The present disclosure relates generally to power transmittal in a network, and more particularly, to initialization and synchronization for pulse power in a network system.
Power over Ethernet (PoE) is a technology for providing electrical power over a wired telecommunications network from power sourcing equipment (PSE) to a powered device (PD) over a link section. In conventional PoE systems, power is delivered over the cables used by the data over a range from a few meters to about one hundred meters. When a greater distance is needed or fiber optic cables are used, power must be supplied through a local power source such as a wall outlet due to limitations with conventional PoE. Furthermore, today's PoE systems have limited power capacity, which may be inadequate for many classes of devices.
Corresponding reference characters indicate corresponding parts throughout the several views of the drawings.
Overview
In one embodiment, a method generally comprises transmitting from power sourcing equipment, low voltage pulse power to a powered device, performing a safety test, enabling high voltage pulse power operation at the power sourcing equipment upon passing the safety test, and transmitting high voltage pulse power from the power sourcing equipment to the powered device. The powered device synchronizes with a waveform of the low voltage pulse power.
In another embodiment, a method generally comprises receiving low voltage pulse power from power sourcing equipment at a powered device, synchronizing timing of a modulator at the powered device with a waveform of the low voltage pulse power received from the power sourcing equipment, and operating with high voltage pulse power received from the power sourcing equipment.
In another embodiment, a method generally comprises receiving high voltage pulse power from power sourcing equipment at a powered device with a modulator switch open, coupling isolated voltage at the powered device when a pulse of the high voltage pulse power is on, energizing a housekeeping circuit at the powered device, and turning on the modulator switch at the powered device after a specified number of high voltage pulses are received.
In yet another embodiment, a method generally comprises identifying at a first powered device in communication with power sourcing equipment, a second powered device in communication with the first powered device, wherein the first powered device is receiving high voltage pulse power from the power sourcing equipment, notifying the power sourcing equipment of the second powered device, and performing a low voltage power initialization at the first powered device with the second powered device before passing the high voltage pulse power to the second powered device.
Further understanding of the features and advantages of the embodiments described herein may be realized by reference to the remaining portions of the specification and the attached drawings.
The following description is presented to enable one of ordinary skill in the art to make and use the embodiments. Descriptions of specific embodiments and applications are provided only as examples, and various modifications will be readily apparent to those skilled in the art. The general principles described herein may be applied to other applications without departing from the scope of the embodiments. Thus, the embodiments are not to be limited to those shown, but are to be accorded the widest scope consistent with the principles and features described herein. For purpose of clarity, details relating to technical material that is known in the technical fields related to the embodiments have not been described in detail.
In conventional Power over Ethernet (PoE) systems used to simultaneously transmit power and data communications, power is delivered over the same twisted pair cable used for data. These systems are limited in range to a few meters to about 100 m (meters). Conventional PoE over communications cabling is generally limited to about 90 W (Watts) based on IEEE 802.3bt, but many classes of powered devices would benefit from power delivery greater than 100 W and in some cases greater than 1000 W. For example, conventional PoE does not provide sufficient power for higher power communications systems such as remote radio heads or front haul routers as seen in cellular networks that typically need between 300 W and 1000 W to operate. Also, enterprise products that provide switching, routing, and power for access points and IP (Internet Protocol) phone systems often need about 1000 W to 1500 W of power. In conventional systems, when larger power delivery ratings are needed, power is supplied to a remote device through a local power source. However, in network communications systems such as 5G cellular build-outs or other communications systems and connected buildings with multiple non-centralized routers on each floor, AC (Alternating Current) grid power is not always available, may not be cost effective to build out at the start, or practical in some locations (e.g. wireless base stations), and in many cases cost prohibitive. For example, in locations that are listed as “co-location”, power is typically charged on a per connection basis, not consumed power, making each additional AC connection very expensive. AC grid power systems are often used because DC (Direct Current) power systems are not a good solution over long distances. There is a therefore a need for a means to deliver power to these and other devices without having to add an AC outlet or other type of secondary power feed.
An increase in power available over multi-function cables to hundreds and even thousands of watts may enable many new choices in network deployments where major devices such as workgroup routers, multi-socket servers, large displays, wireless access points, fog nodes, or other devices are operated. This capability would greatly decrease installation complexity and improve the total cost of ownership of a much wider set of devices that have their power and data connectivity needs met from a central hub.
In order to overcome the above issues, power and data delivery systems may be designed to carry higher data rates and higher power delivery (and may also carry integrated thermal management cooling) combined into a single cable, as described in U.S. patent application Ser. No. 15/910,203 (“Combined Power, Data, and Cooling Delivery in a Communications Network”), filed Mar. 2, 2018, which is incorporated herein by reference in its entirety. These connections may be point-to-point, such as from a central hub to one or more remote devices (e.g., full hub and spoke layout). In another example, a single combined function cable may run most of the way to a cluster of powered devices and then split, as described in U.S. patent application Ser. No. 15/918,972 (“Splitting of Combined Delivery Power, Data, and Cooling in a Communications Network”), filed Mar. 12, 2018, which is incorporated herein by reference in its entirety. With high power applications, further safety concerns arise, which may result in the need for additional testing or safety checks at start-up and during power transmittal.
Embodiments described herein provide for safe delivery of high power over a data system (also referred to herein as advanced power over data or Extended Safe Power (ESP)) in a network system through the use of pulse power with fault detection and safety protection. The power may be transmitted in a network system (e.g., network communications system) with or without communications. The term “pulse power” as used herein refers to power that is delivered in pulses that vary between a very small voltage (e.g., close to 0V (volts), 3V) during a pulse off interval and a larger voltage (e.g., ≥12V) during a pulse on interval. High voltage pulse power (e.g., >56V, ≥60V, ≥300V) may be transmitted from power sourcing equipment (PSE) to a powered device (PD) for use in powering the powered device, whereas low voltage pulse power (low voltage pulses) (e.g., ˜12V, ≤30V, ≤56V) may be used over a short interval for start-up (e.g., initialization, synchronization, charging local energy storage, powering up a controller, testing, or any combination thereof). As described in detail below, an initialization process (low voltage or high voltage initialization process) may be performed prior to transmitting high voltage pulse power to synchronize the PSE and PD and provide a safe start-up. The initialization process may comprise, for example, a safety test including a cable capacitance test and synchronization of modulator switch (pulse) timing between the power sourcing equipment and the powered device. As described below, the initialization may be performed for multiple phases in a multi-phase pulse power system and in various network topologies.
For example, one or more embodiments may use multiple phase (multi-phase) pulse power to achieve less loss, effectively 100% duty cycle power delivery (e.g., continuous uninterrupted power to the output with overlapping phase pulses) to a powered device, while enhancing reliability per power connection and providing safe operation over an extended length of cable to deliver high power, as described in U.S. patent application Ser. No. 16/380,954 (“Multiple Phase Pulse Power in a Network Communications System”), filed Apr. 10, 2019, which is incorporated herein by reference in its entirety. Multiple pair cabling may be used, for example, with a DC pulse on each pair, timed in such a manner as to provide 100% net duty cycle continuous power at the powered device (or load). Pulse power transmissions may be through cables, transmission lines, busbars, backplanes, PCBs (Printed Circuit Boards), and power distribution systems, for example.
The ESP system may test the network devices or cables to identify faults or safety issues. The system may be configured, for example, to identify transmission errors, phase faults (in multi-phase systems), over current, arc events, time base control synchronization faults, MAC drops, or any other communication or power faults or errors. These faults may be identified on a per phase basis in a multi-phase system. As described below, a low voltage initialization may be used for startup (or restart) to test the network and components (as described below with respect to the flowchart of
In addition to performing testing during start-up and initialization, testing may continue to be performed during high voltage operation to safely deliver power in the ESP system. In one or more embodiments, fault sensing may be performed through a low voltage safety check combined with a digital interlock that uses the data system to provide feedback on the power system status and set a power operation mode, as described in U.S. patent application Ser. No. 15/971,729, (“High Power and Data Delivery in a Communications Network with Safety and Fault Protection”), filed May 4, 2018, which is incorporated herein by reference in its entirety. The fault sensing may be performed during a low voltage startup or between high power pulses in the pulse power system. The pulse power may comprise source voltage pulse power (unipolar or bipolar) or load current pulse power with low voltage fault detection between high voltage power pulses. Fault sensing may include, for example, line-to-line fault detection with low voltage sensing of the cable or powered device and line-to-ground fault detection with midpoint grounding. Touch-safe fault protection may also be provided through cable and connector designs that are touch-safe even with high voltage applied. The power safety features provide for safe system operation and installation and removal (disconnect) of components, including in some cases replacement of components without disturbing normal operation of the system (i.e., hot swappable).
The Off-time between pulses may be used, for example, for line-to-line resistance testing for faults and the pulse width may be proportional to DC line-to-line voltage to provide touch-safe fault protection (e.g., about 1 ms at about 1000V). The testing (fault detection, fault protection, fault sensing, touch-safe protection) may comprise auto-negotiation between the PSE and PDs. Low voltage (e.g., less than or equal to 24 VDC (volts direct current), 5-12 VDC, 56 VDC or any other suitable low voltage (e.g., <60 VDC)) resistance analysis may be used for auto-negotiation. The pulse power high voltage DC may be used with a pulse-to-pulse decision for touch-safe line-to-line fault interrogation between pulses for personal safety. Line-to-line touch shock protection may be provided with a source pulse Off-time between pulses for resistance across line detection between pulses.
Ground-fault-detection (GFD) and ground-fault-isolation (GFI) line-to-ground fault detection may be performed to provide fast high voltage interruption with ground fault protection (shock protection) during high voltage operation as part of using a high-resistance mid-point ground circuit. A high voltage DC supply line-to-ground fault protection circuit may be used to turn off power quickly to provide touch-safe shock protection. GFD and GFI may provide shut off in approximately 10 μs (microseconds), for example. A midpoint grounding method by the power source may also be used to allow higher peak pulse line-line voltage within the wire/conductor insulation and isolation ratings for line-ground protection and also provide touch-safe line-to-ground fault for personal safety and to meet safety standards. The system may also be designed for adjustable time and current versus voltage for personal shock protection.
In one or more embodiments, the system may also test for thermal buildup using thermal modeling of the cable as described in U.S. patent application Ser. No. 15/604,344, entitled “Thermal Modeling for Cables Transmitting Data and Power”, filed May 24, 2017, which is incorporated herein by reference in its entirety. For example, thermal buildup may be detected by tracking cable current change and calculating cable current temperature. The cable temperature is a function of amperage, cable gauge, and length of cable. By using known parameters and assuming a wire size (e.g., 22 AWG), the temperature limit of the cable in a bundle environment may be calculated. Temperature ranges may be defined, for example, as normal, minor, major, and critical (e.g., minor defined within 20° C. of cable temperature limit, major defined within 10° C. of cable temperature limit, and critical defined at cable temperature limit). If the temperature range is in the minor range, the system may force renegotiation of power to reduce current on the line. If the temperature is in the critical range, the port may be de-energized. The temperature may be calculated in each wire, each pair of wires, the four-pair cable, or any combination thereof.
In one or more embodiments, the system may also perform a wire fault and electrical imbalance detection as described in U.S. patent application Ser. No. 16/020,881, entitled “Wire Fault and Electrical Imbalance Detection for Power over Communications Cabling”, filed Jun. 27, 2018, which is incorporated by reference in its entirety.
In one or more embodiments, the PSE may inform the PD of a power level that the PSE is capable of providing and the PD may then select the appropriate power level to use. The PSE and PD may negotiate power levels, for example, of 15 W, 30 W, 60 W, 90 W, 150 W, 200 W, 250 W, 300 W, or any other suitable power level. If no faults are detected, the system may auto-negotiate to maximum available power. Once the power is increased, fault detection may continue to be performed, as previously described. Fault detection may include for example, a check for thermal buildup, an electrical imbalance check (wire-to-wire imbalance check, pair-to-pair imbalance check), or short circuit/fault protection check. The system may be configured to perform one or more of these checks in any order or some steps may be performed simultaneously. One or more of the safety checks may be performed continuously or at specified intervals. For example, the wires may be monitored one by one in a continuous loop within a 10 ms window. If a fault is detected or a specified PSE voltage is exceeded, power output is shutdown. If the fault is minor (e.g., one or more parameters close to limit but not exceeding limit), power may be reduced through renegotiation of the power level. If the fault continues, the port may then be shutdown. An alarm may also be generated. In one or more embodiments, packet and idle (link) monitoring may be used to shut down the power. If a wire is lost, the link is lost and per wire faults are covered.
Action may also be taken based on the monitored (or calculated) current. For example, if the current in the cable exceeds the cable current maximum limit, the port may be shutdown. If the cable current reaches a specified range, the line card (PD) may be forced to perform power negotiation with the PSE to reduce current on the line. The current may be monitored per wire, per pair of wires, per cable, or any combination. Current ranges may be defined as normal, minor, major, and critical (e.g., minor defined within 20% maximum current, major defined within 10% maximum current, and critical defined at maximum current). If the range is minor, renegotiation may be performed to reduce current on the cable. If the critical current is reached, the port may be de-energized.
In one or more embodiments, one or more parameters may be user defined. For example, cable impedance, cable length, cable gauge, and cable voltage rating may be set for an ESP system or link. The ESP system may set a maximum voltage, current, or power based on these parameters. As described herein, the system may perform cable safety tests based on cable capacitance. The system may also perform GFI fault tests and line-to-line fault tests as described above for low voltage and high voltage. If a fault is identified, the system may set a fault latch and attempt an auto-restart one or more times. One or more components in the ESP system may include one or more visual indicators (e.g., LED (Light Emitting Diode)) to identify low voltage operation, high voltage operation, or system/component/cable fault, for example.
In one or more embodiments, machine learning may be performed by periodically monitoring and collecting data (e.g., current, voltage, cable capacitance, faults, temperature, etc.) to further define acceptable limits and account for variation in electrical performance based on changes in cable, environment, or components over time. For example, an analytical model may be defined and updated based on data trends for use in updating voltage and load current and operating limits to account for variations in electrical parameters and avoid false system faults.
In one or more embodiments, the PSE may deliver >100 W to a plurality of PDs along with data (e.g., over copper wires or optical fibers) on a power and data combined cable, as described below. In one or more embodiments, the system may safely deliver 2000 W or more of power at cable lengths exceeding 1500 meters. The system may also safely deliver higher power (e.g., 6000 W) on cable lengths less than 25 meters, making it very valuable in de-centralizing large chassis systems to eliminate the back plane/large chassis system design. It is to be understood that the power levels and cable distances described herein are provided as examples and other power levels delivered over different cable lengths may be used without departing from the scope of the embodiments.
The system may be configured to meet safety standards, including, for example, IEC (International Electrotechnical Commission) standard Nos. 62368-3:2017 (“Audio/video information and communication technology equipment—Part 3: Safety aspects for DC power transfer through communication cables and ports”), IEC 60950-1:2005 (“Information technology equipment—Safety—Part 1: General requirements”), IEC 60947 (“Low-voltage switchgear and control gear”), or any other applicable standard to provide touch-safe shock protection for personnel for high voltage (higher power) applications in the extended safe power system. The system may be configured, for example, to limit shock current with line-to-ground fault limit of about 5 mA (e.g., less than 10 mA) and line-to-line fault limit of about 0.5 A for 1 ms using about 2.5 kohms across HVDC power (e.g., 1100V, 550V, 380V) (e.g., for short reach cabling or smart digital sensing techniques). In another example, worst case shock exposure time may be 12 ms. Appropriate techniques (e.g., fail-safe Safety Agency Approved Listed components, redundant circuits or components) may be employed in order to meet safety standards.
The Off-time of the pulses may be configured based on cable pair capacitance and maximum pulse power On-time may be designed to be below limits set by body shock current and standards (e.g., as referenced in UL (Underwriters Laboratories) standards 62368 and 60950 or NFPA (National Fire Protection Association) NEC (National Electrical Code) 70 chapter 7, chapter 8, and tables 11A and 11B in chapter 9, IEC/TR 60479-5, 60479-1, IEC-60947-1, IEC-60947-2, IEC-60947-3, IEC-60335-1, IEC-60990, IEC-60065, IEC-61000-4, or any other appropriate standard or requirement). In one or more embodiments, On-time and Off-time pulse widths may be set dynamically in response to changing cable characteristics. The need for continuous net current supply to the PD may determine the phase relationship of pulses on multiple transmission pair systems. The embodiments described herein may be configured to meet single fault protection or other safety requirements. It is to be understood that the standards and limits discussed herein are only provided as examples and other safety limits or standards may be used, without departing from the scope of the embodiments.
Referring now to the drawings, and first to
In one or more embodiments, the network is configured to pass electrical power along with data to provide both data connectivity and electric power to network devices such as switches 14, routers, access points 15, or other electronic components and devices. Signals may be exchanged among communications equipment and power transmitted from power sourcing equipment (PSE) 10 to powered devices (PDs) 14, 15, 17, 19. In one or more embodiments, the system delivers power to and from a network (e.g., switch/router system) using an interface module 16 (e.g., optical transceiver module) configured to receive and transmit both data (fiber delivered data) and electrical power (high power energy). In one or more embodiments, the power and data may be delivered over a cable comprising both optical fibers and electrical wires (e.g., copper wires), as described in U.S. patent application Ser. No. 15/707,976 (“Power Delivery Through an Optical System”), filed Sep. 18, 2017, which is incorporated herein by reference in its entirety. In one or more embodiments, the system may further provide cooling and deliver combined power, data, and cooling within a single hybrid cable system, as described, for example, in U.S. patent application Ser. Nos. 15/910,203 and 15/918,972, referenced above.
As shown in the example of
The central hub (combined power and data source) 10 is operable to provide high capacity power from an internal power system (e.g., PSU 11 capable of delivering power over and including 5 kW, 100 kW, etc., and driving the plurality of devices 14, 15, each in the 100 W-3000 W range (e.g., 100 W or greater, 900 W or greater, 1000 W or greater), or any other suitable power range. The PSU 11 may provide, for example, PoE (Power over Ethernet), PoF (Power over Fiber), HVDC (high voltage direct current), pulse power HVDC, or AC (alternating current). The central network device 10 is operable to receive external power and transmit power over combined delivery power and data cables 18 in the communications network (e.g., network comprising central hub 10 (PSE) and a plurality of network devices 14, 15, 17, 19 (PDs)). The central network device 10 may comprise, for example, a router, convergence system, or any other suitable line card system. It is to be understood that this is only an example and any other network device operable to transmit power and optical data may be used. One or more of the line cards 13 may also include the interface module 16 (shown at the remote network devices 14, 15) operable to transmit power and data on the cables 18.
The network may include any number or arrangement of network communications devices (e.g., switches 14, access points 15, routers, or other devices operable to route (switch, forward) data communications). In one example, the network comprises a plurality of groups of access points 15, with each group located on a different floor or zone. One or more of the network devices 14, 15 may also deliver power to a downstream node (e.g., PoE device 19) using PoE. For example, one or more of the network devices 14, 15 may deliver power using PoE to electronic components such as IP (Internet Protocol) cameras, VoIP (Voice over IP) phones, video cameras, point-of-sale devices, security access control devices, residential devices, building automation devices, industrial automation devices, factory equipment, lights (building lights, streetlights), traffic signals, fog nodes, IoT devices, sensors, and many other electrical components and devices. In one or more embodiments, a redundant central hub (not shown) may provide backup or additional power or bandwidth, as needed in the network. In this case, the remote network device 14, 15 would include another interface module 16 for connection with another cable 18 delivering power and data from the redundant central hub. As described in detail below, the network may be arranged in various topologies, including for example, point-to-point, daisy chain, multi-drop, or hybrid multi-drop/daisy chain for delivering high voltage pulse power to a downstream device (e.g., PD 17 in communication with switch 14).
As previously noted, the central hub 10 may deliver power and data directly to each network device 14 (point-to-point connection as shown for the switches 14 connected to line cards B and D in
In one or more embodiments, cables (combined cable, multi-function cable, multi-use cable, hybrid cable) 18 extending from the network device 10 to the switches 14 and access points 15 are configured to transmit power and data, and include both optical fibers and electrical wires. The cable 18 may include, for example, two power lines (conductors) and two data lines (optical fibers). It is to be understood that that this is only an example and the cable 18 may contain any number of power or data lines. For example, instead of using two optical fiber paths to transfer data from the central hub 10 to the remote device 14, 15 and from the remote device to the central hub, a bidirectional optical system may be utilized with one wavelength of light going downstream (from central hub 10 to remote device 14, 15) and a different wavelength of light going upstream (from remote device 14, 15 to central hub 10), thereby reducing the fiber count in the cable from two to one. The cable 18 may also include additional optical fibers or power lines. The cables 18 may be formed from any material suitable to carry both electrical power and optical data (e.g., copper, fiber) and may carry any number of electrical wires and optical fibers in any arrangement. The cable 18 may transmit one or more of power, data (electrical), data (optical), and cooling.
As previously noted, the cables 18 may also carry cooling for thermal management of the remote network communications devices 14, 15. For example, in one or more embodiments, the cables 18 extending from the central hub 10 to the remote network devices 14, 15 may be configured to transmit combined delivery power, data, and cooling in a single cable. In this embodiment, the cables 18 may be formed from any material suitable to carry electrical power, data (e.g., copper, fiber), and coolant (liquid, gas, or multi-phase) and may carry any number of electrical wires, optical fibers, and cooling tubes in any arrangement.
The cables 18 comprise a connector at each end configured to couple with the interface module 16 at the network devices 10, 14, 15. The connector may comprise, for example, a combined power and data connector (hybrid copper and fiber) configured to connect to an optical transceiver, as described in U.S. patent application Ser. No. 15/707,976, referenced above. The connector may comprise, for example, a modified RJ-45 type connector.
In one or more embodiments, the connectors and cable 18 are configured to meet standard safety requirements for line-to-ground protection and line-to-line protection at relevant high voltage by means including clearance and creepage distances, and touch-safe techniques. The connector may comprise safety features, including, for example, short-pin for hot-plug and hot-unplug without current surge or interruption for connector arcing protection. The connector may further include additional insulation material for hot-plug and hot-unplug with current surge or interruption with arc-flash protection and reliability life with arcing. The insulated cable power connector terminals are preferably configured to meet touch voltage or current accessibility requirements.
As previously noted, one or more of the network devices 10, 14, 15 may comprise an interface module 16 operable to deliver the combined power and data from the PSE 10 or receive the combined power and data at the PD 14, 15. In one or more embodiments, the interface module 16 may comprise an optical transceiver module configured to deliver (or receive) power along with the optical data. For example, in one embodiment, the interface module 16 comprises a transceiver module modified along with a fiber connector system to incorporate copper wires to deliver power through the optical transceiver to the powered device 14, 15 for use by the network communications devices, as described in U.S. patent application Ser. No. 15/707,976, referenced above or in U.S. patent application Ser. No. 15/942,015 (“Interface Module for Combined Delivery Power, Data, and Cooling at a Network Device”), filed Mar. 30, 2018, which is incorporated herein by reference in its entirety. It is to be understood that these are only examples of interface modules that may be used to deliver or receive high power and optical data.
The interface module 16 (optical module, optical transceiver, optical transceiver module, optical device, optics module, silicon photonics module) is configured to source or receive power. The interface module 16 operates as an engine that bidirectionally converts optical signals to electrical signals or in general as an interface to the network element copper wire or optical fiber. In one or more embodiments, the interface module 16 may comprise a pluggable transceiver module in any form factor (e.g., SFP (Small Form-Factor Pluggable), QSFP (Quad Small Form-Factor Pluggable), CFP (C Form-Factor Pluggable), and the like), and may support data rates up to 400 Gbps, for example. Hosts for these pluggable optical modules include line cards 13 on the central network device 10, switches 14, access points 15, or other network devices. The host may include a printed circuit board (PCB) and electronic components and circuits operable to interface telecommunications lines in a telecommunications network. The host may be configured to perform one or more operations and receive any number or type of pluggable transceiver modules configured for transmitting and receiving signals.
Also, it may be noted that the interface module 16 may be configured for operation in point-to-multipoint or multipoint-to-point topology. For example, QFSP may breakout to SFP+. One or more embodiments may be configured to allow for load shifting. The interface module 16 may also be configured for operation with AOC (Active Optical Cable) and form factors used in UWB (Ultra-Wideband) applications, including for example, Ultra HDMI (High-Definition Multimedia Interface), serial high bandwidth cables (e.g., thunderbolt), and other form factors.
The interface module 16 provides for power to be delivered to the switches 14 and access points 15 in locations where standard power is not available. The interface module 16 may be configured to tap some of the energy and make intelligent decisions so that the power source 10 knows when it is safe to increase power on the wires without damaging the system or endangering an operator, as described below. The interface module 16 may include one or more sensors, monitors, or controllers for use in monitoring and controlling the power and data, as described in detail below with respect to
In one or more embodiments, there is no need for additional electrical wiring for the communications network and all of the network communications devices operate using the power provided by the extended safe power system. In addition to the network devices 10, 14, 15 comprising interface modules 16 operable to receive and transmit power over electrical wires and optical data over fibers, the network may also include one or more network devices comprising conventional optical modules that only process and transmit the optical data. These network devices would receive electrical power from a local power source such as a wall outlet. Similarly, specialized variants of transceivers 16 may eliminate the optical data interfaces, and only interconnect power (e.g., moving data interconnection to wireless networks). As previously noted, one or more of the network devices may also receive cooling over cable 18 in addition to power, data, or power and data.
In one or more embodiments, a distributed control system comprising components located on the central hub's controller and on the remote device's processor may communicate over the fiber links in the combined cable 18. Monitoring information from power sensors (e.g., current, voltage) or data usage (e.g., bandwidth, buffer/queue size) may be used by the control system in managing or allocating power or data.
The system may be configured to deliver PoE, PoF, high voltage DC (HVDC), AC power, pulse power, multi-phase pulse power, or any combination thereof. The HVDC power may comprise steady state HVDC or pulse power HVDC. The steady state and pulse power HVDC may be unipolar or bipolar (switching DC), as described in U.S. patent application Ser. No. 15/971,729, referenced above. In one or more embodiments, the system may employ a dual-power mode that detects and negotiates between the power source 10 and powered device 14, 15. This negotiation distinguishes between and accommodates different power-delivery schemes, such as standard PoE or PoF, high power, pulse power, or other power modes capable of power delivery through the interface module 16. For example, standard PoE distribution may be used for remote network devices rated less than about 100 W. For higher power remote powered devices, pulse power or other higher voltage techniques may be used to create an efficient energy distribution network.
As described in detail below, the remote network device 14, 15, 17 may use a small amount of power at startup to communicate its power and data requirements to the central network device 10. The powered device 14, 15, 17 may then configure itself accordingly for full power operation. In one example, power type, safety operation of the module, and data rates are negotiated between the central hub (PSE) 10 and the network device 14, 15, 17 through data communications signals on the optical fiber. The interface module 16 communicates any operational fault, including the loss of data. Such fault may result in power immediately being turned off or switching to a low power (low voltage) mode. Full power supply may not be reestablished until the powered device is able to communicate back in low power mode that higher power may be safely applied.
It is to be understood that the network devices and topology shown in
Memory 24 may be a volatile memory or non-volatile storage, which stores various applications, operating systems, modules, and data for execution and use by the processor 22. For example, components of the optical module 28 or controller 29 (e.g., code, logic, or firmware, etc.) may be stored in the memory 24. The network device 20 may include any number of memory components.
The network device 20 may include any number of processors 22 (e.g., single or multi-processor computing device or system), which may communicate with a forwarding engine or packet forwarder operable to process a packet or packet header. The processor 22 may receive instructions from a software application or module, which causes the processor to perform functions of one or more embodiments described herein. The processor 22 may also operate one or more components of the power control module 29 for fault detection, auto-negotiation, digital interlock, synchronization, multi-phase control, pulse power control, low voltage, high voltage control, modulator switch control, etc.
The controller (power module/controller) 29 may be configured for auto-negotiation, fault detection, initialization, digital interlock, synchronization, multi-phase control, pulse power control, or other control or management functions. The control system 29 may comprise components (modules, code, software, logic) located at the central hub 10 and the remote device 14, 15, and interconnected through the combined power and data cable 18 (
Logic may be encoded in one or more tangible media for execution by the processor 22. For example, the processor 22 may execute codes stored in a computer-readable medium such as memory 24. The computer-readable medium may be, for example, electronic (e.g., RAM (random access memory), ROM (read-only memory), EPROM (erasable programmable read-only memory)), magnetic, optical (e.g., CD, DVD), electromagnetic, semiconductor technology, or any other suitable medium. In one example, the computer-readable medium comprises a non-transitory computer-readable medium. Logic may be used to perform one or more functions described below with respect to the flowcharts of
The interface 26 may comprise any number of network interfaces (line cards, ports, connectors) for receiving data or power, or transmitting data or power to other devices. The network interface may be configured to transmit or receive data using a variety of different communications protocols and may include mechanical, electrical, and signaling circuitry for communicating data over physical links coupled to the network interfaces. For example, line cards may include port processors and port processor controllers. The interface 26 may comprise one or more optical and electrical interfaces. The interface 26 may also comprise fluid ports if the system is configured for cooling. One or more of the interfaces 26 may be configured for PoE+F+C (Power over Ethernet+Fiber+Cooling), PoE+F, PoE, PoF, high voltage pulse power, multi-phase pulse power, or similar operation.
The optical module 28 may include logic, firmware, software, etc. for use in monitoring or controlling the extended safe power system. For example, the optical module 28 may comprise hardware or software for use in power detection, system start-up, synchronization, power monitor and control, or power enable/disable. The optical module 28 may further comprise one or more of the processor or memory components, or interface 26 for receiving or delivering power and data. As previously described, in one or more embodiments, power is supplied to the optical module by power supply 27 and the optical module 28 provides power to the rest of the components at the network device 20.
It is to be understood that the network device 20 shown in
The network device 30 includes optical/electrical components 31 for receiving optical data and converting it to electrical signals (or converting electrical signals to optical data) and power components including, power detection modules 32a, 32b, power monitor and control modules 33, and power enable/disable modules 34. Although PoE and pulse power are described in conjunction with detection elements 32a, 32b, it should be understood that other power delivery schemes including AC, DC, and USB may be supported with similar elements. Also, the type of power may be split between high voltage power and low voltage power. The power components may be isolated from the optical components 31 via an isolation component (e.g., isolation material or element), which electromagnetically isolates the power circuit from the optical components to prevent interference with operation of the optics. The network device 30 may include an auto detection module 35 that operates with the pulse power detection module 32a and PoE detection module 32b. Module 35 may also operate to select a power delivery mode (e.g., PoE or pulse power) based on which delivery mode is more efficient based on network device operations. One or more functions of the detection elements 32a, 32b, auto detection module 35, power monitor and control modules 33, or auto-negotiation module 39 may be combined into a power module and operate within the interface module.
The auto-negotiate/digital interlock module 39 may be used in performing one or more fault detection, auto-negotiation, or digital interlock processes. As described in detail below, auto-negotiation may include communication between the PSE and the PD and interaction between controllers at the central network device and remote network device. A gate control/modulator 40 may be provided to isolate one or more circuits during system initialization or testing and modulate the pulse power, as described below with respect to
In the example shown in
The network device 30 is configured to calculate available power and prevent the cabling system from being energized when it should not be powered. The power monitor and control modules 33 continuously monitor power delivery to ensure that the system can support the needed power delivery and no safety limits (e.g., voltage, current) are exceeded. The power monitor and control modules 33 may also monitor optical signaling and disable power if there is a lack of optical transitions or communication with the power source. Power monitor and control functions may sense the voltage and current flow, and report these readings to a central control function. In one embodiment, the network device 30 uses a small amount of low voltage power (e.g., ≤12V, ≤24V, ≤60V) at startup or restart to communicate its power and data requirements and status. The network device 30 may then be configured for full power operation (e.g., >60V, ≥300V, ≥500V, ≥1000V) (e.g., at high power enable/disable module 34) if no faults or safety conditions are detected. If a fault is detected, full power operation may not be established until the network device communicates in low power mode that high power can be safely applied. The auto-negotiation module 39 communicates with a control system at the central network device to select a safe operating mode (e.g., determine that it is safe to apply high voltage power), identify a fault in the circuit (e.g., line-to-line or line-to-ground fault detection), and shutdown power if a fault is identified at start-up or during testing between high voltage pulse power during normal operation. As described below, power may be delivered with or without communications.
It is to be understood that the system shown in
As described below, an initialization process may be performed with low voltage (
As described in detail below, PD initialization may include power-up for initial PD housekeeping voltage with a PD modulator switch Off for power to transceiver, PD modulator gate, and microcontroller/DSP. PD housekeeping voltage may be developed during the PSE modulator On-time by synchronizing a power converter load operation with a cable voltage waveform. As previously noted, the initialization may comprise a low voltage or high voltage initialization. In one low voltage initialization example, a low voltage (e.g., 24 VDC) may be applied before switching to high voltage (e.g., 380 VDC). This may include a long initial On-time period to power up a DC housekeeping capacitor fully for faster start-up time before only drawing power during high voltage pulsing. For high voltage initialization, a short-time high voltage pulse may be used for added high voltage protection during initialization. In another high voltage initialization example, a nominal-time (normal operating pulse width) operation high voltage pulse and duty/frequency may be used as needed for a safety test, including a cable capacitance test. This high voltage initialization process may be used, for example, for PD hot-swap replacement or addition of a new PD to cable with high voltage pulsing (high voltage pulse power on cable).
In one or more embodiments, low voltage initialization at the PSE comprises transmitting low voltage pulse power from the PSE to the PD, performing a safety test (e.g., safety body shock protection test, cable capacitance test), and enabling high voltage pulse power operation at the power sourcing equipment upon passing the safety test. During the low voltage initialization, the PD synchronizes with a waveform of the low voltage pulse power. For example, a modulator switch at the PD may synchronize with a modulator switch at the PSE. The term “modulator switch” as used herein may refer to one or more modulator switches (e.g., one or more switches with common control), power modulator, pulse modulator, pulse power modulator, control switch, gate control, isolation switch, or similar component or group of components operable to perform the functions described herein. The synchronization may continue during high voltage pulse power operation.
In one or more embodiments, low voltage initialization at the PD comprises receiving low voltage pulse power at the PD from the PSE, synchronizing the powered device with a waveform of the low voltage pulse power received from the power sourcing equipment, and operating the PD with high voltage pulse power received from the power sourcing equipment. During initialization at the PD, a modulator switch may be open while energizing a housekeeping circuit at the PD. The modulator switch may then be turned on while the capacitance and safety test are performed by the PSE.
It is to be understood that the term “synchronize” as used herein refers to coordination of the pulses at the PSE and PD through coordination of the PSE and PD modulator switch drives or of one of the modulator switches with a voltage waveform, for example. Synchronization is used to align the pulses (modulator switches) at the PSE and PD, and may result in differences between pulse width (modulator switching) at the PSE and PD. For example, as described below with respect to
The PD and PSE may optionally auto-negotiate modulator switch timing (synchronize modulator switches) (step 46) if communications are available. The PSE performs a capacitance test (step 47a) and a safety test (step 47b). It is to be understood that the capacitance test (step 47a) and safety test (step 47b) may be collectively referred to as a “safety test”. Results of the capacitance test may be used to adjust the modulator pulse timing of the PSE and PD for the safety test calibration and timing. For example, results of the capacitance test may be used to identify a minimum Off-time and high voltage exposure time, adjust high voltage exposure time, and set safety fault sense level as described below with respect to
In one or more embodiments, the powered device receives high voltage pulse power from the power sourcing equipment with a modulator switch at the powered device open, couples isolated housekeeping voltage at the powered device when a pulse of the high voltage pulse power is on, energizes a housekeeping circuit at the powered device, and turns on a modulator switch at the powered device after a specified number of high voltage pulses are received to power the powered device with the high voltage pulse power.
Referring now to
As previously described with respect to
If a fault is identified, fault mode is entered until reset (step 74). If the test passes, the cable capacitance is calculated and the 100 kohm load voltage threshold is set to the fault dv/dt to inhibit additional fault during auto-negotiation high voltage pulse Off-time (step 75). A maximum high voltage pulse Off-time is determined for the 100 kohm fault dv/dt voltage threshold (step 76). This value preferably includes a margin (e.g., fault threshold of dv/dt=10% plus another 5% margin). A desired duty cycle is determined for On-time for desired power, cable loss, and RMS (Root Mean Square) current (step 77).
The above described process may be performed only at initialization (low voltage or high voltage start-up) or may be repeated at fixed intervals or pulse-to-pulse to identify if additional cable lengths have been added. The cable capacitance and shock fault test may be performed for each phase in a multi-phase system described below. It is to be understood that the resistance values, margins, and discharge times described above are only examples and other values may be used without departing from the scope of the embodiments. Additional details of the capacitance test are described below with respect to
It is to be understood that the processes shown in
Referring now to
The PSE 81 includes an isolated high voltage source (e.g., 380 VDC) and a modulator switch 84a with gate. The DSP (Digital Signal Processor) 85a, 85b may comprise a microcontroller or FPGA (Field Programmable Gate Array) digital control and software/firmware. Tx/Rx 86a, 86b at the PSE and PD represent transceivers with a coupling network. An isolated power supply 87a is provided for PSE housekeeping. An isolated power supply 87b is provided for PD housekeeping with 24 VDC input example for low voltage initialization and testing. The PD 82 also includes a DC/DC isolated converter 87c for generating 12V/3.3V housekeeping voltage with 60-380 VDC input from the output of the PD (high voltage pulse power operation) example. In this example, current sense transformer/Hall-effect sensors (CS/CT) 88a, 88b are included at the PSE and PD. A safety sensing circuit (Vsense safety) 89a and PD sync voltage sensor (Vsense sync) 89b are located in the PSE and PD, respectively. As shown in
Additional details of operation of portions of the circuit shown in
A smart digital system may be used to increase the accuracy and reliability and minimize the Off-time. As previously described with respect to
It is to be understood that the circuits shown in
As previously discussed with respect to steps 45 and 46 of
In a first example, PD modulator control is provided with pulse-pulse off/on command communications after initial power up. The PSE modulator control 104 turns on with low voltage (e.g., 24V) without pulsing. The PD modulator control 107 turns on until it is told to turn off with no load other than housekeeping power. A communications link is then established between the PSE and PD. The PSE modulator 103 starts pulsing at an established On-time and Off-time duty cycle and frequency. The PSE sends a command at the end of a data stream period of modulator On-time to turn off PD modulator for Xms and then turn back on. The Off-time command may be sent earlier in the data stream and changed pulse-to-pulse, then the last word sent may be a turn-off-now command at a specified time (knowing that there will be some turn off delay).
A second synchronization method provides PD modulator control and PLL synchronization without communication. The Vsense sync circuit 106 senses the cable capacitance (Ccable) voltage waveform droop (VCcable) when PSE gate switch 102 is off due to cable resistance (i.e., mid-point ground resistance and sensing circuits). The Vsense circuit 106 develops pulses from VCcable positive transition after droop with PSE gate switches on (
A third synchronization method provides a pre-established default On-time between the PSE and the PD modulators. One or more embodiments utilize a one-shot monostable multi-vibrator (MV) default pulse width and default delay time to synchronize with the PSE default modulator On-time triggered from the cable capacitor voltage waveform fast-rising dv/dt at the start of the PSE Modulator pulse On-time. The circuit may include, for example a differentiator circuit, bias average trigger threshold circuit, and op-amp. The circuit may further include an adjustable delay-On 105a (e.g., 100 μs default) and an adjustable one-shot multi-vibrator 105b (e.g., 7.8 ns default). In this example, PD modulator control is provided with pulse-pulse default On-time until updated On-time command for next pulse during communication. The PSE modulator first pulses a default On-time duty cycle (e.g., 8 ms) and period (e.g., 12 ms) to cable phase/pair with voltage waveform droop (Vccable) to the PD Vsense sync circuit 106. The Vsense sync circuit 106 triggers on the Vccable positive transition with a delayed pulse width desired for the PD modulator switch control with a default On-time duty cycle. During the On-time duty cycle, data communications may update or modify the sync delay time, pulse width, and period, as needed to sync with the PD modulator On-time duty cycle for each next pulse period. The above steps may then be repeated. This provides pulse-pulse change for on-the-fly synchronization changes in On/Off time, duty cycle, and frequency from the PSE and keeps the PD in sync for each phase/pair. This sequence also ensures the PSE modulator voltage is On-first before the PD modulator switches-On and then Off-first before the PSE modulator voltage switches-Off for noise transient mitigation.
The Vsense circuit 116 develops an enable pulse width from VCcable positive transition after the voltage droop from PSE gate switches on to operate the DC/DC housekeeping converter 120 for continued housekeeping power (
It may be noted that for long cable resistance voltage drop for 5 W, the start-up low voltage may be increased from 24V to 56 VDC. In one or more embodiments, the low voltage may be less than or equal to 56V and a difference between the high voltage power (at power on pulse at PSE) and low voltage power may be greater than 200V (e.g., ˜324V, ˜368V). It is to be understood that these voltage levels are only examples and other levels may be used. The low voltage is preferably rated to prevent any safety issues during low voltage start-up (e.g., initialization and synchronization) and the high voltage is preferably rated to provide sufficient power to power the powered device, while providing safety checks during off pulse intervals. As described below, the high voltage power level may be based on the number of phases in a multi-phase power system in which the pulses are offset from one another between phases.
Referring first to
The PSE modulator switch 133 starts pulsing high voltage at an established On-time (e.g., 8 ms) and Off-time (e.g., 4 ms) duty cycle and frequency. The DC/DC initial startup circuit 140 at the PD is energized on the first high voltage On-time cycle for a fixed operating time (e.g., 6-8 ms). The Vsense circuit 136 develops an enable pulse width (e.g., 6 ms) from VCcable positive transition after the voltage droop when PSE gate switches on to operate the DC/DC housekeeping converter 140 for continued housekeeping power (
In the example shown in
It is to be understood that the circuits and block diagrams shown in
Referring now to
In one or more embodiments, PoE or high voltage power (e.g., ESP, pulse power, multi-phase pulse power) may be delivered over the same cable and connectors. Depending on a capability of the PSE 150 and PD 152, the PD may operate in one or more different modes. If the PSE 150 and PD 152 are not compatible (i.e., one only configured for PoE and the other one only configured for ESP) the circuit will be not be powered. If both the PSE 150 and PD 152 are capable of ESP operation, the PSE will supply high voltage pulse power and the PD will operate using the high voltage pulse power. In another example, the PSE, PD, or both PD and PSE may select an operating mode based on the most efficient delivery mode (e.g., using auto-negotiation between PD and PSE).
It is to be understood that the power inputs and outputs shown in the simplified block diagrams of
As previously described, the pulse power system may operate as a multiple phase (multi-phase) system. The initialization, synchronization, testing, and fault detection described herein may be performed on each phase of the multi-phase system. In one or more embodiments, the pulse power system may comprise a multi-phase pulse power system as described in U.S. patent application Ser. No. 16/380,954, referenced above. In one example, single conductor pair cable is replaced with 2-phase pulse power transmission system cable with two pairs of power lines, busbars, power planes, or cable wired pairs. For example, one or more embodiments may comprise a 2-phase pulse power transmission system cable with 3-wire, busbars, power planes, or a cable wire trio. Multi-phase (three or more phase) operation may further reduce RMS current per phase and effectively provide continuous DC voltage without bulky filter components. In one or more embodiments, high or effectively 100% duty cycle to the output and split ground (e.g., mid-point high-resistance ground) may provide higher efficiency with lower RMS current cable losses, allow fast and effective phase to ground fault detection, allow for higher voltage and power to the load from limited cable voltage rating, and implement common mode systems (separate ground connection) with lower peak currents for lower EMI/EMC noise radiated and susceptible fields.
In one or more embodiments, the multiple phase approach allows for a significant Off-time in a 10 ms window, for example, to verify the cable for shorts, opens, unreported power loss (e.g., low current short), or human or animal added resistance. This extended Off-time allows for a significant improvement in safety. The multi-phase pulse power also allows for a lower source voltage to be used to meet 100% of the powered device requirements. As previously noted, in a single phase system, the Off-time may need to be filtered out with bulky filters, and even then, power efficiency/effectivity is about 80% on high loads. Use of multiple phases at a higher duty cycle and higher efficiency provides a significant component advantage and may also provide increased power delivery and reliability. For example, the loss of a single phase in a three or more phase system does not impact the 100% continuous duty cycle power effectivity at the powered device. As described below, loss of a sourced phase front end circuit may not impact operation with redundant power sources.
Referring now to
The PSE network device 200 comprises an input power interface (e.g., three PSUs 205 receiving power cords 209 in the example shown in
The pulse power tap/receiver 212 comprises an input cable interface 213a for receiving the multiple phase DC pulse power and data from the PSE 200, an isolation switch (described below), and an interface 213b for transmitting power to the endpoint node 214. The interface 213b may be, for example, an interface connected to HVDC cable 222, pulse power cable, or a direct interface to the endpoint node. The tap/receiver 212 may supply power to one or more nodes 214 along a pulse power cable system. The tap/receivers 212 may be sized to support individual node power and may implement disconnect for fault isolation or node control based on data link communications. The multiple phase (multi-phase) DC pulse power comprises at least two phases to provide continuous DC voltage at the endpoint node 214. In one or more embodiments, the multi-phase pulse power comprises at least three phases to provide continuous power in case of loss of one phase. One or more of the pulse power tap/receivers 212 also comprises an output cable interface 213c for transmitting the multiple phase DC pulse power and data on the cable to a downstream tap node 212 in a taper topology (tap node configuration).
In the example shown in
The pulse power module control system 207 may provide, for example, timing and sequencing, line detection and characterization, voltage and current sensing, mid-point high resistance grounding, fault sensing, communications to PSUs, and data link/control to remote nodes. As described herein, the control system 207 may verify cable operation (e.g., verify cable operational integrity) during the Off-time of pulses in the DC pulse power. The pulse power module 206 may include a pulse power modulator, safety circuits, initialization circuits, PMBus, PMBus I2C (I2C (Inter-Integrated Circuit)), logic, FPGA (Field-Programmable Gate Array), DSP (Digital Signal Processor), or any combination of these or other components configured to perform the functions described herein.
As shown in the example of
The wires within cable 211 may comprise two conductor, twisted pair (with or without shielding), coaxial or triaxial cable, depending on EMC considerations. A separate ground conductor may be provided to address potential common-mode noise issues. It is to be understood that the term wire as used herein may refer to a single wire or a pair of wires. As described below, the power system may comprise any number of wires, which may be bundled with fiber or other communications transmission media.
Power is supplied to the endpoint 214 through the pulse power tap/receiver 212 (also referred to as a branch tap, smart branch tap, receiver/converter). In one or more embodiments, the smart branch taps 212 allow branch fault isolation. The tap/receiver 212 may include, for example, an isolation switch (disconnect switch), data link, and logic/timing controller. The tap/receiver 212 may be used for initializing an auto-negotiation process, fault branch isolation algorithm, power initialization, and faulty PD replacements. The data link over the pulse power wires allows for implementation of the smart branch taps 212 for each node 214 and independent control (disconnect) of each branch for fault isolation or node management.
Each of the endpoints 214 may include an HVDC PSU for powering equipment at the endpoint. The endpoint 214 may comprise, for example, a 56 VDC load and may operate, for example, as a PON (Passive Optical Network) endpoint, 5G node, access point, router, switch, or other type of equipment. The endpoint 214 may also power one or more other nodes (e.g., PoE node, IoT (Internet of Things) device).
It is to be understood that the system shown in
The multiple PSUs allow for multi-phase operation and may also provide redundancy. For example, if one phase is lost in a system comprising three or more phases, continuous power may still be delivered to the PD nodes 214. Each phase is preferably sized to supply higher peak power to maintain full power to the PD nodes 214. Further redundancy may be provided by utilizing N+1 Front End Power (FEP) supplies. For example, in the case of a 1500 W total PD power system, three 1200 W FEPs can power the system with full redundancy of N+N or N+1, with each FEP needing only a common 120V, 15 A feed.
As shown in
As shown in
The net PD voltage is shown combined for the three phase voltages at 225. The corresponding phase currents (A, B, C) (226a, 226b, 226c) are shown below the voltages. The net line current corresponding to the three phase currents is shown at 227. As shown in
As shown in
In one or more embodiments, the Off-time may be fixed, based on worst case cable length and characteristics or actively controlled based on detected cable characterization (for higher efficiency/longer range). The On-time (power delivery) for each phase may be fixed based on total pulse power voltage and shock hazard limits based on appropriate body resistance data. This approach may be used to achieve maximum pulse overlap, thereby reducing cable RMS current and maximizing power transmission distance (or minimizing conductor wire size).
As previously noted, idealized waveforms are shown in
As shown in
In one or more embodiments, a central controller at the PSE may coordinate offset between phases and adapt pulse width for optimization (or following loss of a phase as needed). Any changes in pulse timing are communicated to the PD for synchronization.
It is to be understood that the currents, voltages, pulse widths, duty cycles, and phase overlaps shown in
As previously noted, the multi-phase pulse power system may comprise two or more wires or wire pairs. It is to be understood that the multi-phase system described herein may be implemented on systems comprising a different number of wires or wire pairs and the three phase system shown in
As previously described, PD and PSE modulators may be synchronized during low voltage or high voltage initialization or during high power operation for each phase in a multi-phase system. In one or more embodiments, PSE and PD modulator (control) switches (described above) may include timing control such that a PSE pulse is turned on before a PD modulator switch is turned on, and PD modulator switch is turned off before the PSE modulator switch is turned off for each pulse, as shown in
As previously discussed with respect to
Details of an initialization process for the PSE and PDs in the hybrid multi-drop/daisy chain topology (
It is to be understood that while
In one or more embodiments, a first powered device 322a in communication with power sourcing equipment 320 identifies a second powered device 322b in communication with the first powered device, while the first powered device is receiving high voltage pulse power from the power sourcing equipment (
Referring now to
High voltage operation is enabled at the PSE 320 as shown in
As shown at
A communications link is brought up at the second PD 322b, as shown in
As previously noted, the above described process may be performed for multi-phase pulse power with synchronization and checks performed for each phase. Also, the network may comprise any number of nodes in any topology with one or more end nodes configured for pulse power operation, one or more nodes configured for pulse power or PoE, and one or more endpoints configured only for PoE. Also, one or more of the PDs may include capability to operate as a PSE for a downstream node as shown in
Although the method and apparatus have been described in accordance with the embodiments shown, one of ordinary skill in the art will readily recognize that there could be variations made to the embodiments without departing from the scope of the embodiments. Accordingly, it is intended that all matter contained in the above description and shown in the accompanying drawings shall be interpreted as illustrative and not in a limiting sense.
The present application is a divisional of U.S. patent application Ser. No. 16/671,508 entitled “INITIALIZATION AND SYNCHRONIZATION FOR PULSE POWER IN A NETWORK SYSTEM”, filed Nov. 1, 2019, which is incorporated herein by reference in its entirety.
Number | Name | Date | Kind |
---|---|---|---|
3335324 | Buckeridge | Aug 1967 | A |
3962529 | Kubo | Jun 1976 | A |
4811187 | Nakajima | Mar 1989 | A |
4997388 | Dale | Mar 1991 | A |
5652893 | Ben-Meir | Jul 1997 | A |
6008631 | Johari | Dec 1999 | A |
6220955 | Posa | Apr 2001 | B1 |
6259745 | Chan | Jul 2001 | B1 |
6295356 | De Nicolo | Sep 2001 | B1 |
6448672 | Voegeli | Sep 2002 | B1 |
6636538 | Stephens | Oct 2003 | B1 |
6685364 | Brezina | Feb 2004 | B1 |
6756881 | Bateman | Jun 2004 | B2 |
6784790 | Lester | Aug 2004 | B1 |
6822457 | Borchert et al. | Nov 2004 | B2 |
6826368 | Koren | Nov 2004 | B1 |
6855881 | Khoshnood | Feb 2005 | B2 |
6860004 | Hirano | Mar 2005 | B2 |
7325150 | Lehr | Jan 2008 | B2 |
7417443 | Admon | Aug 2008 | B2 |
7420355 | Liu | Sep 2008 | B2 |
7490996 | Sommer | Feb 2009 | B2 |
7492059 | Peker | Feb 2009 | B2 |
7509505 | Randall | Mar 2009 | B2 |
7564904 | Isachar | Jul 2009 | B2 |
7566987 | Black | Jul 2009 | B2 |
7583703 | Bowser | Sep 2009 | B2 |
7589435 | Metsker | Sep 2009 | B2 |
7593747 | Karam | Sep 2009 | B1 |
7603570 | Schindler | Oct 2009 | B2 |
7616465 | Vinciarelli | Nov 2009 | B1 |
7813646 | Furey | Oct 2010 | B2 |
7835389 | Yu | Nov 2010 | B2 |
7854634 | Filipon | Dec 2010 | B2 |
7881072 | DiBene | Feb 2011 | B2 |
7915761 | Jones | Mar 2011 | B1 |
7921307 | Karam | Apr 2011 | B2 |
7924579 | Arduini | Apr 2011 | B2 |
7940787 | Karam | May 2011 | B2 |
7973538 | Karam | Jul 2011 | B2 |
8020043 | Karam | Sep 2011 | B2 |
8037324 | Hussain | Oct 2011 | B2 |
8068937 | Eaves | Nov 2011 | B2 |
8081589 | Gilbrech | Dec 2011 | B1 |
8184525 | Karam | May 2012 | B2 |
8276397 | Carlson | Oct 2012 | B1 |
8279883 | Diab | Oct 2012 | B2 |
8310089 | Schindler | Nov 2012 | B2 |
8319627 | Chan | Nov 2012 | B2 |
8345439 | Goergen | Jan 2013 | B1 |
8350538 | Cuk | Jan 2013 | B2 |
8358893 | Sanderson | Jan 2013 | B1 |
8386820 | Diab | Feb 2013 | B2 |
8638008 | Baldwin | Jan 2014 | B2 |
8700923 | Fung | Apr 2014 | B2 |
8712324 | Corbridge | Apr 2014 | B2 |
8750710 | Hirt | Jun 2014 | B1 |
8768528 | Millar | Jul 2014 | B2 |
8781637 | Eaves | Jul 2014 | B2 |
8787775 | Earnshaw | Jul 2014 | B2 |
8793511 | Bishara | Jul 2014 | B1 |
8829917 | Lo | Sep 2014 | B1 |
8836228 | Xu | Sep 2014 | B2 |
8842430 | Hellriegel | Sep 2014 | B2 |
8849471 | Daniel | Sep 2014 | B2 |
8898446 | Ronen | Nov 2014 | B2 |
8966747 | Vinciarelli | Mar 2015 | B2 |
8971399 | Kwon | Mar 2015 | B2 |
9001881 | Okamura | Apr 2015 | B2 |
9019895 | Li | Apr 2015 | B2 |
9024473 | Huff | May 2015 | B2 |
9184795 | Eaves | Nov 2015 | B2 |
9189036 | Ghoshal | Nov 2015 | B2 |
9189043 | Vorenkamp | Nov 2015 | B2 |
9273906 | Goth | Mar 2016 | B2 |
9319101 | Lontka | Apr 2016 | B2 |
9321362 | Woo | Apr 2016 | B2 |
9373963 | Kuznelsov | Jun 2016 | B2 |
9419436 | Eaves | Aug 2016 | B2 |
9484771 | Braylovskiy | Nov 2016 | B2 |
9510479 | Vos | Nov 2016 | B2 |
9531551 | Balasubramanian | Dec 2016 | B2 |
9590811 | Hunter, Jr. | Mar 2017 | B2 |
9618714 | Murray | Apr 2017 | B2 |
9640998 | Dawson | May 2017 | B2 |
9665148 | Hamdi | May 2017 | B2 |
9693244 | Maruhashi | Jun 2017 | B2 |
9734940 | McNutt | Aug 2017 | B1 |
9768978 | Coenen | Sep 2017 | B2 |
9823296 | Thanner et al. | Nov 2017 | B2 |
9853689 | Eaves | Dec 2017 | B2 |
9874930 | Vavilala | Jan 2018 | B2 |
9882656 | Sipes, Jr. | Jan 2018 | B2 |
9891678 | Butcher | Feb 2018 | B2 |
9893521 | Lowe | Feb 2018 | B2 |
9948198 | Imai | Apr 2018 | B2 |
9979370 | Xu | May 2018 | B2 |
9983267 | Fassnacht et al. | May 2018 | B2 |
9985600 | Xu | May 2018 | B2 |
10007628 | Pitigoi-Aron | Jun 2018 | B2 |
10028417 | Schmidtke | Jul 2018 | B2 |
10128764 | Vinciarelli | Nov 2018 | B1 |
10191100 | Blank et al. | Jan 2019 | B2 |
10248178 | Brooks | Apr 2019 | B2 |
10263526 | Sandusky | Apr 2019 | B2 |
10281513 | Goergen | May 2019 | B1 |
10374813 | Sheffield | Aug 2019 | B2 |
10407995 | Moeny | Sep 2019 | B2 |
10439432 | Eckhardt | Oct 2019 | B2 |
10468879 | Eaves | Nov 2019 | B2 |
10541543 | Eaves | Jan 2020 | B2 |
10541758 | Goergen | Jan 2020 | B2 |
10631443 | Byers | Apr 2020 | B2 |
10671146 | Wendt | Jun 2020 | B2 |
10672537 | Goergen | Jun 2020 | B2 |
10714930 | Weiss et al. | Jul 2020 | B1 |
10732688 | Goergen | Aug 2020 | B2 |
10735105 | Goergen | Aug 2020 | B2 |
10790997 | Jones et al. | Sep 2020 | B2 |
10809134 | Bullock | Oct 2020 | B2 |
10958471 | Goergen | Mar 2021 | B2 |
20010024373 | Cuk | Sep 2001 | A1 |
20020126967 | Panak | Sep 2002 | A1 |
20040000816 | Khoshnood | Jan 2004 | A1 |
20040033076 | Song | Feb 2004 | A1 |
20040043651 | Bain | Mar 2004 | A1 |
20040073703 | Boucher | Apr 2004 | A1 |
20040264214 | Xu | Dec 2004 | A1 |
20050044431 | Lang | Feb 2005 | A1 |
20050197018 | Lord | Sep 2005 | A1 |
20050220021 | Sosnowski et al. | Oct 2005 | A1 |
20050268120 | Schindler | Dec 2005 | A1 |
20060100799 | Karam | May 2006 | A1 |
20060202109 | Delcher | Sep 2006 | A1 |
20060209875 | Lum | Sep 2006 | A1 |
20060214253 | Camagna | Sep 2006 | A1 |
20070103168 | Batten | May 2007 | A1 |
20070143508 | Linnman | Jun 2007 | A1 |
20070236853 | Crawley | Oct 2007 | A1 |
20070263675 | Lum | Nov 2007 | A1 |
20070284941 | Robbins | Dec 2007 | A1 |
20070284946 | Robbins | Dec 2007 | A1 |
20070288125 | Quaratiello | Dec 2007 | A1 |
20070288771 | Robbins | Dec 2007 | A1 |
20080054720 | Lum | Mar 2008 | A1 |
20080198635 | Hussain | Aug 2008 | A1 |
20080229120 | Diab | Sep 2008 | A1 |
20080310067 | Diab | Dec 2008 | A1 |
20090027033 | Diab | Jan 2009 | A1 |
20100077239 | Diab | Mar 2010 | A1 |
20100117808 | Karam | May 2010 | A1 |
20100171602 | Kabbara | Jul 2010 | A1 |
20100190384 | Lanni | Jul 2010 | A1 |
20100237846 | Vetteth | Sep 2010 | A1 |
20100290190 | Chester | Nov 2010 | A1 |
20110004773 | Hussain | Jan 2011 | A1 |
20110007664 | Diab | Jan 2011 | A1 |
20110057612 | Taguchi | Mar 2011 | A1 |
20110083824 | Rogers | Apr 2011 | A1 |
20110228578 | Serpa | Sep 2011 | A1 |
20110266867 | Schindler | Dec 2011 | A1 |
20110290497 | Stenevik | Dec 2011 | A1 |
20120043935 | Dyer | Feb 2012 | A1 |
20120064745 | Ottliczky | Mar 2012 | A1 |
20120170927 | Huang | Jul 2012 | A1 |
20120188796 | Randall | Jul 2012 | A1 |
20120201089 | Barth | Aug 2012 | A1 |
20120231654 | Conrad | Sep 2012 | A1 |
20120287984 | Lee | Nov 2012 | A1 |
20120317426 | Hunter, Jr. | Dec 2012 | A1 |
20120319468 | Schneider | Dec 2012 | A1 |
20130077923 | Weem | Mar 2013 | A1 |
20130079633 | Weem | Mar 2013 | A1 |
20130103220 | Eaves | Apr 2013 | A1 |
20130249292 | Blackwell, Jr. | Sep 2013 | A1 |
20130262887 | Biederman | Oct 2013 | A1 |
20130272721 | Van Veen | Oct 2013 | A1 |
20130329344 | Tucker | Dec 2013 | A1 |
20140111009 | Ruef | Apr 2014 | A1 |
20140111180 | Vladan | Apr 2014 | A1 |
20140126151 | Campbell | May 2014 | A1 |
20140129850 | Paul | May 2014 | A1 |
20140258742 | Chien | Sep 2014 | A1 |
20140258813 | Lusted | Sep 2014 | A1 |
20140265550 | Milligan | Sep 2014 | A1 |
20140372773 | Heath | Dec 2014 | A1 |
20150078740 | Sipes, Jr. | Mar 2015 | A1 |
20150106539 | Leinonen | Apr 2015 | A1 |
20150115741 | Dawson | Apr 2015 | A1 |
20150137841 | Thanner et al. | May 2015 | A1 |
20150207317 | Radermacher | Jul 2015 | A1 |
20150215001 | Eaves | Jul 2015 | A1 |
20150215131 | Paul | Jul 2015 | A1 |
20150219725 | Fassnacht et al. | Aug 2015 | A1 |
20150333918 | White, III | Nov 2015 | A1 |
20150340818 | Scherer | Nov 2015 | A1 |
20150365003 | Sadwick | Dec 2015 | A1 |
20160018252 | Hanson | Jan 2016 | A1 |
20160020911 | Sipes, Jr. | Jan 2016 | A1 |
20160064938 | Balasubramanian | Mar 2016 | A1 |
20160069944 | Blank et al. | Mar 2016 | A1 |
20160111877 | Eaves | Apr 2016 | A1 |
20160118784 | Saxena | Apr 2016 | A1 |
20160133355 | Glew | May 2016 | A1 |
20160134331 | Eaves | May 2016 | A1 |
20160142217 | Gardner | May 2016 | A1 |
20160173008 | Waltuch | Jun 2016 | A1 |
20160188427 | Chandrashekar | Jun 2016 | A1 |
20160197600 | Kuznetsov | Jul 2016 | A1 |
20160365967 | Tu | Jul 2016 | A1 |
20160241148 | Kizilyalli | Aug 2016 | A1 |
20160262288 | Chainer | Sep 2016 | A1 |
20160273722 | Crenshaw | Sep 2016 | A1 |
20160294500 | Chawgo | Oct 2016 | A1 |
20160294568 | Chawgo | Oct 2016 | A1 |
20160308683 | Pischl | Oct 2016 | A1 |
20160334856 | Yseboodt et al. | Nov 2016 | A1 |
20160352535 | Hiscock | Dec 2016 | A1 |
20170041152 | Sheffield | Feb 2017 | A1 |
20170041153 | Picard | Feb 2017 | A1 |
20170054296 | Daniel | Feb 2017 | A1 |
20170110871 | Foster | Apr 2017 | A1 |
20170123466 | Carnevale | May 2017 | A1 |
20170146260 | Ribbich | May 2017 | A1 |
20170155517 | Cao | Jun 2017 | A1 |
20170164525 | Chapel | Jun 2017 | A1 |
20170155518 | Yang | Jul 2017 | A1 |
20170214236 | Eaves | Jul 2017 | A1 |
20170229886 | Eaves | Aug 2017 | A1 |
20170234738 | Ross | Aug 2017 | A1 |
20170237580 | Radermacher | Aug 2017 | A1 |
20170244318 | Giuliano | Aug 2017 | A1 |
20170248976 | Moller | Aug 2017 | A1 |
20170294966 | Jia | Oct 2017 | A1 |
20170325320 | Wendt | Nov 2017 | A1 |
20180020881 | Tessier | Jan 2018 | A1 |
20180024964 | Mao | Jan 2018 | A1 |
20180053313 | Smith | Feb 2018 | A1 |
20180054083 | Hick | Feb 2018 | A1 |
20180060269 | Kessler | Mar 2018 | A1 |
20180088648 | Otani | Mar 2018 | A1 |
20180098201 | Torello | Apr 2018 | A1 |
20180102604 | Keith | Apr 2018 | A1 |
20180123360 | Eaves | May 2018 | A1 |
20180159430 | Albert | Jun 2018 | A1 |
20180188712 | MacKay | Jul 2018 | A1 |
20180191513 | Hess | Jul 2018 | A1 |
20180254624 | Son | Sep 2018 | A1 |
20180313886 | Mlyniec | Nov 2018 | A1 |
20180340840 | Bullock | Nov 2018 | A1 |
20190064890 | Donachy | Feb 2019 | A1 |
20190089467 | Goergen et al. | Mar 2019 | A1 |
20190126764 | Fuhrer | May 2019 | A1 |
20190267804 | Matan | Aug 2019 | A1 |
20190272011 | Goergen | Sep 2019 | A1 |
20190277899 | Goergen | Sep 2019 | A1 |
20190277900 | Goergen | Sep 2019 | A1 |
20190278347 | Goergen | Sep 2019 | A1 |
20190280895 | Mather | Sep 2019 | A1 |
20190281725 | Byers et al. | Sep 2019 | A1 |
20190304630 | Goergen | Oct 2019 | A1 |
20190312751 | Goergen | Oct 2019 | A1 |
20190342011 | Goergen | Oct 2019 | A1 |
20190363493 | Sironi | Nov 2019 | A1 |
20190380954 | Takahashi et al. | Dec 2019 | A1 |
20200044751 | Goergen | Feb 2020 | A1 |
20200067720 | Hartnett | Feb 2020 | A1 |
20200153174 | Curtis | May 2020 | A1 |
20200235949 | Jones et al. | Jul 2020 | A1 |
20200295955 | O'Brien et al. | Sep 2020 | A1 |
20200389329 | Jones et al. | Dec 2020 | A1 |
20220190587 | Eaves et al. | Jun 2022 | A1 |
Number | Date | Country |
---|---|---|
1209880 | Jul 2005 | CN |
201689347 | Dec 2010 | CN |
204168139 | Feb 2015 | CN |
104793544 | Jul 2015 | CN |
105049216 | Nov 2015 | CN |
204836199 | Dec 2015 | CN |
205544597 | Aug 2016 | CN |
205544597 | Aug 2016 | CN |
104081237 | Oct 2016 | CN |
106165342 | Nov 2016 | CN |
103490907 | Dec 2017 | CN |
207135120 | Mar 2018 | CN |
104412541 | May 2019 | CN |
209134431 | Jul 2019 | CN |
1936861 | Jun 2008 | EP |
2120443 | Nov 2009 | EP |
2257009 | Jan 2010 | EP |
2432134 | Mar 2012 | EP |
2693688 | Feb 2014 | EP |
2012003523 | Jan 2012 | JP |
2016525331 | Aug 2016 | JP |
2017195763 | Oct 2017 | JP |
9316407 | Aug 1993 | WO |
WO199316407 | Aug 1993 | WO |
WO2006127916 | Nov 2006 | WO |
2007030303 | Mar 2007 | WO |
WO2010053542 | May 2010 | WO |
WO2017054030 | Apr 2017 | WO |
WO2017167926 | Oct 2017 | WO |
WO2018017544 | Jan 2018 | WO |
WO2019023731 | Feb 2019 | WO |
WO2019212759 | Nov 2019 | WO |
Entry |
---|
English Translation of Office Action in counterpart Japanese Application No. 2022-507587, mailed May 16, 2023, 3 pages. |
Voltserver Inc., v. Cisco Technology, Inc., “Decision Denying Institution of Post-Grant Review,” United States Patent and Trademark Office, PGR2021-00055, U.S. Pat. No. 10,735,105 B2, Aug. 19, 2021, 25 pages. |
Voltserver Inc., v. Cisco Systems, Inc., “Patent Owner's Preliminary Response to Post Grant Review Under 35 U.S.C. $ 312 and 37 C.F.R. § 42.107,” United States Patent and Trademark Office, PGR2021-00055, U.S. Pat. No. 10,735,105, 2021, Jun. 2, 2021, 51 pages. |
“Effects of current on human beings and livestok—Part 1: General aspects,” Technical Specification, Basic Safety Publication, IEC/TS 60479-1, Edition 4.0, Jul. 2005, 122 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 1-61, 63 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 62-122, 61 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 123-181, 59 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 182-253, 72 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 254-319, 66 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 320-377, 58 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 378-433, 56 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 434-490, 57 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 491-551, 61 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 552-622, 71 pages. |
“Information technology equipment—Safety—Part 1: General requirements,” International Standard, IEC 60950-1, Edition 2.2, May 2013, pp. 623-644, 24 pages. |
“Low-voltage switchgear and controlgear—Part 1: General rules,” International Standard, Amendment 2, IEC 60947-1, Edition 5.0, Sep. 2014, pp. 1-63, 65 pages. |
“Low-voltage switchgear and controlgear—Part 1: General rules,” International Standard, Amendment 2, IEC 60947-1, Edition 5.0, Sep. 2014, pp. 64-102, 41 pages. |
Stephen Edelstein, “Updated 2016 Tesla Model S also gets new 75-kWhbattery option,” Internet Archive WayBack Machine, Green Car Reports, May 5, 2016, 3 pages. |
Stephen S. Eaves, “Network Remote Powering using Packet Energy Transfer,” IEEE Xplore, Proceedings of IEEE International Conference on Telecommunications Energy (INTELEC) 2012, 978-1-4673-1000, Sep. 30-Oct. 4, 2012, 4 pages. |
“Audio/video, information and communication technology equipment—Part 1: Safety requirements,” International Standard, IEC 62368-1, Edition 2.0, Feb. 2014, pp. 1-132, 134 pages. |
“Audio/video, information and communication technology equipment—Part 1: Safety requirements,” International Standard, IEC 62368-1, Edition 2.0, Feb. 2014, pp. 133-263, 131 pages. |
“Audio/video, information and communication technology equipment—Part 1: Safety requirements,” International Standard, IEC 62368-1, Edition 2.0, Feb. 2014, pp. 264-387, 124 pages. |
“Audio/video, information and communication technology equipment—Part 1: Safety requirements,” International Standard, IEC 62368-1, Edition 2.0, Feb. 2014, pp. 388-508, 121 pages. |
“Audio/video, information and communication technology equipment—Part 1: Safety requirements,” International Standard, IEC 62368-1, Edition 2.0, Feb. 2014, pp. 509-593, 85 pages. |
“Audio/video, information and communication technology equipment—Part 1: Safety requirements,” International Standard, IEC 62368-1, Edition 2.0, Feb. 2014, pp. 594-676, 85 pages. |
“National Electrical Code,” National Fire Protection Association (NFPA) 70, 2017, 881 pages. |
Voltserver Inc., v. Cisco Technology, Inc., “Declaration of David A. Durfee, Ph.D.,” United States Patent and Trademark Office, PGR2021-00055, U.S. Pat. No. 10,735,105, Feb. 16, 2021, 340 pages. |
David A. Durfee Ph.D., “Curriculum Vitae,” 4 pages. |
Adel S. Sedra, “Microelectronic Circuits,” Sedra/Smith, Oxford University Press, Seventh Edition, 2015, 38 pages. |
Charles k. Alexander, et al., “Fundamentals of Electric Circuits,” McGraw Hill Education, Indian Edition 5e, 2013, 37 pages. |
Andrew S. Tanenbaum, “Computer Networks,” Prentice Hall PTR, Third Edition, 1996, 12 pages. |
William Stallings, “Data and Computer Communications,” Macmillan Publishing Company, Fourth Edition, 1994, 14 pages. |
B.P. Lathi, et al., “Modern Digital and Analog Communication Systems,” Oxford University Press, Fourth Edition, 2009, 15 pages. |
Voltserver Inc., v. Cisco Technology, Inc., “Petition for Post Grant Review of U.S. Pat. No. 10,735,105,” United States Patent and Trademark Office, PGR2021-00055, U.S. Pat. No. 10,735,105, Feb. 16, 2021, 132 pages. |
Stephen H. Hall, et al., “High-Speed Digital System Design: A handbook of Interconnect Theory and Design Practices,” , John Wiley & Sons, Inc., 2000, 55 pages. |
“Understanding 802.3at, PoE Plus Standard Increases Available Power,” Microsemi, Jun. 2011, 7 pages. |
“Digital Electricity Gen2 Detailed Installation Manual,” Voltserver Digital Electricity, Rev B.1, Nov. 29, 2017, 68 pages. |
Berkeley Lab ETA, “Touch-Safe, High Voltage Digital Electricity Transmission using Packet Energy Transfer, ” Vimeo, https://vimeo.com/172469008, Mar. 8, 2016, 8 pages. |
Voltserver Inc., v. Cisco Technology, Inc., “Decision Denying Institution of Post-Grant Review,” United States Patent and Trademark Office, PGR2021-00056, U.S. Pat. No. 10,735,105 B2, Aug. 23, 2021, 18 pages. |
Voltserver Inc., v. Cisco Systems, Inc., “Patent Owner's Preliminary Response to Post Grant Review Under 35 U.S.C. $ 312 and 37 C.F.R. § 42.107,” United States Patent and Trademark Office, PGR2021-00056, U.S. Pat. No. 10,735,105, 2021, Jun. 2, 2021, 46 pages. |
Voltserver Inc., v. Cisco Technology, Inc., “Declaration of Stephens S. Eaves,” United States Patent and Trademark Office, PGR2021-00056, U.S. Pat. No. 10,735,105, Feb. 16, 2021, 7 pages. |
“Electrical—Computer Conference Proceedings,” Internet Archive WayBack Machine Search for Intelec 2012, Curran Associates, Inc., http://www.proceedings.com/electrical-computer-proceedings.html, 2012, 125 pages. |
“Part VII: A Summary of Commonly Used MARC 21 Fields,” Marc, Understanding MARC, https://www.loc.gov/marc//umb/um07to10.html, retrieved from Internet Feb. 13, 2021, 17 pages. |
LC Catalog-Browse, https://catalog.loc.gov/vwebv/searchBrowse, retrieved from the Internet Feb. 12, 2021, 1 page. |
“International Telecommunications Energy Conference: [proceedings] (Marc Tags),” Library Catalog, https://catalog.loc.gov/vwebv/staffView?searchId=3877&recPointer=0&recCount=25&searchType=1&bibld=11348322, retrieved from the Internet Feb. 12, 2021, 3 pages. |
Voltserver Inc., v. Cisco Technology, Inc., “Petition for Post Grant Review of U.S. Pat. No. 10,735,105,” United States Patent and Trademark Office, PGR2021-00056, U.S. Pat. No. 10,735,105, Feb. 16, 2021, 116 pages. |
“International Telecommunications Energy Conference: [proceedings] (Full Record),” Library Catalog, https://catalog.loc.gov/vwebv/holdingsInfo?searchId=3810&recPointer=0&recCount=25&searchType=1&bibld=11348322, retrieved from the Internet Feb. 12, 2021, 4 pages. |
International Search Report and Written Opinion in counterpart International Application No. PCT/US2020/055532, mailed Mar. 15, 2021, 15 pages. |
https://www.fischerconnectors.com/us/en/products/fiberoptic. |
http://www.strantech.com/products/tfoca-genx-hybrid-2x2-fiber-optic-copper-connector/. |
http://www.qpcfiber.com/product/connectors/e-link-hybrid-connector/. |
https://www.lumentum.com/sites/default/files/technical-library-items/poweroverfiber-tn-pv-ae_0.pdf. |
“Network Remote Power Using Packet Energy Transfer”, Eaves et al., www.voltserver.com, Sep. 2012. |
Product Overview, “Pluribus VirtualWire Solution”, Pluribus Networks, PN-PO-VWS-05818, https://www.pluribusnetworks.com/assets/Pluribus-VirtualWire-PO-50918.pdf, May 2018, 5 pages. |
Implementation Guide, “Virtual Chassis Technology Best Practices”, Juniper Networks, 8010018-009-EN, Jan. 2016, https://wwwjuniper.net/us/en/local/pdf/implementation-guides/8010018-en.pdf, 29 pages. |
Yencheck, Thermal Modeling of Portable Power Cables, 1993. |
Zhang, Machine Learning-Based Temperature Prediction for Runtime Thermal Management across System Components, Mar. 2016. |
Data Center Power Equipment Thermal Guidelines and Best Practices. |
Dynamic Thermal Rating of Substation Terminal Equipment by Rambabu Adapa, 2004. |
Chen, Real-Time Termperature Estimation for Power MOSEFETs Conidering Thermal Aging Effects:, IEEE Trnasactions on Device and Materials Reliability, vol. 14, No. 1, Mar. 2014. |
Jingquan Chen et al: “Buck-boost PWM converters having two independently controlled switches”, 32nd Annual IEEE Power Electronics Specialists Conference. PESC 2001. Conference Proceedings, Vancouver, Canada, Jun. 17-21, 2001; [Annual Power Electronics Specialists Conference], New York, NY: IEEE, US, vol. 2,Jun. 17, 2001 (Jun. 17, 2001), pp. 736-741, XP010559317, DOI: 10.1109/PESC.2001.954206, ISBN 978-0-7803-7067-8 paragraph [SectionII]; figure 3. |
Cheng K W E et al: “Constant Frequency, Two-Stage Quasiresonant Convertor”, IEE Proceedings B. Electrical Power Applications, 1271980 1, vol. 139, No. 3, May 1, 1992 (May 1, 1992), pp. 227-237, XP000292493, the whole document. |
UPOE-2400G, 7 pages (Year: 2016). |
Hirshmann, 8 pages, (Year: 2011). |
Selecting Cables for Power over Ethernet , Hitachi Cable America Inc. Aug. 12, 2017, 7 pages (Year: 2017). |
How Cable Temperature Impacts Cable Reach, Belden, Sep. 29, 2017, 2 pages (Year: 2017). |
NCP1095, PoE-PD Interface Controller, IEEE 802.3bt, 17 pages, Jun. 2019 (Year: 2019). |
IEEE 802.3af PoE Powered Device Controllers With Auto-Retry, Texas Instruments, Apr. 2008, 28 pages (Year: 2008). |
Petition for Post Grant Review of U.S. Pat. No. 10,735,105 [Public] wtih Exhibits, filed Feb. 16, 2021, PGR 2021-00055. |
Petition for Post Grant Review of U.S. Pat. No. 10,735,105 [Public] with Exhibits, filed Feb. 16, 2021, PGR 2021-00056. |
Eaves, S. S., Network Remote Powering Using Packet Energy Transfer, Proceedings of IEEE International Conference on Telecommunications Energy (INTELEC) 2012, Scottsdale, AZ, Sep. 30-Oct. 4, 2012 (IEEE 2012) (EavesIEEE). |
Edelstein S., Updated 2016 Tesla Model S also gets new 75-kWhbattery option, (Jun. 19, 2016), archived Jun. 19, 2016 by Internet Archive Wayback machine at https://web.archive.org/web/20160619001148/https://www.greencarreports.com/news/1103 782_updated-2016-tesla-model-s-also-gets-new-7 5-kwh-battery-option (“Edelstein”). |
NFPA 70 National Electrical Code, 2017 Edition (NEC). |
International Standard IEC 62368-1 Edition 2.0 (2014), ISBN 978-2-8322-1405-3 (“IEC-62368”). |
International Standard IEC/TS 60479-1 Edition 4.0 (2005), ISBN 2-8318-8096-3 (“IEC-60479”). |
International Standard IEC 60950-1 Edition 2.2 (2013), ISBN 978-2-8322-0820-5 (“IEC-60950”). |
International Standard IEC 60947-1 Edition 5.0 (2014), ISBN 978-2-8322-1798-6 (“IEC-60947”). |
Tanenbaum, A. S., Computer Networks, Third Edition (1996) (“Tanenbaum”). |
Stallings, W., Data and Computer Communications, Fourth Edition ( 1994) (“Stallings”). |
Alexander, C. K., Fundamentals of Electric Circuits, Indian Edition (2013) (“Alexander”). |
Hall, S. H., High-Speed Digital System Design, A Handbook of Interconnect Theory and Design Practices (2000) (“Hall”). |
Sedra, A. S., Microelectronic Circuits, Seventh Edition (2014) (“Sedra”). |
Lathi, B. P., Modem Digital and Analog Communication Systems, Fourth Edition (2009) (“Lathi”). |
Understanding 802.3at PoE Plus Standard Increases Available Power (Jun. 2011) (“Microsemi”). |
Notification of Registration and Granting a Patent Right in Counterpart Chinese Application No. 202080070369.3, mailed Apr. 19, 2024, 8 pages. |
Office Action for Indian Application No. 202247007610, mailed Mar. 26, 2024, 7 pages. |
Ying J-P., “Research and Application of Power Over Ethernet Technology (Modern Communication.03),” Study and Application of Power Over Ethernet Technology, China Academic Journal Electronic Publishing House, Telecommunication Network, published Jun. 30, 2006, pp. 85-87. |
Office Action in counterpart Chinese Application No. 202080070369.3, mailed Nov. 8, 2023, 18 pages. |
Number | Date | Country | |
---|---|---|---|
20210167813 A1 | Jun 2021 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 16671508 | Nov 2019 | US |
Child | 17171723 | US |