1. Field of the Invention
The present invention relates to a hybrid generation system and a control method thereof, and more particularly, to a hybrid generation system, which supplies selectively one of normal utility power and power, which is produced by a generator, to a load depending on a level of power supplied to the load, and to a control method thereof.
2. Description of the Background Art
Driving power is generally required to drive home or industrial electrical appliances and devices. Typically, these home or industrial electrical appliances and devices receive necessary power through a power supply, which supplies normal utility power provided from a power station (e.g., Korea Electric Power Corporation). However, it is a frequent case that externally provided normal utility power is insufficient to supply power to all loads in industrial plants. Thus, a self-generation system is often prepared separately.
As illustrated, the self-generation system includes a generator 2, a switch 3 and a generator controller 4. The generator 2 generates power as an internal engine is driven and supplies the power to a load 1. The generator controller 4 sends data to the generator 2 or receives data from the generator 2 to control operation of the generator 2. The switch 3 is turned on or off in response to a control signal transmitted from the generator controller 4 to supply to the load 1 or break the power generated by the generator 2.
In the above conventional self-generation system, when a signal that indicates a load generation is transmitted to the generator controller 4, the generator controller 4 detects the signal, and generates a driving instruction and transmits the driving instruction to an engine of the generator 2. The generator 2 generates a certain level of power as the engine drives, and then, the switch 3 is turned on. As a result, the generated power is supplied to the load 1.
However, in the above described conventional self-generation system, the generator 2 is mandated to operate whenever there is a load generation. Hence, the generator 2 generates a certain level of power regardless of a size of the load and supplies the power to the load 1. Supplying the power to the load 1 may cause an abrupt decrease in efficiency of the self-generation system. For instance, assuming that a generator has the maximum operation efficiency when generating 100 kilowatts (KW) of power, the generator drives until reaching a state that the generator can generate 100 KW of power even if not only 100 KW of power but also 10 KW thereof are to be transferred to a load coupled with the generator. Accordingly, the self-generation system may have a decreased level of efficiency, and resources may be wasted unnecessarily and a cost to drive the generator may increase to a greater extent.
Accordingly, an object of the present invention is to solve at least the problems and disadvantages of the background art.
It is an object of the present invention to provide a hybrid generation system, which can drive a generator effectively by determining operation efficiency of the generator based on a summated level of power supplied to a load and supplying normal utility power instead of power generated by the generator when the operation efficiency is low, and a control method thereof.
According to a first embodiment of the present invention, a hybrid generation system includes a generator engine and a generator controller. The generator generates a certain output to generate power. The generator controller summates a power level supplied to a load and selectively supplies normal utility power or the generated power according to the summated power level.
According to a second embodiment of the present invention, a method of controlling a hybrid generation system includes supplying power generated by a generator to a load and calculating a summated power level of the generated power supplied to the load and comparing the calculation result with an operation efficiency of the generator to supply one of the generated power and normal utility power to the load according to the comparison result.
The invention will be described in detail with reference to the following drawings in which like numerals refer to like elements.
Embodiments of the present invention will be described in a more detailed manner with reference to the drawings.
Referring to
The power transfer switch 40 is coupled individually with the generator 30 and the power supply 20 and includes first and second switches 41 and 42, which can break driving power in response to a signal transmitted from the generator controller 50, and a circuit breaker 43, which can break the driving power transmitted through the first and second switches 41 and 42.
The first and second switches 41 and 42 may be configured as a magnetic relay switch, which is turned on or off according to the control signal transmitted from the generator controller 50. The circuit breaker 43 is a manual switch, and can prevent leakage current by shutting down the power supply when a level of power supplied to the load 10 through the first and second switches 41 and 42 exceeds a predetermined level.
In the present embodiment, an air conditioner is exemplified as the load 10 because the air conditioner generally consumes power with the maximum amount of load during summer and thus, frequently determines a peak level of power. However, it should be noted that the load 10 is not limited only to the exemplified air conditioner; rather, the load 10 can be configured with multiple devices that can drive by supplied power.
A self-generation system including the generator 30 can be configured to a cogeneration system. A cogeneration system uses waste heat while generating power using a co-generator and, includes an engine, a co-generator, which generates power using a rotational force produced by the engine, a heat supplier, which supplies waste heat collected from cooling water which cools the engine or an exhausted gas from the engine to a heat consumer such as an air conditioner.
The power generated in the cogeneration system can be used to operate various electrical appliances and devices such as light bulbs and air conditioners. Also, the cogeneration system may be specifically set to generate a consistent level of power under an optimum operation condition regardless of a size of the load generally necessary for such electrical appliances and devices such as air conditioners.
Referring to
Particularly, the generator controller 50 includes a power calculator 55, an efficiency determination unit 53 and a main controller 51 to supply selectively one of power generated in the generator 30 and normal utility power provided from the power supply 20 to the load 10. The power calculator 55 summates a level of power transferred to the load 10. The efficiency determination unit 53 compares the summated level of power calculated by the power calculator 55 with operation efficiency of the generator engine 31 and determines the comparison result thereafter. According to the determination result by the efficiency determination unit 53, the main controller 51 generates a control signal and transmits the control signal to the power transfer switch 40.
Although not illustrated, the generator controller 50 further includes a memory into which a control program for operation of the main controller 51 and a data about the summated power level calculated by the power calculator 55.
The power calculator 55 detects and summates a level of power supplied from the circuit breaker 43 to the load 10.
In the case that the generated power by the generator 30 is supplied to the load 10, if the efficiency determination unit 53 determines that a summated level of power for a certain period falls within a range of low efficiency of the generator engine 31, the main controller 51 transmits an off-signal and an on-signal to the second switch 42 coupled with the generator 30 and to the first switch 41 coupled with the power supply 20, respectively. Also, the main controller 51 breaks a supply of the generated power and, supplies the normal utility power to the load 10.
In the case that the normal utility power is supplied to the load 10, if the efficiency determination unit 53 determines that a summated level of power for a certain period falls within a range of high efficiency of the generator engine 31, an off-signal and an on-signal are transmitted respectively to the first switch 41, which is coupled with the power supply 20, and the second switch 42, which is coupled with the generator 30. As a result, the power generated in the generator 30 is supplied to the load 10.
The efficiency determination unit 53 compares the summated level of the power with a generator efficiency based on the summated level. Various efficiency comparison methods may be employed depending on cases. For instance, a cost for the generator 30 to generate the summated power level supplied to the load 10 can be compared with a power rate charged based on the calculation for which the power is supplied from the power supply 20. That is, if the generation cost is higher than the power rate, the efficiency determination unit 53 may determine that the generator 30 is in a range of low efficiency. On the other hand, if the generation cost is lower than the power rate, the efficiency determination unit 53 may determine that the generator 30 is in a range of high efficiency.
More simply, on the basis of the maximum efficiency of the generator 30, if the summated power level exceeds approximately 50% of the power level generated by the generator 30, it may be determined that the generator 30 has high efficiency. On the other hand, if the summated power level does not exceed approximately 50% thereof, it may be determined that the generator 30 has low efficiency.
When a load is generated in operation S101, the load generation is detected to drive the generator 30. In operation S103, when the generator 30 generates a certain output (e.g., electric power), a control signal is transmitted to the second switch 42 coupled with the generator 30, so that the power generated in the generator 30 is supplied to the load 10. Continuously, a level of the power transmitted to the load 10 is detected to calculate a summated power level.
After a certain elapse of time, in operation S105, operation efficiency of the generator 30 is determined based on a summated power level for the certain time elapse. At this point, the determination is based on a comparison result between a cost to generate the summated power level and a power rate charged according to a consumption level of the summated power level, or a reference value of approximately 50% of the generated power level in the generator 30.
If the determination result provided in operation S105 is that the operation efficiency of the generator 30 to generate the summated power level is low, in operation S107, the second switch 42 coupled with the generator 30 is broken, whereas the first switch 41 coupled with the power supply 20 is connected, so that normal utility power is supplied to the load 10.
If the normal utility power is supplied to the load 10 for a certain period of time, in operation S109, a summated power level calculated for the certain period of time and operation efficiency of the generator 30 are determined. If the determination result is that the generator 30 has high operation efficiency, in operation S111, the first switch 41 coupled with the power supply 20 is broken; on the contrary, the second switch 42 coupled with the generator 30 is connected. Hence, the generated power in the generator 30 is supplied to the load 10.
The generator 30 may be set to be detected by a user through outputting supply power (e.g., generated power or normal utility power) supplied to the load 10 and a data about a supply level of power to outside.
According to the exemplary embodiments of the present invention, using a summated level of power supplied to the load allows a determination of high or low operation efficiency of the generator. Thus, normal utility power and the generated power in the generator are set to be supplied selectively to the load. As a result, operation efficiency of the generator can be maximized, and the maximized operation efficiency results in a decreased level of power consumption in the hybrid generation system.
The invention being thus described, it will be obvious that the same may be varied in many ways. Such variations are not to be regarded as a departure from the spirit and scope of the invention and all such modifications as would be obvious to one skilled in the art are intended to be included within the scope of the following claims.