This invention generally relates to the helical segmental lining mainly in the tunnel industry and its variations along with other related applications.
The tunneling industry has been waiting for a reliable continuous Tunnel Boring Machine (TBM) mining system for decades. In typical/conventional soft ground tunneling using a shield machine, forward movement is stopped for installation of the segmental lining. This means that the advance cycle is the sum of excavation and segment installation, which often take equal amount of time. In rock tunneling, use of double-shield TBMs are on the rise due to the advantages they offer, mainly one pass tunneling where the final lining is installed. Since the excavation and segment installation is simultaneous for double shield TBM, the advance cycle is determined by the longer of either excavation or segment erection process. Often in medium to soft rock conditions, segment erection takes more time, thus adding to the time requirement for each advance cycle. Meanwhile, when grippers of a Double shield TBM cannot operate, machine works by locking the front and tail shield and operates as in single shield, thus the work cycle of single shield and same timing issues apply.
The proposed method in this invention which involves a system of helical segments that is installed continuously as the TBM thrusts forward, all the aforementioned concerns are addressed. The Helical segment system allows for uninterrupted segment erection as the machine continues to excavate. Nearly all the TBM's thrust cylinders are utilized in pushing against the segments, with the exception for those that would push against a single segment that is being erected at any given time. This is expected to increase tunneling speed significantly, with the possibility to reach up to twice the daily advance rates in certain settings.
The Helical segmental lining is an invention in tunneling industry wherein segments are designed in helical shape that are connected by interlocking system. The proposed helical tunnel lining method allows for segment erection and excavation to be completed concurrently and continuously by Tunnel Boring Machine (TBM) which will result in increasing the tunneling speed. The segments have tongue projection on the two trailing sides (circumferential and radial) and similar groove recess in the opposite two leading sides. This forms a tongue-and-groove joint at both circumferential and radial joints. The system allows for optional post-tensioning (PT) strand to be inserted into the leading circumferential side of the segments. The optional PT strand is fitted into a continuous groove located at the leading circumferential side of the segments. The system has solutions for the alignment curves and turning of the helical segmental lining, sealing of the system as well as terminating the strand and beginning another due to limitation of the strand length. The method is eliminating bolt connection between segments and increase tunnel advancement rate. The system allows for using typical (identical) segments.
a. A view of one course of the Helical segmental lining
a. Sealing gasket extension on the groove corner at radia side
c. Examples of Gasket grooves on Tongue and Groove
d. Gasket on groove option
a. Embedded ducts inside Helical segment for Strand
b. Coupler recess provision for strand
a. TBM thrust cylinder shoe pushing on Tongue or Groove
a. Example of Sub-rectangular section helical tunnel example
Similarly, each helical lining can be comprising 5.5, 6.5, 7.5, 8.5, 4.5 or such nos. of typical helical segments 100 at one course as most common sequences, or 5.25, 5.75, 6.25, 6.75, 5.10, 5.20, 5.30 or any nos. of helical segments 100 as other possible sequences for each course.
The Helical segments 100 are generally typical and identical in size and shape (However different size of the segments can be utilized as well, if necessary). A typical helical segment 100 can be manufactured or precast from several materials including but not limited to any type of concrete (fiber concrete, reinforced concrete, polymer concrete and etc.), combisegment, metal (mainly steel), wood, GFRP etc. and it is comprising 6 sides (or faces) including segment Outer surface 102 always with a cylindrical surface, segment inner surface 104 usually with a cylindrical surface, the Leading circumferential side of Segment 160 which is a helix curve parallel to the Trailing circumferential side of the segment 162. The Leading Radial side of segment 164 which can be straight or polyline (combination of lines and curves) parallel to the Trailing Radial side of segment 166. (See
The helical segment 100 has projections called tongue 106 on the Trailing circumferential side of segment 162 and tongue 116 at the Trailing Radial side of segment 166, and recesses called groove 107 on the Leading circumferential side of Segment 160 and groove 117 the Leading Radial side of segment 164. (See
These joints interlock naturally and no other connection is required, however this system provides the option to insert a strand 110 if necessary. The strand 110 can be added into a continuous strand groove 150 located at the Leading circumferential side of the segment 160 as shown in
Alternatively, strand 110 can be inserted into the embedding duct (sheath) 250 within the segments body instead of inserting into the leading circumferential side 160 of the segments. The duct will be parallel to the circumferential sides 160/162 and will cross the length of the segment 100 between radial sides 164 and 166. (see
Generally the Tongue 106 of the trailing circumferential side 162 of the helical segment 100 is comprising Tongue front side 190, Tongue outer rear side 191, Tongue inner rear side 192, Tongue outer projection side 193 and Tongue inner projection side 194 and the Groove 107 of leading circumferential side 160 of the helical segment 100 is comprising Groove rear side 195, Groove outer front side 196, Groove inner front side 197, Groove outer recess side 198, Groove inner recess side 199. (see
The helical segment corner angle 108 can be equal to (90 degree minus helix angle), or 90 degree as common helical segment corner angles 108 or other chosen angle at typical helical segment 100.
Numbers of Lift sockets 152 on the helical segment 100 can be either one or two or more depending on size and weight of the segment 100 which is used by segment erector or feeder for lifting and installation of the helical segment 100. By using a powerful vacuum lifting erector, the lift socket 152 may be eliminated.
As an option, the front or rear sides of the tongues (190-192 and 200-202) of the helical segment 100 may be rounded and matching with the rear or front sides of the groove (195-197 and 205-207) to help smoother connection between segments.
Similar to the typical segmental linings, the TBM thrust cylinders will temporarily support each segment 100 until the next segment is erected and if necessary the strand 110 is inserted. The TBM thrust cylinders would be operating at different extension lengths to push uniformly against the helical leading edge of the segments. It may be necessary to reduce thrust force on the segment located on the side opposite that of the segment being installed to better balance the thrust forces for TBM steering. Other mechanisms for maintaining the balanced forward thrust on the cutterhead can be envisioned and implemented. This includes pressing against a dummy bridge where the segment is being installed or use of steering shoes in the front shield if the balance of forces delivered by the active thrust cylinders cannot be achieved by other means. Since the TBM and its components are readily available it isn't deemed necessary to illustrate them.
The geometrical dimension of the Tongue and Groove of the helical segment 100 can vary as needed within fixed thickness of the segment 100; for instance if it is needed that thrust cylinder of the TBM to push on the rear side of the groove 195, then width of it 195 and width of tongue front side 190 can be enlarged in comparison to the groove front and Longue rear sides (191, 192, 196, 197).
If it is needed that thrust cylinder pushes on the groove front sides (196 and 197) then those sides width and the width of tongue rear sides (191 and 192) may be considered to be bigger than groove rear and tongue front sides (195, 190).
Likely pushing by TBM thrust shoe 210 on the grove rear side 195 may be better option for the cases since TBM thrust force will be transferred to the middle portion of the segment 100 which would result in better stress distribution and specially less induced tensile stresses in the segment 100.
It can be also decided to push on all 3 sides of the groove (195, 196, 197) as well by a modified TBM thrust cylinder shoes that should fit inside the groove 107.
Generally combination of different materials can be used in the helical segments 100 parts including tongues 106/116, grooves 107/117 and main body (Full body except tongue and groove). For instance as an alternative the projection part of the groove 107 can be made by steel, GFRP, Plastic or such.
In most of the projects the helical segmental lining 50 can be considered without any strand 110 and relevant Strand groove 150 provisions. However if strand 110 decided to be used, there are practical limits on the length of tunnel that can be constructed using a single length of strand 110. These include supply and tensioning length limits on the strands, project scheduling, and other constructability concerns. A special socket segment 170 can be employed for terminating one strand 110 and beginning another. Such a segment would include two pockets (opening) 180 with conduits 260 that cross over each other before emerging into the strand groove 150. The leading pocket is used to terminate the previous strand 110 while the trailing pocket is used to begin the next strand 110. This special socket segment 170 is shown in
At tunnel's openings such as cross-passages and adits, the disruption of the strand 110 should be considered in advance in order to anchor the strand 110 before and after the opening locations by the socket segment 170. Similar to typical tunnels other means of local supports may be used such as extra framing inside the tunnel, anchoring segments to the bedding soil/rock and etc.
An alternative method for anchoring a strand 110 that does not require a socket segment 170 is anchoring and tensioning (if necessary) the leading end of the strand 110 using a temporary frame then grouting the strand groove 150. Once the grout has cured, the temporary frame may be removed as the strand 110 will be locked (anchored) in to the segmental lining structure via the grout. The temporary frame can be eliminated if the strand 110 is placed autonomously where it is continuously tensioned (if necessary) by the TBM and grouted at regular intervals.
An additional recess as coupler recess 151 on the strand groove 150 line located near the center of the segment leading circumferential side 160 would provide clearance for a coupler connection between the previous and new strands wherever required. (See
If the strand 110 is tensioned to provide pre-stresses in the helical segments 100, it will be providing other advantages that the load induced by the stressed strand 110 is applied in both the circumferential and longitudinal directions, effectively pulling the helical segmental lining 50 structure together.
Rarely in some projects, it might be decided to connect the helical segments 100 not only by interlock and strand connection, but also with additional means of connection such as bolt, rod, strut or weld connection to other adjacent segments 100 too.
In the helical segment 100 any front, rear or recess sides of the Groove (195-199, 205-209) or front, rear or projection sides of the Tongue (190-194, 200-204) may be slightly tapered, rounded, chamfered or filleted. (See
The tongue-and-groove feature at circumferential sides 160 and 162 sides of the helical segment 100 is crucial for this system, however at the radial sides 164 and 166 the tongue-and-groove connection can be changed to other means of connections (similar to the conventional/typical tunnels) such as rod, bolt, dowels, strut, welding or such or combination of them.
In Tongue 106 and Groove 107, one of two tongue projection sides 193 or 194 width can be more than other one and accordingly the matching groove recess side width 198 or 199 will be more than other one. Also Tongue rear sides 191 and 192 doesn't need to have equal width as one can be wider than other one. Accordingly matching Groove front sides 196 and 197 won't have equal width. (see
For better contact between matching surfaces of Tongue and Groove, some gap can be considered between other sides. (see
Optionally similar to typical segmental lining coupling elements at any side of the segment 100 may be considered for further ensuring about stability of the lining, if needed. Such coupling may be longer than usual due to the length of the tongue 106/116 and groove 107/117.
Sub-rectangular, Sub-square or elliptical section shape lining can also be constructed by consideration of additional geometrically different tubular helical segments that should be repeated at each course to provide a tubular helical segmental lining.
For instance
The proposed system for interlocking the segments, sealing and post-stressing of the Helical segmental lining 50 can be generalized and used at current typical tunnels as well to provide ring lining. Accordingly, plurality of segments that are interlocked together will build a ring (instead of helical course) in a ring lining of a tunnel, wherein a precast segment comprising a tongue projection at radial and circumferential trailing sides and groove recess at radial and circumferential leading sides to provide interlock connection between adjacent precast segments, wherein one or a plurality rows of sealing gaskets located on the tongue projection sides or on the groove recess sides of the said precast segments. However, alignment curves (turns) at this case will be provided by implementing tapered segments like the conventional/typical tunneling curve methods. The circumferential or trailing sides of precast segments at ring lining can be straight or polyline similar to conventional tunnels. Due to available general conventional system, it isn't deemed necessary to illustrate it.
Two options are considered for helical segmental lining 50 in the turns along curved alignment. The first option involves the use of either continues tapered spacers 120 (Spacer strip) or un-continues tapered spacers 130 placed within the leading circumferential side 160. The spacers can be installed at different locations on the mentioned side 160.
The spacer maximum thickness should be chosen according to the tunnel alignment requirement and limitation of the depth of tongue 106 and groove 107 to avoid sealing problem.
Optionally the continues tapered spacer 120 may be considered to be continues on the segment 100 circumferential side 160/162 but with short interruptions when they reach to radial joints locations 164/166.
For easier steering of the TBM at starting of the tunnel curve, thinner spacer 120/130 (e.g. 12 mm) may be used at 1st course of the curve then spacers 120/130 with max thickness (e.g. 24 mm) may be used from 2nd course of the curve.
Application of the tapers 120/130 in the circumferential side 160/162 of the helical segments 100 would slightly change orientation of the segments 100 in the curve and will create angle and radial gap between radial sides 164/166 of the segments 100. Therefore, other tapered spacers may be decided to be used at the mentioned radial sides 164/166 as well. Since the mentioned radial gaps will be relatively small, therefore depth of tongue 116 and depth of groove 117 at radial side 164 and 166 of the helical segment 100 can be considered to be shorter than circumferential sides 160 and 162 of the segment 100.
The second option for negotiating turns requires the use of Width-modified segments. In this case, minimum 3 more type of segments need to be added in the lining other than typical helical segment 100 which they will be placed at outer radius side of the alignment curves (See
One Wider helical segment 113 type wherein is slightly longer at both radial sides 164 and 166 of the segment than the typical helical segment 100. (e.g. 24 mm wider than width 122 of helical segment 100 radial side). One starting transition segment 112 type need to be used after helical segment 100 and before said wider helical segment 113. Such segment's trailing radial side 166 length will be equal to length of helical segment 100 radial side, but length of its leading radial side 164 will be equal to length of Wider helical segment 113 radial side. And,
One finishing transition segment 114 type need to be used after the said Wider helical segment 113 and before helical segment 100. Such segment's length of trailing radial side 166 will be equal to length of wider helical segment 113 radial side, but its length of leading radial side 164 will be equal to length of helical segment's 100 radial side.
Indeed, more transition type of segments can be considered in some projects for making smoother transition between helical segment 100 and wider helical segment 113.
Also the radial gap between radial sides 164/166 of the helical segments between transition segments and helical segment 100 can be predicted geometrically and avoided by proper sizing of the starting transition segment 112 and finishing transition segment 114 sides.
For system of providing curves by spacers, The spacers 120/130 could be manufactured from several materials including, but not limited to vulcanized rubber, GFRP, HDPE, Wood, Concrete and steel. Tapered spacer 120/130 thicknesses would be expected to range from 3 mm or smaller to 24 mm or more depending on various tunnel diameter and turning radiuses. The segment groove 107 recess side width 198/199 will limit the maximum allowable spacer 120/130 thickness whereas the minimum thickness is expected to be approximately 2-3 mm due to practical constructability.
As shown at
It is also possible to reduce material costs by employing segmented un-continues spacers 130 rather than continuous spacers 120 (see
Sometime spacers may be used between radial sides 164/166 of the helical segment 100 as well to adjust helical course arrangement. Alternatively different helical segment with various length of the circumferential sides can be precast and utilized in the tunnel as well to adjust helical course arrangement.
The main method for achieving waterproofing at this system is using two rows (straps) of gaskets 140 on the sides of the Tongue projection side 193 and 194 as shown in
As an alternative, the gaskets 140 can be placed on the sides of the Groove recess sides 198, 199, 208 and 209 as shown at
The gasket 140 need proper flanking by other segment 100, to provide efficient sealing. Due to fact that a relatively small triangle shape gap would be created between radial sides 164/166 of the helical segments 100 in curves because of placing spacers 120/130 on its circumferential side 160 which will change orientation of the helical segment 100 slightly, it will be necessary to place the gasket 140 at end portion (edge) of the Tongue 116 projection side 203 and 204 (i.e. at intersections of tongue projection sides 203 and 204 with tongue front side 200) as shown in
Also to seal mentioned radial gap at entire radial sides 164/166 in curve, it will be necessary to extend the gasket 140 on the Groove 107 front corner at the radial side 166 of the segment 100 as shown at
The tongue 106 and 116 projection sides (193, 194, 203 and 204) and groove 107 and 117 recess sides (198, 199, 208 and 209) would need ideally parallel surfaces since the gaskets 140 need to be properly compressed within tongue 106/106 and groove 107/117 sides for providing sealed joints, however they can be slightly tapered to help formwork retraction in the casting stage. But tapered angle should be minimal to avoid harming the sealing. (See
It may be necessary to provide smaller grooves as Gasket groove 142 on Tongues 106 and 116 and Grooves 107 and 117 for making rooms for the gaskets 140.
There can be many variation on design of gaskets 140 size and geometry and gasket groove 142 will be provided as needed. The gasket might be designed to completely cover some sides of Tongue 106/116 and Groove 107/117.
Alternatively, the continuous tapered spacers 120 may be constructed of such a compressible and hard material (e.g. stiff sealing rubber) and in such a manner as to function as both a gasket and a spacer for completing alignment curves (not illustrated).
Also continues spacer can be used between circumferential sides 160/162 of the helical segments 100 in a helical lining 50 and follow the helical line of tunnel to provide sealing for the mentioned sides.
Two other means of achieving water proofing is to post-inject grout behind the segment (through specialty ports or hoses on the segment) as it is common practice in many conventional tunneling projects in soft ground or rock, also the placement of a continuous PVC or sealing lining or membrane on the inside surface to prevent exfiltration of the water.
It is possible for existing shielded TBMs to be adopted for (or refurbished to) use of helical tunnel lining segments 50. The main alteration required is to modify the thrust cylinder shoes 210 to include hinge/ball and plates to best fit against the leading circumferential side 160.
Geometrically, the force from the thrust cylinders shoes 210 is applied to the segments 100 in the direction parallel to the tunnel alignment and acts on a plane with an angle equal to the helix angle 109. Thus, the thrust force will be the resultant of two component loads: the load perpendicular to the segment leading circumferential side 160 and the load tangent to the segment leading circumferential side 160. The perpendicular load will push each segment 100 toward the previously erected course and tangent load will push each segment 100 toward the previously installed segment 100. The two component loads will thrust the segment 100 in two desired directions helping to tightly close each radial and circumferential joint and maintain stability of the helical lining 50 structure.
The tunneling direction the by helical segmental lining can be considered in any of both directions either toward circumferential leading side 160 or toward circumferential trailing side 162. i.e. leading and trail sides of the segments can be changed for the entire or part of a tunnel. Accordingly, the TBM thrust cylinders shoes 210 either will push on the groove 107 side or will push on the tongue 106 side of the Helical segment 100.
For better contact of the shoes 210 on the circumferential sides 160/162 which have helix curve, the shoe 210 surface may be machined (accustomed) to have same helix curve surface of the helical segment 100.
The helical tunnel lining TBM could be automated such that other than automatically handling and installing the helical segments 100 in the lining by segment feeder and segment erector units, it automatically inserts the strand 110 and any spacer 120/130 as the tunnel advances. Further it is expected that a TBM may be able to automatically tension the strand 110 continuously and grout the strand groove 150 after a predetermined length of tunnel construction. Hence, with an optimistic vision, the implementation of this system could lead to minimizing the underground crew in the tunnel construction where the TBM and associated systems could be controlled from a remote area (i.e. the surface)—akin to microtunneling—in a near future. Such intelligent and automated tunneling system might be suitable for underground construction in future space application, primarily on Moon/Mars.
Installation of the segments are part of or main component of ground support system in tunneling operations, as such segment erection is one of the unit operations in tunneling work cycle. This means that in soft ground tunneling using single shield in conventional/typical tunneling, operation has to stop after each stroke to install the segment as part of an advance cycle. Segment erection can take anywhere from 15-20 minute for smaller to medium size machines or as long as 30-40 minutes on larger TBMs. In addition to the downtime for this activity, there are other activities that are impacted. For example in earth pressure balance machines (EPBM) the soil conditioning and grouting behind segment is an integral part of the operation. Typical soil conditioning involves use of surfactants or foam to reduce the viscosity of the muck and reduce torque/wear on the head. Foams have a half life that is typically in the range of 20-50 minutes, depending on the type of surfactant and its chemistry (stabilized or conventional foam), and it will start breaking down in the chamber and screw conveyor. This means that when the segment erection is complete and new cycle starts, the machine has to use higher torque to start the stroke. Also, this interrupts the production of the foam in the foam maker and it has to restart for the new stroke. This means that the system including the foam generators and the cutterhead and screw conveyor have to deal with loading cycle and stoppages to reach the same consistency in muck that is in the cutting chamber/screw conveyor.
A continuous operation by helical segmental lining will therefore eliminate these cyclic loading, while allows for better consistency of the muck and smooth soil conditioning process. The results are better control of the face pressure, lower pressure fluctuation, and better face stability, lower energy requirement, and perhaps lower consumption of the soil conditioning agents. Added benefits include the smoother work load on machine components, better performance of gearbox and drive units, and ultimately lower maintenance requirements. Same it thru for the grouting system and a continuous movement of the machine means that there is no need for stopping of the grouting system. This allows for better ground control behind the segments, lower ground loss, and better overall grouting of the segments in place.
When considering the slurry TBMs, the interruption in the advance cycle for segment erection means that the machine should interrupt the flow cycle of the slurry and use the auxiliary loop to allow for the flow in the system and prevent muck sedimentation along the tunnel, while the front loop maintains the pressure at the face. A continuous advance by helical lining will allow for smoother and better control of the flow and pressures in the slurry machines. This yields better results in the operation and will reduce the stress on various machine components and hence lowers the maintenance requirements.
Obviously tunneling operation comprises of a variety of activities that would require machine stoppage, for example utility extension, switching the ventilation tubes, installation of rail, extension of the power cables, surveying, etc. The use of helical segments and change in operation does not mean that these stoppages are going to be eliminated while automating these activities are a possibility in the future.
The additional works have been done to ensure that the proposed helical lining system 50 is feasible, stable and functional with details for certain applications. Non-linear analysis is considered as better choice for study. As part of the adaptation of the helical segmental lining 50, certain calculations and studies are done to assure that the system is in compliance with different relevant codes. For instance ACI 544.7R-16 is used for design of fiber reinforced concrete segments. This means that the design engineer should use Load and Resistance Factor Design (LRFD) method to design precast concrete tunnel segments for ultimate limit state (ULS) and serviceability limit state (SLS) as outlined by this code. ULS is a state associated with the collapse or structural failure of tunnel linings.
In the case of using Fiber Reinforced concrete, the current practice in the tunnel industry is to design these elements for the following load cases, which occur during segment production, transportation, installation, and service conditions (Ref. ACI 544.7R-16):
In addition, the loads induced by gaskets 140 need to be considered and applied for the segment designs to prevent local spalling, specially at corners of the tongue 106/116 and groove 107/117.
To verify the design requirements for the helical segments 50, FEA modeling of various tunnel diameters and loading conditions have been conducted. The results confirm the satisfactory performance of the helical tunnel lining system. For the precast concrete type of the segments 100 in order to provide economic reinforcement, general reinforcement requirement can be provided by fibers and for high stresses areas rebars in certain directions may be considered. In order to provide rebar reinforcement more efficiently, welded reinforcement may be provided with limited bent rebars.
For Helical lining starter 70 in a tunnel, a course with various width of the segments can be used in order to provide a vertical face of the start section as shown at
Further, the helical system with different sections (circle, elliptical, sub-square, sub-rectangular and such) can be applied to construct of vertical structures as well such as Manhole, watertank, bridge pier and Marine crib. They can be also used in parking, low/mid/high-rises with consideration of openings(windows) in the segments.
The analysis of the proposed helical segmental lining system shows that the system is a viable alternative to the conventional/typical segmental lining and offers many advantages. The proposed system can offer operational advantages and facilitate more continuous and seamless tunneling operation that could reduce the work cycle and offer increase tunneling speed. Reduced labor, better final product, reduced machine maintenance, and lower cost could be the result of using this system. Overall the main advantages of the system can be listed as follows:
The scope of the claims should not be limited by embodiment of the examples but should be broadly interpreted from the consistent of the description as a whole.
50 Helical Segmental lining
60 Sub-rectangular section
70 Helical Lining Starter
80 Vertical helical Lining
100 Typical Helical Segment
102 Outer surface of 100
104 Inner surface of 100
106 Tongue at 162
107 Groove at 160
108 Corner angle
109 Helix angle
110 Strand
112 Starting transition segment
113 Wider Helical Segment
114 Finishing transition segment
116 Tongue at 166
117 Groove at 164
120 Continues Taper
130 Un-continues Taper
132 side taper (optional)
140 Sealing gasket
142 Gasket groove
150 Strand Groove (provision)
151 Strand Coupler recess provision
152 Lift socket
160 Leading circumferential side of Segment
162 Trailing circumferential side of the segment
164 Leading Radial side of segment
166 Trailing Radial side of segment
170 Socket Segment
180 Pocket on the Socket Segment
190 Tongue front side of 162
191 Tongue outer rear side of 162
192 Tongue inner rear side of 162
193 Tongue outer projection side of 162
194 Tongue inner projection side of 162
195 Groove rear side of 160
196 Groove outer front side of 160
197 Groove inner front side of 160
198 Groove outer recess side of 160
199 Groove inner recess side of 160
200 Tongue front side of 166
201 Tongue outer rear side of 166
202 Tongue inner rear side of 166
203 Tongue outer projection side of 166
204 Tongue inner projection side of 166
205 Groove rear side of 164
206 Groove outer front side of 164
207 Groove inner front side of 164
208 Groove outer recess side of 164
209 Groove inner recess side of 164
210 TBM Thrust Cylinder shoe
220 MDF spacer
230 Steel plate making groove
240 Embedded rebars
250 Embedded duct
260 Conduit
262 Outer surface of 265
263 Curvature radius of 265
264 Circumferential side of 265
265 tubular helical segment
266 radial side of 265
Number | Date | Country | |
---|---|---|---|
62632061 | Feb 2018 | US |