This invention relates in general to bridges having precast or Cast-In-Place (CIP) concrete deck panels. In particular, this invention relates to embodiments of improved girders for use in bridges having precast or CIP concrete decks and an improved system for assembling a bridge comprising the improved girders and precast or CIP concrete deck panels.
Known bridges that are assembled using precast or CIP concrete deck panels typically use girders formed from steel, reinforced concrete, or pre-stressed concrete that are relatively heavy. For example, a typical 40 ft bridge steel girder may weigh about 3,440 lbs, and a typical 40 ft concrete double-T girder may weigh about 40,120 lbs. For example, to assemble one four-span, two-lane bridge with such steel or concrete girders, requires multiple trucks to move the girders to a bridge site, and involves mobilizing large, expensive cranes with a high load capacity at the bridge site.
It is therefore desirable to provide improved girders for use in bridges having precast or CIP concrete decks that are lighter, stackable, and therefore easier to move and assemble than known girders.
This invention relates to improved girders for use in bridges having precast or CIP concrete decks that are lighter, stackable, and therefore easier to move and assemble than known girders. In one embodiment, an elongated girder for use in a bridge includes a girder body having a modified V-shaped cross section. The body includes longitudinally extending webs defining sides of the girder, a bottom flange extending between the webs, and top flanges extending outwardly from the webs.
Various aspects of this invention will become apparent to those skilled in the art from the following detailed description of the preferred embodiment, when read in light of the accompanying drawings.
Referring now to
If desired, an interior of the girder 12 at the distal ends 11A and 11B of the girder body 11 may be filled with a material 24, such as concrete to strengthen the distal ends 11A and 11B of the girder body 11 to prevent crippling of the girder 12 at the bridge abutments 16. Alternatively, a plate (not shown) of solid composite material, such as, but not limited to FRP may be installed in the interior of the girder 12 at the distal ends 11A and 11B of the girder body 11, extend between the bottom flange 30 and the top flanges 32 and 34, and affixed to the webs 26 and 28 in a plane substantially perpendicular to a longitudinal axis of the girder 12. The plate (not shown) may have solid construction or may have one or more openings therethrough. Further, a truss-type brace (not shown) may be installed in the interior of the girder 12 at the distal ends 11A and 11B of the girder body 11 between the webs 26 and 28.
In conventional bridge construction for two-lane bridges, approximately four girders are placed between bridge abutments. The bridge deck is then supported on the bridge girders. The girders are typically placed about 6 ft to 7 ft apart. Concrete deck panels, such as the panels P1, P2, and P3, are then positioned perpendicularly to the girders and attached thereto. Alternatively, a concrete deck may be cast in place over the girders. A length of the deck members is typically equal to a width of the bridge.
For a single-span two-lane bridge, the girders have a length about equal to the length of the bridge to be constructed. The precast reinforced concrete deck panels may have a length equal to a width of the bridge such as about 30 ft, or half the width of the bridge such as about 15 ft, and a width within the range of about 4 ft to about 8 ft. For multi-span bridges, the girders typically have a length equal to a length of each span. CIP decks, such as the concrete deck 18, may be placed over temporary, i.e., removable, or stay-in-place formwork spanning between and/or over the girders 12.
As shown in
The bottom flange 30 and the top flanges 32 and 34 are preferably formed from solid composite fiber reinforced polymer (FRP) material. The webs 26 and 28 preferably have a sandwich type construction and are formed from a layer of lightweight core material 29 (shown schematically in
To minimize weight, the thicknesses of the webs 26 and 28 and the bottom flange 30 will preferably vary in a stepwise manner along the girder span. The thickness of the bottom flange 30 increases mostly stepwise towards mid-span of the girder and the thickness of the webs 26 and 28 increase stepwise towards the ends of the girder. This is illustrated using typical dimensions for an exemplary 42 ft girder in
As shown in
It will be understood that within the assembled bridge 10, shear transfer from the reinforced concrete deck panels P1, P2, and P3, or the CIP deck 18, to the elongated girders 12 occurs through the top flanges 32 and 23 of the elongated girders 12. The top surface of the top flanges 32 and 34 (the upwardly facing surface when viewing
An alternate embodiment of the hybrid composite girder is shown at 80 in
The illustrated corrugations have a depth D2 of about 0.25 inches. Alternatively, the depth D2 of the corrugations may vary based on factors including, but not limited to, the size of the hybrid composite girder 80 and a desired value of shear transfer between each girder 80 and the concrete deck panels P1, P2, and P3.
Advantageously, each hybrid composite hybrid composite girder 12 has a significantly lower weight than a conventional girder of the same length. As shown in Table 2, a 40.0 ft hybrid composite hybrid composite girder 12 has a weight of about 1,323 lbs. A 40.0 ft conventional steel I-beam girder 44 (see
As best shown in
Advantageously, because of the combination of these features, i.e., the significantly reduced weight of the hybrid composite girders 12 relative to the conventional steel I-beam girder 44 and the conventional reinforced concrete double-T girder 46 as shown in Table 2, and the angle α from the vertical line L1 at which the webs 26 and 28 are formed (which thus defines the modified V-shaped cross-section of the hybrid composite girder 12) that allows for nesting, transportation costs may be significantly reduced. For example, as shown in
Advantageously, the illustrated 15 hybrid composite girders 12 are enough to assemble three to four bridges and collectively weigh only about 19,845 lbs. In contrast, 15 of the 40.0 ft span steel I-beam girders 44 weigh about 51,600 lbs and will require at least two trucks to move. In further contrast, 15 of the 40.0 ft span reinforced concrete double-T girders 46 weigh about 601,800 lbs and will require at least 15 trucks to move, i.e., each 40.0 ft span reinforced concrete double-T girder 46 requires one truck to move.
The efficiencies realized in moving a plurality of a 70.0 ft span embodiment of the hybrid composite girders 50 is even greater. For example, as shown in
Advantageously, the 16 hybrid composite girders 50 are enough to assemble four bridges and collectively weigh only about 42,496 lbs, or about 2,656 lbs each. In contrast, 16 of a 70.0 ft embodiment of the steel I-beam girders 44 weigh about 151,200 lbs, or about 9,450 lbs each, and will require at least four trucks to move. Further, a 70 ft span embodiment of the concrete double-T girder 46 weighs about 70,210 lbs. Thus, as with the 40.0 ft span reinforced concrete double-T girders 46, each 70 ft span embodiment of the concrete double-T girder 46 will require one truck to move.
Once the required number of hybrid composite girders 12 arrive at the site of a bridge 10 to be assembled, the bridge 10 may be assembled in minimal time, such as in one day or less, and with minimal, economical, and readily available equipment. For example, a bridge 10 comprising a plurality of the hybrid composite girders 12 according to the invention may be assembled with one locally available conventional crane truck or one locally available conventional deck crane. It will be understood that any suitable conventional crane truck and any suitable conventional deck crane may be used. Advantageously, such conventional crane trucks and conventional deck cranes are typically commercially available from an equipment rental firm, thus allowing a required crane truck and/or a required deck crane to be rented only for the short duration of the bridge assembly, such as one day, eliminating the cost of mobilizing and operating a large crane.
If desired, the top flanges 32 and 34 may be braced together with X-bracing in a substantially horizontal plane.
As shown in
The precast concrete deck panels P1, P2, and P3 further include pairs of parallel channels 64 in a lower surface thereof. The deck panels P1, P2, and P3 may be positioned on the hybrid composite girders 12 such that the shear connectors 42 on each of the top flanges 32 and 34 are positioned inside one of the channels 64. Each channel 64 may include one or more access bore 66 extending from the channels 34 to an upper surface of the deck panels P1, P2, and P3. As shown in
As shown in
Advantageously, when the concrete deck panels P1, P2, and P3 are attached to the girders 12, no portion of the concrete deck panels P1, P2, and P3 extend below the top flanges 32 and 34. Additionally, the concrete grout within the parallel channels 64 and about the shear connectors 42 therein, further secure the concrete deck panels P1, P2, and P3 to the elongated girders 12, such that the bridge system 12 is capable of supporting a weight of the concrete deck panels P1, P2, and P3 prior to the concrete grout within the parallel channels 64 being fully cured.
Alternatively, in lieu of the precast concrete deck panels P1, P2, and P3, a CIP deck may be formed over the hybrid composite girders 12. The CIP deck, such as the CIP concrete deck 18 shown in
The hybrid composite girders 12, shear connectors 42, reinforced (CIP) concrete deck 18 (or alternatively, the precast concrete deck panels P1, P2, and P3) according to this invention define a hybrid composite concrete bridge system, such as shown at 10 in
The principle and mode of operation of the invention have been described in its preferred embodiments. However, it should be noted that the invention described herein may be practiced otherwise than as specifically illustrated and described without departing from its scope.
Number | Name | Date | Kind |
---|---|---|---|
4129917 | Sivachenko | Dec 1978 | A |
4912764 | Hartwell | Mar 1990 | A |
5966764 | Vodicka | Oct 1999 | A |
6081955 | Dumlao | Jul 2000 | A |
7861346 | Wilson | Jan 2011 | B2 |
8671490 | Carney | Mar 2014 | B1 |
9915045 | Azizinamini | Mar 2018 | B1 |
20050262651 | Snead | Dec 2005 | A1 |
20060265819 | Azizinamini | Nov 2006 | A1 |
20080301889 | Kang | Dec 2008 | A1 |
20130061406 | Southworth | Mar 2013 | A1 |
Number | Date | Country |
---|---|---|
2009131284 | Oct 2009 | WO |
Entry |
---|
Rajchel, et al., “Hybrid Bridge Structures Made of FRP Composite and Concrete”, Civil and Environmental Engineering Reports, (2017), Issue No. 2080-5187, pp. 162-169. |
Williams, “The Ongoing Evolution of FRP Bridges”, Public Roads, (2008), Publication No. FHWA-HRT-08-006, vol. 72, No. 2. |
EP Search Report, Application No. 19162378.4, dated Jul. 26, 2019. |
Number | Date | Country | |
---|---|---|---|
20190276994 A1 | Sep 2019 | US |
Number | Date | Country | |
---|---|---|---|
62641562 | Mar 2018 | US |