The present application claims the priority to Chinese Patent Application No. 202210564818.0, titled “HYDROGEN PRODUCTION SYSTEM, AND THERMAL MANAGEMENT METHOD AND APPARATUS THEREFOR”, filed with the China National Intellectual Property Administration on May 23, 2022, which is incorporated herein by reference in its entirety.
The present application relates to the technical field of water-electrolysis hydrogen production, and in particular to a hydrogen production system, a thermal management method and an apparatus therefor.
In a water-electrolytic hydrogen production system with a large-scale renewable energy, in order to increase a hydrogen production capacity of the hydrogen production system while reducing the manufacturing cost of the entire hydrogen production system, a technical solution of sharing single post-treatment equipment by multiple electrolytic cells may be adopted. The operation temperature of the electrolytic cell is a key parameter during the operation of the system. In order to maintain a stable operation temperature, the post-treatment equipment is provided with a heat exchanger and the like for a thermal management of the hydrogen production system.
In the existing technology, for the hydrogen production system combined with renewable energy, an input power is constantly changing, and thus a thermal management control thereof also needs to be adaptively regulated. However, the existing hydrogen production system has defects, which cannot achieve a precise temperature control to each electrolytic cell.
A hydrogen production system, a thermal management method and an apparatus therefor are provided in the present application to achieve a precise temperature control of each electrolytic cell and improve efficiency of the system.
According to one aspect of the present application, a hydrogen production system is provided, including:
at least two electrolytic cells; and
a post-treatment equipment, which is shared by the at least two electrolytic cells and includes first electrolyte inflow branch pipes and second electrolyte inflow branch pipes, wherein
the first electrolyte inflow branch pipes share a single cooling device to introduce a cold electrolyte into the corresponding electrolytic cells, and the second electrolyte inflow branch pipes are bypass branch pipes of the cooling device to introduce a hot electrolyte into the corresponding electrolytic cells.
Optionally, the post-treatment equipment further includes:
a gas-liquid separation unit, which is arranged at an electrolyte outlet of the at least two electrolytic cells and shared by the at least two electrolytic cells; and
an electrolyte circulation device arranged in a electrolyte circulation pipeline.
Optionally, a common electrolyte inlet for the first electrolyte inflow branch pipes is arranged downstream of an electrolyte outlet of the cooling device, and
a common electrolyte inlet for the second electrolyte inflow branch pipes is arranged upstream of the electrolyte inlet of the cooling device.
Optionally, a first switch device is provided in each of the second electrolyte inflow branch pipes and is configured to control a flow rate of the hot electrolyte.
Optionally, a second switch device is provided in each of the first electrolyte inflow branch pipes to control a flow rate of the cold electrolyte.
Optionally, the post-treatment equipment further includes
third switch devices provided and corresponding to the electrolytic cells, wherein the third switch device is located at a electrolyte inlet of the corresponding electrolytic cell, and the first electrolyte inflow branch pipe and the second electrolyte inflow branch pipe are connected to the third switch device, the third switch device is configured to control a total flow rate of the electrolyte introduced into the corresponding electrolytic cell.
Optionally, the third switch device includes at least one of a regulating valve and a switching valve.
According to another aspect of the present application, a thermal management method for a hydrogen production system is provided, which is applied to the hydrogen production system according to any embodiment of the present application. The thermal management method includes:
acquiring a working condition of the hydrogen production system in real time;
regulating a flow rate of the cold electrolyte introduced into the electrolytic cells through the first electrolyte inflow branch pipes and a flow rate of the hot electrolyte introduced into the electrolytic cells through the second electrolyte inflow branch pipes according to the working condition, so as to maintain the temperatures of the individual electrolytic cells at the respective preset temperatures.
Optionally, regulating the flow rates of the cold electrolyte and the hot electrolyte introduced into the electrolytic cells according to the working condition includes at least one of the flowing:
in case of the working condition that at least one electrolytic cell needs to be cooled, controlling the flow rate of the cold electrolyte in the first electrolyte inflow branch pipe corresponding to the at least one electrolytic cell to increase, or controlling the flow rate of the hot electrolyte in the second electrolyte inflow branch pipe corresponding to the at least one electrolytic cell to decrease or cut off;
in case of the working condition that at least one electrolytic cell needs to be heated, controlling the flow rate of the hot electrolyte in the second electrolyte inflow branch pipe corresponding to the at least one electrolytic cell to increase, or controlling the flow rate of the cold electrolyte in the first electrolyte inflow branch pipe corresponding to the at least one electrolytic cell to decrease or cut off.
Optionally, a condition that the electrolytic cell needs to be cooled includes that: the temperature of the electrolytic cell in various operating states is higher than a corresponding preset cooling temperature, wherein the preset cooling temperature corresponding to different operating states are same or different, and
a condition that the electrolytic cell needs to be heated includes that: the temperature of the electrolytic cell in various operating states is lower than a corresponding preset heating temperature, wherein the preset heating temperature corresponding to different operating states are same or different.
Optionally, regulating the flow rates of the hot electrolyte and the cold electrolyte introduced into the electrolytic cell according to the working condition includes:
in case that the electrolytic cell is in a standby state, closing the corresponding first electrolyte inflow branch pipe, and
in case that the electrolytic cell in the standby state meets a preset condition, communicating the corresponding second electrolyte inflow branch pipe.
Optionally, after the second electrolyte inflow branch pipe is communicated, the thermal management method further includes:
regulating the flow rate of the hot electrolyte introduced into the corresponding electrolytic cells according to the temperature of the corresponding electrolytic cells.
Optionally, before the step of regulating the flow rate of the cold electrolyte introduced into the electrolytic cells, the thermal management method further includes:
detecting the temperature of the individual electrolytic cells, finding a electrolytic cell having the highest temperature, and defining the electrolytic cell having the highest temperature as a second electrolytic cell; and
regulating a flow rate of a cooling pump in the cooling device according to the temperature of the second electrolytic cell so as to cool the second electrolytic cell by the cold electrolyte after the first electrolyte inflow branch pipe corresponding to the second electrolytic cell is communicated.
Optionally, the thermal management method for the hydrogen production system further includes:
defining the electrolytic cell that is not at the highest temperature as a third electrolytic cell; wherein,
at the time of communicating the first electrolyte inflow branch pipe corresponding to the second electrolytic cell, regulating an opening degree of the corresponding first electrolyte inflow branch pipe and/or the corresponding second electrolyte inflow branch pipe according to a temperature of the third electrolytic cell so as to maintain a constant temperature in the third electrolytic cell.
Optionally, a control method for the cooling pump includes at least one of a PID regulation and a hysteresis regulation,
a control method for the opening degree of the first electrolyte inflow branch pipes includes at least one of the PID regulation and the hysteresis regulation, and
a control method for the opening degree of the second electrolyte inflow branch pipes includes at least one of the PID regulation and the hysteresis regulation.
According to another aspect of the present application, a thermal management apparatus for a hydrogen production system is provided, which is applied to the hydrogen production system according to any embodiment of the present application. The thermal management apparatus includes:
A working condition acquisition module, which is configured to acquire a real-time working condition of the hydrogen production system; and
a temperature regulating module, which is configured to regulate the flow rate of the cold electrolyte introduced into the electrolytic cells through the first electrolyte inflow branch pipes and the flow rate of the hot electrolyte introduced into the electrolytic cells through the second electrolyte inflow branch pipes according to the working condition, so as to maintain the temperature of each electrolytic cell at the preset temperature.
According to the technical solutions of the embodiments of the present application, the post-treatment equipment of the hydrogen production system includes first electrolyte inflow branch pipes and second electrolyte inflow branch pipes, wherein the first electrolyte inflow branch pipes share one cooling device to introduce a cold electrolyte into corresponding electrolytic cells, and the second electrolyte inflow branch pipes are bypass branch pipes of the cooling device to introduce a hot electrolyte into corresponding electrolytic cells. With the arrangement of the first electrolyte inflow branch pipes and the second electrolyte inflow branch pipes, it can not only cool the electrolytic cells when being in operation, but also maintain the electrolytic cells to be in a hot standby state when being in a shutdown state, which is beneficial to the rapid start-up of the electrolytic cells. There is no need to provide separate heating equipment to heat the electrolytic cells. Therefore, in the embodiments of the present application, the operation of cooling and heating to each electrolytic cell can be carried out according to the needs, achieving a precise temperature control of each electrolytic cell while reducing costs and improving the system efficiency. Moreover, according to the embodiments of the present application, the temperature of the electrolytic cell in the hot standby state may be maintained by utilizing the heat generated by the electrolytic cell in operation, achieving a heat-cyclic utilization, which is beneficial to reducing the overall power consumption of the hydrogen production system.
It should be understood that the content described in this section is neither intended to identify key or important features of the embodiments of the present application, nor intended to limit the scope of the present application. Other features of the present application will be easily understood through the following description.
In order to illustrate the technical solution in embodiments of the present application more clearly, a brief introduction will be made to the accompanying drawings required in the description of the embodiments. Apparently, the accompanying drawings to be described are merely some embodiments of the present application. For those skilled in the art, other accompanying drawings can be obtained based on these drawings without paying creative efforts.
In order to better understand the present application for those skilled in the art, a clear and complete description of the technical solution in embodiments of the present application will be given below in conjunction with the accompanying drawings. Apparently, the described embodiments are only a part of embodiments of the present application rather than all of them. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without paying creative work shall fall within the scope of the present application.
It should be noted that the terms “first”, “second”, etc. in the specification and claims of the present application, as well as the above drawings, are used to distinguish similar objects, and are not intended to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged in appropriate circumstances, so that the embodiments described herein can be implemented in order other than those illustrated or described herein. In addition, the terms “including” and “having”, as well as any variations thereof, are intended to cover a non-exclusive inclusion, Exemplarily, a process, method, system, product, or equipment that includes a series of steps or units do not need to be limited to those clearly listed steps or units, but may include other steps or units that are not clearly listed or inherent to the process, method, product, or equipment.
When electrolyzing water to produce hydrogen, it is necessary to maintain a stable temperature. However, a large amount of heat is generated in electrolysis process, causing the temperature of the electrolyte to rise. Moreover, the higher the electrolytic power is, the faster the temperature rises, thereby increasing temperature of the electrolytic cells. In order to maintain the stability of the electrolyte temperature, it is necessary to cool the electrolyte. The cooling device 430 can cool the electrolyte flowing out of the electrolytic cells. Exemplarily, all the first electrolyte inflow branch pipes are connected to an electrolyte outlet of the cooling device 430, and thus one cooling device 430 can be shared within all first electrolyte inflow branch pipes. The cold electrolyte (cooled electrolyte) flows into the electrolytic cells through the respective first electrolyte inflow branch pipes so as to decrease the temperature of the corresponding electrolytic cells.
When using a new energy for a power supply, a fluctuation of the power supply of the new energy may cause a fact that multiple electrolytic cells in the hydrogen production system do not operate under a same input power and thus are different in temperature increasing degree. In that case, the cold electrolyte flowing into the first electrolyte branch pipes can be used to adaptively regulate temperature of the electrolytic cells.
Furthermore, due to the fluctuation of the power supply of the new energy, some electrolytic cells in the hydrogen production system may be in a shutdown state, and it is likely for the electrolytic cells that are in a shutdown state to be restarted at any time. In order to quickly reach the rated hydrogen production capacity in the next start-up of the electrolytic cells by a thermal insulation, i.e., keeping in a hot standby state, the hydrogen production system provided by the embodiments of the present application further includes a second electrolyte inflow branch pipe for transporting the hot electrolyte. The second electrolyte inflow branch pipe is a bypass branch pipe of the cooling device 430, that is, the second electrolyte inflow branch pipe bypasses the cooling device 430. The electrolyte in the second electrolyte inflow branch pipes is not cooled, that is, is a hot electrolyte. When being in a shutdown state, the electrolytic cells are naturally heat-dissipated and thus are decreased in temperature. By using the second electrolyte inflow branch pipe to timely supply the hot electrolyte, the temperature of the electrolytic cell can be maintained, which is beneficial to a rapid start-up of the electrolytic cell. At this time, the hot electrolyte functions to keep temperature of the electrolytic cell. This can be achieved by circulating the electrolyte at a small flow rate without the need to additionally increase an electrolyte circulation flow rate. Therefore, in the embodiment of the present application, by providing the second electrolyte inflow branch pipe, it does not need to additionally increase the power consumption of the hydrogen production system.
In summary, with the hydrogen production system provided by the embodiments of the present application, the number of the electrolytic cells in working state may be determined based on the power of the input power source, and the electrolytic cells in working state and the electrolytic cells in hot standby state can share a single post-treatment equipment 400, that is, the post-treatment equipment 400 is always in operation without the repeated shutdown. As such, it is beneficial to improve the hydrogen production capacity of the hydrogen production system while reducing the manufacturing cost of the entire hydrogen production system. Moreover, providing both the first electrolyte inflow branch pipe and the second electrolyte inflow branch pipe can not only cool the electrolytic cells when being in operation, but also maintain the electrolysis cells in a hot standby state when being in a shutdown state, without the need for a separate heating equipment to heat the electrolysis cells, which is beneficial to the rapid start-up of the electrolysis cells. Therefore, in the embodiments of the present application, the individual electrolytic cells can be cooled or heated according to the needs, achieving a precise temperature control of the individual electrolytic cells while reducing costs, and improving the system efficiency. Moreover, according to the embodiments of the present application, the temperature of the electrolytic cell in the hot standby state is maintained by utilizing the heat generated by the electrolytic cell in operation, achieving a heat-cyclic utilization, which is beneficial to reduction of the overall power consumption of the hydrogen production system.
On the basis of the above embodiments, optionally, the post-treatment equipment 400 further includes a gas-liquid separation unit 410 and an electrolyte circulation device 420. Herein, the electrolyte circulation device 420 is configured to power the electrolyte to flow, and the electrolyte circulation device 420 may be, for example, a circulation pump. The electrolyte circulation device 420 may be located at any position in the electrolyte flow path, and it only needs to accordingly adjust the locations of the first electrolyte inflow branch pipe and the second electrolyte inflow branch pipe, which is not limited in the present application. The following will explain several configurations, which cannot be regarded as a limitation to the present application.
Referring to
On the basis of the above embodiments, optionally, a common electrolyte inlet for the individual first electrolyte inflow branch pipes is arranged downstream the electrolyte outlet of the cooling device 430, and a common electrolyte inlet for individual second electrolyte inflow branch pipes is arranged upstream the electrolyte inlet of the cooling device 430. With this arrangement, it ensures that a cold electrolyte is flowing into the first electrolyte inflow branch pipe and a hot electrolyte is flowing into the second electrolyte inflow branch pipe.
Referring to
In other embodiments, the second electrolyte inflow branch pipes may be connected to different positions, respectively, for example, some of which are connected to the electrolyte inlet of the electrolyte circulation device 420 and some of which are connected to the electrolyte outlet of the electrolyte circulation device 420, which may be arranged according to the needs in practical applications.
Referring to
On the basis of the above embodiments, optionally, switch devices are further provided in various pipelines to achieve a flow control of the corresponding pipelines. Herein, the arrangements of the switch devices may be varied, and the following will explain some of them, which cannot be regarded as the limitation to the present application.
Referring to
Herein, a certain fluid resistance exists in a flowing process of the electrolyte in both the first electrolyte inflow branch pipe and the second electrolyte inflow branch pipe, and the fluid resistance of the cold electrolyte is greater than that of the hot electrolyte. Therefore, when the first switch device is switched on, both the hot electrolyte and the cold electrolyte flow into the corresponding electrolytic cells simultaneously, where the flow rate of the hot electrolyte accounts for a dominant proportion. Specifically, the larger the opening degree of the first switching device is, the greater the flow rate of the hot electrolyte is, resulting in a smaller flow rate of the cold electrolyte. On the contrary, the smaller the opening degree of the first switching device is, the smaller the flow rate of the hot electrolyte is, resulting in a higher flow rate of the cold electrolyte. In the embodiment of the present application, the flow control of the hot electrolyte and the cold electrolyte is achieved only by providing the first switch device on the second electrolyte inflow branch pipe and utilizing the fluid resistance difference between the hot electrolyte and the cold electrolyte. With this arrangement, it is beneficial to simplify the structure of the hydrogen production system and save costs.
In the embodiment of the present application, in addition to the first switch devices arranged in the second electrolyte inflow branch pipes, a second switch device is located in each first electrolyte inflow branch pipe, so that the flow rate of the cold electrolyte is controlled by the second switch device and the flow rate of the hot electrolyte is controlled by the first switch device. With this arrangement, it is beneficial to control the proportion between the hot and cold electrolytes, thereby making the temperature control more precise.
Referring to
In summary, in the embodiment of the present application, the hot electrolyte upstream the cooling device 430 is introduced into the electrolytic cells after passing through the respective third switch device, and thus the regulation of the flow rate of the hot electrolyte does not affect the total flow rate of the electrolyte entering each electrolytic cell. With this arrangement, a decoupling control between the flow control and the temperature control can be achieved for each electrolytic cell, that is, the flow control does not affect the temperature control and vice visa, which is beneficial to a precise temperature control of each electrolytic cell.
Referring to
Referring to
Referring to
Referring to
Referring to
On the basis of the above embodiments, optionally, the hydrogen production system further includes a controller. The automatic regulating devices including the temperature sensor, the flow sensor, the switch device, the electrolyte circulation device, and the cooling pumps are all connected to the controller. The controller controls the automatic regulating device based on the collected temperature and flow rate in combination with corresponding thermal management strategy. For example, the control strategy may be a PID regulation or a hysteresis regulation. Optionally, the controller may be a programmable logic controller (PLC) or a distributed control system (DSC), etc.
It should be noted that, in the above embodiments, exemplarily, the first electrolyte inflow branch pipes correspond to the electrolytic cells in one-to-one manner, and the second electrolyte inflow branch pipes correspond to the electrolytic cells in one-to-one manner. In a temperature control loop, an alkaline solution flow rate of each electrolytic cell may be controlled independently, so the power and the alkaline solution flow rate of the electrolytic cell can be provided according to the needs so as to adapt to a scenario of the hydrogen production with a variable power, which is not a limitation to the present application. In other embodiments, no second electrolyte inflow branch pipes are provided for some of the electrolytic cells. For example, some of the electrolytic cells are always in an operating state and do not need to be in a hot standby state, so that it is not necessary to provide a second electrolyte inflow branch pipe.
It should be noted that, in the above embodiments, exemplarily, an alkaline-electrolysis-water hydrogen production system is taken as an example for illustration, using an alkaline solution as the electrolyte, which cannot be regarded as a limitation to the present application. In other embodiments, the technical solution provided by the embodiments of the present application can also be applied to other hydrogen production systems, e.g., PEM electrolysis-water hydrogen production system. The PEM electrolysis-water hydrogen production uses a perfluorosulfonic acid proton exchange membrane as a solid electrolyte to replace asbestos membrane in an alkaline water hydrogen production electrolysis system, and uses deionized water as the electrolyte.
A thermal management method for a hydrogen production system is further provided in the embodiments of the present application, which is applied to the hydrogen production system provided in any embodiment of the present application and has corresponding beneficial effects. The thermal management can be performed by a thermal management apparatus, which may be implemented by software and/or hardware and may be integrated in the controller of the hydrogen production system.
S110: acquire a working condition of the hydrogen production system in real time.
The working condition depicts a running condition of the hydrogen production system. Exemplarily, the working condition may include a temperature of the electrolytic cell, an electrolysis power, etc. The working condition may also refer to a running condition of various modules in the post-treatment equipment, an opening degree of switch devices, etc.
S120: according to the working condition, regulate a flow rate of a cold electrolyte introduced into each electrolytic cell through the first electrolyte inflow branch pipe and a flow rate of the hot electrolyte introduced into each electrolytic cell through the second electrolyte inflow branch pipe, so as to maintain the temperature of each electrolytic cell at the corresponding preset temperature.
Herein, the cold electrolyte is used to cool the electrolytic cell, and the hot electrolyte is used to heat the electrolytic cell. The first electrolyte inflow branch pipe and the second electrolyte inflow branch pipe are simultaneously regulated so as to achieve a temperature control of the electrolytic cell. The regulating method includes but is not limited to: opening, closing, increasing, and decreasing. Referring to
In the subsequent operation process, as the electrolyte flowing into the electrolytic cell 100 is a hot electrolyte, only a small amount of the hot electrolyte is needed to maintain the temperature of the electrolytic cell 100 to be in the hot standby state for a next start-up. Meanwhile, the temperature of the electrolytic cell 100 is detected in real time. The opening degree of the third switch device A is reduced when the temperature of the electrolytic cell 100 is greater than a preset value, and is increased when the temperature of the electrolytic cell 100 is less than a preset value.
In the embodiments of the present application, the flow rates of the hot electrolyte and the cold electrolyte introduced into each electrolytic cell can be regulated, and the temperature of each electrolytic cell can be increased or decreased as needed. It achieves a precise temperature control of each electrolytic cell while reducing costs, and thus improves system efficiency. Further, according to the embodiments of the present application, the temperature of the electrolytic cell in the hot standby state may be maintained by utilizing the heat generated by the electrolytic cell in operation, achieving a heat-cyclic utilization, which is beneficial to reduction of the power consumption of the hydrogen production system.
On the basis of the above embodiments, there are various ways to regulate the hot electrolyte and the cold electrolyte in the step S120. The following will explain some of them, which cannot be regarded as a limitation to the present application.
In an embodiment of the present application, optionally, regulating the flow rate of the hot electrolyte and the cold electrolyte introduced into each electrolytic cell in S120 includes at least one of the following cases.
In case of the working condition under which at least one electrolytic cell needs to be cooled, the flow rate of the cold electrolyte in the first electrolyte inflow branch pipe corresponding to the electrolytic cell may be controlled to increase, or the flow rate of the hot electrolyte in the second electrolyte inflow branch pipe corresponding to the electrolytic cell may be controlled to decrease or even cut off. Optionally, a condition that the electrolytic cell needs to be cooled includes: the temperature of the electrolytic cell in various operating states is higher than a corresponding cooling set temperature. Herein, the operating states include: a normal operating state, a standby state, an initial operating state, an initial standby state, etc. The cooling set temperatures corresponding to different states are same or different, and can be set according to needs in practical applications. In general, the expression “the electrolytic cell needs to be cooled” means that cooling is needed since a large amount of heat generated by the electrolysis when the electrolytic cell is running. The second electrolyte inflow branch pipe corresponding to the electrolytic cell may be in the closed state. Exemplarily, the electrolytic cell 200 is in normal operating state and the temperature of the electrolytic cell 200 is detected in real time. If the temperature of the electrolytic cell 200 is higher than the first preset temperature value, it indicates that the electrolytic cell 200 needs to be cooled. Thus, the flow rate of the cold electrolyte in the first electrolyte inflow branch pipe 482 may be increased by, for example, increasing the opening degree of the second switch device H. When the electrolytic cell in other states needs to be cooled, a similar regulation method can be used, which will not be repeated.
In case of the working condition under which at least one electrolytic cell needs to be heated, the flow rate of the hot electrolyte in the second electrolyte inflow branch pipe corresponding to the electrolytic cell may be controlled to increase, or the flow rate of the cold electrolyte in the first electrolyte inflow branch pipe corresponding to the electrolytic cell may be controlled to decrease or even cut off. Optionally, the conditions that the electrolytic cell needs to be heated include: the temperature of the electrolytic cell in various operating states is lower than the corresponding heating set temperature. Herein, the operating states include: a normal operating state, a standby state, an initial operating state, an initial standby state, etc. The heating set temperatures corresponding to different states are same or different, and can be set according to needs in practical applications. Exemplarily, the electrolytic cell 300 is in a cold standby state, has not been in operation for a long time, and has no hot electrolyte flowing therein, resulting in a low temperature of the electrolytic cell 300. When the electrolytic cell 300 is to be switched to the initial operating state or the initial standby state, it needs to be heated, and thus the second electrolyte inflow branch pipe 493 is opened, for example, the first switch F is opened, so that the hot electrolyte flows into the electrolytic cell 300. When the electrolytic cell in other states needs to be heated, a similar regulation method can be used, which will not be repeated.
Herein, a flow regulating range for the first electrolyte inflow branch pipe and the second electrolyte inflow branch pipe is between 0 and the maximum flow rate.
On the basis of the above embodiments, optionally, regulating the flow rates of the hot electrolyte and the cold electrolyte introduced into each electrolytic cell according to the working conditions includes: if the electrolytic cell is in a standby state, closing the corresponding first electrolyte inflow branch pipe; and if the electrolytic cell in the standby state meets a preset condition, communicating the corresponding second electrolyte inflow branch pipe. With this configuration, a thermal management of the electrolytic cell with low energy consumption may be achieved.
Optionally, after the second electrolyte inflow branch pipe is communicated, it further includes: regulating the flow rate of the hot electrolyte introduced into the corresponding electrolytic cell according to the temperature of the electrolytic cell to achieve a precise temperature control of the electrolytic cell, which improves the flexibility of the thermal management method.
Specifically,
S210: acquire a working condition of the hydrogen production system in real time.
S220: determine whether the electrolytic cell is in operation; if yes, execute S230, and if no, execute S240.
S230: define the electrolytic cell in operation as the first electrolytic cell; communicate the first electrolyte inflow branch pipe corresponding to the first electrolytic cell, and close the second electrolyte inflow branch pipe corresponding to the first electrolytic cell.
S240: determine whether the first electrolytic cell has been regulated from the operating state to the shutdown state; if so, execute S250; and if no, execute S220.
S250: close the first electrolyte inflow branch pipe corresponding to the first electrolytic cell.
S260: when the first electrolytic cell is regulated into the shutdown state or when the preset conditions are met, communicate the second electrolyte inflow branch pipe corresponding to the first electrolytic cell.
Referring to
Optionally, if the first switch device in the second electrolyte inflow branch pipe is a switching valve, a precise temperature control of the first electrolytic cell can be achieved by timely opening or closing the switching valve based on a real-time temperature of the first electrolytic cell. If the first switch device in the second electrolyte inflow branch pipe is a regulating valve, the flow rate of the hot electrolyte introduced into the first electrolytic cell can be further regulated according to the temperature of the first electrolytic cell, thereby achieving a precise temperature control of the first electrolytic cell.
The control strategy for switching the operating state to the hot standby state of the first electrolytic cell is achieved through the steps of S210 to S250.
In the above embodiments, it is exemplarily shown that the temperature of the electrolytic cell is regulated by regulating the flow rate of the cold and hot electrolytes, which cannot be regarded as a limitation to the present application. In other embodiments, the temperature of the cold electrolyte may be further regulated according to the power of the cooling device, thereby making the thermal management of the hydrogen production system more comprehensive and adaptable.
S310: detect the temperature of each electrolytic cell and select the electrolytic cell at the highest temperature; and define the electrolytic cell at the highest temperature as the second electrolytic cell.
Herein, the electrolytic cell at the highest temperature is a key target of the thermal management methods, and the flow rate and the temperature of the coolant should be able to cool the electrolytic cell at the highest temperature and ensure that it operates at an appropriate temperature.
Referring to
S320: regulate the flow rate of the cooling pump in the cooling device according to the temperature of the second electrolytic cell, so that the second electrolytic cell is cooled by the cold electrolyte after the first electrolyte inflow branch pipe corresponding to the second electrolytic cell is communicated.
It can be seen from the above description that the flow rate of the cooling pump has a direct impact on the temperature of the cold electrolyte. Specifically, if the flow rate of the cooling pump is increased, the heat exchange efficiency of the coolant with the hot electrolyte is improved, which is beneficial to reduction of the temperature of the electrolyte. If the flow rate of the cooling pump is reduced, the heat exchange efficiency of the coolant with the hot electrolyte is decreased, and the temperature of the electrolyte is increased. In the embodiments of the present application, the flow rate of the cooling pump is regulated according to the second electrolytic cell at the highest temperature, ensuring that the cooling requirements of the electrolytic cell at the highest temperature are met while avoiding the problem of high power consumption caused by an excessive flow rate of the cooling pump.
S330: define the electrolytic cell that is not at the highest temperature as a third electrolytic cell, regulate the opening degree of the corresponding first electrolyte inflow branch pipe and/or the corresponding second electrolyte inflow branch pipe according to the temperature of the third electrolytic cell to maintain a constant temperature of the third electrolytic cell.
Herein, in the hydrogen production system, except for the second electrolytic cell at the highest temperature, all other electrolytic cells are third electrolytic cells. With the aforementioned steps, the temperature of the second electrolytic cell at the highest temperature can be controlled within a required range by the cold electrolyte at its maximum flow rate. Among those third electrolytic cells at a lower temperature, there may be some electrolytic cells at a secondary high temperature which need to be cooled and some electrolytic cell at a low temperature which need to be heated. The temperature of the third electrolytic cells can be regulated by regulating the flow rate of the hot electrolyte or regulating the total flow rate of the electrolyte into the third electrolytic cells. For example, in case that the first switch device is a regulating valve and the third switch device is a switching valve, the flow rate of the electrolyte introduced into the electrolytic cell cannot be regulated by the third switch device, and thus the temperature of the electrolyte can be reasonably increased by switching on the first switch device and regulating the flow rate thereof so as heat the third electrolytic cell. For another example, in case that both the first switch device and the third switch device are regulating valves, the first switch device can be switched off and the flow rate of coolant flowing into the third electrolytic cell can be reduced only by regulating the opening degree of the third switch device.
The control strategy of regulating the temperature of the cold electrolyte in conjunction with the power of the cooling device is achieved through the steps of S310 to S330. Due to that the electrolytic cell at the highest temperature in the hydrogen production system is controlled to not exceed the temperature limit; the electrolytic cell at the secondary high temperature is also controlled to not exceed the temperature limit; and the temperature of the electrolytic cell at a low temperature is gradually increased. Thus, it ensures that all electrolytic cells in the hydrogen production system not only have no risk of overheating but also operate at an optimal operating temperature, achieving a precise temperature control of all electrolytic cells, and avoiding the performance degradation of individual electrolytic cells due to a continuous operation at a high temperature. Therefore, in the embodiments of the present application, the reliability of the entire hydrogen production system is improved, and the hydrogen production energy consumption of the electrolytic cell can be effectively reduced, thereby improving the system efficiency.
On the basis of the above embodiments, optionally, the temperature of all electrolytic cells is detected in real time. When an electrolytic cell is detected to be changed at the highest temperature, the previous electrolytic cell at the highest temperature will be replaced by this electrolytic cell. Referring to
On the basis of the above embodiments, optionally, the control method for the cooling pump includes at least one of the PID regulation and the hysteresis regulation. The control method for the circulating pump includes at least one of the PID regulation and the hysteresis regulation. The control method for the opening degree of the first electrolyte inflow branch pipe includes at least one of the PID regulation and the hysteresis regulation. The control method for the opening degree of the second electrolyte inflow branch pipe includes at least one of the PID regulation and the hysteresis regulation. Herein, the cooling pump and the circulation pump are controlled in the power, the rotate speed or the torque. The opening degree of the first electrolyte inflow branch pipe is controlled by the second switch device, and the opening degree of the second electrolyte inflow branch pipe is controlled by the first switch device. The opening degree of the first electrolyte inflow branch pipe and the second electrolyte inflow branch pipe is controlled by controlling the opening degree of the switch device. Optionally, the control method for the third switching device includes at least one of the PID regulation and the hysteresis regulation.
Hereinafter, the PID regulation will be described in detail.
Hereinafter, the hysteresis regulation will be described in detail. The hysteresis control of the cooling pump is taken as an example for illustration. An upper limit temperature and a lower limit temperature are set, and a difference between the upper limit temperature and the lower limit temperature is defined as a hysteresis loop width. The upper limit temperature is higher than the target temperature by 0.5 time of the hysteresis loop width, and the lower limit temperature is lower than the target temperature by 0.5 time of the hysteresis loop width. When the temperature feedback is higher than the upper limit temperature, the execution unit is controlled in response to a control signal to increase the flow rate of the cooling pump. When the temperature feedback is lower than the lower limit temperature, the execution unit is controlled in response to a control signal to decrease the flow rate of the cooling pump. Herein, the action sensitivity and frequency of the cooling pump can be regulated by regulating the hysteresis loop width. Specifically, the smaller the hysteresis loop width is, the more frequent the action is and the higher the sensitivity is. The larger the hysteresis loop width is, the lower the action frequency is and the lower the sensitivity is. The control method of the hysteresis loop regulation for the circulation pump and switch device is similar, which will not be repeated here.
A thermal management apparatus for a hydrogen production system is further provided in the embodiments of the present application, and is applied to the hydrogen production system provided in any embodiment of the present application. The thermal management apparatus may be implemented by software and/or hardware, and may be integrated into the controller of the hydrogen production system.
a working condition acquisition module 1, which is used to acquire a real-time working condition of the hydrogen production system;
a temperature regulating module 2, which is used to regulate the flow rate of the cold electrolyte introduced into each electrolytic cell through the first electrolyte inflow branch pipe and the flow rate of the hot electrolyte introduced into each electrolytic cell through the second electrolyte inflow branch pipe according to the working condition, so as to maintain the temperature of each electrolytic cell at a corresponding preset temperature.
The thermal management apparatus of the hydrogen production system provided in the embodiments of the present application can execute the thermal management method of the hydrogen production system provided in any embodiment of the present application, and has the corresponding functional modules for executing the method as well as the beneficial effects.
Optionally, the temperature regulating module includes:
a cooling unit, which is used to, in case of the working condition that at least one electrolytic cell needs to be cooled, control the flow rate of the cold electrolysis in the first electrolyte inflow branch pipe corresponding to the electrolytic cell to increase, or control the flow rate of the hot electrolysis in the second electrolyte inflow branch pipe corresponding to the electrolytic cell to decrease or even cut off;
a heating unit, which is used to, in case of the working condition that at least one electrolytic cell needs to be heated, control the flow rate of the hot electrolysis in the second electrolyte inflow branch pipe corresponding to the electrolytic cell to increase, or control the flow rate of the cold electrolysis in the first electrolyte inflow branch pipe corresponding to the electrolytic cell to decrease or even cut off.
Optionally, the conditions for cooling the electrolytic cell include: the temperature of the electrolytic cell in each operating state is higher than the corresponding preset cooling temperature, wherein the preset cooling temperatures corresponding to different states are same or different.
The conditions for heating the electrolytic cell include: the temperature of the electrolytic cell in each operating state is lower than the corresponding preset heating temperature, wherein the preset heating temperatures corresponding to different states are same or different.
Optionally, the temperature regulating module is further used to:
if the electrolytic cell is in a standby state, close the corresponding first electrolyte inflow branch pipe; and
in case that the electrolytic cell in the standby state meets the preset conditions, communicate the corresponding second electrolyte inflow branch pipe.
Optionally, the temperature regulating module is further used to regulate the flow rate of the hot electrolyte introduced into the corresponding electrolytic cell according to the temperature of the electrolytic cell after the second electrolyte inflow branch pipe is communicated.
Optionally, the temperature regulating module is further used to, before regulating the flow rate of the cold electrolyte introduced into each electrolytic cell, detect the temperature of each electrolytic cell and find the one having the highest temperature, and define the electrolytic cell having the highest temperature as the second electrolytic cell; and
regulate the flow rate of the cooling pump in the cooling device according to the temperature of the second electrolytic cell so as to cool the second electrolytic cell by the cold electrolyte after the first electrolyte inflow branch pipe corresponding to the second electrolytic cell is communicated.
Optionally, the temperature regulating module is further used to: define the electrolytic cell that is not at the highest temperature as the third electrolytic cell; at the time of communicating the first electrolyte inflow branch pipe corresponding to the second electrolytic cell, it further includes:
regulating the opening degree of the corresponding first electrolyte inflow branch pipe and/or the corresponding second electrolyte inflow branch pipe according to the temperature of the third electrolytic cell so as to maintain a constant temperature in the third electrolytic cell.
Optionally, the control method of regulating the cooling pump includes at least one of the PID regulation and the hysteresis regulation.
The control method for the opening degree of the first electrolyte inflow branch pipe includes at least one of the PID regulation and the hysteresis regulation, and the control method for the opening degree of the second electrolyte inflow branch pipe includes at least one of the PID regulation and the hysteresis regulation.
In summary, in the technical solution of the embodiment of the present application, the post-treatment equipment for the hydrogen production system includes first electrolyte inflow branch pipes and second electrolyte inflow branch pipes. Herein, the first electrolyte inflow branch pipes share one cooling device and are used to introduce the cold electrolyte into the corresponding electrolytic cells. The second electrolyte inflow branch pipes are bypass branch pipes of the cooling device, and are used to introduce the hot electrolyte into the corresponding electrolytic cells. By provision of the first and second electrolyte inflow branch pipes, the electrolytic cell can not only be cooled when being in operation, but also be maintained in a hot standby state when being in a shutdown state, which is beneficial to a rapid start-up of the electrolytic cell. There is no need to provide a separate heating device for heating the electrolytic cell. Therefore, in the embodiments of the present application, each electrolytic cell can be cooled or heated according to the needs, achieving a precise temperature control of each electrolytic cell while reducing costs and improving the system efficiency. Furthermore, according to the embodiments of the present application, the temperature of the electrolytic cell in the hot standby state may be maintained by the heat generated from the electrolytic cell in operation, achieving a heat-cyclic utilization, which is beneficial to reduction of the overall power consumption of the hydrogen production system.
It should be understood that various forms of processes shown above can be used to reorder, add, or delete the steps. For example, the steps described in the present application can be executed in parallel, sequentially, or in different orders, as long as they can achieve the desired results of the technical solution of the present invention, which is not limited herein
The above specific implementation methods do not constitute a limitation on the scope of the present application. Those skilled in the art should understand that various modifications, combinations, sub-combinations, and substitutions can be made based on design requirements and other factors. Any modifications, equivalent substitutions, and improvements made within the concept and principles of the present application shall be included within the scope of the present application.