This application claims the priority of Korean Patent Application No. 10-2008-0096912, filed on Oct. 2, 2008, in the Korean Intellectual Property Office, the disclosure of which is incorporated herein by reference.
1. Field of the Invention
The present invention relates to a hybrid heating furnace system for hot stamping, in which a high-frequency heating furnace is combined with an electric furnace (or a gas furnace).
2. Description of the Related Art
In vehicle manufacturing fields, there has been a focus on a decrease in weight and an increase in strength. Recently, hot stamping technology has been located at the center of this focus. The hot stamping technology was proposed by Norrbottens Jarnverk AB in Sweden in the early 1970s. In GB Patent No. 1490535 issued to this company, the hot stamping technology is disclosed in detail.
Referring to
This hot stamping technology has advantages in that it simultaneously carries out formation and heat treatment to thereby provide excellent productivity, in that it forms a steel plate at high temperature to thereby improve formability and dimensional precision, and in that it remarkably reduces spring-back or delayed fracture that becomes an issue, particularly, in high-strength parts. In contrast, the hot stamping technology has disadvantages in that it cannot avoid surface oxidation of the steel plate due to a high-temperature process, and that it must perform a separate descaling process 30 on formed products as illustrated in
Meanwhile, in terms of application of the hot stamping technology, heating furnaces that have mainly been used for a long time are electric furnaces. The steel plate for the hot stamping must be completely austenitized by heating at a temperature between 880° C. and 950° C. above Ac3. For the austenitization, the steel plate, being 1.2 mm thick, requires between 12 minutes and 17 minutes when the electric furnace is used. In this manner, the heating furnaces such as electric furnaces or gas furnaces increase heating time, and thus cause a decrease in process speed and an increase in production cost. Furthermore, the heating furnaces have a considerable length ranging from 23 m to 30 m, and thus have no choice but to have a huge volume. These large facilities increase various expenses.
Currently, high-frequency induction heating is used for local strengthening of body parts such as center pillars. This high-frequency induction heating can heat the steel plate to a temperature of 1000° C. or more within several seconds. As such, in the case where high-frequency induction heating is applied to hot stamping technology, this can make the heating furnaces small, and reduce heating time and cost of the steel plate. However, in the case of the heating furnace based on the high-frequency induction heating (hereinafter, referred to as “high-frequency furnace”), the heating furnace has a problem of a sharp increase in temperature or deformation during transferring the steel plate. For this reason, the heating furnace has been merely used for heat treatment of somewhat thick parts rather than thin parts.
An aspect of the present invention is to provide a hybrid heating furnace system for hot stamping, in which a high-frequency heating furnace is combined with an electric furnace (or a gas furnace) in order to make facilities small and improve productivity.
According to an aspect of the present invention, there is provided a heating furnace system for hot stamping, including a steel plate feed section; a first heating furnace having a plurality of pairs of upper and lower rolls arranged in a lengthwise direction thereof in order to transfer a steel plate, and high-frequency coils alternately arranged with the pairs of upper and lower rolls in the lengthwise direction thereof; a second heating furnace continuously transferring the steel plate from the first heating furnace during heating the steel plate at temperature of Ac3 or more, and having a plurality of transfer rollers arranged in a lengthwise direction thereof; and a discharge section discharging the steel plate from the second heating furnace.
Here, the first heating furnace may include at least two heating zones having different target temperatures. Each heating zone may have high-frequency coils connected to a separate inverter.
Further, the high-frequency coils maybe each installed between the upper rolls adjacent to each other and between the lower rolls adjacent to each other.
The pairs of upper and lower rolls may be hollow, and be made of ceramic material.
Further, the pairs of upper and lower rolls may have extensions inserted into opposite ends thereof in order to lengthen the rolls and to make connection to drives, and yarns wound on outer circumferences of the rolls into which the extensions are inserted. The yarns may be impregnated with resin.
The discharge section may include rotation rolls installed for introducing the steel plate, and stoppers installed upwards between the rotation rolls adjacent to each other in order to fix a position of the introduced steel plate.
According to an aspect of the present invention, there is provided a heating furnace system for hot stamping, including: a steel plate feed section; a first heating furnace having at least two heating zones with different target temperatures, each heating zone having high-frequency coils connected to a separate inverter; a second heating furnace at least having heating sections and a standby section, heating a steel plate transferred from the first heating furnace at temperature of Ac3 or more in the heating sections, and controlling a transferring speed of the steel plate in the standby section independently of that in the heating section; and a discharge section discharging the steel plate from the second heating furnace.
Here, the first heating furnace may include a plurality of pairs of upper and lower rolls arranged in a lengthwise direction thereof in order to transfer the steel plate, and the high-frequency coils alternately installed with the pairs of upper and lower rolls in the lengthwise direction thereof.
Further, the standby section may include position and temperature detection sensors for the steel plate.
Further, the transferring speed of the steel plate before the steel plate is discharged from the standby section maybe equal to those in the heating sections. The transferring speed of the steel plate may be increased when the steel plate completely enters the standby section and is discharged from the standby section.
The transferring speed of the steel plate after the steel plate is discharged from the standby section may be gradually reduced to be equal to those in the heating sections.
The second heating furnace may include one of an electric furnace and a gas furnace.
According to embodiments of the present invention, the heating furnace system for hot stamping can reduce space required for facilities by 50% or more compared to the related art, fuel cost due to a decrease in the length of an electric furnace, and the unit cost of a hot stamped part.
Further, the heating furnace system can not only properly adjust outputs of inverters in the first heating furnace to gradually increase temperature of a steel plate, but can also prevent deformation caused by sharp heating of the steel plate due to use of a plurality of pairs of upper and lower rolls, and minimize deformation during the transfer of the steel plate.
In addition, high-frequency coils are alternately installed with pairs of upper and lower rolls, so that they can perform direct induction heating on the steel plate. During high-frequency heating, it is possible to minimize a high-frequency influence on other parts than the steel plate.
The above and other objects, features and advantages of the present invention will become more apparent to those of ordinary skill in the art by describing in detail exemplary embodiments thereof with reference to the attached drawings in which:
A heating furnace system for hot stamping according to an exemplary embodiment of the present invention will be described below with reference to the accompanying drawings.
Referring to
The heating furnace system includes a steel plate feed section 100, heating furnaces 200 and 300, and a discharge section 400. The heating furnaces 200 and 300 are sorted into a first heating furnace 200 and a second heating furnace 300.
As illustrated in
As illustrated in
Meanwhile, in the first heating furnace 200, a plurality of pairs of upper and lower rolls 210 for transferring the steel plate are arranged in a lengthwise direction of the first heating furnace, and the high-frequency coils 220 are alternately arranged with the pairs of upper and lower rolls 210 in the lengthwise direction of the first heating furnace. Referring to
The speed at which the steel plated is transferred at the first heating furnace 200 is adjusted within a range from 70 mm/sec to 90 mm/sec. Referring to
The upper and lower rolls 210 are made of a hollow ceramic material for the insulating characteristic. As illustrated in
The second heating furnace 300 includes an electric furnace or a gas furnace for heating the steel plate transferred from the first heating furnace 200 at temperature of Ac3 or more (about 950° C. or more). As illustrated in
As illustrated in
The transferring speed of the steel plate in the heating section 300a is equal to that in the soaking section 300b. The transferring speed of the steel plate in the standby section 300b is also equal to those in the heating and soaking sections 300a and 300b until the steel plate is discharged. When the steel plate completely enters the standby section 300c and then is discharged (i.e. when it is determined on the basis of measured values of the position and temperature detection sensors that the steel plated can be discharged from the standby section, and thus the steel plate is actually discharged), the transferring speed of the steel plate is set so as to be increased. This is because, in the case where the steel plate is placed in the standby section 300c at a leading end thereof, and in the soaking section 300b at a trailing end thereof, and if the center of gravity of the steel plate is located at the trailing end of the steel plate, the transferring speed of the steel plate is dependent on the rotating speed of the transfer rollers of the soaking section 300b, although the rotating speed of the transfer rollers of the standby section 300c is increased. Further, in the case where the increased rotating speed of the transfer rollers 310 is sharply reduced, the transfer rollers 310 are overloaded to have a possibility of flexure or damage. As such, after the steel plate is discharged from the standby section 300c, the transferring speed thereof is set in such a manner that it is gradually reduced to be equal to those for the heating and soaking sections 300a and 300b. The temperature of the steel plate is sharply lowered for several seconds until the steel plate comes out of the standby section 300c and then is formed by the press 600. The second heating furnace 300 may be supplied with an atmosphere gas in order to prevent oxidation of the steel plate.
Referring to
As illustrated in
While the present invention has been shown and described in connection with the exemplary embodiment, it will be apparent to those skilled in the art that modifications and variations can be made without departing from the spirit and scope of the invention as defined by the appended claims.