The present invention relates to an insulator for a spark plug, and a method for manufacturing the spark plug.
FIGS. 2 to 6 of Japanese Patent Document JP-A-2000-315563 discloses a method for manufacturing an insulator for a spark plug. This manufacturing method forms a through hole in the insulator for inserting a center electrode and a terminal electrode in an axial direction.
In this manufacturing method, first, as a preparing step, a press pin used to form the through hole is prepared and a forming die is prepared that has a cavity in which an opening is formed on the rear end side in the axial direction. The press pin is formed at a rear end thereof with a rib-shaped pin-side spiral portion which turns spirally around its own outer peripheral surface.
Next, as a powder filling step, green powder is loaded and filled into the cavity from the opening. Next, as a press pin arranging step after the powder filling step, the press pin is arranged within the cavity by moving the press pin toward a tip side of the forming die in the axial direction from the opening. As a cavity blocking step after the press pin arranging step, the opening is blocked by a blocking member. Then, as a compression molding step, the green powder within the cavity is pressed along with the press pin to obtain a compact (i.e., compact piece).
As a die releasing step after the compression molding step, the compact along with the press pin are removed from the cavity. As a press pin removing step after the die releasing step, the press pin is pulled out of the compact. The compact obtained in this way has an external shape corresponding to an insulator for a spark plug. Grinding is performed on this compact to form a green (non-sintered) insulator.
Then, the green insulator is sintered at a temperature of 1400° C. to 1650° C. Thereby, a pinhole formed by the press pin becomes the through hole. Then, the sintered insulator is coated with glaze and finish-sintered to provide an insulator for a spark plug. This insulator for a spark plug is assembled together with a center electrode, a terminal electrode, a metal shell, and a resistor, and becomes a spark plug. This spark plug is attached to an engine by a threaded portion of the metal shell, and is used as an igniting source for an air-fuel mixture supplied to a combustion chamber.
The diameter of the spark plug tends to decrease in order to save space, and thus the diameter of an insulator for the spark plug is correspondingly required to become smaller. For this reason, it is necessary to decrease the diameter of the through hole of the insulator for the spark plug. Thus, the insulator for the spark plug should be manufactured using the press pin whose diameter is small. However, in the above manufacturing method, when an insulator for a spark plug is manufactured using the press pin whose diameter is small, the press pin may be bent due to the resistance which the press pin receives from the green powder within the cavity in the press pin arranging step after the powder filling step. In this case, the pinhole of the compact does not extend straight in the axial direction, and thus the through hole of the insulator for the spark plug does not extend straight in the axial direction. For this reason, the insulator for the spark plug may become a defective article, or replacement of the press pin should be required frequently, and thus cause an increase in manufacturing costs.
The present invention was made in view of the above-noted and/or other circumstances.
As one of illustrative, non-limiting embodiments, the present invention can provide a method for manufacturing an insulator for a spark plug. The method includes: a preparing step; a press pin arranging step; a powder filling step after the press pin arranging step; a cavity blocking step after the powder filling step; a compression molding step after the cavity blocking step; a die releasing step after the compression molding step; and a press pin removing step after the die releasing step.
Accordingly, as one of the advantages, the present invention can provide a method for manufacturing an insulator for a spark plug, which can use a press pin of a small diameter. As another one of the advantages, the present invention can provide a method for manufacturing an insulator for a spark plug, in which bending of the press pin is prevented. As yet another one of the advantages, the present invention can provide a method for manufacturing an insulator for a spark plug, which can guarantee high yield. As still another one of the advantages, the present invention can provide a method for manufacturing an insulator for a spark plug, which can realize a low manufacturing cost.
These and other advantages of the present invention will be discussed in detail with reference to the accompanying drawings.
Hereinafter, exemplary embodiments 1 to 3 for carrying out the present invention will be described, with reference to the drawings. In addition, in respective drawings (excluding
A manufacturing method of embodiment 1 is a method of manufacturing the insulator 2, which is an insulator for a spark plug. Since the insulator 2 is included in the spark plug 100, first, the entire configuration of the spark plug 100 will be described.
The spark plug 100 includes a tubular metal shell 1, an insulator 2 fitted into the metal shell 1 such that its tip protrudes, a center electrode 3 provided inside the insulator 2 in a state where its tip protrudes, and a grounding electrode 4 arranged such that one end is connected to the metal shell 1 by welding or the like, and the other end is bent laterally such that a side surface of the other end faces a tip portion of the center electrode 3.
A spark discharge gap g is formed between the grounding electrode 4 and the center electrode 3. The metal shell 1 is formed in a tubular shape from metal, such as low-carbon steel, and forms a housing of the spark plug 100. The outer peripheral surface of the metal shell 1 is formed with a threaded portion 7 and a tool engaging portion 1e. The threaded portion 7 is used to attach the spark plug 100 to an engine, which is not shown. The tool engaging portion 1e has a hexagonal axial cross-sectional shape for engagement with a tool, such as a spanner or a wrench when the metal shell 1 is attached to the engine. The center electrode 3 and the grounding electrode 4 are made of an Ni alloy or the like, and a core material 3a, such as Cu or a Cu alloy, for promotion of heat radiation, may be embedded if necessary.
The insulator 2 is made of an insulating material which includes mainly alumina or the like. The insulator 2 is formed with a through hole 6 extending in an axial direction. The center electrode 3 is inserted into and fixed to the through hole 6 on the tip side thereof, and the terminal electrode 13 is inserted into and fixed to the through hole 6 on the rear end side thereof. A resistor 15 is arranged between the terminal electrode 13 and the center electrode 3 within the through hole 6. Both ends of the resistor 15 are electrically connected to the center electrode 3 and the terminal electrode 13, respectively, via conductive glass seal layers 16 and 17. The resistor 15 is formed from a resistor composition obtained by mixing glass powder and conductive powder (and if required, ceramic powder other than glass) and sintering the resulting mixture by a hot press or the like.
The diameter of the center electrode 3 (in a cross-section orthogonal to the axial direction) is set to be smaller than the diameter of the resistor 15. The through hole 6 has a first portion 6a and a second portion 6b, each in the form of a hole having a circular cross-sectional shape. The second portion 6b is arranged on the rear side (on the upper side in the drawing) of the first portion 6a and has a larger diameter than the first portion 6a. The terminal electrode 13 and the resistor 15 are accommodated within the second portion 6b, and the center electrode 3 is inserted into the first portion 6a. A rear end of the center electrode 3 is formed with an electrode-fixing lug 3b which protrudes outward from an outer peripheral surface thereof. A lug-receiving surface 6c for receiving the electrode-fixing lug 3b of the center electrode 3 is formed in the form of a tapered surface or an arcuate surface in a connecting position between the first portion 6a and the second portion 6b of the through hole 6.
In order to make it easy to extract the press pin 50 which will be described later, an extraction taper (for example, about 5/1000 to 5/100) which has a larger diameter toward the rear side in the axial direction is given to an inner peripheral surface of the second portion 6b of the through hole 6. On the other hand, an extraction taper with a smaller angle than the second portion 6b is given to an inner peripheral surface of the first portion 6a, or an extraction taper is not substantially given to the inner peripheral surface of the first portion 6a.
In addition, if specific dimensions of an external shape of the insulator 2 are exemplified, the total length of the insulator 2 is, for example, 30 to 75 mm, the mean inner diameter of the second portion 6b of the through hole 6 is about 2 to 5 mm, and similarly, the mean inner diameter of the first portion 6a is, for example, about 1 to 3.5 mm. In order to save the space for the spark plug 100 or improve the performance thereof, such as a heat generation characteristic, the diameter of the insulator 2 is made smaller.
Next, a method for manufacturing the insulator 2 will be described. The above-mentioned insulator 2 is manufactured by the manufacturing method including a preparing step, a press pin arranging step, a powder filling step, a cavity blocking step, a compression molding step, a die releasing step, and a press pin removing step in this order. Hereinafter, each of the steps will be described.
Preparing Step
In the preparing step, the press pin 50 and the forming die 80 are prepared.
The press pin 50, as shown in
An extraction taper (for example, about 5/1000 to 5/100 corresponding to the extraction taper of the second portion 6b) providing a larger diameter toward the rear side in the axial direction is given to an outer peripheral surface of the second shaft portion 52. An extraction taper (corresponding to the extraction taper of the first portion 6a) with a smaller angle than the second shaft portion 52 is given to an outer peripheral surface of the first shaft portion 51, or an extraction taper is not substantially given to the outer peripheral surface of the first shaft portion 51. The mean outer diameter of the first shaft portion 51 corresponds to the mean inner diameter of the first portion 6a, and the mean outer diameter of the second shaft portion 52 corresponds to the mean inner diameter of the second portion 6b of the through hole 6. The dimension of the press pin 50 may be selected according to the types of insulators to be manufactured. Particularly when a thin insulator is to be manufactured, a press pin having a small diameter of about 2.5 mm to 3.6 mm as the dimension of the second shaft portion 52 can be used.
Since the press pin 50 is a very thin shaft member in this way, for example, the whole press pin is made of a material of high rigidity, for example, cemented carbide, alloy tool steel, etc. so that problems, such as bending, are not caused, for example, in a compression molding step or the like.
A flange-shaped end face forming portion 55 which is used to form a rear end face of a compact PC, which will be described later, is integrally formed at a rear end of the second shaft portion 52 of the press pin 50. A head 56 in which a female threaded portion 57 extends in the axial direction is integrally formed at the rear of the forming portion 55. As shown in
As shown in
The forming die 80, as shown in
In more detail, the forming die 80 is configured such that a cylindrical inner rubber die 82 is substantially concentrically arranged within a cylindrical outer rubber die 81 arranged within a forming die member 80a. The inner rubber die 82 defines a cavity 83 passing therethrough in an axial direction. A lower (the tip side in the axial direction) opening of the cavity 83 is blocked by a bottom lid 84 and a lower holder portion 85. An opening 89 is formed above (the rear end side in the axial direction) the cavity 83. The opening 89, as shown in
Press Pin Arranging Step
In the press pin arranging step, as shown in
Powder Filling Step
In the powder filling step, as shown in
The green powder GP is prepared, for example, as follows. First, a base slurry for forming is made by blending alumina powder (whose mean particle diameter is 1 to 5 μm) with an additive-element-based material, such as an Si component, a Ca component, an Mg component, a Ba component, or a B component which is used as a sintering agent, in a predetermined ratio, and adding and mixing a hydrophilic binder (for example, PVA or an acrylamide-based binder) and water. As for the additive-element-based materials, for example, the Si component can be blended in the form of an SiO2 powder, the Ca component can be blended in the form of a CaCO3 powder, the Mg component can be blended in the form of an MgO powder, the Ba component can be blended in the form of a BaCO3, the B component can be blended in the form of an H3BO3 powder (or may be an aqueous solution). Further, the green powder GP as a base granulated material for forming is manufactured by spraying and drying the base slurry for forming by a spraying and drying method or the like.
The green powder GP manufactured in this way is adjusted so as to contain moisture within a range of 1.5% or less by weight by adjustment of conditions at the time of spraying and drying (for example, drying temperature, spraying velocity, etc.). Main objects of the moisture blending are to lower the binding force of powder particles in granulated particles to promote cracking of the granulated particles at the time of pressing, and to expand a hydrophilic binder blended with the base material for forming to exhibit a caking property effectively to thereby enhance the strength of the compact PC.
Although the lower limit of the moisture content of the green powder GP differs according to the particle size distribution of the green material GP or the like, the lower limit is suitably set to such a degree that the above effect is not insufficient. If the water content exceeds 1.5% by weight, the fluidity of the granulated material degrades, and handling becomes difficult. More desirably, this water content is adjusted to a range of 1.3% or less by weight.
The blending amount of the hydrophilic binder in the green powder GP is preferably adjusted to 0.5 to 3.0% by weight. If the blending amount of the hydrophilic binder becomes less than 0.5% by weight, the strength of the compact PC becomes insufficient, handling becomes difficult, and cracking, chipping, or the like is apt to occur. If the blending amount exceeds 3.0% by weight, de-binder treatment time at the time of sintering becomes long, which leads to lowering of the manufacturing efficiency of an insulator. In addition to this, the residual volume of impurities components (for example, carbon) derived from a binder in the insulator may increase, which leads to deterioration of performance (for example, dielectric voltage resistance).
As shown in
Cavity Blocking Step
In the cavity blocking step, as shown in
Compression Molding Step
In the compression molding step, as shown in
In more detail, fluid pressure FP is applied to the outer peripheral surface of the outer rubber die 81 in the radial direction via a pressurized liquid passage 80b formed in the forming die body 80a, so that the outer rubber die 81 and the inner rubber die 82 elastically deform to reduce their diameters and the volume of the cavity 83. Accordingly, the fluid pressure FP is indirectly applied to the green powder GP via the outer rubber die 81 and the inner rubber die 82 to compress the green powder GP filled into the cavity 83. As a result, the green material GP of the cavity 83 is solidified in such a form that the press pin 50 is integrated therewith, and the compact PC is obtained.
In this case, the fluid pressure FP is preferably adjusted in a range of 30 to 150 MPa. If the fluid pressure FP becomes less than 30 MPa, the strength of the compact PC becomes insufficient, handling becomes difficult, and cracking, chipping, or the like, is apt to occur. If the fluid pressure exceeds 150 MPa, the lifespan of the outer rubber die 81 and the inner rubber die 82 may become short, which may lead to an increase in cost.
Die Releasing Step
In the die releasing step, as shown in
Press Pin Removing Step
In the press pin removing step, as shown in
As shown in
That is, since the press pin 50 moves up slowly, while rotating by way of the threading action, generation of an excessive frictional force is prevented between the outer peripheral surface of the press pin 50 and the opposing, inner tubular surface of the compact PC. Therefore, the press pin 50 can be extracted smoothly without damaging the compact PC. Moreover, since an extraction taper is given to the second shaft portion 52 of the press pin 50, a gap from the inner tubular surface of the compact PC can be secured when the press pin 50 is moved slightly upward relative to the compact PC. Therefore, the press pin 50 can be easily released. In addition, a die-releasing layer, such as a hard-carbon-based die releasing layer, may be formed on the outer peripheral surface of the press pin 50 to further facilitate extraction of the press pin 50.
The outer surface of the compact PC which has completed the above respective steps and from which the press pin 50 has been extracted, is machined by grinder or the like to be finished into an external shape corresponding to the insulator 2 as shown in
As described above, in the method for manufacturing an insulator for a spark plug according to the embodiment 1, the press pin arranging step is carried out before the powder filling step so that the press pin 50 is arranged within the cavity 83 while the gap S1 is secured. Next, in the powder filling step, the green powder GP is charged into the cavity 83 from the gap S1 to be filled into the cavity 83 around the press pin 50 arranged within the cavity 83. In the subsequent cavity blocking step, the distance by which the press pin 50 is inserted to the final position E becomes a very short distance substantially corresponding to gap S1. Accordingly, during the cavity blocking step, the resistance that the press pin 50 receives from the green powder GP can be made significantly small. For this reason, bending of the press pin 50 is prevented, and the inner tubular surface of the compact PC, which faces the outer peripheral surface of the press pin 50, can be formed to extend straight in the axial direction. Consequently, the through hole 6 of the insulator 2 also extends straight in the axial direction.
According to the manufacturing method of the embodiment 1, generation of inferior articles can be reduced, and replacement frequency of the press pin 50 can be reduced when the insulator 2 having a small diameter is manufactured. That is, this manufacturing method can guarantee high yield about the insulator 2, and can realize low manufacturing cost of the spark plug 100.
According to the manufacturing method of the embodiment 1, the upper holder portion 86, serving as a blocking member, and the press pin 50 are integral. In the press pin arranging step, the press pin 50 is stopped short of the final position E to secure such a gap S1 between the upper holder portion 86 and the opening 89 that is enough to supply the green powder GP into the cavity 83. The green powder GP is supplied and filled into the cavity 83 from the gap S1. Moreover, when the press pin 50 is moved to the final position E in the cavity blocking step, the upper holder portion 86 also moves integrally with the press pin 50 to block the opening 89. This manufacturing method having such a simple configuration can easily provide the operational effects.
Although the manufacturing method of an embodiment 2 is similar to the embodiment 1, a press pin 250 and an upper holder portion 286 are used instead of the press pin 50 and the upper holder portion 86 of the embodiment 1. For this reason, the above-mentioned respective steps also have points of difference due to differences of the configuration of these members. Hereinafter, differences from those of the manufacturing method of the embodiment 1 will be described in an emphasized manner, and the description of the same steps as the steps of the embodiment 1 will be omitted or simplified. The same configurations as those of the embodiment 1 are denoted by the same reference numerals, and the description thereof is omitted.
Hereinafter, the method for manufacturing an insulator 2 according to the embodiment 2 will be described referring to
Preparing Step
In a preparing step, as shown in
Similar to the press pin 50 of the embodiment 1, the press pin 250 is formed with the first shaft portion 51, the stepped portion 53, the second shaft portion 52, and the pin-side spiral portion 54. The press pin 250 is not formed with the end face forming portion 55 and head 56 in the press pin 50 of the embodiment 1. Instead, the press pin 250 is integrally formed with a columnar rotary shaft portion 287 which extends from the rear end of the second shaft portion 52 toward the rear side in the axial direction. The rotary shaft portion 287 corresponds to the rotary shaft 87 of the embodiment 1, and is adapted to rotate by a driving source, such as a motor (not shown).
As shown in
As shown in
As shown in
As shown in
Press Pin Arranging Step
In the press pin arranging step, the press pin 250 and the upper holder portion 286 are first arranged above the opening 89 of the forming die 80. Then, the split members 286a, 286b, and 286c of the upper holder portion 286 are separated radially outward from the rotary shaft portion 287 to increase the diameter of the insertion hole 286d. In this case, a gap S2 in the vertical direction is formed between the upper holder portion 286 and the opening 89. In the embodiment 2, since the press pin 250 and the upper holder portion 286 are relatively movable in the axial direction independently of each other, it is possible to form a larger gap S2 than the gap S1 in the embodiment 1.
Next, the rotary shaft portion 287 is moved relative to the insertion hole 286d toward the tip in the axial direction so that the press pin 250 is inserted into the cavity 83 from the opening 89 until the press pin 250 reaches the final position on the tip side in the axial direction. The position of the press pin 250 within the cavity 83 when the compression molding step shown in
Powder Filling Step
In the powder filling step, as shown in
Cavity Blocking Step
In the cavity blocking step, as shown in
Compression Molding Step
In the compression molding step, as shown in
Die Releasing Step
In the die releasing step, application of the fluid pressure FP is released in a state shown in
Press Pin Removing Step
In the press pin removing step, as shown in
The compact PC which has completed the above respective steps and from which the press pin 250 has been extracted, similar to the embodiment 1, is cut and sintered into the insulator 2, and is assembled to the spark plug 100.
According to the method of the embodiment 2, the press pin 250 can be moved within the insertion hole 286d by increasing the diameter of the insertion hole 286d of the upper holder portion 286 serving as a blocking member. That is, the press pin 250 and the upper holder portion 286 can be moved independently from each other. Therefore, in this manufacturing method, as described above, the gap S2 can be easily secured between the upper holder portion 286 and the opening 89 even when the press pin 250 is moved to the final position within the cavity 83 in the press pin arranging step followed by the powder filling step.
According to this manufacturing method, in the powder filling step, the green powder GP is charged into the cavity 83 from the gap S2 to be filled into the cavity 83 around the press pin 250 arranged in the final position within the cavity 83. In the cavity blocking step, the upper holder portion 286 is moved independently from the press pin 250 to block the opening 89. Accordingly, in the cavity blocking step, the press pin 250 does not move, and does not receive any resistance from the green powder GP. That is, bending of the press pin 250 is prevented.
Accordingly, the manufacturing method of the embodiment 2 can also exhibit the same operational effects as the manufacturing method of the embodiment 1 more reliably than the manufacturing method of the embodiment 1.
Additionally, in this manufacturing method, the tip of the press pin 250 is restrained within the cavity 83 by the recess 284a as a positioning portion formed at the bottom lid 84 of the forming die 80. Even if the compressive force in a direction perpendicular to the axis acts on the press pin 250 when the cavity 83 shrinks in the compression molding step, displacement of the radial position of the tip of the press pin 250 is prevented. That is, bending of the press pin 250 is prevented.
Although the manufacturing method of the embodiment 3 is similarly to Embodiment 1, the press pin arranging step (shown in
Preparing Step
In a preparing step, similar to the embodiment 1, the press pin 50 and the forming die 80 are prepared. As described in the preparing step of the embodiment 1, the press pin 50 has the first shaft portion 51 on the tip side in the axial direction, the second shaft portion 52 nearer the rear end side in the axial direction than the first shaft portion 51 and having a larger diameter than the first shaft portion 51, and the stepped portion 53 between the first shaft portion 51 and the second shaft portion 52. As shown in
Press Pin Arranging Step
In the press pin arranging step, as shown in
Powder Filling Step
In the powder filling step, as shown in
As described above in the powder filling step of the embodiment 1, the green powder GP is manufactured by spraying and drying base slurry for forming by a spraying and drying method or the like. Thus, the green powder is adjusted so as to contain moisture within a range of 1.5% or less by weight by adjustment of conditions at the time of spraying and drying (for example, drying temperature, spraying velocity, etc.). For this reason, if the green powder GP is excessively compressed, a consolidated aggregate is easily generated.
In the powder filling step, the charged green material GP is deposited upward from the lower portion of the die 80 within the cavity 83. After a predetermined amount of green powder GP is filled into the cavity 83, the next step is carried out.
Cavity Blocking Step
In a cavity blocking step, similar to the embodiment 3, as shown in
Compression Molding Step
In the compression molding step, similar to the embodiment 1, as shown in
Die Releasing Step
In the die releasing step, similarly to the embodiment 1, as shown in
Press Pin Removing Step
In the press pin removing step, similar to the embodiment 1, as shown in
The compact PC which has completed the above respective steps and from which the press pin 50 has been extracted, similar to the embodiment 1, is cut and sintered into the insulator 2, and is assembled to the spark plug 100.
In the method for manufacturing an insulator according to the embodiment 3, the press pin 50 has the first shaft portion 51, the second shaft portion 52, and the stepped portion 53 as described above. Further, as described above, the press pin arranging step is carried out before the powder filling step, such that the press pin 50 is arranged within the cavity 83 while the gap S3 is secured. Next, in the powder filling step, the green powder GP is charged into the cavity 83 from the gap S3 and filled into the cavity 83 around the press pin 50 arranged within the cavity 83. Accordingly, in the subsequent cavity blocking step, the press pin 50 can be inserted to reach the final position E by a very short distance, i.e. the stroke F. Consequently, during the cavity blocking step, the resistance that the press pin 50 receives from the green powder GP can be made significantly small.
Accordingly, the manufacturing method of the embodiment 3 can also exhibit the same operational effects as the manufacturing method of the embodiment 1.
In this manufacturing method according to the embodiment 3, the stroke F by which the stepped portion 53 is moved toward the tip side in the axial direction, while the green powder GP is compressed, is shorter than the axial length T of the first shaft portion 51. Accordingly, excessive compression of the green powder GP nearer the tip side than the stepped portion 53 is prevented, and generation of the consolidated aggregate is also prevented. For this reason, the variation in density of the green powder GP is unlikely to occur around the first shaft portion 51, the second shaft portion 52, and the stepped portion 53 within the cavity 83. Consequently, a defect, such as a pinhole, is not generated in the insulator 2 obtained through the compression molding step, and the occurrence of deteriorating insulating performance is prevented. Further, in the manufacturing method of the embodiment 3, the green powder GP around the first shaft portion 51 is appropriately compressed and densified in the axial direction by the stepped portion 53 when the stepped portion 53 is moved by stroke F. Therefore, a defect is not generated at a tip small-diameter portion 2a (shown in
According to this manufacturing method, the taper angle of the tapered stepped portion 53 can be adjusted suitably to control the resistance that the stepped portion 53 receives from the green powder GP and the degree of compression that the stepped portion 53 compresses the green powder GP around the first shaft portion 51, when the stepped portion 53 is moved toward the tip side in the axial direction in the cavity blocking step. Specifically, the taper angle of the stepped portion 53 is preferably about 20° to 70°.
A test example for conforming the operational effects of the embodiment 3 was carried out as follows.
Test Example
In a test example, an aggregate which was formed by consolidating the green powder GP was prepared. The particle diameter of the green GP was about 50 to 160 μm, whereas the particle diameter of the prepared aggregate was about 2 to 5 mm. In the powder filling step, the aggregate was intentionally mixed with the green powder GP to be filled into the cavity 83. Then, five test articles 1-1 and five test articles 1-2 as the insulator 2 were obtained by carrying out the above respective steps. In this case, to obtain the test articles 1-1, the aggregate was mixed in a region within the cavity 83 corresponding to the tip-side middle-diameter portion 2b of the insulator 2. To obtain the test articles 1-2, the aggregate was mixed in a region within the cavity 83 corresponding to the large-diameter portion 2c (shown in
Next, as for the test articles 1-1 to 1-3, the penetration voltage in the tip small-diameter portion 2a was measured. Specifically, a rod-shaped electrode for testing was inserted into the through hole 6 of an insulator 2 to which neither the center electrode 3 nor the terminal electrode 13 was assembled and on the surface of which glaze was not formed. An annular electrode (a metal plate having a through-hole into which the tip small-diameter portion 2a is insertable and which can receive the tip small-diameter portion 2a) was arranged at the outer peripheral side of the tip small-diameter portion 2a A high voltage was applied between the rod-shaped electrode and the annular electrode such that the voltage is changed from the low-voltage side to the high-voltage side, and a voltage at which the insulation by the tip small-diameter portion 2a is broken down (that is, penetration voltage of the insulator) was measured. The voltage values measured and acquired are shown in
As shown in
It was found from this test example that if an aggregate is mixed during the manufacture of an insulator 2, the resultant insulator 2 may have a low penetration voltage. According to the manufacturing method of the embodiment 3, an aggregate which can cause lowering of a penetration voltage is not mixed, and therefore an insulator that has high insulating performance and that is formed with the straight through hole 6 can be manufactured. In addition, bending of the press pin is prevented, and high yield can be secured.
Although the present invention has been described with reference to the embodiment 1 to 3, the present invention is not limited to the embodiments 1 to 3, and can be properly changed and applied without departing from the spirit or scope thereof.
For example, in the manufacturing method of the embodiment 3, the press pin 250 and the upper holder portion 286 of the embodiment 2 may be adopted instead of the press pin 50 and the upper holder portion 88. In this case, although illustration is omitted, the press pin 250 is stopped at a position axially away from the final position E by the stroke F that is shorter than the axial length T of the first shaft portion 51 in the press pin arranging step. Further, the upper holder portion 286 is positioned to form the gap S2 in the vertical direction between the upper holder portion 286 and the opening 89. In the cavity blocking step, the press pin 250 is inserted to reach the final position E, and then, the upper holder portion 286 is moved downward to block the opening 89. Such a manufacturing method can exhibit the same operational effects as those of the manufacturing method of the embodiment 3.
As discussed above, the present invention can provide at least the following illustrative, non-limiting embodiments:
(1) A method for manufacturing an insulator for a spark plug in which a through hole for inserting a center electrode and a terminal electrode is formed in an axial direction, the method including: a preparing step of preparing a press pin to be used to form the through hole, and a forming die having a cavity in which an opening is formed on the rear end side in the axial direction; a press pin arranging step of arranging the press pin within the cavity by advancing the press pin toward the tip side in the axial direction from the opening; a powder filling step of loading and filling green powder into the cavity from the opening after the press pin arranging step; a cavity blocking step of blocking the opening by a blocking member after the powder filling step; a compression molding step of pressing the green powder within the cavity along with the press pin to obtain a compact, after the press pin arranging step; a die releasing step of releasing the compact along with the press pin from the cavity after the compression molding step; and a press pin removing step of pulling the press pin out of the compact after the die releasing step.
According to the manufacturing method of (1), the press pin arranging step is carried out before the powder filling step. For this reason, bending of the press pin is prevented. For this reason, a hole of the compact, formed by the press pin, extends straight in the axial direction, and therefore the through hole of the insulator for a spark plug also extends straight in the axial direction.
Accordingly, even if the diameter of the insulator for a spark plug is made small, generation of defective articles can be reduced, and replacement frequency of the press pin can be reduced. Therefore, it is possible to guarantee high yield and realize low manufacturing cost.
(2) The manufacturing method of (1), wherein the blocking member and the press pin are coupled integrally, the press pin is stopped before reaching a final position in the press pin arranging step to secure a gap, through which the green powder can be loaded into the cavity between the blocking member and the opening, and the press pin is moved to the final position to block the opening by the blocking member in the cavity blocking step.
According to the method of (2), the blocking member and the press pin are moved integrally. In the press pin arranging step, the press pin stops before the final position within the cavity. Thus, the gap between the blocking member and the opening of the forming die is secured. Here, the final position is the position of the tip of the press pin arranged when the compression molding step is performed. For this reason, in the powder filling step, it is possible to load and fill the green powder into the cavity from the gap between the blocking member and the opening of the forming die. When the press pin is moved to the final position in the cavity blocking step, the blocking member is also moved integrally with the press pin, and blocks the opening. Because most of the press pin is arranged within the cavity before the powder filling step, the resistance that the press pin receives from the green powder within the cavity when the press pin is moved to the final position is small, and therefore bending of the press pin is prevented. Accordingly, the operational effects can be realized by a simple configuration.
The expression “stopped before reaching the final position” is intended to mean stopping the press pin at a position as close to the final position as possible within a range in which green powder can be filled into the cavity though the gap between the blocking member and the opening of the forming die. Preferably, the press pin is stopped at a position distanced from the final position by about 5 mm to about 20 mm (about 4 times to 16 times the external diameter of the press pin).
In addition, the expression “the blocking member and the press pin are coupled integrally” includes a case where both are separate members which can be separated from each other but are moved integrally in addition to a case where both are an integral article.
(3) The manufacturing method of (1), wherein the press pin has a first shaft portion formed on the tip side in the axial direction, a second shaft portion formed nearer the rear end side in the axial direction than the first shaft portion and having a larger diameter than the first shaft portion, and a stepped portion formed between the first shaft portion and the second shaft portion, wherein, in the press pin arranging step, the press pin is stopped at a position distanced from the final position by a stroke that is shorter than an axial length of the first shaft portion, and wherein, in the cavity blocking step, the press pin is moved to the final position and the blocking member concurrently or subsequently blocks the opening.
According to the method of (3), in the press pin arranging step, the press pin is stopped at the position distanced from the fnal position by the stroke that is shorter than the axial length of the first shaft portion. In this case, the blocking member may be adapted to move integrally with the press pin, and may be adapted to move independently from the press pin.
In the case where the blocking member is adapted to move integrally with the press pin, the press pin integrated with the blocking member stops before reaching the final position, and therefore it is possible to secure the gap between the blocking member and the opening of the forming die. The green powder can be filled into the cavity through the gap. When the press pin is moved to reach the final position in the cavity blocking step, the blocking member integrated with the press pin is concurrently moved to block the opening.
In the case where the blocking member is adapted to move independently from the press pin, in the powder filling step, it is possible to fill the green powder into the cavity from the opening of the forming die. In the cavity blocking step, the press pin is moved to reach the final position, and thereafter the blocking member is moved independently from the press pin to block the opening of the forming die.
When the press pin is moved to reach the final position in the cavity blocking step, a stepped portion of the press pin between first and second shaft portions thereof is moved toward the tip side in the axial direction while compressing the green powder by a stroke shorter than the axial length of the first shaft portion.
In a case of a manufacturing method, in which the press pin arranging step is carried out after the powder filling step, the press pin is moved toward the tip side in the axial direction from the opening after the powder filling step to arrange the press pin within the cavity. For this reason, the stroke by which the press pin is moved toward the tip side in the axial direction while compressing the green powder is significantly longer than the axial length of the first shaft portion. According to the inventors' investigation, this is one of the causes that the green powder nearer the tip side than the stepped portion may be compressed excessively, and the consolidated aggregate may be generated. The aggregate is scattered around the first shaft portion, the stepped portion, and the second shaft portion within the cavity, and the variation in density of the green powder is likely to occur around the aggregate. As a result, a defect, such as a pinhole, occurs in the insulator obtained through the compression molding step, etc., and deterioration of insulating performance occurs. In more detail, the first shaft portion forms a hole which becomes part of a through hole within a so-called tip small-diameter portion of the insulator for a spark plug, and the second shaft portion forms a pinhole which become the rest of the through hole within a tip-side middle-diameter portion, a large-diameter portion and a rear side portion (situated in the rear side from those portion) of the insulator for a spark plug. Therefore, a defect is easily generated at the tip small-diameter portion, or between the tip small-diameter portion and the tip-side middle-diameter portion. Since the insulator for a spark plug is thin-walled at the tip small-diameter portion and is also thin-walled between the tip small-diameter portion and the tip-side middle-diameter portion, insulating performance may deteriorate due to a defect generated in these portions.
In this regard, according to the manufacturing method of (3), the stroke by which the press pin is moved toward the tip side in the axial direction while compressing the green powder is shorter than the axial length of the first shaft portion. According to the inventors' investigation, this is effective in that excessive compression of the green powder nearer the tip side than the stepped portion is prevented, and generation of the consolidated aggregate is prevented. For this reason, the variation in density of the green powder is prevented around the first shaft portion, the stepped portion, and the second shaft portion within the cavity. As a result, occurrence of a defect, such as a pinhole, is prevented in the insulator obtained through the compression molding step, etc., and deterioration of insulating performance is prevented. Further, according to the manufacturing method of (3), the green powder around the first shaft portion is appropriately compressed and densified in the axial direction by the stepped portion when the stepped portion is moved by the stroke. Therefore, generation of a defect is prevented at a small-diameter portion of the tip of the insulator, or between the tip small-diameter portion and a tip-side middle-diameter portion.
(4) The method of (3), wherein, the stepped portion preferably has a tapered shape. According to the method of (4), the resistance that the stepped portion receives from the green powder when the stepped portion is moved toward the tip side in the axial direction can be relaxed, and the degree of the compression of the green powder around the first shaft portion can be easily adjusted.
(5) The method of (3) or (4), wherein the blocking member has an insertion hole formed in the axial direction, and the press pin is movable within the through hole, and, in the cavity blocking step, the press pin is moved to the final position, and thereafter the blocking member is moved toward the tip side in the axial direction. According to the method of (5), a configuration in which the blocking member is movable independently from the press pin can be easily realized. That is, the blocking member and the press pin can be configured as independently movable, separate members to provide a process in which the press pin reaches the final position and thereafter the blocking member reaches a position where the blocking member blocks the cavity.
(6) The manufacturing method of (1), wherein the blocking member has an insertion hole formed in the axial direction, and the press pin is movable within the through hole, and the press pin is moved to the final position in the press pin arranging step, and the blocking member is moved toward the tip side in the axial direction in the cavity blocking step.
According to the method of (6), the press pin can be moved independently from the blocking member, and in the press pin arranged step, the press pin can be arranged in the final position within the cavity. The “final position” is as mentioned above. For this reason, in the powder filling step, it is possible to load and fill the green powder into the cavity from the opening. In the cavity blocking step, the press pin can be moved independently from the press pin to block the opening of the forming die. In the cavity blocking step, the press pin does not receive resistance from the green powder, and bending of the press pin is prevented. Accordingly, the operational effects can be realized reliably.
(7) The method of (5) or (6), wherein the blocking member is obtained by assembling plural split members so as to surround the press pin, and the split members constitute an integral annular member at least in the blocking step. As a concrete configuration in which the press pin is provided so as to be movable within the insertion hole, any arbitrary configurations may be adopted so long as they exhibit the operational effects of the present invention. In a case where the blocking member is constructed as in the method of (7), the insertion hole can expands as the split members surrounding the press pin are separated from each other radially outward of the press pin. For this reason, even if a portion of an outer peripheral surface of the press pin is thicker than the insertion hole, the press pin can be moved without any difficulty within the insertion hole. In the cavity blocking step, since the split members can constitute an integral annular member to block the opening, high sealing performance of the cavity can be achieved.
The configuration of the above blocking member is particularly effective in a case where that a pin-side spiral portion is formed on the rear end side of the press pin. In this case, the compact is formed with a compact-side spiral portion to which the pin-side spiral portion is transferred by the compression molding step. For this reason, in a press pin removing step after the die releasing step, in which the press pin is retreated relative to the compact while being rotated around an axis, the press pin can be pulled out of the compact easily. Since the pin-side spiral portion of the press pin can be moved without any difficulty within the insertion hole whose diameter has been increased, the size of a manufacturing apparatus can be reduced.
(8) The manufacturing method of any one of (1) to (7), wherein, a bottom of the cavity opposite the opening is formed with a positioning portion which positions the radial position of a tip of the press pin. The positioning portion is, for example, a recess into which the tip of the press pin fits. According to the method of (8), since the tip of the press pin is constrained so as not to be displaced in the radial direction, bending of the press pin is prevented.
(9) A method for manufacturing a spark plug, which includes a step of manufacturing an insulator for the spark plug by the method of any one of (1) to (8), and a step of assembling the manufactured insulator with other constituent members. According to the method of (9), since the spark plug obtained by this manufacturing method can enjoy the operational effects described above, high yield can be guaranteed, and low manufacturing cost can be realized.
Number | Date | Country | Kind |
---|---|---|---|
P2008-072000 | Mar 2008 | JP | national |
P2008-329107 | Dec 2008 | JP | national |