This disclosure relates to an installation test circuit, and more particularly to an installation test circuit for a photovoltaic (PV) system with rapid shutdown.
At present, no installation test circuit is installed in a PV system. After solar panels have been installed in a serial connection manner or after multiple stages of solar panels have been installed, an easy test for measuring an output voltage can be performed in a normal shutdown condition to determine whether the installation is correct. When each solar panel has the output voltage ranging from 10 to 80 volts, the multiple stages of solar panels serially connected together may have the test output voltage ranging from 100 to 800 volts.
In order to facilitate the installation test of solar panels, it is specified to output an output voltage ranging from 0.6 to 1.0 volts from positive and negative output terminals. That is, this disclosure utilizes the least circuit elements to generate an installation test output voltage ranging from 0.6 to 1.0 volts. That is, after multiple stages of solar panels have been serially connected in the shutdown condition, the output voltage lower than that of the prior art can be measured to simply determine whether the installed PV system is correct or not.
This disclosure provides an installation test circuit capable of shortening the installation test time of the PV system and enhancing the safety.
This disclosure provides an installation test circuit for a PV system with rapid shutdown. The installation test circuit includes: a voltage generator, which is coupled to a solar panel in the PV system, and generates a first output voltage and a second output voltage according to a first control signal, a second control signal and a voltage source outputted by the solar panel, wherein a voltage difference between the first output voltage and the second output voltage is less than or equal to the voltage source; wherein the first control signal and the second control signal control the voltage generator to determine the first output voltage and the second output voltage.
Symbols Description: installation test circuit: 100 and 300; voltage generator: 101; high-voltage rectifier: 102; level converter: 103; switch SW1˜SW3; solar panel: PV; voltage source: PV+ and PV−; output voltage: OV1 and OV2; control signal: C1 and C2; regulation voltage: D1 and D2; diode: dio1 and dio2; resistor: R1˜R5.
The voltage generator 101 is coupled to a solar panel PV in the PV system, and generates a first output voltage OV1 and a second output voltage OV2 according to a first control signal C1, a second control signal C2 and a voltage source PV+ outputted by the solar panel. A voltage difference between the first output voltage OV1 and the second output voltage OV2 is less than or equal to the voltage source PV+. The high-voltage rectifier 102 is coupled to the solar panel PV, and provides a first regulation voltage D1 according to the voltage source PV+. The first control signal C1 and the second control signal C2 control the voltage generator 101 to determine the first output voltage OV1 and the second output voltage OV2 of the voltage generator 101.
The level converter 103 is coupled to the high-voltage rectifier 102, performs boost conversion according to the first regulation voltage D1 and the second control signal C2, and outputs a second regulation voltage D2.
In one embodiment, the high-voltage rectifier 102 includes a first resistor R1 and a second resistor R2, wherein the first regulation voltage D1 is a divided voltage of the voltage source PV+ generated after the first resistor R1 and the second resistor R2 are serially in series.
In another embodiment, the second resistor R2 may be implemented by a Zener diode, so that the voltage value of the first regulation voltage D1 can be stabilized.
In one embodiment, the voltage generator 101 includes a first switch SW1, a second switch SW2 and a third switch SW3. The first switch SW1 is coupled to the solar panel, and a first diode dio1 and a third resistor R3 connected in series are coupled to and between the first switch SW1 and the solar panel. The first diode dio1 is parallelly connected to a fourth resistor R4. The first switch SW1 determines whether to turn on or not according to the first control signal C1.
The second switch SW2 is coupled to the first diode dio1 and the third resistor R3, and determines whether to turn off or turn on according to a divided voltage divided by the first diode dio1, the third resistor R3 and the fourth resistor R4. When the first switch SW1 turns on, the second switch SW2 turns on according to the divided voltage of the voltage source PV+ divided by the first diode dio1, the third resistor R3 and the fourth resistor R4.
In addition, a second diode dio2 is serially connected to the second switch SW2. When the second switch SW2 turns on, a current flowing through the second diode dio2 is generated from the first output voltage OV1, and the second output voltage OV2 is determined according to a divided voltage generated after the second switch SW2 and a fifth resistor R5 are connected in series.
The third switch SW3 is coupled to the level converter 103 and parallelly connected to the fifth resistor R5. When the third switch SW3 turns on, the voltage difference between the first output voltage OV1 and the second output voltage OV2 is equal to the voltage source PV+ because the other voltage source PV− is grounded. In one embodiment, the third switch SW3 determines whether to turn on according to the second control signal C2. In other words, the level converter 103 outputs the second regulation voltage D2 according to the second control signal C2 and the first regulation voltage D1 to determine the turn on state of the third switch SW3.
In one embodiment, the first switch SW1 and the third switch SW3 turn on at different time instants. In another embodiment, each of the first switch SW1 and the third switch SW3 is implemented by an N-type metal-oxide-semiconductor field-effect transistor (NMOSFET), and the second switch SW2 is implemented by a P-type metal-oxide-semiconductor field-effect transistor (PMOSFET).
The operation behaviors of the installation test circuit 100 will be described in the following.
In a first state where the solar panel PV is just installed and ready to supply power, the low-voltage first control signal C1 is “O” such that the first switch SW1 turns off, the low-voltage second control signal C2 is “0” such that the third switch SW3 turns off, and the solar panel PV is just installed in an initial state.
In a second state (installation test mode), the low-voltage first control signal C1 is “1” such that the first switch SW1 turns on, the low-voltage second control signal C2 is “0” such that the third switch SW3 turns off, and the voltage difference between the first output voltage OV1 and the second output voltage OV2 ranges from about 0.6 to 1.0 volts.
In a third state (transitional state), the low-voltage first control signal C1 is “0” such that the first switch SW1 turns off, and the low-voltage second control signal C2 is “0” such that the third switch SW3 turns off.
In a fourth state (normal power generating mode), the low-voltage first control signal C1 is “O” such that the first switch SW1 turns off, the low-voltage second control signal C2 is “1” such that the third switch SW3 turns on, and the voltage difference between the first output voltage OV1 and the second output voltage OV2 is equal to the voltage source PV+.
When the second state (installation test mode) is entered, the first switch SW1 turns on, and the divided voltage between the third resistor R3 of 1 MΩ and the fourth resistor R4 of 10 MΩ is parallelly connected to the second diode dio2. Furthermore, the second diode dio2 is implemented by a Zener diode of 7.5 volts. In this case, the second switch SW2 turns on therewith.
When the solar panel outputs the voltage of 10 volts, the second diode dio2 has the voltage drop of 0.8 volts and a current of 11.5 mA flowing therethrough according to the fifth resistor R5 of 800Ω, and the fifth resistor R5 withstands the power of about 0.1 watts. At this time, the overall maximum load that can be withstood is about 10.5 mA, and the voltage of 0.6 volts is outputted.
When the solar panel outputs the voltage of 80 volts, the second diode dio2 has the voltage drop of 1 volt and a current of 99 mA flowing therethrough according to the fifth resistor R5 of 800Ω, and the fifth resistor R5 withstands the power of about 7.8 watts. At this time, the overall maximum load that can be withstood is about 98 mA, and the voltage of 0.6 volts is outputted.
When the normal mode is entered, the first switch turns off, the second switch may also turn off, and then the second control signal C2 is “1” such that the third switch SW3 turns on to connect the second output voltage OV2 and the voltage source PV− together. Because the voltage source PV− is grounded, the voltage difference between the first output voltage OV1 and the second output voltage OV2 will be equal to the voltage source PV+.
In summary, this disclosure provides the installation test circuit after the solar panel has been installed. In the installation test mode, the output terminals thereof may output an output voltage ranging from 0.6 to 1.0 volts. That is, this disclosure utilizes the least circuit elements to generate the installation test output voltage, ranging from 0.6 to 1.0 volts, to be output for testing the solar panel. Whether the PV system has been installed correctly or not can be determined by measuring the output voltage lower than that of the prior art.
Number | Date | Country | Kind |
---|---|---|---|
202110918083.2 | Aug 2021 | CN | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2021/134772 | 12/1/2021 | WO |