The present disclosure is generally related to insulation retention apparatuses and more particularly is related to insulation retention apparatus for use with overhead structural beams and related methods.
Insulation materials are conventionally placed in walls, ceilings, roofs, floors and other “wall structures” to thermally insulate a structure. The insulation material typically comprises fibrous blanket insulation, such as elongated blankets formed of fiberglass. The principle of the blanket insulation is to form dead air spaces that provide insulation against convection and conduction heat transfer. The blanket insulation can be formed in small “clumps” or particulate and can then be blown into spaces, such as into the attics of residential homes and other building structures. Blanket insulation can also be made into elongated blankets formed in a specific width and depth that is suitable for placement between parallel joists, studs, rafters, and other parallel support structures that are uniformly spaced apart. The elongated blanket, such as a fiberglass blanket, is cut to the desired length at the job site for placement between the parallel structures. Also, a sheet of facing material usually is applied to one broad surface of the blanket, with the facing material having overhanging edges extending beyond the sides of the blanket to form “tabs” that can be applied by the installer to studs, joists, etc. of the building structure to hold the blanket in place.
In commercial or industrial settings, such as in box stores with expansive drop ceilings, insulation for preventing overhead heat loss is often missing or severely lacking, namely due to the expense and difficulty of installing insulation within the expansive space. To gain greater energy efficiency, it is desirable to retrofit these ceilings with insulation, but doing so is often a time consuming and tedious job. For example, conventionally, these types of ceilings would be insulated using rigid foam board insulation that is cut to fit between rafters. Then, optionally, clumped insulation can be blown in above the rigid foam board insulation to increase the thermal efficiency of the insulation. The costs of installing such a system may be prohibitively high, due to the labor and time needed for installation. This prohibitive cost is especially true for structures with many wires, pipes, and ventilation conduits which are positioned above a drop ceiling—which a substantial majority of commercial and industrial buildings have. During installation, the rigid foam board insulation must be fitted around each structure, which requires significant cutting of the board insulation.
Furthermore, even when a conventional installation system is put in place, there still exists significant air flow through the cracks, gaps, and joints between the board insulation and the rafters. All of these spaces allow the flow of air between the spaces below the ceiling and the spaces above the ceiling, which allows cool air-conditioned air to leak out of the structure in the hot parts of the year and heated air to leak out of the structure in the colder parts of the year. The result is high inefficiencies in heating or cooling large buildings.
Thus, a heretofore unaddressed need exists in the industry to address the aforementioned deficiencies and inadequacies.
Embodiments of the present disclosure provide an insulation retention apparatus and related systems and methods. Briefly described, in architecture, one embodiment of the apparatus, among others, can be implemented as follows. An insulation retention apparatus includes a non-gas-permeable plastic sheet. At least a first foam strip is affixed to the non-gas-permeable plastic sheet along a first side and at least a second foam strip is affixed to the non-gas-permeable plastic sheet along a second side, wherein the first side is substantially opposite the second side. An adhesive is positioned on each of the first and second foam strips, wherein the first foam strip is affixed to a first overhead structural beam with the adhesive and the second foam strip is affixed to a second overhead structural beam with the adhesive, wherein the first overhead structural beam is positioned spaced from the second overhead structural beam, wherein the non-gas-permeable plastic sheet is extended therebetween, and wherein a quantity of insulation is retained on the non-gas-permeable plastic sheet.
The present disclosure can also be viewed as providing a building structure air barrier system. Briefly described, in architecture, one embodiment of the system, among others, can be implemented as follows. An elongated sheet of non-gas-permeable material has at least a first foam strip affixed to the non-gas-permeable material along a first elongated side and at least a second foam strip affixed to the non-gas-permeable material along a second elongated side, wherein the first elongated side is substantially opposite the second elongated side. An adhesive is positioned on each of the first and second foam strips. A first overhead structural beam and a second overhead structural beam are incorporated into a building structure. The first overhead structural beam is positioned spaced from the second overhead structural beam. The first foam strip is affixed to the first overhead structural beam with the adhesive and the second foam strip is affixed to the second overhead structural beam with the adhesive, wherein the non-gas-permeable material is extended therebetween. A quantity of insulation is retained on the non-gas-permeable material.
The present disclosure can also be viewed as providing a method of creating an air barrier between a first and a second overhead structural beam within a building structure. In this regard, one embodiment of such a method, among others, can be broadly summarized by the following steps: providing a non-gas-permeable plastic sheet having at least a first foam strip affixed along a first side and at least a second foam strip affixed along a second side, wherein the first side is substantially opposite the second side; affixing the first foam strip to a first overhead structural beam with an adhesive; affixing the second foam strip to a second overhead structural beam with the adhesive, wherein the first overhead structural beam is positioned in a spaced, parallel orientation from the second overhead structural beam, wherein the non-gas-permeable plastic sheet is extended between the first and second overhead structural beams thereby creating an air barrier between spaces above and below the first and second overhead structural beams; and retaining a quantity of insulation on the non-gas-permeable plastic sheet.
Other systems, methods, features, and advantages of the present disclosure will be or become apparent to one with skill in the art upon examination of the following drawings and detailed description. It is intended that all such additional systems, methods, features, and advantages be included within this description, be within the scope of the present disclosure, and be protected by the accompanying claims.
Many aspects of the disclosure can be better understood with reference to the following drawings. The components in the drawings are not necessarily to scale, emphasis instead being placed upon clearly illustrating the principles of the present disclosure. Moreover, in the drawings, like reference numerals designate corresponding parts throughout the several views.
In
The components of the apparatus 10 may include a variety of materials and devices, including many that are commonly used within the industry. For example, the plastic sheet 20 may include a sheeted material of polyethylene or similar material that is substantially flexible and pliable. The plastic sheet 20 may have a length that substantially exceeds a width, and a width dimension of the plastic sheet 20 may be larger than a dimension between the first and second overhead structural beams 60, 62. The first and second foam strips 30, 32 may include any type of foam material, including open or closed cell foam, so long as it is capable of being compressed. The adhesive 40 applied to the first and second foam strips 30, 32 may include any type of adhesive material, such as glue, which may be activated by a variety of catalysts. For example, the adhesive 40 may have a releasable, peel-away film positioned over it (such that the adhesive 40 is positioned between the foam strip 30, 32 and the releasable film) which, when removed from the adhesive 40, exposes it to the surrounding air to activate the adhesive 40. In one of many alternatives, the adhesive 40 could be activated by heat, light, such as UV light, or any other type of catalyst. The insulation material 50 used with the apparatus 10 may commonly include particulate or clumped insulation which is blown in above the apparatus 10 after it is installed in place between the overhead structural beams 60, 62. The insulation material 50 may occupy a position that is at least partially between the first and second overhead structural beams 60, 62 and at least partially above the first and second overhead structural beams 60, 62.
As is known in the industry, rafters and ceiling joists are conventionally positioned spaced from one another, such that there is a predetermined distance or gap between each rafter or joist from another. This span may include distances of 16″, 24″ 36″ 48″ or any other distance, the particular size of which is determined by the particular requirements of the structure or characteristics of the rafter or joist. To accommodate for efficient installation of the apparatus 10, the apparatus 10 may be provided as a rolled material having a preselected width (as measured between the first and second foam strips 30, 32) which substantially matches the gap between the rafters or joists to which the apparatus 10 will be installed. Further, the apparatus 10 may include an elongated length, which can be unrolled to whatever length is required during installation.
To install the apparatus 10, each of the first and second foam strips 30, 32 may be contacted to the overhead structural beam 60, 62 with the adhesive 40 positioned therebetween. A worker may move along the length of the overhead structural beam 60, 62 ensuring that each of the first and second foam strips 30, 32 is properly contacting its overhead structural beam 60, 62, to ensure that there are no gaps or spaces therebetween. When wires, pipes, ventilation structures, or other obstructions are positioned in the path of the apparatus 10, the plastic sheet 20 may be cut across its width at a position before the obstruction and restarted after the obstruction. Tape or a similar fastening device may be used to connect the two edges of the plastic sheet 20 together, thereby ensuring that the air barrier is maintained even around the obstruction.
After a length of the apparatus 10 is installed, the particulate insulating material 50 may be blown in to a position between the overhead structural beams 60, 62 and above the plastic sheet 20. As is shown in
The use of the apparatus 10 provides for an easier and more cost-effective solution to retrofitting ceilings with rafters and joists, and also provides an enhanced thermal barrier. Specifically, the use of the plastic sheet 20 and the adhesive 40 connected to the overhead structural beams 60, 62 maintains a sealed air barrier which substantially aids in preventing the loss of heated air, in comparison to the conventional rigid board insulation which has gaps and cracks that allow air movement. Use of the apparatus 10 allows for substantially easier installation over conventional techniques, since the apparatus 10 is capable of quickly being positioned between the overhead structural beams 60, 62 and retained therein.
As shown in
In
Relative to
As is shown by block 102, a non-gas-permeable plastic sheet having at least a first foam strip affixed along a first side and at least a second foam strip affixed along a second side is provided, wherein the first side is substantially opposite the second side. The first foam strip is affixed to a first overhead structural beam with an adhesive (block 104). The second foam strip is affixed to a second overhead structural beam with the adhesive, wherein the first overhead structural beam is positioned in a spaced, parallel orientation from the second overhead structural beam, wherein the non-gas-permeable plastic sheet is extended between the first and second overhead structural beams thereby creating an air barrier between spaces above and below the first and second overhead structural beams (block 106). A quantity of insulation is retained on the non-gas-permeable plastic sheet (block 108).
The method may include any number of additional steps, processes, or functions, including any that are disclosed relative to
It should be emphasized that the above-described embodiments of the present disclosure, particularly, any “preferred” embodiments, are merely possible examples of implementations, merely set forth for a clear understanding of the principles of the disclosure. Many variations and modifications may be made to the above-described embodiment(s) of the disclosure without departing substantially from the spirit and principles of the disclosure. All such modifications and variations are intended to be included herein within the scope of this disclosure and the present disclosure and protected by the following claims.
This application claims benefit of U.S. Provisional Application Ser. No. 62/051,997 entitled, “Insulation Retention Apparatus For Use With Overheard Structural Beams” filed Sep. 18, 2014, the entire disclosure of which is incorporated herein by reference.
Number | Name | Date | Kind |
---|---|---|---|
3708379 | Flint | Jan 1973 | A |
4233791 | Kuhl | Nov 1980 | A |
4405341 | Jaschek et al. | Sep 1983 | A |
4566239 | Smigel | Jan 1986 | A |
4996803 | Karrfalt et al. | Mar 1991 | A |
5085023 | Duffy | Feb 1992 | A |
5421133 | Berdan, II | Jun 1995 | A |
5918436 | Alderman | Jul 1999 | A |
6199337 | Colson | Mar 2001 | B1 |
6401426 | Alderman | Jun 2002 | B1 |
6857238 | Alderman | Feb 2005 | B2 |
7425515 | Fellinger et al. | Sep 2008 | B2 |
7785685 | Fay et al. | Aug 2010 | B2 |
8438810 | Robbins et al. | May 2013 | B2 |
9038327 | Harkins | May 2015 | B1 |
9605426 | Robins | Mar 2017 | B2 |
20020121061 | Rippey | Sep 2002 | A1 |
20030061777 | Alderman | Apr 2003 | A1 |
20040088939 | Fay et al. | May 2004 | A1 |
20040103608 | Lionel | Jun 2004 | A1 |
20040159063 | Fligg | Aug 2004 | A1 |
20040185210 | Fay et al. | Sep 2004 | A1 |
20040250490 | Hall | Dec 2004 | A1 |
20050000183 | Fay et al. | Jan 2005 | A1 |
20050276959 | DeMasi | Dec 2005 | A1 |
20070181704 | Ernst | Aug 2007 | A1 |
20070259155 | Zupon | Nov 2007 | A1 |
20080022620 | Crowley | Jan 2008 | A1 |
20100024325 | Robbins | Feb 2010 | A1 |
20110061311 | Peng | Mar 2011 | A1 |
20110078973 | Oberg | Apr 2011 | A1 |
20130047543 | Musick | Feb 2013 | A1 |
20150218803 | Rockwell | Aug 2015 | A1 |
20150233110 | Alter | Aug 2015 | A1 |
Number | Date | Country |
---|---|---|
2854476 | Jul 1980 | DE |
WO 9111567 | Aug 1991 | WO |
Entry |
---|
Machine translation of DE 2854476 A1, date pulled Dec. 26, 2016, p. 1-4. |
Number | Date | Country | |
---|---|---|---|
20160083958 A1 | Mar 2016 | US |
Number | Date | Country | |
---|---|---|---|
62051997 | Sep 2014 | US |