1. Field of the Invention
The present invention relates to a hydraulic system for a construction machinery such as a hydraulic excavator.
2. Description of the Related Art
In a construction machinery such as a hydraulic excavator, hydraulic actuators are driven by hydraulic pressure (pressure of hydraulic fluid) obtained by driving a hydraulic pump by using a prime mover (engine, electric motor, etc.). The hydraulic actuators are small-sized, lightweight and high-power actuators and are widely used as actuators for construction machineries. In a hydraulic excavator that drives its front structure by using a hydraulic cylinder, the front structure can be moved in the gravitational direction by using the front structure's potential energy as the power for the movement, without the need of inputting hydraulic energy.
In this case, the speed of the front structure in the gravitational direction has to be controlled properly. For the control of the descending speed of the front structure, conventional construction machineries generally throttle the meter-out opening area of the control valve while dumping the hydraulic energy of the hydraulic fluid in the form of heat. In contrast, there exists a construction machinery comprising a regeneration device including a hydraulic motor and an electric motor and recovering the hydraulic energy (generally dumped in the form of heat) as electric energy by driving the electric motor with the hydraulic motor driven by the return fluid returning to the tank (see JP, A 2007-327527 (hereinafter referred to as “Patent Document 1”), for example).
There are cases where such a construction machinery comprising the regeneration device has a return fluid control valve for controlling the flow of the return fluid from a hydraulic actuator in relation to the flow rate control of the return fluid flowing into the regeneration device. The construction machinery described in Patent Document 1 employs a return fluid control valve of the solenoid pilot type. Compared to a return fluid control valve of a hydraulic type that is assumed to be controlled purely hydraulically, the return fluid control valve of the solenoid pilot type is capable of performing more meticulous control according to the current condition by taking advantage of the merit of the electrical control. For example, when the front structure is moved in the gravitational direction, the return fluid control valve of the solenoid pilot type is capable of making the front structure smoothly start the descent by blocking the flow of the return fluid into the regeneration device and returning all the return fluid to the tank at the beginning of the descent.
However, in cases like a malfunction of a solenoid valve in contradiction to the control logic due to trouble in the electric system (a power supply failure of a solenoid valve driver, a failure of a controller, etc.), an abnormality can occur to the control of the return fluid and an irregularity not intended by the operator can occur to the operation of the front structure.
The object of the present invention, which has been made in consideration of the above-described situation, is to provide a hydraulic system for a construction machinery capable of suppressing the irregularity in the operation of the front structure not intended by the operator.
To achieve the above object, a hydraulic system for a construction machinery according to a an aspect of the present invention comprises: a hydraulic pump; a cylinder control valve adapted to control the flow of hydraulic fluid from the hydraulic pump to a hydraulic cylinder; an operating device adapted to operate the cylinder control valve; a regeneration motor adapted to be driven by return fluid from one hydraulic fluid port of the hydraulic cylinder; a regeneration electric motor adapted to convert rotary power of the regeneration motor into electric energy; a pilot hydraulic pressure source; at least one return fluid control valve adapted to control the flow of the return fluid according to pilot pressure that is led from the pilot hydraulic pressure source in conjunction with an operation on the operating device; at least one solenoid valve for return fluid control valve adapted to control the pilot pressure for driving the return fluid control valve; and a malfunction prevention device adapted to be capable of interrupting the delivery of the pilot pressure from the solenoid valve for return fluid control valve to the return fluid control valve.
Referring now to the drawings, a description will be given in detail of preferred embodiments of the present invention.
1. Construction Machinery
The hydraulic excavator shown in
The track structure 101 includes a pair of (left and right) crawlers 11 (only one side is shown in
The swing structure 20 includes a swing frame 21, an engine (prime mover) 22 mounted on the swing frame 21, a swing hydraulic motor 10 for swinging (rotating) the swing structure 20 with respect to the track structure 101, a deceleration mechanism 26 for reducing the revolution speed of the swing hydraulic motor 10, a cab in which the operator rides, and so forth.
The excavation mechanism 30 is provided in a front part (where the cab is arranged) of the swing structure 20. The excavation mechanism 30 includes a boom 31 which can be raised and lowered, a boom cylinder 32 for driving the boom 31, an arm 33 which is supported by the boom 31 to be rotatable around an axis in the vicinity of the tip end of the boom 31, an arm cylinder 34 for driving the arm 33, a bucket 35 which is supported by the arm 33 to be rotatable around an axis in the vicinity of the tip end of the arm 33, a bucket cylinder 36 for driving the bucket 35, and so forth.
2. Hydraulic System
The hydraulic system 40 is a device (system) for driving and controlling hydraulic actuators such as the swing hydraulic motor 10, the travel hydraulic motors 13, the boom cylinder 32, the arm cylinder 34 and the bucket cylinder 36. The hydraulic system 40 is mounted on the swing structure 20. The hydraulic system 40 has an energy regeneration circuit which recovers energy by converting the hydraulic energy of the return fluid from a hydraulic actuator (assumed to be the boom cylinder 32 in this embodiment) into electric energy.
As shown in
The hydraulic system 40 shown in
(1) Pump
The hydraulic pump 41 sucks in the hydraulic fluid from a tank 44 and delivers (discharges) the hydraulic fluid as pressurized fluid for driving the hydraulic actuators. The pilot hydraulic pressure source 45 is a constant pressure source which constantly generates a constant pilot primary pressure. The hydraulic pump 41 and the pilot hydraulic pressure source 45 are driven by the engine 22 in this embodiment.
(2) Control Valve
The control valve 42 has the function of controlling the flow (flow rate and direction) of the hydraulic fluid supplied from the hydraulic pump 41 to the boom cylinder 32. The control valve 42 is connected to the delivery line of the hydraulic pump 41. While details are not illustrated in
(3) Boom Control Lever
The boom control lever 46 has a pressure reducing valve function of reducing the pressure supplied from the pilot hydraulic pressure source 45 according to the lever operation amount. The boom control lever 46 operates the control valve 42 by supplying a pressure according to the lever operation amount to the control valve 42.
(4) Regeneration Device
The regeneration device 71 includes a regeneration motor 55 and a regeneration electric motor 54. The regeneration motor 55 is connected to a regeneration line 56 branching from the bottom line 47. The regeneration motor 55 is adapted to be driven by the hydraulic fluid returning from the bottom port BP of the boom cylinder 32 and lead to the regeneration line 56. The regeneration electric motor 54 is mechanically connected to the regeneration motor 55 and adapted to convert the rotary power of the regeneration motor 55 into electric energy. The electric energy generated by the regeneration electric motor 54 is supplied to the electric system of the hydraulic excavator or stored in a battery (not shown), for example. The hydraulic fluid after driving the regeneration motor 55 returns to the tank 44. Incidentally, the regeneration device 71 has an inverter (not shown) for controlling the revolution speed of the regeneration motor 55. The inverter has been set so that the revolution speed of the regeneration motor 55 becomes 0 when a regeneration valve 53 (explained later) is at a throttling position, for example.
(5) Return Fluid Control Valve
The return fluid control valve in this specification means a valve having a certain function for controlling the flow of the return fluid according to pilot pressure that is led from the pilot hydraulic pressure source 45. The hydraulic system is provided with at least one return fluid control valve. In this embodiment, a bypass valve 51, a flow control valve 52 and the regeneration valve 53 are provided as the return fluid control valves.
Bypass Valve
The bypass valve 51, as a selector valve having a closed position and an open position, is arranged in a bypass line 49 connecting the bottom line 47 and the rod line 48. The bypass valve 51 is biased by a spring toward the closed position (the state shown in
Flow Control Valve
The flow control valve 52, as a selector valve having a throttling position and an open position, is arranged in the bottom line 47. The flow control valve 52 is biased by a spring toward the throttling position (the state shown in
Regeneration Valve
The regeneration valve 53, as a selector valve having a throttling position and an open position, is arranged in the regeneration line 56 connecting the bottom line 47 to the regeneration motor 55. The regeneration valve 53 is biased by a spring toward the throttling position (the state shown in
(6) Solenoid Valve for Return Fluid Control Valve
The solenoid valve for return fluid control valve means a solenoid valve adapted to control the pilot pressure driving a corresponding return fluid control valve. The number of the solenoid valves for return fluid control valve can vary depending on the number of the return fluid control valves. In this embodiment, a solenoid valve for bypass valve 57, a solenoid valve for flow control valve 58 and a solenoid valve for regeneration valve 59 are provided as the solenoid valves for return fluid control valve.
Solenoid Valve for Bypass Valve
The solenoid valve for bypass valve 57 is a solenoid-operated proportional pressure reducing valve adapted to control the pilot pressure driving the bypass valve 51. The solenoid valve for bypass valve 57 has a function of generating pilot secondary pressure (control pilot pressure) from the pilot primary pressure supplied from the pilot hydraulic pressure source 45 according to a control command from a controller (not shown) and supplying the pilot secondary pressure to the bypass valve 51. The solenoid valve for bypass valve 57 in this embodiment has an open position for connecting the pilot hydraulic pressure source 45 to the pilot pressure port of the bypass valve 51 and a drain position for connecting the pilot hydraulic pressure source 45 to the tank 44 and is capable of continuously changing the pilot secondary pressure according to the control command. The control command from the controller to the solenoid valve for bypass valve 57 is generated according to a program based on the current condition (e.g., the operation amount of the boom control lever 46).
Solenoid Valve for Flow Control Valve
The solenoid valve for flow control valve 58 is a solenoid-operated proportional pressure reducing valve adapted to control the pilot pressure driving the flow control valve 52. The solenoid valve for flow control valve 58 has a function of generating pilot secondary pressure (control pilot pressure) from output pilot pressure (boom lowering pilot pressure) of the boom control lever 46 according to a control command from the controller and supplying the pilot secondary pressure to the flow control valve 52. The solenoid valve for flow control valve 58 in this embodiment has an open position adapted to connect the boom control lever 46 to the pilot pressure port of the flow control valve 52 and a drain position for connecting the boom control lever 46 to the tank 44 and is capable of continuously changing the pilot secondary pressure according to the control command. The control command from the controller to the solenoid valve for flow control valve 58 is generated according to a program based on the current condition (e.g., the operation amount of the boom control lever 46).
Solenoid Valve for Regeneration Valve
The solenoid valve for regeneration valve 59 is a solenoid-operated proportional pressure reducing valve adapted to control the pilot pressure driving the regeneration valve 53. The solenoid valve for regeneration valve 59 has a function of generating pilot secondary pressure (control pilot pressure) from the pilot primary pressure supplied from the pilot hydraulic pressure source 45 according to a control command from the controller and supplying the pilot secondary pressure to the regeneration valve 53. The solenoid valve for regeneration valve 59 in this embodiment has an open position for connecting the pilot hydraulic pressure source 45 to the pilot pressure port of the regeneration valve 53 and a drain position for connecting the pilot hydraulic pressure source 45 to the tank 44 and is capable of continuously changing the pilot secondary pressure according to the control command. The control command from the controller to the solenoid valve for regeneration valve 59 is generated according to a program based on the current condition (e.g., the operation amount of the boom control lever 46).
(7) Malfunction Prevention Device
The malfunction prevention device is a device that is adapted to activate by pressure fluctuation caused by malfunction of a solenoid valve for return fluid control valve, for example, and function to interrupt the delivery of the pilot secondary pressure from the solenoid valve for return fluid control valve to the corresponding return fluid control valve. In this embodiment, a quick acceleration prevention valve 64 and a shuttle valve 65 are provided as the malfunction prevention device.
Shuttle Valve
One input port of the shuttle valve 65 is connected to a secondary pressure port of the solenoid valve for flow control valve 58 via a pilot line PL1, while the other input port of the shuttle valve 65 is connected to the quick acceleration prevention valve 64 via a pilot line PL3. The output port of the shuttle valve 65 is connected to the pilot pressure port of the flow control valve 52. With this configuration, the higher pressure is selected by the shuttle valve 65 from the pilot pressure led from the solenoid valve for flow control valve 58 (pilot line PL1) and the pilot pressure led from the quick acceleration prevention valve 64 (pilot line PL3) and the selected higher pilot pressure is led to the pilot pressure port of the flow control valve 52.
Quick Acceleration Prevention Valve
The quick acceleration prevention valve 64 is arranged in a delivery line PL2 of the pilot hydraulic pressure source 45 to form a circuit in parallel with the solenoid valve for flow control valve 58. Via the quick acceleration prevention valve 64, the pilot primary pressure of the pilot hydraulic pressure source 45 is led to the solenoid valve for bypass valve 57 and the solenoid valve for regeneration valve 59. The quick acceleration prevention valve 64 uses the pressure in the regeneration line 56 between the regeneration valve 53 and the regeneration motor 55 (i.e., between the regeneration valve 53 and the regeneration check valve 63) as its switch pressure and is switched from a switched position (the position shown in
3. Operation
Next, the operation of the hydraulic system will be explained below in regard to a normal state and an operating state of the malfunction prevention device.
(1) Normal State
When the boom bottom pressure as the holding pressure of the boom cylinder 32 is acting on the regeneration motor 55 via the regeneration valve 53 at the throttling position and the check valve 63, the revolution speed of the regeneration motor 55 is maintained at 0 and the boom bottom pressure works on the entire region of the regeneration line 56. The boom bottom pressure in the regeneration line 56 acts on the quick acceleration prevention valve 64 via the fixed restrictor 66, by which the quick acceleration prevention valve 64 is maintained at the normal position.
When the quick acceleration prevention valve 64 is at the normal position, the pilot primary pressure of the pilot hydraulic pressure source 45 is led to the primary pressure ports of the solenoid valve for bypass valve 57 and the solenoid valve for regeneration valve 59. The solenoid valve for bypass valve 57 and the solenoid valve for regeneration valve 59 are operated by commands that are outputted from the controller (not shown) based on the current condition and generate the pilot secondary pressures (control pilot pressures) by reducing the pilot primary pressure. The pilot secondary pressures are respectively inputted to the pilot pressure ports of the bypass valve 51 and the regeneration valve 53 and control the open angles of the bypass valve 51 and the regeneration valve 53. On the other hand, the pilot line PL3 is connected to the tank 44 via the quick acceleration prevention valve 64, and thus the shuttle valve 65 constantly selects the pilot secondary pressure generated by the solenoid valve for flow control valve 58 and inputs the pilot secondary pressure to the pilot pressure port of the flow control valve 52. Therefore, the bypass valve 51, the flow control valve 52 and the regeneration valve 53 operate in cooperation with the solenoid valve for bypass valve 57, the solenoid valve for flow control valve 58 and the solenoid valve for regeneration valve 59, respectively, and are controlled in the solenoid pilot manner according to the command values outputted from the controller (not shown) based on the current condition.
(2) Operating State
When a malfunction of the flow control valve 52 fully opening in contradiction to the current condition has occurred due to abnormality in the command value to the solenoid valve for flow control valve 58, for example, the flow rate of the return fluid from the boom cylinder 32 flowing into the tank 44 via the flow control valve 52 increases more than needed. As a result, the pressure in the regeneration line 56 drops excessively, the switch pressure led to the quick acceleration prevention valve 64 via the pilot line PL4 and the fixed restrictor 66 falls below the preset value, and the quick acceleration prevention valve 64 is switched to the switched position.
By the switching of the quick acceleration prevention valve 64 to the switched position, the primary pressure ports of the solenoid valve for bypass valve 57 and the solenoid valve for regeneration valve 59 are connected to the tank 44. Accordingly, the bypass valve 51 and the regeneration valve 53 stop receiving the pilot secondary pressures of the solenoid valve for bypass valve 57 and the solenoid valve for regeneration valve 59 and are fixed at the closed position and the throttling position, respectively. Further, since the pilot line PL3 is connected to the output line PL5 of the boom control lever 46, the shuttle valve 65 is supplied with the output pilot pressure of the boom control lever 46 via the pilot lines PL1 and PL3. In this case, the pilot pressure supplied via the pilot line PL1 has been reduced by the solenoid valve for flow control valve 58 whereas the pilot pressure supplied via the pilot line PL3 has not been reduced, and thus the output pilot pressure of the boom control lever 46 supplied via the pilot line PL3 is constantly selected by the shuttle valve 65 and inputted to the pilot pressure port of the flow control valve 52. In other words, the output pilot pressure of the boom control lever 46 is inputted to the pilot pressure port of the flow control valve 52 by bypassing the solenoid valve for flow control valve 58.
4. Effects
When a malfunction of the flow control valve 52 fully opening in contradiction to the control logic has occurred due to abnormality in the command value to the solenoid valve for flow control valve 58 or the like, the return fluid from the boom cylinder 32 flows into the tank 44 more than needed and irregular operation of the boom 31 suddenly dropping in contradiction to the operator's intension can possibly occur during the boom lowering operation.
In this embodiment, the quick acceleration prevention valve 64 is activated in such cases due to the drop in the pressure in the regeneration line 56 as explained above, by which the primary pressure ports of the solenoid valve for bypass valve 57 and the solenoid valve for regeneration valve 59 are connected to the tank 44 and the output line PL5 of the boom control lever 46 is connected to the pilot pressure port of the flow control valve 52 by bypassing the solenoid valve for flow control valve 58. Accordingly, the delivery of the pilot pressure from the solenoid valve for flow control valve 58 to the flow control valve 52 is interrupted and the regeneration valve unit 72 is disconnected from the electric system. Consequently, the regeneration valve unit 72 is operated purely hydraulically by the output pilot pressure of the boom control lever 46. Therefore, the irregularity in the operation of the front structure can be suppressed without being affected by the failure in the electric system. Further, safety can also be improved since the circuit is made up exclusively of hydraulic devices having few failure factors at the time of the abnormal operation of a return fluid control valve.
Furthermore, since the delivery of the switch pressure to the quick acceleration prevention valve 64 is delayed by providing the pilot line PL4 with the fixed restrictor 66, too sensitive operation of the quick acceleration prevention valve 64 due to transient pressure fluctuation in the regeneration line 56 can be prevented and stable operation of the hydraulic system can be provided.
5. Others
While a configuration including the bypass line 49, the bypass valve 51 and the solenoid valve for bypass valve 57 for improving the energy recovery efficiency has been described as an example in the above explanation of this embodiment, the bypass line 49, the bypass valve 51 and the solenoid valve for bypass valve 57 can be left out since they are not essential for achieving the aforementioned effects. Further, the fixed restrictor 66 can also be left out in cases where stable operation of the quick acceleration prevention valve 64 can be expected by properly setting the switch pressure at which the quick acceleration prevention valve 64 is switched (spring force of the spring), for example. It is also possible to form the flow control valve 52 to have a closed position instead of the throttling position or to leave out the regeneration hydraulic line for the open position.
1. Configuration
This embodiment differs from the first embodiment only in the configuration of the malfunction prevention device. In this embodiment, a rapid deceleration prevention valve 68 and a shuttle valve 67 are provided as the malfunction prevention device as shown in
Shuttle Valve
One input port of the shuttle valve 67 is connected to the secondary pressure port of the solenoid valve for flow control valve 58 via the pilot line PL1, while the other input port of the shuttle valve 67 is connected to the rapid deceleration prevention valve 68 via a pilot line PL6. The output port of the shuttle valve 67 is connected to the pilot pressure port of the flow control valve 52. With this configuration, the higher pressure is selected by the shuttle valve 67 from the pilot pressure led from the solenoid valve for flow control valve 58 (pilot line PL1) and the pilot pressure led from the rapid deceleration prevention valve 68 (pilot line PL6) and the selected higher pilot pressure is led to the pilot pressure port of the flow control valve 52.
Rapid Deceleration Prevention Valve
The rapid deceleration prevention valve 68, as a selector valve having a closed position and an open position, is arranged in the output line PL5 of the boom control lever 46 to form a circuit in parallel with the solenoid valve for flow control valve 58. The output pilot pressure of the boom control lever 46 is led to the shuttle valve 67 via the solenoid valve for flow control valve 58 and the pilot line PL1 and also via the rapid deceleration prevention valve 68 and the pilot line PL6. The rapid deceleration prevention valve 68 uses the sum total of the pilot secondary pressure from the solenoid valve for flow control valve 58 (pressure downstream of the valve 58) and the pilot secondary pressure from the solenoid valve for regeneration valve 59 (pressure downstream of the valve 59) as its switch pressure and is switched from the closed position to the open position (the position shown in
The rest of the configuration is equivalent to that in the first embodiment.
2. Operation
(1) Normal State
In the normal state, switch pressure not less than the preset pressure is inputted to the rapid deceleration prevention valve 68 since the solenoid valve for flow control valve 58 or the solenoid valve for regeneration valve 59 is outputting pilot secondary pressure according to the command from the controller (not shown). Thus, the rapid deceleration prevention valve 68 remains at the closed position and each of the bypass valve 51, the flow control valve 52 and the regeneration valve 53 receives the pilot secondary pressure from the corresponding solenoid valve (solenoid valve for bypass valve 57, solenoid valve for flow control valve 58, solenoid valve for regeneration valve 59) at its pilot pressure port and changes its opening area according to the pilot secondary pressure. Thus, the bypass valve 51, the flow control valve 52 and the regeneration valve 53 are controlled in the solenoid pilot manner.
(2) Operating State
When an abnormality like a rapid decrease in the pilot secondary pressures of the solenoid valve for flow control valve 58 and the solenoid valve for regeneration valve 59 has occurred due to an electrical failure such as a power supply failure of the solenoid valve drivers, the switch pressure inputted to the rapid deceleration prevention valve 68 (i.e., the sum total of the pilot secondary pressures of the solenoid valves 58 and 59) falls below the preset pressure and the rapid deceleration prevention valve 68 is switched to the open position (the position shown in
3. Effects
When the flow control valve 52 and the regeneration valve 53 close rapidly during the boom lowering operation in contradiction to the control logic due to a factor like an abnormality in the command values to the solenoid valve for flow control valve 58 and the solenoid valve for regeneration valve 59 (caused by trouble in the electric system or a runaway of the controller, for example), the descending speed of the boom 31 decreases suddenly. In this embodiment, however, when the sum total of the pilot secondary pressures of the solenoid valve for flow control valve 58 and the solenoid valve for regeneration valve 59 falls below the preset pressure, the rapid deceleration prevention valve 68 opens and the output pilot pressure of the boom control lever 46 is led to the pilot pressure port of the flow control valve 52 by bypassing the solenoid valve for flow control valve 58. Accordingly, the delivery of the pilot secondary pressure from the solenoid valve for flow control valve 58 to the flow control valve 52 is interrupted and the flow control valve 52 is operated purely hydraulically by the output pilot pressure of the boom control lever 46. Consequently, the irregularity in the operation of the front structure (in this embodiment, unintended rapid deceleration of the descending speed of the boom 31) can be suppressed while avoiding the influence of the failure in the electric system.
1. Configuration
This embodiment differs from the first embodiment in the configuration of the malfunction prevention device. As shown in
The bypass shut-off valve 70, as a selector valve having an open position and a drain position, is arranged in a pilot line PL9 connecting the solenoid valve for bypass valve 57 to the bypass valve 51. The pressure in the bottom line 47 and the pressure in the rod line 48 are led to pilot pressure ports on both sides of the bypass shut-off valve 70 via pilot lines PL10 and PL11, respectively. The bypass shut-off valve 70 is switched according to the pressure ratio between the bottom line 47 and the rod line 48 (thrust of the boom cylinder 32). The principle of the operation of the bypass shut-off valve 70 will be explained below.
The thrust (load) of the boom cylinder 32 can be described as:
F=Ab·Pb−Ar·Pr
where “Ab” represents the pressure receiving area on the bottom side of the boom cylinder 32, “Ar” represents the pressure receiving area on the rod side of the boom cylinder 32, “Pb” represents the boom bottom pressure, and “Pr” represents the boom rod pressure. If the bypass shut-off valve 70 is designed so that its pressure receiving area Asb on the bottom line 47's side and its pressure receiving area Asr on the rod line 48's side satisfy Asb:Asr=Ab:Ar, the bypass shut-off valve 70 is switched according to the thrust of the boom cylinder 32. Specifically, since the bypass shut-off valve 70 is biased by a spring toward the open position, when the thrust of the boom cylinder 32 exceeds a preset value that is set by the spring, the bypass shut-off valve 70 is switched from the open position to the drain position and adapted to connect the pilot pressure port of the bypass valve 51 to the tank 44.
The rest of the configuration is equivalent to that in the first embodiment.
2. Operation
(1) Normal State
In the normal state, the bypass valve 51 is controlled by the controller (not shown) via the solenoid valve for bypass valve 57 within a range in which the boom bottom pressure does not exceed the preset relief pressure of the relief valve 60, by which the bypass line 49 is connected and interrupted.
(2) Operating State
In cases where the solenoid valve for bypass valve 57 is fixed at the open position and a command for opening the bypass valve 51 is outputted continuously due to an electrical failure such as a power supply failure of the solenoid valve driver (not shown) or an abnormality in the command value to the solenoid valve for bypass valve 57, when the boom bottom pressure rises to the vicinity of the preset relief pressure of the relief valve 60 (i.e., when the thrust F exceeds the preset value) due to the opened bypass valve 51, the bypass shut-off valve 70 is switched to the drain position and the bypass valve 51 is switched to the closed position. Thereafter, when the boom bottom pressure Pb drops to a level at which the boom bottom pressure does not exceed the preset relief pressure of the relief valve 60 even if the bypass valve 51 opens (i.e., when the thrust F falls below the preset value), the bypass shut-off valve 70 is switched to the open position and then the bypass valve 51 is switched to the open position.
3. Effects
Even though the regeneration device 71 is capable of recovering the hydraulic energy as electric energy, a surplus hydraulic fluid flow beyond the capacity of the regeneration device 71 has to be dumped by opening the flow control valve 52. However, the energy recovery efficiency can be increased by opening the bypass valve 51 and returning part of the return fluid to the rod line 48. For example, when an operation for lowering the boom 31 at a relatively high speed is performed, the flow control valve 52 is controlled by the controller (not shown) so that no hydraulic fluid flow beyond the capacity of the regeneration device 71 flows into the regeneration line 56. In this case, the bypass valve 51 is properly opened by the controller and the hydraulic fluid is returned from the bottom line 47 to the rod line 48 within an extent in which the relief valve 60 is not opened, by which the energy efficiency is increased.
However, when the solenoid valve for bypass valve 57 is opened in contradiction to the original control logic due to a failure in the electric system, the bottom line 47 is connected to the rod line 48 and the pressure difference between the bottom line 47 and the rod line 48 decreases, and consequently, the pressure in the bottom line 47 rises. If the relief valve 60 is activated by the high pressure in the bottom line 47, the boom 31 drops irrespective of the operation by the operator.
In contrast, in this embodiment employing the bypass shut-off valve 70, the bypass shut-off valve 70 is closed in response to the rise in the boom bottom pressure and the delivery of the pilot secondary pressure from the solenoid valve for bypass valve 57 to the bypass valve 51 is interrupted depending on the current condition. Accordingly, even when the operation of the solenoid valve for bypass valve 57 deviates from the control logic, the bypass valve 51 is blocked in a situation in which the boom bottom pressure can exceed the relief pressure. Consequently, the irregularity in the operation of the front structure, for example, the dropping of the boom 31 not intended by the operator in this embodiment, can be prevented.
The first through third embodiments which have been described above can be combined in any way. For example, it is possible to combine two arbitrarily selected embodiments or all the three embodiments. In this fourth embodiment, an example combining all the three embodiments will be described.
In this embodiment, the quick acceleration prevention valve 64, the rapid deceleration prevention valve 68, the bypass shut-off valve 70, etc. are provided as the malfunction prevention device. The output ports of the quick acceleration prevention valve 64 and the rapid deceleration prevention valve 68 are connected to input ports of a shuttle valve 73 via the pilot lines PL3 and PL6, respectively. The secondary pressure port of the solenoid valve for flow control valve 58 is connected to one input port of the shuttle valve 65 via the pilot line PL1, while the output port of the shuttle valve 73 is connected to the other input port of the shuttle valve 65 via the pilot line PL12. The output port of the shuttle valve 65 is connected to the pilot pressure port of the flow control valve 52. The connective relationship, etc. of the bypass shut-off valve 70 are equivalent to those in the third embodiment. The rest of the configuration is equivalent to that in the first through third embodiments. The first through third embodiments can be easily combined together as above and the effects of these embodiments can be properly achieved by the combination.
Others
While the engine 22 is used in the above embodiments as an example of the prime mover for the hydraulic pump 41 and so forth, there are also cases where an electric motor is used as the prime mover. Further, while the above explanation has been given by taking a hydraulic excavator as an example of the construction machinery to which the hydraulic system according to the present invention is applied, the present invention is applicable also to other types of construction machineries such as wheel loaders. While the present invention is applied to a construction machinery of the so-called crawler type in the above explanation, the present invention is applicable also to construction machineries of the so-called wheel type. Furthermore, while the irregularity in the operation of the boom 31 is suppressed in the above explanation, the present invention can be employed also for suppressing irregularity in the operation of the arm 33 or the bucket 35 as needed.
Number | Date | Country | Kind |
---|---|---|---|
2014-135131 | Jun 2014 | JP | national |
Number | Name | Date | Kind |
---|---|---|---|
20150152900 | Egawa | Jun 2015 | A1 |
20160237648 | Kawasaki | Aug 2016 | A1 |
Number | Date | Country |
---|---|---|
2007-327527 | Dec 2007 | JP |
WO 2014017492 | Jan 2014 | WO |
Number | Date | Country | |
---|---|---|---|
20150377264 A1 | Dec 2015 | US |