Claims
- 1. A method of installing a high capacity tieback comprising:
- connecting a unitary hollow casing to a drill;
- inserting prestressing steel within the casing;
- fixing a lost bit to one end of the casing;
- positioning the drill and casing at the desired location of the tieback;
- rotating the casing into the ground with the drill and removing soil with a drilling fluid as the casing is advanced into the ground;
- releasing the bit from the casing and pumping grout down the hollow interior of the casing at a pressure of at least 150 psi forcing water in the grout to bleed from the grout;
- extracting the casing from the ground by developing a torque of at least 12,000 ft./lbs on the casing with the drill to overcome the frictional engagement between the grout and the casing and by applying a pulling force to the casing generally along the axis of the casing with the drill; and
- anchoring the prestressing steel.
- 2. A method as in claim 1 wherein the pulling force applied by the drill is potentially at least 16,000 lbs.
- 3. A method as in claim 1 including forming solified grout adjacent the casing end in the ground as the water bleeds from the solidifying grout during the extracting step.
- 4. A method as in claim 1 wherein the casing is drilled into coarse-grained soil having a penetration resistance of at least ten blows per foot and a permeability greater than 10.sup.-4 cm/second.
- 5. A method as in claim 1 wherein the installed tieback has a ultimate load-carrying capacity of at least 70 tons.
- 6. A method as in claim 1 wherein the installed tieback has a unit load-carrying capacity of at least 9,000 lbs/linear foot of grouted anchor in the ground.
- 7. A method as in claim 1 wherein said prestressing steel inserted in the ground is formed of a multi-element tendon fabricated from seven-wire prestressing steel strand.
- 8. A method as in claim 1 wherein said prestressing steel inserted in the ground is a bar.
- 9. A method of installing a high capacity tieback comprising:
- connecting a unitary hollow casing to a drill;
- inserting prestressing steel within the casing;
- fixing a lost bit to one end of the casing;
- positioning the drill and casing at the desired location of the tieback;
- rotating the casing into coarse-grained soil having a penetration resistance of at least ten blows per foot and a permeability greater than 10.sup.-4 cm/second with the drill and removing soil with a drilling fluid as the casing is advanced into the ground;
- releasing the bit from the casing and pumping grout down the hollow interior of the casing at a pressure of at least 150 psi forcing water in the grout to bleed from the grout and forming solidified grout adjacent to the casing end in the ground during the extracting step;
- extracting the casing from the coarse-grained soil by applying a torque of at leat 12,000 ft.-lbs. to the casing with the drill to overcome the frictional engagement between the solidifying grout and the casing, and by applying a pulling force to the casing generally along the axis of the casing with the drill; and
- anchoring the prestressing steel to form a tieback having a unit load-carrying capacity of at least 9,000 lbs/linear foot of grouted anchor in a coarse-grained soil.
Parent Case Info
This application is a continuation of application Ser. No. 798,621, filed Nov. 15, 1985.
US Referenced Citations (14)
Non-Patent Literature Citations (1)
Entry |
Schnabel Foundation Company Six-Year Plan for Fiscal Year 1985-1986, Key Actions Cost Benefit Analysis. |
Continuations (1)
|
Number |
Date |
Country |
Parent |
798621 |
Nov 1985 |
|