The present invention relates in general to precast panels. In particular, the present invention relates to panels having precast concrete beams and a corrugated metal deck.
It is known to use certain methods for building concrete floor slabs on the above grade floors of multi-story buildings. One method simply builds forms in place, pours the floor slab, and removes the forms after the slab reaches sufficient strength. Pans are used to form voids in the floor slab to reduce weight, while maintaining strength. This method allows the floor system to be inherently fireproof, to create thin floor sections, and to be reusable. This method, however, is costly, requires long construction times, and provides for a floor system having a heavy selfweight.
Another method involves creating a structural system with steel beams or open web joists, attaching corrugated metal decking to provide a form and casting the floor on the decking. The decking and the structural supports remain in place. This method allows for low selfweight, relatively fast construction, and relatively low cost. This method, however, requires the steel beams or joists to be fireproofed, the overall floor system to be relatively deep (often causing the building to be taller), and mechanical systems that usually run below the floor joists (which further increases building height).
Another method involves making a precast concrete element having a portion of the floor slab in its construction, placing the element(s) on structural supports and casting a thin topping slab over the slab portion for the final finished floor. The precast elements include single tees, double tees, hollow-core slabs, and flat slabs. The resulting floor system is fireproof, has a relatively fast construction time, and allows for offsite fabrication of large floor components. This method, however, is costly, expensive to transport, and, in the case of tees, results in a relatively deep floor system.
In the drawings, like reference numerals represent similar parts of the illustrated embodiments of the present invention throughout the several views wherein:
One embodiment of the present invention provides for a structural panel system (e.g., a structural floor system) that combines precast concrete structural beams (e.g., ribs) for load capacity with corrugated metal deck to provide a diaphragm and a form for a poured-in-place concrete topping slab. The embodiment combines the construction speed and offsite fabrication of precast elements with low self-weight, similar to steel structure and deck, with the relatively shallow depth and fire resistance of cast-in-place systems. The embodiment can provide for the best features of known methods, discussed above, without their respective disadvantages.
In one implementation of the present invention, a hybrid precast/steel deck panel includes structural ribs in a longitudinal direction that may provide primary spanning capacity, with minor ribs in a transverse direction that may provide lateral stability to the longitudinal ribs. These beam elements may be formed to lock small panels of corrugated steel deck into the rib elements permanently. The edges of the upper section of the ribs may be cast with an undulating pattern to interlock the rib with the poured-in-place slab, resulting in a composite action between the rib and the poured-in-place slab. The full depth of the system (e.g., a floor system) may be the effective beam depth. These ribs may be reinforced, prestressed, and/or post-tensioned, as loads and conditions dictate.
The corrugated steel deck panels may serve as the structural diaphragm of the individual panels during handling, shipping, and/or erection. The corrugated steel deck panels may also serve as a permanent form for the poured-in-place topping slab. The floor slab may be poured to the thickness required for load and fireproofing requirements. The deck may also be fireproofed after erection to allow for thinner floor slabs.
The panels may be fabricated in standard precast beds, where they can be prestressed. These panels have a low self-weight, as the metal deck may weigh 1 or 2 pounds per square foot as compared to 25 to 30 pounds for the 2″ deck on tees or 50 pounds for hollow core slabs. This low self-weight provides for less expensive shipping and allows for smaller equipment to erect the panels.
The formed lugs in the upper edge of the beams may form a composite with the poured-in-place slab to allow for a thinner overall floor system. The corrugated metal deck may be fireproofed if a thinner overall floor thickness is needed. This allows for a single mold to accommodate a greater variety of loading conditions. The concrete floor slab may also be penetrated for piping, conduits, and/or ducts, unlike post tensioned cast-in-place floors.
One embodiment of a hybrid precast concrete/metal deck panel and its method of manufacture and use will be further described below with reference to
A precast bed (I) includes a collection of void forms (H), placed upon it in an array forming both longitudinal ribs (A) and transverse ribs (B). These void forms have a flexible filler (G) with an undulating upper surface that forms a seal with the corrugations in a metal corrugated deck (D). Onto the upper surface of the metal deck (D) may be placed a flexible filler mat (F) to prevent concrete from flowing onto the upper surface of the metal deck (D). The edges of the metal deck (D) may extend past the upper (F) and lower (G) flexible fillers to interlock into the concrete of ribs (A) and (B).
After all void forms (H) are covered, reinforcing steel may be installed in the ribs (A) and (B). Concrete may then be cast into the ribs (A) and (B), with the flexible filler (F) preventing the concrete from covering the upper surface of the metal deck (D).
The upper flexible filler (F) may include an undulating pattern on all four edges that create shear lugs (E) in the precast ribs (A) and (B) (see
After the precast concrete has gained sufficient strength, the upper flexible fillers (F) may be removed, and the panel may be removed from the mold as well. The panel may then be transported to the construction site where it can be erected onto a primary support framing. A topping slab (J) may then be poured over the entire floor to provide the desired load bearing and fire resistive capacity.
This embodiment of a type of panel combines the low weight of corrugated metal floor decking with the fire resistance and load carrying capacity of precast concrete. By taking advantage of the low weight of corrugated metal decking to provide the form for a poured-in-place floor, this panel can be manufactured and shipped more economically than existing panels that use a thin concrete slab as the form element. Because the structural beams (e.g., structural ribs) are precast concrete, for example, they do not require additional fireproofing as structural steel does.
The foregoing presentation of the described embodiments is provided to enable any person skilled in the art to make and use the present invention. Various modifications to these embodiments are possible, and the generic principles presented herein may be applied to other embodiments as well. As such, the present invention is not intended to be limited to the embodiments shown above, and/or any particular configuration of structure but rather is to be accorded the widest scope consistent with the principles and novel features disclosed in any fashion herein.
This application claims the benefit of U.S. Provisional Application No. 60/326,225, filed Oct. 2, 2001.
Number | Name | Date | Kind |
---|---|---|---|
918699 | Ransome | Apr 1909 | A |
1101188 | Kahn | Jun 1914 | A |
1959119 | Young | May 1934 | A |
1990157 | Young | Feb 1935 | A |
2268311 | Sheehan | Dec 1941 | A |
3864888 | Tupper et al. | Feb 1975 | A |
3890750 | Berman et al. | Jun 1975 | A |
4628654 | Boswel | Dec 1986 | A |
4682458 | Sparrow | Jul 1987 | A |
4685264 | Landis | Aug 1987 | A |
5317846 | Michlovic | Jun 1994 | A |
5941035 | Purse | Aug 1999 | A |
6098359 | Stodulka | Aug 2000 | A |
6128878 | Erickson | Oct 2000 | A |
6508043 | Bond et al. | Jan 2003 | B1 |
6568139 | Bot | May 2003 | B1 |
6578343 | Dumler et al. | Jun 2003 | B1 |
6631599 | Takagi | Oct 2003 | B1 |
20040074022 | Tokuno et al. | Apr 2004 | A1 |
Number | Date | Country | |
---|---|---|---|
20030093965 A1 | May 2003 | US |
Number | Date | Country | |
---|---|---|---|
60326225 | Oct 2001 | US |