and Written Opinion dated Nov. 17, 2010, 11 pages.
PCT/US2010/049042—International Preliminary Report on Patentability dated Mar. 29, 2012, 18 pages.
PCT/US2011/029486—International Preliminary Report on Patentability dated Sep. 25, 2012, 6 pages.
PCT/US2011/029486—International Search Report and Written Opinion dated Nov. 16, 2011, 9 pages.
PCT/US2011/062266—International Search Report and Written Opinion dated Jul. 9, 2012, 12 pages.
PCT/US2011/062198—International Search Report and Written Opinion dated Jul. 2, 2012, 9 pages.
PCT/US2011/062198—Extended European Search Report dated May 6, 2014, 9 pages.
PCT/US2011/062201—International Search Report and Written Opinion dated Jun. 26, 2012, 9 pages.
PCT/US2011/062201—Extended European Search Report dated May 28, 2014, 8 pages.
PCT/US2011/062204—International Search Report dated Nov. 1, 2012, 10 pages.
PCT/US2011/62207—International Search Report and Written Opinion dated Jun. 28, 2012, 7 pages.
PCT/US2012/000470—International Search Report dated Mar. 8, 2013, 10 pages.
PCT/US2012/061151—International Search Report and Written Opinion dated Feb. 25, 2013, 9 pages.
PCT/US2012/061159—International Search Report dated Mar. 2, 2013, 10 pages.
PCT/US2013/055547—Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration dated Jan. 24, 2014, 11 pages.
PCT/US2013/064470—Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration dated Jan. 22, 2014, 10 pages.
PCT/US2013/064471—Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration dated Jan. 24, 2014, 10 pages.
PCT/US2014/013154—International Search Report dated May 23, 2014, 4 pages.
PCT/US2014/013170—Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration, dated May 9, 2014, 12 pages.
PCT/US2014/023026—Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration dated Jul. 22, 2014, 11 pages.
PCT/US2014/023990—Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration dated Jul. 17, 2014, 10 pages.
PCT/US2014/026173—Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration dated Jul. 9, 2014, 10 pages.
Persichilli, Michael, et al., “Supercritical CO2 Power Cycle Developments and Commercialization: Why SCO2 can Displace Steam”, Echogen Power Systems, LLC, Power-Gen India & Central Asia 2012, Apr. 19-21, 2012, New Delhi, India, 15 pages.
Renz, Manfred, “The New Generation Kalina Cycle”, Contribution to the Conference: Electricity Generation from Enhanced Geothermal Systems, Sep. 14, 2006, Strasbourg, France, 18 pages.
Saari, Henry, et al., “Supercritical CO2 Advanced Brayton Cycle Design”, Presentation, Carleton University, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 21 pages.
San Andres, Luis, “Start-Up Response of Fluid Film Lubricated Cryogenic Turbopumps (Preprint)”, AIAA/ASME/SAE/ASEE Joint Propulsion Conference, Cincinnati, OH, Jul. 8-11, 2007, 38 pages.
Sarkar, J. and Bhattacharyya, Souvik, “Optimization of Recompression S-CO2 Power Cycle with Reheating”, Energy Conversion and Management 50, May 17, 2009, pp. 1939-1945.
Thorin, Eva, “Power Cycles with Ammonia-Water Mixtures as Working Fluid”, Doctoral Thesis, Department of Chemical Engineering and Technology Energy Processes, Royal Institute of Technology, Stockholm, Sweden, 2000, 66 pages.
Tom, Samsun Kwok Sun, “The Feasibility of Using Supercritical Carbon Dioxide as a Coolant for the Candu Reactor”, The University of British Columbia, Jan. 1978, 156 pages.
VGB Powertech Service GMBH, “CO2 Capture and Storage”, A VGB Report on the State of the Art, Aug. 25, 2004, 112 pages.
Vidhi, Rachana, et al., “Study of Supercritical Carbon Dioxide Power Cycle for Power Conversion from Low Grade Heat Sources”, Presentation, University of South Florida and Oak Ridge National Laboratory, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 17 pages.
Vidhi, Rachana, et al., “Study of Supercritical Carbon Dioxide Power Cycle for Power Conversion from Low Grade Heat Sources”, Paper, University of South Florida and Oak Ridge National Laboratory, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 8 pages.
Wright, Steven A., et al., “Modeling and Experimental Results for Condensing Supercritical CO2 Power Cycles”, Sandia Report, Jan. 2011, 47 pages.
Wright, Steven A., et al., “Supercritical CO2 Power Cycle Development Summary at Sandia National Laboratories”, May 24-25, 2011, 1 page (Abstract Only).
Wright, Steven, “Mighty Mite”, Mechanical Engineering, Jan. 2012, pp. 41-43.
Yoon, Ho Joon, et al., “Preliminary Results of Optimal Pressure Ratio for Supercritical CO2 Brayton Cycle Coupled with Small Modular Water Cooled Reactor”, Presentation, Korea Advanced Institute of Science and Technology and Khalifa University of Science, Technology and Research, Boulder, CO, May 25, 2011, 18 pages.
Yoon, Ho Joon, et al., “Preliminary Results of Optimal Pressure Ratio for Supercritical CO2 Brayton Cycle Coupled with Small Modular Water Cooled Reactor”, Paper, Korea Advanced Institute of Science and Technology and Khalifa University of Science, Technology and Research, May 24-25, 2011, Boulder, CO, 7 pages.
Alpy, N., et al., “French Atomic Energy Commission views as regards to SCO2 Cycle Development priorities and related R&D approach”, Presentation, Symposium on SCO2 Power Cycles, Apr. 29-30, 2009, Troy, NY, 20 pages.
Angelino, G. and Invernizzi, C.M., “Carbon Dioxide Power Cycles using Liquid Natural Gas as Heat Sink”, Applied Thermal Engineering, Mar. 3, 2009, 43 pages.
Bryant, John C., Saari, Henry, and Zanganeh, Kourosh, “An Analysis and Comparison of the Simple and Recompression Supercritical CO2 Cycles”, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 8 pages.
Chapman, Daniel J., Arias, Diego A., “An Assessment of the Supercritical Carbon Dioxide Cycle for Use in a Solar Parabolic Trough Power Plant”, Presentation, Abengoa Solar, Apr. 29-30, 2009, Troy, NY, 20 pages.
Chapman, Daniel J., Arias, Diego A., “An Assessment of the Supercritical Carbon Dioxide Cycle for Use in a Solar Parabolic Trough Power Plant”, Paper, Abengoa Solar, Apr. 29-30, 2009, Troy, NY, 5 pages.
Chen, Yang, Lundqvist, P., Johansson, A., Platell, P., “A Comparative Study of the Carbon Dioxide Transcritical Power Cycle Compared with an Organic Rankine Cycle with R123 as Working Fluid in Waste Heat Recovery”, Science Direct, Applied Thermal Engineering, Jun. 12, 2006, 6 pages.
Chen, Yang, “Thermodynamic Cycles Using Carbon Dioxide as Working Fluid”, Doctoral Thesis, School of Industrial Engineering and Management, Stockholm, Oct. 2011, 150 pages (3 parts).
Chinese Search Report for Application No. 201080035382.1, 2 pages.
Chinese Search Report for Application No. 201080050795.7, 2 pages.
Chordia, Lalit, “Optimizing Equipment for Supercritical Applications”, Thar Energy LLC, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 7 pages.
Combs, Osie V., “An Investigation of the Supercritical CO2 Cycle (Feher cycle) for Shipboard Application”, Massachusetts Institute of Technology, May 1977, 290 pages.
Di Bella, Francis A., “A Gas Turbine Engine Exhaust Waste Heat Recovery Navy Shipboard Module Development”, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 8 pages.
Dostal, V., et al., “A Supercritical Carbon Dioxide Cycle for Next Generation Nuclear Reactors”, Mar. 10, 2004, 326 pages. (7 parts).
Dostal, Vaclav and Kulhanek, Martin, “Research on the Supercritical Carbon Dioxide Cycles in the Czech Republic”, Czech Technical University in Prague, Symposium on SCO2 Power Cycles, Apr. 29-30, Troy, NY, 8 pages.
Dostal, Vaclav, and Dostal, Jan, “Supercritical CO2 Regeneration Bypass Cycle—Comparison to Traditional Layouts”, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 5 pages.
Eisemann, Kevin, and Fuller, Robert L., “Supercritical CO2 Brayton Cycle Design and System Start-up Options”, Barber Nichols, Inc., Paper, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 7 pages.
Eisemann, Kevin, and Fuller, Robert L., “Supercritical CO2 Brayton Cycle Design and System Start-up Options”, Presentation, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 11 pages.
Feher, E.G., et al. “Investigation of Supercritical (Feher) Cycle”, Astropower Laboratory, Missile & Space Systems . Division, Oct. 1968, 152 pages.
Fuller, Robert L. and Eisemann, Kevin, “Centrifugal Compressor Off-Design Performance for Super-Critical CO2”, Barber Nichols, Inc. Presentation, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 20 pages.
Fuller, Robert L. and Eisemann, Kevin, “Centrifugal Compressor Off-Design Performance for Super-Critical CO2”, Paper, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 12 pages.
Gokhstein, D.P. and Verkhivker, G.P., “Use of Carbon Dioxide as a Heat Carrier and Working Substance in Atomic Power Stations”, Soviet Atomic Energy, Apr. 1969, vol. 26, Issue 4, pp. 430-432.
Gokhstein, D.P., Taubman, E.I., Konyaeva, G.P., “Thermodynamic Cycles of Carbon Dioxide Plant with an Additional Turbine After the Regenerator”, Energy Citations Database, Mar. 1973, 1 page, Abstract only.
Hejzlar, P., et al., “Assessment of Gas Cooled Gas Reactor with Indirect Supercritical CO2 Cycle”, Massachusetts Institute of Technology, Jan. 2006, 10 pages.
Hoffman, John R. and Feher, E.G., “150 kwe Supercritical Closed Cycle System”, Transactions of the ASME, Jan. 1971, pp. 70-80.
Jeong, Woo Seok, et al., “Performance of S-CO2 Brayton Cycle with Additive Gases for SFR Application”, Korea Advanced Institute of Science and Technology, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 5 pages.
Johnson, Gregory A. & McDowell, Michael, “Issues Associated with Coupling Supercritical CO2 Power Cycles to Nuclear, Solar and Fossil Fuel Heat Sources”, Hamilton Sundstrand, Energy Space & Defense-Rocketdyne, Apr. 29-30, 2009, Troy, NY, Presentation, 18 pages.
Kawakubo, Tomoki, “Unsteady Roto-Stator Interaction of a Radial-Inflow Turbine with Variable Nozzle Vanes”, ASME Turbo Expo 2010: Power for Land, Sea, and Air; vol. 7: Turbomachinery, Parts A, B, and C; Glasgow, UK, Jun. 14-18, 2010, Paper No. GT2010-23677, pp. 2075-2084, 1 page, (Abstract only).
Kulhanek, Martin, “Thermodynamic Analysis and Comparison of S-CO2 Cycles”, Presentation, Czech Technical University in Prague, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 14 pages.
Kulhanek, Martin, “Thermodynamic Analysis and Comparison of S-CO2 Cycles”, Paper, Czech Technical University in Prague, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 7 pages.
Kulhanek, Martin and Dostal, Vaclav, “Supercritical Carbon Dioxide Cycles Thermodynamic Analysis and Comparison”, Abstract, Faculty Conference held in Prague, Mar. 24, 2009, 13 pages.
Ma, Zhiwen and Turchi, Craig S., “Advanced Supercritical Carbon Dioxide Power Cycle Configurations for Use in Concentrating Solar Power Systems”, National Renewable Energy Laboratory, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 4 pages.
Moisseytsev, Anton and Sienicki, Jim, “Investigation of Alternative Layouts for the Supercritical Carbon Dioxide Brayton Cycle for a Sodium-Cooled Fast Reactor”, Supercritical CO2 Power Cycle Symposium, Troy, NY, Apr. 29, 2009, 26 pages.
Munoz De Escalona, Jose M., “The Potential of the Supercritical Carbon Dioxide Cycle in High Temperature Fuel Cell Hybrid Systems”, Paper, Thermal Power Group, University of Seville, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 6 pages.
Munoz De Escalona, Jose M., et al., “The Potential of the Supercritical Carbon Dioxide Cycle in High Temperature Fuel Cell Hybrid Systems”, Presentation, Thermal Power Group, University of Seville, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 19 pages.
Muto, Y., et al., “Application of Supercritical CO2 Gas Turbine for the Fossil Fired Thermal Plant”, Journal of Energy and Power Engineering, Sep. 30, 2010, vol. 4, No. 9, 9 pages.
Muto, Yasushi and Kato, Yasuyoshi, “Optimal Cycle Scheme of Direct Cycle Supercritical CO2 Gas Turbine for Nuclear Power Generation Systems”, International Conference on Power Engineering-2007, Oct. 23-27, 2007, Hangzhou, China, pp. 86-87.
Noriega, Bahamonde J.S., “Design Method for S-CO2 Gas Turbine Power Plants”, Master of Science Thesis Delft University of Technology, Oct. 2012, 122 pages, (3 parts).
Oh, Chang, et al., “Development of a Supercritical Carbon Dioxide Brayton Cycle: Improving PBR Efficiency and Testing Material Compatibility”, Presentation, Nuclear Energy Research Initiative Report, Oct. 2004, 38 pages.
Oh, Chang, et al., “Development of a Supercritical Carbon Dioxide Brayton Cycle: Improving VHTR Efficiency and Testing Material Compatibility”, Presentation, Nuclear Energy Research Initiative Report, Final Report, Mar. 2006, 97 pages.
Parma, Ed, et al., “Supercritical CO2 Direct Cycle Gas Fast Reactor (SC-GFR) Concept”, Presentation for Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 40 pages.
Parma, Ed, et al., “Supercritical CO2 Direct Cycle Gas Fast Reactor (SC-GFR) Concept”, Supercritical CO2 Power Cycle Symposium, May 24-25, 2011, Boulder, CO, 9 pages.
Parma, Edward J., et al., “Supercritical CO2 Direct Cycle Gas Fast Reactor (SC-GFR) Concept”, Presentation, Sandia National Laboratories, May 2011, 55 pages.
PCT/US2006/049623—Written Opinion of ISA dated Jan. 4, 2008, 4 pages.
PCT/US2007/001120—International Search Report dated Apr. 25, 2008, 7 pages.
PCT/US2007/079318—International Preliminary Report on Patentability dated Jul. 7, 2008, 5 pages.
PCT/US2010/0131614—International Search Report dated Jul. 12, 2010, 3 pages.
PCT/US2010/031614—International Preliminary Report on Patentability dated Oct. 27, 2011, 9 pages.
PCT/US2010/039559—International Preliminary Report on Patentability dated Jan. 12, 2012, 7 pages.
PCT/US2010/039559—Notification of Transmittal of the International Search Report and the Written Opinion of the International Searching Authority, or the Declaration dated Sep. 1, 2010, 6 pages.
PCT/US2010/044476—International Search Report dated Sep. 29, 2010, 23 pages.
Related Publications (1)
Number Date Country
20140096524 A1 Apr 2014 US
Provisional Applications (1)
Number Date Country
61243200 Sep 2009 US
Continuations (1)
Number Date Country
Parent 13278705 Oct 2011 US
Child 14102628 US
Continuation in Parts (1)
Number Date Country
Parent 12631379 Dec 2009 US
Child 13278705 US