Claims
- 1. A method for constructing a containment structure, comprising:
- (a) forming an impermeable basin containment structure in situ around a site to be contained; and
- (b) sealing an impermeable containment cap to said impermeable basin containment structure so as to form a substantially air-tight vault around said site.
- 2. The method for constructing a containment structure according to claim 1, further comprising passively verifying the integrity of the containment structure.
- 3. The method for constructing a containment structure according to claim 1, further comprising measuring differentials in conditions inside and outside of the containment structure.
- 4. The method for constructing a containment structure according to claim 1, further comprising the step of providing the inside of the containment structure with dry air or an inert gas.
- 5. The method for constructing a containment structure according to claim 1, further comprising the step of locating a leak by monitoring a condition selected from soil gas pressure, soil gas humidity, sound, concentration of diffusing substances, and their combinations and sealing said leak with a jet grouting or permeation grouting process.
- 6. The method for constructing a containment structure according claim 1, further comprising the step of reducing the water and volatile organic compound levels inside the containment structure.
- 7. The method for constructing a containment structure according to claim 1 further comprising desiccating contents of the impermeable containment basin structure before sealing the impermeable containment cap to the containment structure.
- 8. The method for constructing a containment structure according to claim 1 further comprising
- c) installing sensors for measuring a condition indicative of the integrity of the containment structure; and
- d) evaluating variations in sensor readings to verify the integrity of the vault.
- 9. The method for constructing a containment structure according to claim 8 wherein at least one sensor is installed inside the containment structure and wherein the measured condition is selected from soil gas pressure, soil gas humidity, sound, concentration of diffusing substances, and their combinations.
- 10. The method for constructing a containment structure according to claim 8 wherein at least one sensor is installed inside and outside the containment structure and wherein the measured conditions are selected from soil gas pressure, soil gas humidity, sound, concentration of diffusing substances, and their combinations.
- 11. The method for constructing a containment structure according to claim 8 further comprising forming a subterranean barrier under and around the containment structure and verifying the airtightness of the barrier.
- 12. The method for constructing a containment structure according to claim 8 further comprising placing an odor producing tracer chemical inside the containment structure and monitoring the containment structure for the detection of the odor producing tracer chemical outside the containment structure.
- 13. The method for constructing a containment structure according to claim 8 wherein a layer of the containment cap is constructed from material effective to discourage the burrowing of animals or plants into the soil of the containment cap.
- 14. The method for constructing a containment structure according to claim 13 wherein the material effective to discourage the burrowing of animals or plants is selected from bitter tasting additives, irritating additives, and their combinations.
- 15. A method for constructing a containment structure comprising:
- (a) forming an impermeable basin containment structure in situ around a site to be contained;
- (b) installing pipes within the containment structure;
- (c) sealing an impermeable containment cap to said impermeable basin containment structure so as to form a substantially air-tight vault around said site; and
- d) passing electronic logging tools through the pipes to evaluate the integrity of the containment structure.
- 16. A method for constructing a containment structure comprising:
- (a) forming an impermeable basin containment structure in situ around a site to be contained;
- (b) installing acoustic transducers inside and outside the containment structure;
- (c) sealing an impermeable containment cap to said impermeable basin containment structure so as to form a substantially air-tight vault around said site; and
- d) locating any leak in the containment structure by monitoring the relative attenuation of acoustic energy of various frequencies.
CROSS-REFERENCE TO RELATED APPLICATION
This application is a divisional of U.S. application Ser. No. 08/761,273 filed Dec. 6, 1996 which claims priority from provisional application number 60/009,065 filed on Dec. 8, 1995.