Claims
- 1. A method of forming a ground-supported column or post, comprising the steps of providing a ground situs of suitable depth and width, filling said situs with a cementitious slurry, providing a reinforced, precast concrete member whose reinforcing bars extend out of the bottom of said member a substantial length beyond said bottom to form an exposed portion, inserting said exposed portion into said slurry until said member merges with said slurry, and permitting said slurry to harden, thus providing an integral column and pile set in the ground.
- 2. The method of claim 1 wherein the ground situs and slurry is provided by an auger which removes earth as it penetrates the soil to form the hole and permits pumping the cementitious slurry into the hole.
- 3. The method of claim 1 wherein falsework is used to keep the precast concrete member in position while the slurry is hardening.
Parent Case Info
This application is a continuation of the application Ser. No. 07/545,557 filed Jun. 29, 1990 and now abandoned.
US Referenced Citations (9)
Continuations (1)
|
Number |
Date |
Country |
Parent |
545557 |
Jun 1990 |
|