Claims
- 1. A method of connecting a product input line with a gasoline dispenser and a product output line within a gasoline containment box using a T-assembly having a main body and first and second flanges, for installing a flammable fluids handling system, wherein there is a primary pipeline, a secondary pipeline around at least a portion of the primary pipeline, and at least first, second and third adjacent flammable fluids containment boxes located along the primary and secondary pipelines, the method comprising the steps of:
- (a) installing the input product line such that it has a free end extending into one side of the first box;
- (b) fixing the first flange of the T-assembly to the free end of the input product line;
- (c) positioning an end of the output product line a predetermined distance from the free end of the input product line;
- (d) fixing the second flange of the T-assembly to the end of the output product line;
- (e) connecting a gasoline dispenser input line to a stem of the main body of the T-assembly;
- (f) positioning first and second ends of the main body of the T-assembly in alignment with the first and second flanges, respectively; and
- (g) releasably connecting the ends of the main body of the T-assembly to the first and second flanges, respectively,
- (h) whereby the T-assembly may be disconnected from and reconnected to the input and output product lines by disconnecting and reconnecting the ends of the main body of the T-assembly to the first and second flanges, respectively.
- 2. The method of claim 1 wherein prior to the step of releasably connecting the ends of the main body of the T-assembly to the first and second flanges, there is a step of placing a gasket between the first and second ends of the main body and the first and second flanges, respectively, and in the step of releasably connecting, the gasket is releasably connected between the ends of the main body and the first and second flanges.
- 3. The method of claim 1 wherein the step of releasably connecting further comprises clamping the ends of the first and second flanges to the first and second ends of the main body, respectively.
- 4. The method of claim 1 wherein there are a plurality of through-holes in the periphery of the first and second flanges and a plurality of through-holes in the periphery of the first and second ends of the main body, and the step of releasably connecting comprises a step of bolting the periphery of each of the flanges to the periphery of each of the first and second ends of the main body using the through-holes.
- 5. The method of claim 4 wherein in the step of positioning the first and second ends of the main body in alignment with the first and second flanges, the through-holes in the periphery of the flanges are aligned with the through-holes in the periphery of the first and second ends of the main body.
- 6. The method of claim 5 wherein the aligning is performed using alignment markings on the first and second ends and on the first and second flanges.
- 7. The method of claim 1 wherein in the step of connecting the gasoline dispenser input line to the stem of the main body, the gasoline dispenser input line is a flexible pipe and the gasoline dispenser input line is flexed.
- 8. The method of claim 1 wherein the steps of fixing the flanges, the flanges are threaded to the input product line and output product line.
- 9. The method of claim 1 wherein in the step of installing the input product line, positioning one end of the input product line into the second box before moving the input product line's other end into the first box.
- 10. The method of claim 9 further comprising a step of positioning one end of the secondary pipeline inside the second box before moving the other end of the secondary pipeline into the first box, and fixing the secondary pipeline inside the first box.
- 11. In a flammable fluids handling system, wherein there is a primary pipeline, a secondary pipeline around at least a portion of the primary pipeline, and at least first, second and third adjacent flammable fluids containment boxes located along the primary and secondary pipelines, the improvement wherein the relative depth of the primary pipeline in the second box is at a second depth greater than the first, and the relative depth in the third box of the primary pipeline is less than the second depth, such that the primary pipeline and secondary pipeline are inclined downward from the first box and third box to the second box located therebetween, whereby the second box represents a gravitational low point of the primary pipeline and secondary pipeline for the first, second and third boxes, and further comprising:
- a T-member comprising a main body having an inlet opening, an outlet opening, and a stem having means for connecting to the pipes a first flange fixed to the primary pipeline and a second flange fixed to the primary pipeline, a first seal member for sealing the first flange to the main body at the inlet opening of the main body and a second seal member for sealing the second flange to the main body at the outlet opening of the main body, and means for fixing the first and second seal members to the flanges and the main body at the inlet and outlet openings, respectively, whereby the flammable fluids supply pipeline will be carrying fluid through the containment box and will be communicated with the flammable fluids dispenser, and wherein the means for fixing releasably fixes the first and second seal members to the flanges and the main body.
- 12. The system of claim 11 wherein the T-member main body is internally threaded at the stem.
- 13. The system of claim 11 wherein the flanges are internally threaded for connection to the primary pipeline.
- 14. The system of claim 11 wherein the means for fixing comprises bolts and through-holes formed in the main body and flanges, and alignment marks for aligning the holes in the main body with the holes in the flanges.
- 15. The system of claim 11 wherein the member for sealing comprises a rubber ring for each flange, and each flange has concentrically formed projections for defining a space for receiving each rubber ring.
- 16. The system of claim 14 wherein the through-holes in the main body are elongated with respect to the through-holes in the flanges for providing alignment slack.
CROSS-REFERENCE TO RELATED APPLICATIONS
This application is a continuation-in-part of U.S. patent application Ser. No. 08/936,331, filed Sep. 24, 1997 pending, which is further related to and claims priority from U.S. Ser. Nos. 08/829,827, filed Mar. 25, 1997, 29/077,027, filed Sep. 17, 1997, and 08/936,331, filed Sep. 24, 1997, all pending.
US Referenced Citations (11)
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
936331 |
Sep 1997 |
|