The present invention relates to a hydraulic excavator.
On a hydraulic excavator, there mounted are a boom, an arm, and a bucket, and a plurality of hydraulic actuators such as a boom cylinder, an arm cylinder and a bucket cylinder for driving those. Generally, since the number of hydraulic pumps that deliver hydraulic fluid for driving hydraulic actuators is smaller than that of hydraulic actuators, when a plurality of hydraulic actuators are simultaneously operated, it is necessary to appropriately distribute hydraulic fluid delivered from one hydraulic pump to the plurality of hydraulic actuators. As documents that disclose prior arts of such a hydraulic as described above, there are Patent Document 1 and Patent Document 2, for example.
The hydraulic circuit disclosed in Patent Document 1 is configured such that a restrictor is provided before a first arm directional control valve (arm second directional control valve) of a bypass line (parallel line) and even when operation such as horizontal drawing (composite operation of boom raising and arm crowding) in which the load pressure applied to the arm cylinder is lower than that applied to the boom cylinder is performed, the flow of hydraulic fluid to flow into the first arm directional control valve (arm second directional control value) is restricted and hydraulic fluid flows preferentially to the first boom directional control valve (boom first directional control valve).
In the hydraulic circuit disclosed in Patent Document 1 configured in this manner, even when the boom raising operation is gradually decreased to reduce the hydraulic fluid to flow into the boom cylinder in the horizontal drawing operation, the flow rate of hydraulic fluid flowing into the arm cylinder through the bypass line (parallel line) remains restricted by the restrictor. Therefore, there has been a possibility that hydraulic pressure loss generated at the restrictor may cause deterioration of the work efficiency or increase in fuel consumption amount.
On the other hand, the hydraulic circuit disclosed in Patent Document 2 has been invented in order to solve the problem of the hydraulic circuit disclosed in Patent Document 1. In the hydraulic circuit, the restrictor of the bypass line (parallel line) in the hydraulic circuit disclosed in Patent Document 1 is removed, and instead, a solenoid proportional pressure reducing valve is provided in front of an arm two-speed selector valve (arm second directional control valve) and an arm operation lever (arm pilot valve). The arm two-speed selector valve (arm second directional control valve) is used like a variable opening restrictor to reduce the hydraulic pressure loss generated upon horizontal drawing operation.
In the hydraulic circuit disclosed in Patent Document 1, even when the boom raising operation is gradually decreased to reduce the hydraulic fluid that flows into the boom cylinder in horizontal drawing operation, since the flow rate of hydraulic fluid that flows into the arm cylinder through the bypass line (parallel line) remains restricted by the restrictor, there has been a possibility that the hydraulic pressure loss generated at the restrictor may cause deterioration of the work efficiency or increase in fuel consumption amount.
On the other hand, in the hydraulic circuit disclosed in Patent Document 2, since the spool stroke amount of the arm two-speed selector valve (arm second directional control valve) is limited to a fixed amount, even when the arm crowding operation is gradually increased during horizontal drawing operation, the center bypass opening of the arm two-speed selector valve (arm second directional control valve) does not close fully. Accordingly, the amount of hydraulic fluid that flows from the arm two-speed selector valve (arm second directional control valve) into the arm cylinder does not increase. In other words, in the hydraulic circuit disclosed in Patent Document 2, hydraulic fluid delivered from the hydraulic pump cannot be fully used effectively, and there is a problem that the hydraulic circuit disclosed in Patent Document 2 is inferior to the hydraulic circuit disclosed in Patent Document 1 in terms of the arm crowding speed upon horizontal drawing maximum operation.
The present invention has been made in view of the subject described above, and it is an object of the present invention to provide a hydraulic excavator that can suppress the fuel consumption amount and improve the work efficiency by reducing the hydraulic pressure loss generated when a plurality of hydraulic actuators different in load are simultaneously operated simultaneously.
In order to achieve the object described above, according to the present invention, there is provided a hydraulic excavator that includes a main body configured from an upper swing structure and a lower track structure; a boom pivotably coupled to the main body; an arm pivotably coupled to a distal end portion of the boom; a bucket pivotably coupled to a distal end portion of the arm; a first hydraulic pump; a second hydraulic pump; a boom cylinder or a bucket cylinder to which hydraulic fluid is supplied from the first hydraulic pump and the second hydraulic pump to drive the boom or the bucket; an arm cylinder to which hydraulic fluid is supplied from the first hydraulic pump to drive the arm; a first operation device that issues an instruction on operation of the boom cylinder or the bucket cylinder; a second operation device that issues an instruction on operation of the arm cylinder; a first directional control valve that controls a direction and a flow rate of hydraulic fluid to be supplied from the first hydraulic pump to the boom cylinder or the bucket cylinder in response to an operation amount of the first operation device; a second directional control valve that controls a direction and a flow rate of hydraulic fluid to be supplied from the first hydraulic pump to the arm cylinder in response to an operation amount of the second operation device; and a third directional control valve that controls a direction and a flow rate of hydraulic fluid to be supplied from the second hydraulic pump to the arm cylinder in response to an operation amount of the second operation device, the first directional control valve and the second directional control valve being tandem connected to a center bypass line of the first hydraulic pump and being connected in parallel to a parallel line branched from the center bypass line, the hydraulic excavator including a center bypass flow control valve that is arranged at a most downstream of the center bypass line and limits a flow rate of hydraulic fluid passing through the center bypass line in response to an operation amount of the second operation device when the second operation device is operated, and a spool stroke limitation device that is configured to, in a case where the first operation device and the second operation device are operated simultaneously, limit a spool stroke amount of the second directional control valve in response to an operation amount of the first operation device in a state in which a spool stroke amount of the third directional control valve is controlled in response to an operation amount of the second operation device.
According to the present invention configured in such a manner as described above, the flow rate passing through the center bypass line from the first hydraulic pump is restricted in response to the operation amount of the second operation device when the second operation device is operated, and when the first operation device and the second operation device are operated simultaneously, in a state in which the spool stroke amount of the third directional control valve is controlled in response to the operation amount of the second operation device, the spool stroke amount of the second directional control valve is restricted in response to the operation amount of the first operation device. Therefore, the hydraulic pressure loss generated when the plurality of hydraulic actuators different in load are operated simultaneously is reduced, and consequently, the fuel consumption can be suppressed and besides the work efficient can be improved.
According to the present invention, the fuel consumption amount can be suppressed and besides the work efficiency can be improved by reducing the hydraulic pressure loss generated when a plurality of hydraulic actuators different in load are simultaneously operated.
In the following, a hydraulic excavator according to an embodiment of the present invention is described with reference to the drawings. It is to be noted that, in the figures, an equivalent member is denoted by a like reference character and overlapping description is suitably omitted.
In the following, a first embodiment of the present invention is described with reference to
The directional control valves 18 to 22 are tandem center type spool valves and are operated by secondary pressures outputted from the pilot valves 25 to 27. The pilot valves 25 to 27 are manual pressure reducing valves, and reduces the pressure of pressure fluid delivered from a pilot pump 28 of the fixed capacity type, which is driven by the upper swing structure 1, in response to a lever operation amount and output the reduced pressures as secondary pressures. Further, in a delivery line 40 of the pilot pump 28, a pilot relief valve 29 is provided such that the pressure of the delivery line 40 is kept fixed. On a hydraulic line that connects the secondary pressure ports of the pilot valves 25 to 27 to the operation pressure ports of the directional control valves 18 to 22, pressure sensors 25a, 25b, 26a, 26b, 27a, and 27b are provided such that the secondary pressure of each of the pilot valves can be detected.
At the most downstream of the center bypass line 12, a center bypass flow control valve 31 is provided. An operation pressure port 31a of the center bypass flow control valve 31 is connected to a second pressure port on the arm crowding side of the arm pilot valve 26 through a pilot line 41. Consequently, a secondary pressure on the arm crowding side of the arm pilot valve 26 acts on the operation pressure port 31a of the center bypass flow control valve 31. An operation pressure port 21a on the arm crowding side of the arm second directional control valve 21 is connected to a secondary pressure port of the solenoid proportional pressure reducing valve 30 through a pilot line 42. A primary pressure port of the solenoid proportional pressure reducing valve 30 is connected to a secondary pressure port on the arm crowding side of the arm pilot valve 26 through the pilot line 41. The operation pressure to act on the operation pressure port 21a can be controlled by the solenoid proportional pressure reducing valve 30.
The pressure sensors 25a, 25b, 26a, 26b, 27a, and 27b and the solenoid proportional pressure reducing valve 30 are connected to a controller 100, and the controller 100 controls the secondary pressure of the solenoid proportional pressure reducing valve 30 on the basis of operation pressures detected by the pressure sensors 25a, 25b, 26a, 26b, 27a, and 27b.
Operation of the controller 100 is described with reference to
The opening area calculation section C01 calculates the target meter-in opening (PC) area of the arm second directional control valve 21 according to individual operation pressures using conversion tables T01 to T04 corresponding to the arm crowding operation pressure PIai, the boom raising operation pressure PIbu, the bucket crowding operation pressure PIbi, and the bucket dumping operation pressure PIbo, respectively.
A characteristic of the conversion table T03 is depicted in
Referring back to
A conversion table T05 calculates a target value of the secondary pressure of the solenoid proportional pressure reducing valve 30 corresponding to the opening area outputted from the operation decision section D01. The characteristic of the conversion table T05 is a characteristic in which the axis of ordinate and the axis of abscissa of the meter-in opening (PC) characteristic at the time of arm crowding operation of the arm second directional control valve 21. A conversion table T06 calculates driving current Ird of the solenoid proportional pressure reducing valve 30 corresponding to the target pressure outputted from the conversion table T05 and outputs the driving current Ird to the solenoid proportional pressure reducing valve 30. The characteristic of the conversion table T06 is a characteristic in which the axis of ordinate and the axis of abscissa of the current-pressure characteristic of the solenoid proportional pressure reducing valve 30 are exchanged.
Actual operation of the present embodiment configured in such a manner as described above is described in regard to several scenes.
<Where Arm Crowding Independent Operation is Performed>
If the operator operates the arm pilot valve 26 in an arm crowding direction, then arm crowding operation pressure PIai according to the operation amount is outputted from the arm crowding side secondary pressure port of the arm pilot valve 26. The arm crowding operation pressure PIai acts on an operation pressure port 20a on the arm crowding side of the arm first directional control valve 20, the operation pressure port 31a of the center bypass flow control valve 31 and the primary pressure port of the solenoid proportional pressure reducing valve 30, and the pressure is detected by the pressure sensor 26b and inputted to the controller 100. At this time, all of the boom raising operation pressure PIbu, the bucket crowding operation pressure PIbi, and the bucket dumping operation pressure PIbo are zero and are lower than PIth, and therefore, the controller 100 outputs, at SW01, the maximum opening area Amax. Accordingly, the target value of the secondary pressure of the solenoid proportional pressure reducing valve 30 calculated by the conversion table T05 becomes equal to the operation pressure at the maximum stroke of the arm second directional control valve 21, and therefore, the stroke amount of the arm second directional control valve 21 is not limited.
As a result, all of the arm first directional control valve 20, arm second directional control valve 21, and center bypass flow control valve 31 perform a stroke in response to the arm crowding operation pressure PIai, and therefore, hydraulic fluid delivered from the hydraulic pumps 9 and 10 passes through the arm first directional control valve 20 and the arm second directional control valve 21 and flows into the arm cylinder 7. Consequently, in the case of arm crowding independent operation, the stroke amount of the arm second directional control valve 21 is not limited and the arm 4 operates in accordance with the lever operation.
<Where Horizontal Drawing Operation is Performed (Maximum Speed)>
When horizontal drawing operation is to be performed at a maximum speed, the operator first operates the boom pilot valve 25 and the arm pilot valve 26 maximally, and thereafter, while the arm pilot valve 26 is kept in the maximum operation, the operation amount of the boom pilot valve 25 is gradually decreased such that the claw tip of the bucket 5 moves along the ground. At this time, the boom raising operation pressure PIbu outputted from the boom pilot valve 25 acts on the directional control valves 18 and 19 for the boom, and the arm crowding operation pressure PIai outputted from the arm pilot valve 26 acts on the operation pressure port 20a of the arm first directional control valve 20, the primary pressure port of the solenoid proportional pressure reducing valve 30, and the operation pressure port 31a of the center bypass flow control valve 31.
The controller 100 decides that a boom raising operation is performed by the operation decision section SW01 and executes a process of the opening area calculation section C01. In the conversion table T01 of the opening area calculation section C01, the arm crowding operation pressure PIai is the maximum operation pressure PImax, and therefore, the conversion table T01 outputs the maximum opening area Amax. In the conversion table T02, since the boom raising operation pressure PIbu varies from the maximum operation pressure PImax down to zero, the opening area A according to the boom raising operation pressure PIbu is outputted. In the conversion tables T03 and T04, both of the bucket crowding operation pressure PIbi and the bucket dumping operation pressure PIbo are zero (lower than PImin), and therefore, both of the conversion tables T03 and T04 output the maximum opening area Amax. Since all of the outputs of the conversion tables T01, T03, and T04 are the maximum opening area Amax at the minimum value selection section D01, the output of the conversion table T02 is outputted normally at the minimum value selection section D01. Accordingly, the secondary pressure of the solenoid proportional pressure reducing valve 30 is controlled such that the arm crowding side meter-in opening (PC) of the arm second directional control valve 21 becomes the opening area outputted from the conversion table T02.
When horizontal drawing operation is to be performed at a maximum speed, the arm crowding operation pressure PIai is operated fixedly with the maximum operation pressure PImax, and the boom raising operation pressure PIbu gradually decreases after it is operated to the maximum operation amount PImax at the time of starting of horizontal drawing. Then, at the point at which the arm 4 becomes vertical with respect to the ground, the operation lever (arm pilot valve 26) is operated to the neutral, whereupon the boom raising operation pressure PIbu becomes zero. At this time, the directional control valves 18 and 19 operate in accordance with the boom raising operation amount PIbu, and the arm first directional control valve 20 and the center bypass flow control valve 31 are placed into a maximum stroke state. Further, the arm crowding side meter-in opening (PC) of the arm second directional control valve 21 is the opening area Abu at the time of starting of horizontal drawing, and it gradually increases from this as the boom raising operation pressure PIbu decreases. Then, if the operation lever (arm pilot valve 26) is operated to the neutral and the boom raising operation pressure PIbu becomes zero at the point at which the arm 4 becomes vertical with respect to the ground, then the opening area becomes the maximum opening area (without any limit to the spool stroke amount).
As a result, almost all of hydraulic fluid delivered from the first hydraulic pump 9 flows into the boom cylinder 6 at the time of starting of horizontal drawing. However, after the middle stage of the horizontal drawing, as the boom raising operation amount PIbu decreases, the flow amount of the hydraulic fluid that flows into the arm cylinder 7 gradually increases. Then, when the boom raising operation amount PIbu decreases to zero at the end of the horizontal drawing, the hydraulic fluid flows by the whole amount into the arm cylinder 7. Meanwhile, hydraulic fluid delivered from the second hydraulic pump 10 flows by an almost whole amount into the arm cylinder 7 because the load pressure applied to the arm cylinder 7 is lower than the load pressure applied to the boom cylinder 6.
By such operation as described above, hydraulic fluid is supplied preferentially to the boom cylinder 6 to secure a boom raising speed at the time of starting of horizontal drawing, and at the middle stage of the horizontal drawing, the flow rate of hydraulic pressure that flows into the arm cylinder 7 is increased smoothly in response to decrease in the boom raising operation amount. Then at the last stage of the horizontal drawing, when the boom raising operation is ended, sudden increase in the arm speed is suppressed by the inclination portion X of the conversion table T02 and the arm speed can be increased smoothly. Consequently, the hydraulic pressure loss generated by the restrictor can be reduced together with improvement of the work efficiency upon horizontal drawing.
<Where Horizontal Drawing Operation is Performed (Intermediate Speed)>
Where horizontal drawing is performed at an intermediate speed, only the arm crowding operation pressure PIai is different in comparison with the case in which horizontal drawing is performed at a maximum speed. Here, if it is assumed that the arm crowding operation pressure PIai when horizontal drawing is performed at an intermediate speed is equal to or lower than PI0 of
As a result, when horizontal drawing operation is performed at an intermediate speed, hydraulic fluid delivered from the first hydraulic pump 9 almost flows into the boom cylinder 6 while hydraulic fluid delivered from the second hydraulic pump 10 almost flows into the arm cylinder 7. Consequently, where horizontal drawing is performed at an intermediate speed, hydraulic fluid is supplied preferentially to the boom cylinder, and good workability can be implemented.
<Where Arm Crowding and Bucket Crowding or Bucket Dumping are Performed Simultaneously>
Where arm crowding and bucket crowding or bucket dumping are performed simultaneously, since boom raising operation in the operation at the time of horizontal drawing described above is only replaced with bucket crowding or bucket dumping operation, description of that is omitted.
In the following, advantageous effects achieved by the hydraulic excavator 200 according to the present embodiment are described in comparison with those by the prior art.
The hydraulic circuit depicted in
In the hydraulic circuit configured in this manner, even where the boom raising operation is gradually decreased to decrease the hydraulic fluid to flow into the boom cylinder 6 in horizontal drawing operation, since the flow rate of the hydraulic fluid to flow into the arm cylinder 7 through the parallel line 13 remains restricted by the restrictor 24, there is the possibility that deterioration of the work efficiency or increase in fuel consumption is caused by hydraulic pressure loss generated at the restrictor 24.
Meanwhile, the hydraulic circuit depicted in
In the hydraulic circuit depicted in
On the other hand, in the hydraulic circuit depicted in
In contrast, in the present embodiment, in the hydraulic excavator 200 that includes: the main body including the upper swing structure 1 and the lower track structure 2; the boom 3 pivotably coupled to the main body; the arm 4 pivotably coupled to a distal end portion of the boom 3; the bucket 5 pivotably coupled to a distal end portion of the arm 4; the first hydraulic pump 9; the second hydraulic pump 10; the boom cylinder 6 or the bucket cylinder 8 to which hydraulic fluid is supplied from the first hydraulic pump 9 and the second hydraulic pump 10 to drive the boom 3 or the bucket 5; the arm cylinder 7 to which hydraulic fluid is supplied from the first hydraulic pump 9 to drive the arm 4; the first operation device 25, 27 that issues an instruction on operation of the boom cylinder 6 or the bucket cylinder 8; the second operation device 26 that issues an instruction on operation of the arm cylinder 7; the first directional control valve 18, 22 that controls a direction and a flow rate of hydraulic fluid to be supplied from the first hydraulic pump 9 to the boom cylinder 6 or the bucket cylinder 8 in response to an operation amount of the first operation device 25, 27; the second directional control valve 21 that controls a direction and a flow rate of hydraulic fluid to be supplied from the first hydraulic pump 9 to the arm cylinder 7 in response to an operation amount of the second operation device 26; and the third directional control valve 20 that controls a direction and a flow rate of hydraulic fluid to be supplied from the second hydraulic pump 10 to the arm cylinder 7 in response to an operation amount of the second operation device 26, the first directional control valve 18, 22 and the second directional control valve 21 being tandem connected to the center bypass line 12 of the first hydraulic pump 9 and being connected in parallel to the parallel line 13 branching from the center bypass line 12, the hydraulic excavator 200 including the center bypass flow control valve 31 that is arranged at the most downstream of the center bypass line 12 and limits a flow rate of hydraulic fluid passing through the center bypass line 12 in response to an operation amount of the second operation device 26 in a case where the second operation device 26 is operated, and including the spool stroke limitation device 30, 100 that, in a case where the first operation device 25, 27 and the second operation device 26 are operated simultaneously, limits the spool stroke amount of the second directional control valve 21 in response to the operation amount of the first operation device 25, 27 in a state in which the spool stroke amount of the third directional control valve 20 is controlled in response to the operation amount of the second operation device 26.
Further, in the hydraulic excavator 200 according to the present embodiment, the first operation device 25, 27 includes the boom pilot valve 25 and the bucket pilot valve 27 that reduce delivery pressure of the pilot pump 28 in response to the operation amount of the first operation device 25, 27 and output resulting pressure as operation pressure of the first directional control valve 18, 22, and the second operation device 26 includes the arm pilot valve 26 that reduces delivery pressure of the pilot pump 28 in response to the operation amount of the second operation device 26 and outputs resulting pressure as operation pressure of the second directional control valve 21 and the third directional control valve 20.
Further, the hydraulic excavator 200 according to the present embodiment further includes the pressure sensors 26b, 25a, 27a, and 27b that detect the arm crowding operation pressure PIai outputted from the pilot valve 26, the boom raising operation pressure PIbu outputted from the boom pilot valve 25, the bucket crowding operation pressure PIbi outputted from the bucket pilot valve 27, and the bucket dumping operation pressure PIbo outputted from the bucket pilot valve 27, and the spool stroke limitation device 30, 100 includes the first solenoid proportional pressure reducing valve 30 that has the primary pressure port connected to the secondary pressure port on the arm crowding side of the arm pilot valve 26 and the secondary pressure port connected to the operation pressure port 21a on the arm crowding side of the second directional control valve 21, and the controller 100 that controls the secondary pressure of the first solenoid proportional pressure reducing valve 30 on the basis of the target meter-in opening area having the lowest value among the target meter-in opening areas of the second directional control valve 21 determined on the basis of the arm crowding operation pressure PIai, the boom raising operation pressure PIbu, the bucket crowding operation pressure PIbi, and the bucket dumping operation pressure PIbo, respectively.
According to the hydraulic excavator 200 according to the present embodiment configured in such a manner as described above, when the second operation device 26 is operated, the flow rate passing through the center bypass line 12 is restricted in response to the operation amount of the second operation device 26. When the first operation device 25, 27 and the second operation device 26 are operated simultaneously, in a state in which the spool stroke amount of the third directional control valve 20 is controlled in response to the operation amount of the second operation device 26, the spool stroke amount of the second directional control valve 21 is limited in response to the operation amount of the first operation device 25, 27. Therefore, the hydraulic pressure loss generated when the plurality of hydraulic actuators 6 to 8 different in load are operated simultaneously is reduced, and consequently, the fuel consumption can be suppressed and besides the work efficient can be improved.
Further, the controller 100 sets the target opening area of the first solenoid proportional pressure reducing valve 30 to a maximum opening area Amax in a case where all of the boom raising operation pressure PIbu, the bucket crowding operation pressure PIbi, and the bucket dumping operation pressure PIbo are equal to or lower than a predetermined pressure PIth. Consequently, when the arm cylinder 7 is driven in operation other than horizontal drawing operation, the spool stroke amount of the arm second directional control valve 21 is not limited, and therefore, hydraulic fluid can be supplied from the first hydraulic pump 9 to the arm cylinder 7 in response to the operation amount of the arm pilot valve 26.
Further, the controller 100 can individually set minimum values Ao, Abu, Abi, and Abo of target meter-in opening areas of the second directional control valve 21, the minimum values being respectively corresponding to the arm crowding operation pressure PIai, the boom raising operation pressure PIbu, the bucket crowding operation pressure PIbi, and the bucket dumping operation pressure PIbo. Consequently, since the meter-in opening characteristic of the arm second directional control valve 21 can be adjusted finely in response to a work to be carried out or to a preference of the operator, the work efficiency can be improved.
The operation pressure port 31a of the center bypass flow control valve 31 is connected to the secondary pressure port of a solenoid proportional pressure reducing valve 32 through a pilot line 43. On the operation pressure port 31a of the center bypass flow control valve 31, secondary pressure outputted from the solenoid proportional pressure reducing valve 32 acts. To the primary pressure port of the solenoid proportional pressure reducing valve 32, the delivery line 40 of the pilot pump 28 is connected such that hydraulic fluid delivered from the pilot pump 28 is supplied. Secondary pressure outputted from the solenoid proportional pressure reducing valve 32 is controlled by the controller 100. The controller 100 controls the secondary pressure of the solenoid proportional pressure reducing valve 32 such that the opening characteristic of the center bypass flow control valve 31 coincides with the opening characteristic CB of
The hydraulic excavator 200 according to the present embodiment further includes a second solenoid proportional pressure reducing valve 32 having a primary pressure port connected to the delivery line 40 of the pilot pump 28 and a secondary pressure port connected to the operation pressure port 31a of the bypass flow control valve 31. The controller 100 controls the secondary pressure of the second solenoid proportional pressure reducing valve 32 on the basis of a characteristic obtained when the operation pressure depicted in
According to the hydraulic excavator 200 according to the present embodiment configured in such a manner as described above, not only obtaining advantageous effects similar to those of the first embodiment, but also enabling finely adjustment of the opening characteristic of the center bypass flow control valve 31 at the time of an arm crowding operation in response to a work to be carried out or to a preference of the operator because the center bypass flow control valve 31 is driven by the solenoid proportional pressure reducing valve 32, and thus the work efficiency can be improved.
Although the embodiments of the present invention have been described in detail above, the present invention is not limited to the embodiments described above but includes various modifications. For example, the embodiments described above have been described in detail in order to explain the present invention in an easy-to-understand manner and are not necessarily limited to what includes all configurations described above. Further, also it is possible to add, to the configuration of a certain embodiment, part of the configuration of another embodiment, and also it is possible to delete part of the configuration of a certain embodiment or to replace part of the configuration of a certain embodiment with part of another embodiment.
Number | Date | Country | Kind |
---|---|---|---|
2019-053782 | Mar 2019 | JP | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/JP2019/048766 | 12/12/2019 | WO |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2020/188920 | 9/24/2020 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
5083428 | Kubomoto | Jan 1992 | A |
5493950 | Kim | Feb 1996 | A |
5673558 | Sugiyama | Oct 1997 | A |
5950430 | Tohji | Sep 1999 | A |
6378303 | Higuchi | Apr 2002 | B1 |
8607557 | Ikeda | Dec 2013 | B2 |
9869311 | Du | Jan 2018 | B2 |
9903097 | Hashimoto | Feb 2018 | B2 |
9932994 | Hashimoto | Apr 2018 | B2 |
10253479 | Kaneta | Apr 2019 | B2 |
10619632 | Kondo | Apr 2020 | B2 |
11078646 | Kurokawa | Aug 2021 | B2 |
11346081 | Yamashita | May 2022 | B2 |
11434937 | Misaki | Sep 2022 | B2 |
20070169474 | Oka et al. | Jul 2007 | A1 |
20120067443 | Horii | Mar 2012 | A1 |
20130160439 | Lee et al. | Jun 2013 | A1 |
20150059331 | Hashimoto | Mar 2015 | A1 |
Number | Date | Country |
---|---|---|
58-146632 | Sep 1983 | JP |
3-213703 | Sep 1991 | JP |
7-119709 | May 1995 | JP |
2007-192344 | Aug 2007 | JP |
2010-47983 | Mar 2010 | JP |
5219691 | Jun 2013 | JP |
2013-543086 | Nov 2013 | JP |
2014-1769 | Jan 2014 | JP |
2015-36495 | Feb 2015 | JP |
Entry |
---|
Korean-language Office Action issued in Korean Application No. 10-2021-7005263 dated Jul. 20, 2022 with (five (5) pages). |
International Preliminary Report on Patentability (PCT/IB/338 & PCT/IB/373) issued in PCT Application No. PCT/JP2019/048766 dated Sep. 30, 2021, including English translation of document C2 (Japanese-language Written Opinion (PCT/ISA/237) filed on Mar. 2, 2021) (five (5) pages). |
International Search Report (PCT/ISA/210) issued in PCT Application No. PCT/JP2019/048766 dated Feb. 25, 2020 with English translation (five (5) pages). |
Japanese-language Written Opinion (PCT/ISA/237) issued in PCT Application No. PCT/JP2019/048766 dated Feb. 25, 2020 (three (3) pages). |
Number | Date | Country | |
---|---|---|---|
20210348366 A1 | Nov 2021 | US |