Claims
- 1. A method of producing an in-ground lateral containment barrier system, preventing the lateral migration of fluid contaminants in an area in the ground, while allowing controlled removal of some of the fluid contaminants from the contained area, comprising the following steps:
- a. making an excavation around the area to be contained;
- b. forming a fluid impermeable barrier wall in the ground around the contaminants by placing a series of elongated barrier members within the excavation and slidingly engaging and interconnecting them in a vertical manner, connecting them together, including the sub-steps of:
- i. placing a first guide box assembly, having at least one longitudinal slot formed therein of a width to accommodate a barrier member, in the excavation,
- ii. placing a subsequent series of guide box assemblies in the excavation adjacent to a preceding one of said guide box assemblies, each guide box assembly having at least one longitudinal slot formed therein of a width to accommodate a barrier member, the interiors of said series of guide box assemblies forming a continuous, open area communicating with said slot of said first guide box assembly, providing a temporary, open, protected work space for the insertion and assembly of the barrier members in the longitudinal slots of respective ones of said guide box assemblies,
- iii. inserting a first barrier member in the longitudinal slot of said first guide box assembly, and
- iv. slidingly engaging and connecting together, in longitudinal fashion, a further series of barrier members to said first barrier member in the temporary, open, protected work space formed by said guide box assemblies, forming a fluid impermeable barrier in the ground;
- c. including a restricted, piped, pass-through through at least one of said barrier members, allowing the controlled removal of some of the fluid materials in the contained area through said pass-through; and
- d. filling the excavation with material, laterally containing the contaminated area with the fluid impermeable barrier members, and ultimately removing at least the main structure of at least some of said guide box assemblies from said excavation.
- 2. The method of claim 1, wherein there is further included the steps of:
- repeating sub-steps "b-ii" and "b-iv" until the barrier wall has been completed and the fluid contaminants have been encircled.
- 3. The method of claim 1, wherein there is further included the steps of:
- repeating sub-steps "b-ii" and "b-iv" until a further, supplemental, encircling barrier wall adjacent to but generally isolated from the fluid containment has been completed, providing a protected, satellite work/equipment area for the treatment in situ of contaminated fluids from the contained area.
- 4. The method of claim 3, wherein there is further included the steps of:
- leaving the guide box assemblies surrounding said work/equipment in the ground after the barrier walls have been completely formed.
- 5. The method of claim 4, wherein there is further included the steps of:
- excavating the material from the encircled work/equipment area forming an open, submerged cell.
- 6. The method of claim 5, wherein there is further included the steps of:
- installing a series of spreader beams extending across and between opposed walls forming the encircled work/equipment area as part of the excavation step of claim 5, stabilizing said opposed walls.
- 7. The method of claim 1, wherein there is further included the steps of:
- repeating sub-steps "b-ii" and "b-iv" until a supplemental, encircling barrier wall adjacent to but generally isolated from the contained area has been completed, providing a protected, satellite work/equipment area for the treatment in situ of contaminated fluids from the contained area, with the two adjacent areas sharing a common barrier wall and with said pass-through being located in said common barrier wall.
- 8. The method of claim 1, wherein at least some of said guide box assemblies includes two, spaced wall panels, each having an interior wall defining between them said work space and each having an exterior wall; and wherein there is further included in step "b" the steps of:
- placing said guide box assemblies in the excavation with space between the exterior walls of said wall panels and the sides of said excavation with at least the one to contain a barrier member with an integral pass-through having open, pass-through areas in the walls of the guide box assembly adjacent to said pass-through in said barrier member; and
- after the guide box assembly with the pass-through areas has been installed in the ground, excavating the material around said pass-through areas and said pass-through exposing said pass-through, and connecting pipe sections to both sides of said pass-through through said pass-through areas, allowing fluid material to be passed through said pass-through from the contained area.
- 9. The method of utilizing a guide box assembly system for defining a protected, open, work space for installing and interconnecting, in-ground barrier members in an excavation to form a contaminant containment and processing site, comprising:
- a. excavating a lateral trench about the area to be contained of sufficient depth to interface with an underground, fluid impermeable strata;
- b. providing a guide box, comprising two, spaced, rigid, connected, wall panels, each having a top and a bottom and each having an interior wall defining between them the protected, open, work space of a size to accommodate a barrier member, and each having an exterior wall, said wall panels each having a pass-through area adjacent to the location of the pass-through of the barrier member when positioned in the assembly, said guide box being held together as a rigid, assembled unit by means of laterally extending, rigid, spaced, top, spacer bars attached across the top portions of said wall panels and at least two, laterally extending, rigid, spaced, bottom, spacer bars attached across the bottom portions of said wall panels;
- c. placing said guide box in said trench;
- d. providing a barrier member with a pass-through area formed therein;
- e. placing said barrier member in the work spaced formed within said guide box;
- f. aligning said barrier member within said work space such that the pass-through area formed in said barrier member is generally aligned with the pass-through areas formed in said wall panels of said guide box;
- g. placing fluid conveyance means for conveying fluid through said pass-through areas formed in said wall panels of said guide box; while
- h. placing said fluid conveyance means for conveying fluid through said pass-through area formed in said barrier member.
- i. fluidly sealing the exterior of said fluid conveyance means to said barrier member.
- 10. The method of claim 9, wherein step "i" includes the additional step of utilizing a flanged structure with ends to which said fluid conveyance means can be easily attached through said pass-through areas in said wall panels.
REFERENCE TO THE RELATED APPLICATIONS
This application is a continuation-in-part of: Ser. No. 07/985,944 filed Dec. 4, 1992, entitled "Guide Box Assembly System for In-Ground Barrier Installation", with a co-inventor Lloyd Moffett, which application in turn is a continuation-in-part of patent application Ser. No. 07/831,555 filed Feb. 5, 1992, entitled "Hazardous Waste Containment System", now abandoned which is a continuation of patent application Ser. No. 398,613, filed Aug. 25, 1989 and issued as U.S. Pat. No. 5,106,233 on Apr. 21, 1992, the disclosures of which applications are all incorporated herein by reference.
Applicant with a co-inventor Leonard F. Sansone has also filed a pending application Ser. No. 07/986,241 filed Dec. 4, 1992 entitled "In-Ground Barrier Member Interlocking Joint and Seal System," the disclosure of which is likewise incorporated herein by reference.
US Referenced Citations (50)
Foreign Referenced Citations (1)
Number |
Date |
Country |
32808 |
Apr 1934 |
NLX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
398613 |
Aug 1989 |
|
Continuation in Parts (2)
|
Number |
Date |
Country |
Parent |
985944 |
Dec 1992 |
|
Parent |
831555 |
Feb 1992 |
|