This invention relates to a method for constructing a home and to home constructions.
In a traditional manner of constructing a home, a foundation is laid, then beams and floor joists are supported on the foundation. A sub-floor is installed and lines may be drawn on the sub-floor to indicate the location of interior walls. Wooden wall frames are constructed and then erected along the periphery of the floor and where indicated by the lines. Roof sections are constructed and installed at the top of the wall frames. Sheeting may then be installed on the roof sections and the roof shingled. A cladding (e.g., brick) may be installed on the outside of the outside walls. Electrical wiring and plumbing conduit may be run through the wall frames and drywall thereafter installed on the wall frames. Various finishing steps are then undertaken. This traditional manner of home building is labor intensive, is not particularly fast, and the quality of the homes are highly dependent upon the skill of the on-site labor.
U.S. Pat. No. 5,402,618 issued Apr. 4, 1995 to Biffis discloses a method of mass producing homes where a factory is located proximate a sub-division to be built. A base frame for a home is positioned on a conveyor and the home is constructed as it moves through the factory. The home may then be lifted by the base frame to be placed on a foundation in the sub-division.
While the approach in Biffis allows for faster and more uniform quality home construction, improvements to allow speedier and more uniform quality assembly would be desirable.
In constructing a home, a plurality of upwardly opening U-shaped channel members are installed onto a floor structure. Wall sections are then set into the plurality of U-shaped channel members. The result is that the U-channel members locate the wall sections. Each wall section may be pre-fabricated with lines for service (e.g., electrical lines or plumbing conduit) running through it. After the wall sections are set in place, any such lines for service may be interconnected. Cut-outs may be provided at the sides of the wall sections to provide access to the lines for service to allow their interconnection.
In accordance with the present invention, there is provided a method of constructing a home comprising: installing a plurality of upwardly opening U-shaped channel members onto a floor structure; and setting wall sections into said plurality of U-shaped channel members such that said U-channel members locate said wall sections.
In accordance with another aspect of the present invention, there is provided a home comprising: a plurality of upwardly directed U-shaped channel members on a floor of said home outlining rooms of said home; and wall sections received in said plurality of U-shaped channel members.
In accordance with a further aspect of the present invention, there is provided a gang fastening device comprising a frame; a carriage slidably attached to opposite sides of said frame; and a plurality of gang fastener drivers adjustably mounted to said carriage.
Other features and advantages will become apparent after a review of the following description in conjunction with the drawings.
In the figures which disclose example embodiments of the invention,
With reference to
At station 12-1 parts for bases, or bases which are completed or partially completed, are received and stored. Where required, bases are constructed or completed at this station. Turning to
Where bases are built up at station 12-1, with reference to
Conveniently, the sub-flooring 26 may be fastened to the wooden cross-members with the gang fastening device of
In use, the sub-flooring may first be laid in place, then the gang fastening device 30 lifted onto the sub-flooring. Assuming that device 30 is oriented with its sides 32 parallel to cross-beams 25 (
The gantry crane 19 may lift a completed (or partially completed) base 20 onto a trolley 16. After taking any necessary steps to complete the base, the trolley 16 is then moved along track 14 to station 12-2. Station 12-2 may receive parts for wall sections, or completed, or partially completed, wall sections. Where required, wall sections are constructed or completed at this station. Turning to
With specific reference to
With reference to
Where the wall sections 40′ when set in place lack sheathing. Sheathing with drywall may be quickly accomplished by using a gang fastener device similar to that of
After setting of the wall sections, the trolley moves to station 12-3 where parts for roof sections, or roof sections which are completed or partially completed, are received and stored. Where required, roof sections are constructed or completed at this station. Turning to
The first end roof section 80 is hoisted in place first by the gantry crane 19 such that the tops of the outer wall sections underlying the first end roof section are received by the U-shaped members of the first end roof section. The middle roof section is next hoisted into place with its U-shaped channel members receiving the tops of the outer wall sections underlying it and such that its sheath 86 extends over a portion of the first end roof section. Finally, the second end roof section 88 is placed with its U-shaped channel members receiving the tops of the outer wall sections underlying it and such that its sheath 86 extends over a portion of the middle roof section 84. The sheaths 86 help ensure that the resulting roof will not leak. While three rectangular roof sections have been shown, obviously a different number, or sections with a different configuration, may be appropriate, depending upon the home design.
The trolley then moves to station 12-4 where the terminal ends of the lines for service in the wall sections are joined. At station 12-4 a ceiling may also be installed.
The trolley then moves to station 12-5 where the openings at the joins between the lines for service are covered with covers 46 (
Once manufacturing at station 12-5 is completed, the trolley is moved to station 12-6 where exterior finishes are applied. Next, at station 12-7, flooring is installed on the sub-floor. At station 12-8, interior trim is applied. At station 12-9, cabinetry is installed. At station 12-10, plumbing fixtures are connected to the terminations of the plumbing conduit (as, for example, to termination 56 seen in
The home is then ready to be transferred to the subdivision and this may be accomplished as described in aforereferenced U.S. Pat. No. 5,402,618.
Modifications will be apparent to those skilled in the art and, therefore, the invention is defined in the claims.
This application is a continuation of U.S. application Ser. No. 10/841,856 filed May 7, 2004, now U.S. Pat. No. 7,690,170, the contents of which are incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
2690072 | Reed | Sep 1954 | A |
3255563 | Sauer | Jun 1966 | A |
3707165 | Stahl | Dec 1972 | A |
3766574 | Smid | Oct 1973 | A |
3829174 | Thomas | Aug 1974 | A |
3888059 | MacLennan et al. | Jun 1975 | A |
4222208 | Ferver | Sep 1980 | A |
4276730 | Lewis | Jul 1981 | A |
4631881 | Charman | Dec 1986 | A |
4723598 | Yoshio et al. | Feb 1988 | A |
4835915 | Nilssen | Jun 1989 | A |
4896469 | Wright | Jan 1990 | A |
4986052 | Nelson | Jan 1991 | A |
5402618 | Biffis | Apr 1995 | A |
5740858 | Ingram | Apr 1998 | A |
5842276 | Asher et al. | Dec 1998 | A |
6253509 | Hellwig et al. | Jul 2001 | B1 |
6298619 | Davie | Oct 2001 | B1 |
6490829 | Schreiner et al. | Dec 2002 | B1 |
20020069600 | Bryant | Jun 2002 | A1 |
20030182886 | Parrish | Oct 2003 | A1 |
20040031219 | Banister | Feb 2004 | A1 |
20060201081 | Godwin | Sep 2006 | A1 |
Number | Date | Country |
---|---|---|
1433106 | Apr 1976 | GB |
10102645 | Apr 1998 | JP |
2000 170296 | Jun 2000 | JP |
WO 0112913 | Feb 2001 | WO |
WO 0201014 | Jan 2002 | WO |
Number | Date | Country | |
---|---|---|---|
20100146905 A1 | Jun 2010 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 10841856 | May 2004 | US |
Child | 12707587 | US |