Integrated hazard risk management and mitigation system

Information

  • Patent Grant
  • 9613523
  • Patent Number
    9,613,523
  • Date Filed
    Tuesday, April 28, 2015
    9 years ago
  • Date Issued
    Tuesday, April 4, 2017
    7 years ago
Abstract
A system for hazard mitigation in a structure including a subsystem coupled to a circuit of an electrical distribution system and set of nodes. The nodes monitor operating conditions of the circuit and generate data in response. A data processing system is operable to process the data generated by the set of nodes and in response identify a trigger representing a condition requiring that an action be taken. The data processing system processes the trigger in accordance with a predetermined policy to initiate an action by the subsystem.
Description
FIELD OF INVENTION

The present invention relates in general managing hazard risk related to residential and commercial structures, and in particular to an integrated hazard risk management and mitigation system.


BACKGROUND OF INVENTION

The owners and occupants of any structure, including homes, office buildings, and industrial spaces are continuously subjected to the risks presented by hazards, such as fire, flooding, electrical anomalies, and so on. For example, it is well known that fire prevention and control has been a long term problem for civilization. In the past, the prevention of fires spreading was the primary reason for the development of fire brigades. In modern times, most developed countries have also put in place building codes to reduce the probability of fire. In addition, smoke and fire detectors, either legally mandated or voluntarily installed, have help mitigate the consequences of fires by reducing the amount of time before an occupant is notified of a fire, particularly in situations where the fire is remote from the person at risk or in situations where smoke might quickly overcome an occupant.


Historically, evaluating the risks presented to the owners and occupants of homes and businesses has been based on observing and analyzing events as they were happening or after they had happened. In the case of fire prevention, at least for most building owners, information about the fire status of a building is only provided when a fire has already started or when smoke has been detected.


SUMMARY OF INVENTION

One exemplary embodiment of the principles of the present invention is a system for hazard mitigation in a structure. The system for hazard mitigation includes a subsystem coupled to the a circuit of an electrical distribution system and set of nodes, which monitor operating conditions of the branch circuit and generate data in response. A data processing system processes the data generated by the set of nodes to identify a trigger representing a condition requiring that an action be taken. The data processing system processes the trigger in accordance with a predetermined policy to initiate an action by the subsystem.


Another exemplary embodiment of the present inventive principles is system for mitigating risk associated with an electrical distribution system. The system includes a communications network and a set of sensors coupled to the communications network for monitoring conditions associated with the electrical distribution system. A set of subsystems are coupled to the electrical distribution system, each of which includes a data processor and communications circuitry coupled to the communications network. In response to data from the set of sensors, the data processor of a selected subsystem identifies a trigger representing a condition requiring that an action be taken and in response initiates an action in accordance with a policy. A supervisory subsystem coupled to the communications network provides trigger definitions and policies to at least the data processor of the selected subsystem.


The electrical system of a structure, whether residential or commercial, is both a direct source of electrical hazards and a common initiator of fires. To reduce the risk of fire and injuries presented by the electrical system of a structure, the preferred embodiments of the present integrated hazard risk management and mitigation system continuously monitor the status of the electrical system of the structure for electrical system anomalies, such as overload conditions, arc faults, and ground faults. In addition, information is also gathered from a second set of sensors monitoring non-electrical system conditions, such as pre-lightning strike conditions, gas accumulations, and water accumulations. From the totality of the collected information, the electrical system is selectively switched-off, either in whole or in part, before the actual hazard event occurs.


In addition, notifications are selectively sent to interested parties, based on a predetermined set of rules, informing the receiving party or parties of detected pre-event conditions and actual events (e.g., fires), as well as their consequences. Along with notifying the owner of the structure, its occupants, the fire department, police, and/or the electric utility, specialized notifications may also be sent directly to commercial servicer providers such that repairs to the electrical system and/or equipment operating off the electrical system (e.g., heating and air conditioning, kitchen appliances) can be made. Notifications may also be sent to the owner or occupant of the structure when a piece of electrical equipment has been inadvertently left on (e.g., a stove or other kitchen appliance has been drawing current for an inordinately long period of time).


While the major advantage of the present integrated hazard risk management and mitigations system is the reduction in the risk of structural loss or damage and/or personal injury, these systems also provide for peace-of-mind and financial benefits, as well. For example, insurance companies, always concerned with the reduction in hazard risks, may reduce their rates for individuals and businesses implementing such a system in their homes, offices, or other commercial spaces. Utility companies may become less concerned with the waste of energy due to faults in the electrical system and the connected electrical equipment. Home owners will be able to more quickly identify problems with their appliances and heating and air conditioning systems, thereby allowing for early repair and the subsequent financial savings resulting from efficiently operating electrical equipment.





BRIEF DESCRIPTION OF DRAWINGS

For a more complete understanding of the present invention, and the advantages thereof, reference is now made to the following descriptions taken in conjunction with the accompanying drawings, in which:



FIG. 1A is a block diagram of a networked integrated hazard risk management and mitigation system embodying the principles of the present invention;



FIG. 1B is a block diagram of an electrical distribution system of a structure serviced by the hazard risk management system of FIG. 1A;



FIG. 2A is a block diagram illustrating a preferred information flow across the network of the risk management system of FIG. 1;



FIG. 2B is a more detailed block diagram showing the information flow between the hardware subsystems across the network of the risk management system of FIG. 1A;



FIG. 2C is a more detailed diagram showing exemplary changes in risk indicated by various events detected by the hardware components of FIG. 1A and the resulting actions taken according to the illustrated embodiment of the present principles;



FIG. 3 is a flow diagram illustrating a preferred information flow between various hardware components of FIG. 1A during system configuration;



FIG. 4 is a diagram showing the interrelationships between triggers, policies, policy actions, notifications, users, and messages controlled by the software program of the risk management system of FIG. 1A;



FIG. 5 depicts an exemplary graph database showing electricity flow to the structure of FIG. 1A and the reporting of state data;



FIG. 6 is a flow diagram illustrating an exemplary process for training the risk management system of FIG. 1A;



FIG. 7A illustrates an exemplary high level dashboard presented on the user interface of FIG. 1A;



FIG. 7B illustrates an exemplary configuration dashboard presented on the user interface of FIG. 1A;



FIG. 7C illustrates an exemplary type-2 message presented on the user interface of FIG. 1A;



FIG. 7D illustrates an exemplary email emergency notification message sent to a user of the risk management system of FIG. 1A and



FIG. 7E illustrates an exemplary alert sent to the mobile device of a user of the risk management system of FIG. 1 reporting an action taken in response to a detected risk event.





DETAILED DESCRIPTION OF THE INVENTION

The principles of the present invention and their advantages are best understood by referring to the illustrated embodiment depicted in FIGS. 1-7 of the drawings, in which like numbers designate like parts.



FIG. 1A is a block diagram of a networked integrated hazard risk management and mitigation system 100 embodying the principles of the present invention. System 100 is suitable for use in and around any form of building or enclosure that is serviced by electricity and is therefore prone to the risks presented by its electrical system, including the risks of fire and electrocution. For example, structure 100 may be residential housing (e.g., a home, apartment, or condominium), a commercial building (e.g., an office building, large or small retail outlet, or sports and entertainment facility), an industrial building (e.g., a manufacturing facility), or an equipment infrastructure (e.g., as oil platform or other industrial/transportation infrastructure).


The block diagram of FIG. 1B shows portions of system 100 as is relates to the electrical distribution system 120 servicing the structure. Electrical system 120 includes n number of branch circuits (where n is an integer), two of which are shown for reference as branches circuits 121a and 121b. The actual number of branch circuits will vary depending on the electrical requirements of the structure. In addition, depending on the requirements of the structure, electrical distribution system 120 may provide either single-phase or three-phase power.


System 100 uses various sensors distributed in and around the structure to gather information and assess fire, electrical, and other risks associated with the structure and its surroundings, including adjacent structures or units. Risk analysis is performed, in the illustrated embodiment, using pattern recognition and machine learning, discussed below. Furthermore, human analysts may also be permitted to subscribe to the collected data for human based statistical analysis.


System 100 includes, or alternatively is serviced by, a cloud service 101 through a cloud 102, which may be a global public electronic communications network, such as the Internet, or a private or governmental electronic communications network. As discussed further below, cloud service 101 is preferably used to implement such tasks as analytics, electricity usage prediction, comparative and regional risk analysis, pricing comparison, and the integration of gas/electricity status information from the utility provider with in-structure and adjacent information


In the illustrated embodiment, hardware components within structure 100 communicate with cloud 102 through a building server 103 and a unit server 105. In alternate embodiments, only a building server 103 or a unit server 105 may be required. For example, in the case of an apartment building or office building, a building server 103 may be provided to manage and control overall operations within the building while a unit server 105 may be provided to each individual apartment unit or office. Building server 103 and/or unit server 105 are preferably used to execute such tasks as system setup, risk level setting, notification policy, notification templates, security and permissions, first responder policy setting, contact information, maintenance equipment inventory, history reporting, current risk level, tracking and the generation of recommendations, as discussed in detail below.


In the illustrated embodiment, a communications and control network is established, which includes a link 104 between building server 103 and cloud 102, a link 106 between unit server 105 and cloud 102, and an internal link 108 between building server 103 and unit server 105 and the system hardware components discussed below.


Generally, application of the principles of the present invention is independent of the particular communications protocols or physical path used. Hence, in some embodiments, some or all of links 104, 106, and 108 are implemented, in whole or in part, with a local wireless subsystem, such as WiFi subsystem, Zigbee subsystem, home appliance control system, wireless local area network (WLAN), or a wide area network (WAN) established through a mobile (cellular) network, such as a 3G or 4G telecommunications network. In alternate embodiments, one or more of links 104, 106, and 108 may be implemented, in whole or in part, with a hardwired communications and control path, such as a digital subscriber line (DSL) connection to the Internet, a television cable connection, hardwired local area network, or ethernet over powerline system.


Networking management, including the reporting and control of individual subsystems with hard and soft trip capabilities, communications control, and local policy execution when the risk level demands fast response or when external networks not available, is preferably implemented with at least one of building server 103 and unit server 105.


Electrical power from an electric utility is provided through a smart meter 109, as shown in FIG. 1B. Smart meter 109 includes one or more embedded processors and communicates through the remainder of system 100 across communications link 108. Electrical power flowing through smart meter 109 is passed through a breaker panel 115, which includes a set of n number of “smart” breakers, two of which are shown as breakers 117a and 117b, corresponding to the n number of branch circuits 120. In the preferred embodiment, each breaker 117 includes embedded processing circuitry including a microprocessor, microcontroller, or digital signal processor and a set of embedded sensors for detecting such conditions such as branch circuit overloading, arc faults, ground faults, and pre-lightning strike conditions. The overall operation of breaker panel 115 is monitored and controlled through a breaker panel controller 116, including a microprocessor, microcontroller, or digital signal processor.


As discussed further below, system 100 gathers information using sensors disposed at various points in and around the structure. The available sensors include an external set of sensors, two of which are shown as sensors 110a and 110b in FIG. 1A, for monitoring conditions external to the structure. Depending on the particular embodiment of system 100, sensors 110 monitor for various conditions such as temperature, smoke, gas main leaks, natural gas, toxic gas, radon, CO2, carbon monoxide, water, and ground movement. External sensors 110 also advantageously provide for the assessment of adjacency risks based upon information about neighboring units, offices, buildings, or other sources of external risk (e.g., train routes that carry toxic substances).


Within the structure, system 100 includes a set of smart plugs and smart power bars. A representative smart plug is shown at 111a and a representative smart power bar is shown at 111b. Each smart plug or power bar includes embedded processing circuitry including a microprocessor, microcontroller, or digital signal processor that allows for monitoring and control of electricity usage at the plug-in point. Individual smart plugs, as well as smart power bars, preferably include tripping circuitry (e.g., an embedded breaker) and communications circuitry (wired or wireless), which allow for individual plugs to be tripped in response to the embedded processing circuitry or in response to a command from an external device or subsystem (e.g., a pseudo-breaker discussed below). In addition, the communications circuitry allows electrical usage information and state information to be transmitted to an external device or subsystem of system 100 either directly or in response to polling.


The illustrated embodiment of system 100 includes various equipment including internal monitoring and reporting capabilities, two of which are shown as equipment blocks 112a and 112b. Equipment 112 includes household appliances, industrial equipment, office equipment, and so on. Preferably, a piece of equipment 112 includes embedded processing circuitry including a microprocessor, microcontroller, or digital signal processor for monitoring and controlling electricity usage, operational parameters, and state information and communications circuitry for exchanging information and commands with an external device or another subsystem of system 100. In addition, a piece of equipment 112 also includes tripping circuitry (e.g., an embedded breaker), which can be tripped by the embedded processing circuitry or in response to in response to a command from an external device or subsystem (e.g., a pseudo-breaker discussed below).


System 100 also includes a set of pseudo-breakers (“virtual breakers”), two of which are shown as pseudo-breakers 113a and 113b. Each pseudo-breaker 113 provides electrical measurement functionality and then delegates the soft or hard trip operation to one or more subsystems with breaking capability (e.g., smart plugs 111, equipment 112, breakers 117). Pseudo-breakers 113 provide multiple advantages, including the ability to communicate (wired or wirelessly) with one more other controllers within system 100, have internal or external policies attached to them (discussed below), can trigger soft or hard breaker events, and can restart breakers (e.g., a breaker 117 or an embedded breaker within a smart plug/smart power bar 111 or piece of equipment 112) using a timing interval or by direct command to the soft break initiating devices.


System 100 further includes a set of internal sensors, two of which are shown in FIG. 1A as sensors 114a and 114b. Generally, each sensor 114 provides contemporary or contemporary and historical information through measurements, that can be used for fire risk assessment, analysis and management. Sensors 114 monitor electrical distribution system 120 directly and indirectly.


Sensors 114 monitoring electrical distribution system 120 directly measure such parameters as electrical distribution system state, electrical distribution system events, parameters needed for time series analysis of electrical distribution system 120 faults, and/or electrical spikes and patterns of faults and spikes. Sensors 114 indirectly monitoring electrical distribution system 120 measure for such parameters as temperature, water flooding, gas main leaks, natural gas, toxic gas, radon, CO2, carbon monoxide, and ground movement. Depending on the embodiment of system 100, sensors 114 may also include equipment specific sensors, and non-electrical system sensors.


One particular sensor 114 is an intelligent smoke detector including an embedded microprocessor, microcontroller, digital signal processor, and/or telecommunications function. The intelligent smoke detector may also include a sound based notification alternative to be detected by other devices around the structure with communications capabilities.


In addition to gathering information from external sensors 110 and internal sensors 114, system 100 may also access information, such as extreme weather forecasts, lightning strike patterns, earthquake warnings and occurred events, from cloud 102 through building server 103 and optionally unit server 105.


The processing circuitry within each breaker 117 executes algorithms for the detection and management of branch circuit-specific ground and arc faults and overload conditions. These algorithms may also be executed by breaker panel controller 116 in the preferred hierarchical structure of system 100 discuss below, which provides or redundancy and rapid and efficient risk mitigation under varying circumstances.


Communications circuitry within individual breakers 117, as well as communications circuitry associated with breaker panel controller 116, allows electrical usage information and state information to be transmitted to an external device or subsystem of system 100 and commands and polls to be received from another device or subsystem of system 100. Consequently, for example, a pseudo-breaker 113 can command a given breaker 117 by direct communications or through breaker panel controller 116.


System 100 includes a user interface system 118, which could be a fixed panel with a display screen and an input device such as a touchpad or keyboard, a personal computer, or a mobile device, such as a smart phone, laptop computer, or tablet. User interface system 118 communicates with building server 103 and/or unit server 105 over link 108 and supports system configuration operations, the presentation of system status information, and messaging.



FIG. 2A is a conceptual block diagram graphically describing a preferred information flow in system 100. For purposes of the present discussion, the following definitions apply.


“Edge Subsystems” generically refers to the various subsystems within risk management system 100 having communications functionality (wireless or wired), and tripping circuitry and/or the ability to delegate tripping to another subsystem or device. In the illustrated embodiment the edge subsystems include smart plugs 111, equipment 112, pseudo-breakers 113, breaker panel 115, breaker panel controller 116, and breakers 117. Each edge subsystem also preferably includes dedicated sensing and monitoring components, which monitor its operating performance, local environmental conditions, and electrical parameters associated with its electrical connection to power distribution system 102.


Collectively the edge subsystems, external sensors 110, and internal sensors 114 provide a networked set of nodes for collecting information from various points around system 100. These nodes can exchange information among themselves, as well as with the higher levels of system (e.g., cloud service 100, building server 103, and/or unit server 105). As discussed further below, the network of nodes allows for local information to be collected at various points inside and outside the structure, such as equipment performance, environmental conditions, and electrical performance of electrical distribution system 120. In addition, the network of nodes and processing subsystems (i.e., cloud service 100, building server 103, and/or unit server 1051 provide redundancy allowing policies to respond to triggers in the most efficient manner, depending on the current state of system 100.


A “trigger” is one or more sets of conditions, states, measurements, or combination thereof, which trigger one or more actions by one or more subsystems, preferably with logging and notification. A “policy” defines one or more actions taken in response to a trigger to change the state of a subsystem, send a notification, or react to a non-response to a suggested human mediated action.


“Templates” are published and associated with a corresponding edge subsystem. Templates generally consist of Triggers, Policies, and Notifications. More specifically, Factory Default templates are published by the vendor or distributor of a given edge subsystem. Published templates are published by the vendor, distributor, or a third party and may vary from the Factor Default templates. User Default templates are created by the user or system administrator and may be associated with multiple edge subsystems. Edited templates are templates that have been modified over the original Factory Default or Published template. Published with Addition is a template that identifies alterations or edits that have been made over the original published template.


A “notification template” is set of notifications sent to a set of people with specified dynamic text, in response to a trigger or a recommendation. “Recommendation logic” is a set of rules for analyzing events, equipment data, sensor data, and external data at one or more locations.


“Delegation” means the allocation of a policy, trigger, notification, or recommendation to one or more other subsystems. “Breaker delegation” means a pseudo-breaker acting as a full breaker by delegating the trip function to one or more breaker-enabled devices such as a breaker embedded in a piece of equipment 112 or a breaker 117. A “prescription” is a set of conditions or states that if missing, not reported, not available, or falling outside acceptable measurement parameters, triggers at least one of a policy or notification.


“Spatial risk mapping” is the mapping individual risks for a particular region of a structure or risks across adjacent structures for the purpose of improving risk assessments, notifications and recommendations. Approaches used include estimation of damage and mapping of damage on a map, along with predicting timing of transfer or spread of fire or other problems. “Time Series and Analysis” means the analysis of data belonging to one or more machines of one or more users leading to summary information, modeling, or a recommendation.


As shown in FIG. 2A, the information stream flow includes an external message stream 201 sourced by cloud service 101, building server 104 and/or unit server 105. Sensor stream 202 includes information sourced by external sensors 110 and internal sensors 114. Equipment state reporting stream 203 includes information sourced from equipment 112 such as electricity usage, operational parameters, and state. Raw data stream 204 includes information sourced from smart meter 109, smart plugs 113, breakers 117, and breaker controller 116, such as voltage, current, power consumption, current overloading, over and under voltages, arc faults, frequency, noise, and ground faults.


These information streams are used to generate triggers 205 (logged at block 206), policies 207 (logged at block 208), notifications 209 (logged at block 210), and/or user actions 211 (logged at block 212), which allow for the mitigation of events or potential events detected by system 100 with regards to electrical distribution system 120 and its surroundings.



FIG. 2B is a conceptual block diagram illustrating the network information flow and decision making process in the preferred embodiment of system 100. State notifications are derived from breaker panel state information 214 generated by breaker panel controller 116, circuit breaker state information 215 generated by circuit breakers 117, smart plug state information 216/smart power bar state information 217 from smart plugs 111, and equipment state information received from equipment 112. The state information is taken together with sensor information 220 generated by sensors 110 and 114 and pseudo-breaker information from pseudo-breakers 114 to detect any change in risk level.


The state notifications are evaluated by processes flexibly allocated between the processing and control resources available in the particular embodiment of system 100. The embodiment of FIG. 2B includes processes 221 executed by cloud service 101, processes 222 executed by building server 103 and/or unit server 105, processes 223 executed by breaker panel controller 116, and processes 224 executed by the controllers within the individual breakers 117. Command flow is then returned from one or more of these processes to smart plugs 111, equipment 112, pseud-breakers 114, and circuit breakers 117.


In the illustrated embodiment information flow is upward, from processes 224 executed at the lowest hardware level (i.e., breakers 117) to processes executed at the highest hardware level (i.e., cloud service 101). Information such as electrical consumption, fault, and spike information is locally recorded in each device (e.g., a smart plug 111, piece of equipment 112, pseudo-breaker 113, or breaker 117) as a storage buffer for use by that device in making fast decision making and policy execution. Present data is retained by each subsystem as they are transmitted upward through the system 100 hierarchy. Preferably, all of the collected information is uploaded to cloud service 101, building server 103 and/or unit servers 105 for analysis, storage of record, and backup. Advantageously, cloud service 101 is able to access information from multiple user accounts (e.g., apartment buildings, office buildings, individual residences), which provides a wider database for risk assessment.



FIG. 2C illustrates four exemplary classes of mitigation responses to various potential risks. In FIG. 2C, a change in risk level may be due to external notifications 225 concerning environmental conditions, received for example across cloud 102, and/or external notifications related to adjacent buildings for units received from external sensors 110. Electrical distribution system status information 228, subsystem information 229 (i.e., information from smart plugs 111, equipment 112, breaker panel controller 116, and breakers 117), and pre-lighting strike information 230 may all contribute to an assessment of the risk level, depending on the embodiment of system 100.


In the example of FIG. 2C, changes in the risk level can, depending on the policies implemented, cause one or more responses. First, a recommendation 231 can be made to the human user to change usage of an edge subsystem connected to electrical distribution system 120 (e.g., turn off one or more household appliances or industrial equipment). Second, a recommendation 232 can be made to the human user to take immediate mitigation action, such as disconnecting an appliance from a smart plug 111 or turning-off a piece of equipment 112. Third, one or more subsystems may initiate immediate action (e.g., turn off a branch 121 or shut-down a piece of equipment 112) and send a notification to the human user (Block 233). Fourth, one or more subsystems make take immediate mitigation action, send a notification to the user, and send an emergency alarm to first responders (Block 234). Fifth, a “two-phase commit” may be initiated where a warning is sent to a user or administrator indicating that a mitigation action must be taken within a particular time window, after which system 100 will automatically initiate the mitigation action.


Execution and control policies determine which subsystem in the hierarchy of system 100 executes a given mitigation and/or notification policy. Typically, different risk levels require evaluation and mitigation/notification policy execution at different levels within the system hierarchy. For example, a severe overload of one or more branch circuits 121 may require a hard trip and intervention by breaker controller 116, unit server 105, and/or building server 103. A less severe spike on a branch circuit 121 may only require a soft trip and breaker reset, which may be safely accomplished by the controller within the corresponding breaker 117.


The ability to process state notifications allow system 100 to provide an overall assessment of the reliability of a plug, outlet or connection to an appliance, device, or piece of equipment. For example, a smart plug 111 may consistently transmit state notifications that are associated with higher risk of fire or with actual fires. Similarly, an overall assessment of the status of a branch circuit may take into account state notifications representing arc and ground fault present status, a pattern or history of ground and arc faults and overloading, or pre-lightning indicators. A state notification from one subsystem (e.g., a sensor 110) may be used to support or change the assessment based on the state notifications from another device (e.g., a smart plug).


Mitigation functionality in the preferred embodiment of system 100 is mainly expressed through reusable Policy Templates that specify trigger events and measurements and the resulting mitigation actions. For example, in an automatically fired policy 207 (FIG. 2A), an action (e.g., tripping a breaker 117) will automatically occur upon the corresponding trigger 205. In a two-stage recommendation policy 207, the first stage in response to a trigger is a recommended human user action 211 (e.g., manually trip a breaker 117), which if not performed or denied approval within a specified time interval is automatically executed (e.g., the appropriate breaker 117 is automatically tripped). Other policies 207 may result in a recommendation on usage in response to a given trigger, such as disconnecting one or more edge subsystems, checking the circuit wiring, changing edge subsystem usage and/or the time of day of edge subsystem usage.


Advantageously, mitigation can be implemented at different levels of the system 100 architecture, depending on the severity of the risk and the ability to isolate the triggering events. In the illustrated embodiment, mitigation can be implemented by cutting-off electrical flow at smart meter 109, at breaker panel 115, at the individual breakers 117 (for both hard and soft trips), at smart plugs 111 (either individually or collectively as a power bar), or at the individual pieces of equipment 112.


With regards to the detection of arc faults, ground faults, and pre-lightning strike conditions by breaker panel controller 116 and breakers 117, a typical policy might include issuing commands for cutting off all electricity to the building, reducing the voltage to the building, managing electricity on a branch circuit 121 basis, resetting branch circuits 121 tripped for poor reasons, and/or suppressing usage of a high risk branch 121.


As another example, if a breaker 117 detects a pattern of overload or overheating in a branch circuit 121 (e.g., the trigger 205), then the policy may dictate different actions be taken depending on the severity of the conditions. For example, at high levels of overload or overheating, individual breakers 117 may be programmed or commanded to trip to reduce heat and likelihood of fire. On the other hand, at low levels of overload or overheating, recommendations may be transmitted to the user or other decision maker able to check the branch circuit, an edge subsystem connected to the branch circuit 121, and/or to disconnect an edge subsystem from the branch circuit 121 immediately. Given that a pattern of overheating or overload may reverse after a branch circuit is switched off or as a result of a change in load on the branch circuit, the recommendations may include a recommendation not to use the branch circuit 121 until checked, despite a satisfactory status report from the circuit breaker 117 or circuit breaker controller 116.


The policies and decision rules conversely can recommend the replacement of one or more of sensors 110 or 114, wiring, breakers 117, appliances and equipment 112 where a pattern of false positives has been identified either automatically or through human intervention.


For example, when a smoke detector 114 detects a high level of smoke, a typical policy might initiate a fire alarm to produce a sound to notify any occupants, trigger another sensor which can pick up the sound and send a message, send an SMS to any occupants, and/or our send a notification to building security, fire department or other relevant stakeholder.


Similarly, when an external sensor 110 or an internal sensor 114 detects water flooding, preventive actions taken to minimize impact of flood damage caused electrocution and shorts may include cutting off individual branch circuits 121 with breakers 117, or shutting-off electrical distribution system 120 in its entirety using smart meter 109 or breakers 117. In addition, the executed policy may require the transmittal of a command or recommendation for the shut-off of the main water supply or a particular water distribution control. (The same is true for the detection of a gas leak, which may dictate the shut-off of the gas supply and/or the shut-down of smart plugs 111 or equipment 112 in the vicinity of the leak).


Decision rules can be simple or based upon data about individual pieces of equipment 112 or about individual branch circuits 121. External sensors 110 particularly allow for the evaluation and mitigation of risk presented by adjacent properties.


Negative information is addressed with Prescription Templates. A prescription is a particular set of conditions for a set of subsystems over a designated period of time that if deviated from generates a trigger 205 and a corresponding combination of Notification 209 and Policy 208 execution. The set of conditions may be made conditional on other information generated within system 100 or received from an external source. Some embodiments may include a reference prescription policy created or provided by third parties, utilities, service providers, contractors, building inspectors with recommended or mandated notification policies. Administrator override is permitted if the Prescription Policy originator is notified.


A typical Prescription Template might be used in situations where there is policy non-compliance by a subsystem, no state notifications are being transmitted from a subsystem, monitoring of a subsystem is inadequate, or no policies are set for a given set of conditions. A prescription may trigger a remedial policy, such as manual repair, manual repair plus automatic repair after specified elapsed time, or emergency first responder notification. A Prescription Template may also require notification of a human user that the identified condition is not being not being met, as well as log the prescription for subsystem maintenance, further analysis, pattern analysis and recommendations about settings and policies.


Notification Templates, specify who should be notified in the event that a particular policy 207 is triggered.


Preferably, Notification Templates are tailored to send notifications to those parties requiring information within a given time period after the processing of a trigger. In other words, the extent and urgency of the transmission of notifications will depend on the detected risk. Among others, notifications may be sent to occupants of a unit or building and occupants of adjacent units and buildings also at risk. Notifications may also be sent to building management, building and property owners, the electric or gas utility company, and first responders such as police, ambulance providers, fire departments, and local hospitals. The owners, service providers, and contractors using or maintaining and edge system may also be notified such that repairs can be made and failure analysis performed. Similar information may be sent to original equipment vendors and resellers. Furthermore, notifications may be sent to others having a personal or property interest that could be adversely affected by the triggering event.


Hence, a typical notification template will identify the event type (e.g., electrical, fire/smoke, flooding, earthquake, carbon monoxide, carbon dioxide, and so on), by a representative code or by full text. The notification template may also identify the risk level associated with the event. In accordance with the Notification Template, one or more actions are taken, such as: (1) email or text message a standard format notification text to the appropriate stakeholders based on the event and its severity; (2) send an email or text message recommending an action, a recommended time period for taking such action, and indicating any next steps that will be taken if the recommended action is not taken; (3) place a notification telephone call; or (4) place a 911 emergency call with voice notification of the event. Each notification may also include an indications as to whether first responders have been notified, whether adjacent property owners and individuals have been informed, and/or whether an individual or first responder has taken remedial action.


It should be recognized that the control and notification policies, at least in some embodiments of system 100, may also be used for more general electricity management tasks, in addition to risk management and mitigation. For example, system 100 can interface with home energy management systems (HEMs), home automation systems (HASs) using API or messaging through a home network or cloud integration.


Among other things, control and notification policies can established that trigger different electricity use profiles, thereby allowing the more efficient and less expensive use of electricity. For example, control and notification policies can be set up to send recommendations to a home owner to implement a smart home usage profile, which might include recommendations for settings on equipment, appliances, circuits, and smart plugs. In addition, policies can be set up for automatically cutting off electricity to a location, building, or unit, cutting-off a particular branch circuit, or switching-off a plug outlet or device under given conditions, such as during brown-outs or similar periods of high demand.


System 100 also addresses concerns about when electricity is in use and confirms to users when electricity should be in use. One example is where a piece of equipment 112 includes an electric vehicle charger. In this case, a user can remotely confirm that the charging of batteries is occurring, even when physically distant from the electrical battery being charged.


Triggers, policy templates, notification templates, and prescription templates are preferably set by cloud service 101, building server 103 or unit server 105, but their execution is delegated to smart plugs 111, breakers embedded within equipment 112, or breakers 117. For example, building server 103 may set a two-stage recommendation policy for a piece of equipment 112, which then detects the corresponding trigger, generates an indication to the user, and then trips an embedded breaker when no user action is taken within a specified time interval. Similarly, a pseudo-breaker 113 detects a certain condition and then delegates tripping to the appropriate breaker 117. Preferably, the lower level subsystem receiving the delegation reports back the results of the delegation (e.g., the execution of a policy) to the delegating higher-level subsystem.


Hence, policy execution in the illustrated embodiment of system 100 can advantageously can occur at the device level (e.g., by smart plugs 111, equipment 112, pseudo-breakers 113, or breakers 117), at the controller level (e.g., by breaker controller 116, smart meter 109), or at the higher system levels (e.g., by unit server 105, building server 103, or cloud service 101). Under this hierarchy, if a lower-level subsystem fails, responsibilities are transferred upward. For example, if all the subsystems within system 100 are controlled by building server 103, which fails, then control can be transferred to another locus, such as cloud service 101. Similarly, if breaking fails at the level of smart plugs 111, breaking can be transferred to the circuit level by breakers 117 or breaker controller 116, and if circuit level breaking fails, breaking can be transferred to smart meter 109.


Table 1 illustrates a number of exemplary triggers, representative subsystems invoked in sensing each trigger, possible actions taken in response to the trigger in accordance with the associated policy, possible notifications generated in response to the trigger, and possible analytics performed in response to the trigger, the action taken, and the notifications generated. In actual embodiments of system 100, the triggers, policies and notifications generated will depend on the hardware configuration (e.g., the number and type of sensors 114) and/or the selections made using the policy and notification templates.


A preferred set of recommendations and actions are shown in Table 2, along with subsystems invoked in processing the corresponding signals and data necessary to trigger those actions and recommendations.


The use of policy templates provides the user or administrator with significant flexibility in addressing various detected conditions. Although not exhaustive, Table 3 illustrates a number of representative alternative actions that can be taken in response to specific conditions detected by system 100. The alternatives may be implemented automatically by one or more subsystems, may require notification and active action on the part of a human user or administrator, or may be implemented automatically if a human user or administrator is notified, but takes no action within a specified period of time.


The notification templates are preferably set in response to various needs or use cases (e.g., fire prevention) and corresponding factors (e.g., smoke detector responses and circuit temperatures). Table 4 illustrates a number of use cases during which notifications could be generated, depending on the needs of the user and the configuration of system 100, along with various factors that could be considered in setting up the corresponding notification template.


Triggers, as well as policies, may be automatically updated in response to analytics performed by one or more of cloud service 101, building server 103, and unit server 105. More specifically, the significant amounts of data collected from external sensors 110, internal sensors 114, and the edge equipment, along with analytics packages running on cloud service 100, building server 103, and/or unit server advantageously support adaptive update of the triggers and policies to address conditions to which the user of system 100 may not be aware or able to timely respond.


Each subsystem within system 100 has a composite status, based on the status of various actions taken or being taken at a given instance (e.g., an event has occurred and automatic mitigation has been executed by that subsystem). The capabilities and limitations of a given subsystem, as well as its setup and security, must be accounted for in evaluating the overall risk to the structure being protected by system 100. In the illustrated embodiment, the ability of a given subsystem to monitor, detect, and respond to a given hazard under present conditions is given a risk level score on a 100 point scale (e.g., building server 103 is operating at a certain capacity or a sensor 114 has limitations on its ability to detect certain conditions under certain circumstances). For subsystems requiring setup, a 100 point setup score on a 100 point scale is assigned, which represents the ability of the subsystem under the current setup to monitor, detect, and respond to events under that setup (e.g., the subsystem is presently setup for low-power operation). Finally, for subsystems with variable security settings, a security and permissions setup score on a 100 point scale is assigned to account for the present ability of the subsystem to withstand modification or tampering. Calculation of an overall risk score is discussed further below.


Table 5A illustrates a preferred set of possible states for cloud service 101, Table 5B for building server 103 and unit server 105, and Table 5C for the network management function running on building server 103 and/or unit server 105. A general set of preferred states for smart plugs 111, equipment 112, pseudo-breakers 113, breaker panel 115, and breakers 117 is shown in Table 5D. Table 5E provides a preferred set of states for sensors 110 and 114 and Table 5F sets out a preferred set of states for mobile device 122.


In embodiments of system 100 having multiple sensors 110 and 114 and multiple reporting devices, such as smart plugs 111, pseudo-breakers 113, breaker controller 116, and breakers 117, multiple nodes may detect an event or conditions associated with an event. Table 6 illustrates exemplary scenarios where a first information source detects a potentially hazardous condition (e.g., an arc fault), while a second information source detects a second condition (e.g., a ground fault), which could increase, or potentially substantially increase, the risk of a hazard to the structure and/or its occupants.


From information received from three sources (e.g., external sensors 110, internal sensors 114, sensors within breakers 117) the ability to evaluate risk is further enhanced. For example, the probability of hazardous conditions requiring mitigation will be very high if three sources respectively report an arc fault, a ground fault, and increased circuit temperature. Other examples include the reporting of an arc fault, increased circuit temperature, and smoke and fire and the reporting of a ground fault, increased circuit temperature, and smoke and fire.


An example of four source reporting is the reception of an earthquake notification (e.g., via cloud 102), ground movement detection by a local sensor, natural gas detection by a local sensor, and a ground fault detection. A representative five source reporting would be the notification of an earthquake, local ground sensor detection, local natural gas detection, an arc fault detection, and a ground fault detection.


System 100 preferably implements a permission model to permit control, reporting and changes to triggers 205, policies 207, and notifications 209 only with high level authorization (often referred to as an administrator status). Different levels of access and control e.g.) (time periods, equipment scope, level of authorization) can be specified including privileged Administrator access for first responders in emergency events. Additional security features may include encryption, two factor authentication, and different levels of device registration. In some versions, a dollar value of policy consequences and permissible risk changes may be used to determine permissibility of a user's changes to the system.


With the proper permissions, mobile applications running on mobile device 122 are provided for controlling one or more edge subsystems, interrogate, obtain information, set policies and notification events through a number of entry points into system 100, such as cloud service 101, building server 103, unit server 105, or individual devices having wireless communications capability, such as breaker panel 115.


Triggers and the invocation of control and notification policies provide an information base for analysis, for example, by cloud service 101. The results of such analysis is useful not only for reducing and mitigating risks associated with the structure associated with system 100, but also for adjacent and similar structures.


User interface 118 supports the local display of information regarding the operation of system 100. For example, in the illustrated embodiment of system 100, user interface 118 provides visual displays of notification vectors, log and action status, electrical distribution system 120 activity, logs of alarms, logs of policies triggered, logs of notifications, and logs of automated action, among other things.



FIG. 3 is a block diagram illustrating the configuration of system 100 through screens presented on user interface 118 of FIG. 1. Specifically, the user or administrator of system 100 uses configuration screens 301 on user interface 118 to invoke a command applications programming interface (API) 302, running, for example, on building server 103 or unit server 105. Command API 302 communicates with subsystem vendor API 303 associated with a vendor providing one or more subsystems including external sensors 110, smart plugs 111, equipment 112, pseudo-breakers 113, internal sensors 114, breaker panel 115, breaker panel controller 116, and breakers 117. Through the configuration screens, command API 302, and vendor API 303, the system 100 user or administrator is able to set various settings 304 for the given subsystem.


The user or administrator similarly configures a subsystem provided by a second or alternate vendor through alternate subsystem vendor API 305 and configurable settings 306.


In addition, the system user or administrator can enter a template definition mode 307 through configuration screens 301. In the template definition mode, the user or administrator creates one or more trigger templates 308, one or more policy templates 309, and one or more notification templates 310, as described above. Depending on the embodiment of system 100, this may be achieved through the display of a template list, the selection of a type of template (e.g., policy, notification, prescription), from the list and the selection of a specific template from the set of the selected type of templates. Following selection of the specific template, the library for the template is displayed and an item from the library selected to populate the template. The populated template is finally saved under the template name. For one or more notification templates, the notification template is attached to a policy name and/or may be cloned for a list of policies.


The created templates are then linked to a program 311, discussed further below. The program parameters 312 are entered and saved under a name and identification number.


An emergency event causes a state or parameter change 313, as discussed above, which is then presented to program 312 and processed as a trigger in accordance with the policy and notification templates setup during system configuration.


Some of the specific operations that a user or administrator can implement through user interface 118 during system 100 configuration include specifying the addresses and operating parameters for smart plugs/smart power bars 111, equipment 112, pseudo breakers 113, breaker panel 115, breakers 117, and branch circuits 121. In addition, using interface 118, the user may also specify the edge subsystems connected to a given branch circuit 121, attach plug information to edge subsystems, and specify sensors 114 by room or unit.


Table 7 sets out a preferred set of configuration and functionality options (“epics”) for system 100, including its edge subsystems. In addition, Table 8 sets forth a preferred set of operations that can be performed during use of system 100 through user interface 118 or mobile device 122.


System 100 may be configured to display, through user interface 118, graphical information, such as maps of branch circuits 121 and room (unit) maps, including sensor 114 locations. Through user interface 118, a user with proper permissions may access an information source library, add an information source to the library, select an information source from the library, attach an information source to one or more policies, and edit information source policies.



FIG. 4 is a diagram graphically summarizing the relationship between certain key functions of system 100. A program 400 consists of one trigger 401, at least one policy 403, and at least one notification 405. Each trigger is associated with a trigger name 402 and each policy is associated with one or more policy actions, which are represented in this example by policy actions 404a-404c. Notifications 405 provide information to a user 406.


A specific “published program” is a program 400 associated with the parameters attached to a particular subsystem within system 100. A subsystem may be associated with multiple programs 400 and a program 400 can draw upon triggers 402 associated with multiple sources of information or subsystems.


In general, the preferred embodiment of system 100 operates on information including: (1) electrical consumption information from smart meter 109 (e.g., at one second or specified intervals providing greater detail than a typical smart meter); (2) spike information measured by smart meter 109 for short periods of time (e.g., less than a minute, where electricity usage is collected at smaller units of granularity, such as milliseconds or other specified shorter time periods); (3) state information about a particular subsystem, its policies, parameters and configuration; (4) electrical system architecture information, such as parameters and addresses for edge subsystems and electrical apparatus installed in and/or linked to edge subsystems such as smart plugs 111, equipment 112, pseudo-breakers 113, breaker panel 115 and breakers 117; (5) sensor data feeds from non-electrical system sensors 110 and 114; (6) log information that logs events, triggers, policies executed, notification sent, user responses to two phase actions, changes in triggers, policies, and notifications; (7) user directory with security levels, permissions, contact information, links to programs (named and numbered triggers, policies, notification templates); (8) network availability, policies, priorities, encryption, permissions, and so on; (9) adjacency information (i.e. information about location and status of nearby units, buildings or transportation that might have impact upon the building and its risks; and (10) external source information (e.g., USGS earthquake notification, NOAA extreme weather notification).


System 100 may employ one or more known databases suitable for managing the various types of information required. In the preferred embodiment, system 100 employs two different databases. In alternate embodiments, the number and types of databases may vary depending on the particular system needs and configuration.


The first (electricity) database is focused upon handling the ongoing stream of electricity consumption data. Data are input into the first database either by polling the edge subsystems) or by direct feed from the edge subsystems. Preferably, the first database can handle data with varying degrees of granularity (e.g., milliseconds, seconds, minutes, hours, days, weeks, months, years, and so on).


Data from the electricity database are then passed to a graph database. Generally, a graph database consists of nodes (e.g., subsystems) and the relationship between nodes or sources of data used by each node. In alternate embodiments, the graph database is populated by information received directly from the edge. Advantageously, the graph database may be used for summary information or for investigation of data.


The graph database preferably contains complex information in addition to the time series information. For example, the graph database may contain information associated with the hierarchy of electrical distribution system 120 (i.e., smart meter 109, breaker panel 115, pseudo breakers 113, smart plugs 111, and smart equipment 112. The graph database may also contain information about the structure location, rooms or units within the structure, equipment without telecom or breaker functionality, and sensors and controllers for non-electrical systems such as water and gas.


Among the functions of the graph database are the maintenance of the addresses of the subsystems of risk management system 100, subsystems of electrical distribution system 120, sensors and other equipment for tracking purposes.


Other data storage includes lists of inhabitants and pets, which allows for tracking who has left the building in the event of an emergency, logs of edge subsystems status, commands issued and received, notifications sent and sensor values, relationships with weather and other warning services, and prescriptions.


The databases needed for the particular embodiment of system 100 may be established and maintained on cloud 102, or may be established locally, and maintained by building server 103 and/or unit server 105. In one particular embodiment of system 100, cloud service 100 also manages the storage of the templates associated with the subsystems of system 100, and the electrical apparatus linked to those subsystems.


Some exemplary databases, which may be used in system 100, include a graph database, such as the Neo4j graph database, for managing data representing the electrical distribution system 120 and the various subsystems of system 100. This, in general, a graph database has the significant advantage of being very suitable for representing hierarchical or inconsistent combinations of edge subsystems and circuits is schema-less, which permits dynamic changing of the system 100 structure on an ad hoc basis for adds and subtractions of subsystems. In addition, a graph database provides the ability to manage data in buildings or units of buildings with different electrical distribution, networking and sensor architectures.


An SQL database, such as a Postgress SQL database, is suitable for the logs. Time series analysis may be implemented using Mango or similar tool, as configured for monitoring sensor data. In addition, various known graphical tools may be included for automated representation of the structure and electrical system 120 on user interface 120.



FIG. 5 depicts a representative graph database showing how an implementation of system 100 can operate on either actual data from actual edge subsystems connected to an actual electrical distribution system or from test data from a test bed simulating edge subsystems and an electrical distribution system. More specifically, the left-hand network shows simulated electricity, state data, and messaging flows generated by a test bed and the right-hand network shows electricity, state data, and messaging flows generated by actual edge subsystems and an actual electrical distribution system. In each case, data are reported to a centralized node on cloud 102. (FIG. 5 does not show electricity usage or spike/arc information being flowed up to a server (e.g., building server 103 or unit server 105) or cloud as this is assumed to be a separate reporting path.)


Table 9 sets out a representative data model in terms of graph database objects for one particular exemplary embodiment of system 100.


Depending on the particular embodiment of system 100, policies, triggers, electrical spike identifications, and so on, may be updated in different ways, including automated, human, and hybrid approval processes. An exemplary updating process is shown in example is shown in FIG. 6.


At Block 601, source data are collected from various end points within system 100, such as smart plugs 111, equipment 112, pseudo-breakers 113, sensors 110 and 114, breaker panel 115, and breakers 117. The collected information is processed, at Block 602, by the local processing device (e.g., the controllers internal to smart plugs 111, equipment 112, pseudo-breakers 113, breakers 117, and breaker panel controller 115).


Depending on the result generated by the local processing device, a policy may be executed immediately by the local processing device, when an urgent action is required (Block 603). Otherwise, at Block 604, the information is passed to a higher level or upstream subsystem (e.g., from a breaker 117 to breaker panel controller 116, or from breaker panel controller 116 to unit server 105). If the response time from the next highest processing device in the hierarchy is inadequate or the communications fail, at Block 605, then the information is passed to an alternate subsystem (e.g., from a breaker 117 to unit server 105).


At Blocks 606 and 607, analytics are performed in real time, or close to real time, for decision making. As discussed above, analytics are preferably executed by cloud service 101, although they could also be executed by building server 103, unit server 105, or an external processing system. In executing analytics, a number of information resources may be invoked, as shown in Block 608. Exemplary information resources include, a human data scientist using statistical tools, neural networks, machine learning techniques, rule based expert systems, statistical pattern recognition, induction, regression modeling, and multivariate analysis. (Commercially available tools include Angoss Knowledge Seeker and BeyondCORE).


Generally, the goal is to establish relationships between pieces of information and prioritize the most significant relationships. The analysis of the relationship between various pieces of data advantageously helps increase the accuracy of determining when conventional equipment or apparatus (i.e., without communications capabilities) are attached to the network. For example, signal processing of information on the variation in electricity spikes can be associated with information about equipment attached to circuits, regions of circuits, plugs, smart power bars, and inventoried equipment attached to the network. Deterioration in equipment energy efficiency can also be identified with such approaches.


Based on the results of the analytics, policies, triggers, notifications, and other system 100 parameters are updated at Block 609.


Potential policies can be run in test in parallel to actual policies, using a test bed feature. The test bed functionality provides a virtual representation of the actual system including virtual versions of system 100 and electrical distribution network 120. Elements of the virtual system 100 and/or virtual electrical distribution network 120 can be changed, e.g. parameters, policies, source data, etc., for testing purposes. The testbed information can be edited, saved, duplicated, etc. and published to the operating system 100 when approved by administrator. (The test bed functionality is shown in the left-hand network of FIG. 5).


The presentation of data on user interface 118 and mobile device 122 can vary from embodiment to embodiment of system 100. FIGS. 7A-7E provide examples of possible graphical user interfaces for reference.


An exemplary dashboard 700 on the display of user interface 118 is shown in FIG. 7A. A panel 701 allows the user to switch between dashboard 700 and a configuration window. Panel 701 also indicates that a Type-2 notification (discussed below) has been issued.


Window 702 provides information concerning the power consumption by the subsystems and edge apparatus connected to electrical distribution system 120. Notification activity is indicated in a panel 703. In the example of FIG. 7A, notification panel 703 indicates the type of alert sent (e.g., SMS, email, or both), the alert code (i.e., the urgency of the notification, such as informational, a warning, a danger), a description of the triggering event itself (e.g., stove left on for 6 hours), and a link to the information log associated with the notification. A further panel 704 may be provided for presenting additional information, as required.


A representative configuration dashboard 705 is shown in FIG. 7B, which allows for the input of configuration data as discussed above in conjunction with FIG. 3 and Tables 7 and 8.



FIG. 7C illustrates a Type-2 message pop-up on the display of user interface 118. In this example, the Type-2 message indicates that a policy is about to take an automatic action (e.g., cut electrical power to the stove) unless the user actively overrides the automatic action.



FIG. 7D illustrates an exemplary window on the display of either user interface 118 or mobile device 122 showing an email message providing information regarding an emergency event, including information indicating the location of the emergency, an automatic actions taken, the status of people and property at the location, and the notifications issued.


A representative message sent to mobile device 122 indicating that system 100 has take an automatic action is shown in FIG. 7E.


Remote operations can be initiated and managed through a system or device such as mobile device 122 and remote management API. Generally, the API provides mechanisms for external systems to communicate with system 100, request information, or issue commands using the available policy, notification, triggers, and prescriptions. The remote management API can also be used with the test bed system as part of a two stage testing and publishing process. Conversely, through the remote management API, system 100 can also request information and send commands to third party APIs, which are cooperating or exchanging information with system 100, are being managed by system 100, or are managing system 100.


The remote management API, for example, may perform such specific tasks as:

    • 1. Request a value of specific state or states in specific subsystem or edge apparatus, sensor, event, policy, prescription, trigger, or log;
    • 2. Send one or more commands to one or more subsystems or edge apparatus;
    • 3. Reset one or more subsystem or edge apparatus to factory default values;
    • 4. Backup one or more subsystem or edge apparatus states, triggers, or policy and notification templates;
    • 5. Restore backup to specific subsystem or edge apparatus;
    • 6. Put a subsystem or edge apparatus in a test mode and designate test bed destination address;
    • 7. Publish test bed settings to a subsystem or edge apparatus;
    • 8. Restore previous version of settings to designated subsystem or edge apparatus;
    • 9. Schedule a series of policy, notification, trigger, and prescription changes;
    • 10. Execute a test suite;
    • 11. Initiate a live test with notifications modified to indicate that the message is a test message;
    • 12. Change the primary communications network;
    • 13. Change backup communications network;
    • 14. Disable soft break;
    • 15. Disable hard break;
    • 16. Restart soft break; and
    • 17. Change mesh network link priority.


Analytics performed by one or more of cloud service 101, building server 103, and unit server 105 allow for an individual or entity, including a user, owner, manager, or insurance company to evaluate the risk presented by the systems within the structure monitored and controlled by system 100. The ability to monitor and mitigate risks is generally a function of the number, type, and embedded capabilities of sensors 110 and 114, smart plugs 112, equipment 112, breakers panel 115, and breakers 117. Hence the monitoring and mitigation capacity of system 100 is flexible and will vary from embodiment to embodiment.


Some representative factors that may be used during risk assessment include:

    • 1. Lives at risk: The number of lives at risk at the current point in time in building (Risk scored based on number of people);
    • 2. Value at Risk: The dollar value of potential damage (Risk scored by dollar value);
    • 3. Technology Coverage Risk: The coverage of the structure by the particular embodiment of system 100, such as the number of branch circuits covered by breaker panel 115 and breakers 117, the number of pseudo-breakers 113, and the number and type of sensors 110 and 114 (Risk scored as very high, high, medium, low, or very low);
    • 4. Adjacency Risk: Proximity or sharing with other owners, tenants, renters (Risk scored as very high, high, medium, low, or very low);
    • 5. Exogenous Risk: Presence of nearby high risk sources, such train tracks, explosive or toxic inventories, and production operations (Risk scored as very high, high, medium, low, or very low);
    • 6. Setup Risk: Completeness of setup and validation of system 100 and each of its subsystems (Risk scored as very high, high, medium, low, or very low);
    • 7. Security Risk: Completeness and setup of users and permissions (Risk scored as very high, high, medium, low, or very low);
    • 8. Event Type Risk: Rating of degree of risk for different risk types (Risk scored as very high, high, medium, low, or very low);
    • 9. Notification Risk: Sufficient redundancy in user notification and methods of communication;
    • 10. First Responder Risk: Successful set up and enablement of first responder notification policies, access and redundant communications (Risk scored as very high, high, medium, low, or very low);
    • 11. Policy Risk: Strength of pre-programmed automated responses (Risk scored as very high, high, medium, low, or very low);
    • 12. Equipment Risk: Incremental risk from high risk or old equipment, e.g., welding on site, gas vs. electricity (Risk scored as very high, high, medium, low, or very low);
    • 13. Manual risk reduction: On premise staffing, fire extinguishers, and so on (Risk scored as very high, high, medium, low, or very low);
    • 14. Mitigation Action Response Success: Based on historical data quantifying and qualifying the success in mitigating the risk by risk management system 100 or a similar system for a similar structure. (Success scored as very high, high, medium, low, or very low);
    • 15. Recommendation Compliance: Based on historical data quantifying and qualifying the compliance of the user of system 100 or a similar system with recommendations made by system 100 (Success scored as very high, high, medium, low, or very low); and
    • 16. Automated Action Success: Based on historical data quantifying and qualifying the success of automated actions taken by system 100 or a similar system for a similar structure to mitigate risk (Success scored as very high, high, medium, low, or very low).


From the risk factors used in the particular embodiment of system 100, a risk score is calculated by the subsystem performing the risk analytics (e.g., cloud service 101, building server 103, and/or unit server 105). The risk score, for the illustrated embodiment, is based on a numerical assignment to each level of risk based on a 100 point scale. For example, very high risk is scored at 100, a high risk is scored at 80, a medium risk is scored at 60, a low risk is scored at 40, and a very low risk is scored at 20. For actions such as mitigation response success, recommendation compliances, and automated action success, a reverse scale may be applied, wherein, for example, very low success rate is scored at 100, a low success rate is scored at 80, a medium success rate is scored at 60, high success rate is scored at 40, and very high success rate is scored at 20.


As shown in Table 8, one or more signs of problems might interact in the illustrated embodiment of system 100 for a number of representative situations. The example shown in Table 8 does not cover the situation where there is conflicting information from different information sources.


In this case, the importance of each input is compared to arrive at a conclusion. For example, for two conflicting inputs, the conclusion could be no problem, conflicting information, one strong one weak opposing sign, one weak sign, one opposing strong sign. As the number of inputs rises, the combinatorial complexity increases and rules for dispute resolution are provided in the system 100. The rules can evolve over time in response to manual or automated analysis of notifications, actions, outcomes and user feedback. The ability to have rules that consider multiple sensors can be useful. For example, with battery charging for a hybrid or electrical vehicle, measuring both the existence of charging and the status of the battery being charged is more useful than just knowing that the battery is being charged.


A Persona is a widely used approach for describing different types of users. It typically includes a description of the prototypical Persona background, skill level, knowledge and goal(s) that may vary depending upon a wide variety of factors. Persona definitions may vary depending on the particular embodiment of system 100 in place, as well the nature of the housing, buildings, commercial and industrials/transportation infrastructure. For the purposes of this description, a Persona requirement can be used to present the minimum information necessary for allowing fast and effective achievement of goals and shapes the user interface screens.


Table 10 illustrates a typical set of personas participating in the design, setup, management, and use of system 100.


In sum, the principles of the present invention take advantage of information from sensors, intelligent control devices and equipment, smart breaker devices, in-unit/building/infrastructure controller(s) and external services at data centers or in the cloud to provide more granular data on electricity usage. These more granular data meet the more demanding requirements of hazard risk management, as well as allow for the identification of problems such as leakage, overconsumption, and system inefficiencies. The ultimate goals are to reduce risk, minimize the impact of hazardous events when they do occur, and save time and money.


Although the invention has been described with reference to specific embodiments, these descriptions are not meant to be construed in a limiting sense. Various modifications of the disclosed embodiments, as well as alternative embodiments of the invention, will become apparent to persons skilled in the art upon reference to the description of the invention. It should be appreciated by those skilled in the art that the conception and the specific embodiment disclosed might be readily utilized as a basis for modifying or designing other structures for carrying out the same purposes of the present invention. It should also be realized by those skilled in the art that such equivalent constructions do not depart from the spirit and scope of the invention as set forth in the appended claims.


It is therefore contemplated that the claims will cover any such modifications or embodiments that fall within the true scope of the invention.


APPENDIX












TABLE 1





Trigger
Sensing





Condition
Subsystem
Action
Notification
Analysis







Pattern of
Pseudo-
If risk crosses policy
Recommended
Time series


arc faults
breaker 113
threshold, initiate soft trip of
change in
analysis of



Circuit Breaker
at least one circuit breaker
status for
temperature



117
117.
corresponding
rise, demand




When available, combine
branch circuit
for electricity,




data on pattern of arc faults
121, smart
and/or spike




with temperature rise and
plugs 111,
information




fall data.
and/or
from




Generate recommended
equipment 112
subsystem




change in status for

on-off




corresponding branch

transitions.




circuit 121, smart plugs

Associate




111, and/or equipment 112

recommended




from pattern of arc faults

actions with




and temperature data:

time series




manual check

analysis.




change in usage pattern

Save pattern




disconnection

of arc faults




replacement.

for






benchmarking






and






improvement






of arc fault






signatures.


Smoke
Internal
Depending on the location
Those
Associate pre-


detected and
Sensors 114:
of the smoke and
designated in
conditions for


temperature
smoke
temperature rise:
notification
event trigger


of
detector.
Switch off entire breaker
template for
for future


electrical
electrical
panel 115.
this class of
analysis of


circuit higher
line
Switch off individual
event.
time series


than normal.
temperature
smart plugs 111,

events.



sensor.
equipment 112 and/or

Access risk to



Breakers
circuit breakers 117.

adjacent units



117.
Depending on the severity

in multi-tenant/




of the event, policy can be

multi-unit




recommended or

buildings.




automatic.


Natural gas
Internal
Depending on the location
Those
Associate pre-


supply
Sensors 114:
and severity of the event:
designated in
conditions for


anomaly,
Natural gas
Switch off gas supply
notification
event trigger


such as leak
detectors.
immediately.
template for
for future


detected,
Associated
Notify gas utility for
this class of
analysis of


unusual flow,
with gas
upstream switch off of
event.
time series


leak
distribution
gas supply.

events.


detected in
system.
Switch off entire breaker

Access risk to


specific

panel 115.

adjacent units


location on

Switch off individual

in multi-tenant/


property.

smart plugs 111,

multi-unit




equipment 112 and/or

buildings.




circuit breakers 117.


Change in
External
If risk crosses policy
Recommended
Event


natural gas
Sensors 110:
threshold, initiate soft
change in
recorded and


risk on
Natural gas
trip of at least one circuit
status for
correlated


adjacent
detectors.
breaker 117 associated
corresponding
with other


property.
Associated
with particular rooms or
circuit 121,
information for



with gas
areas.
smart plugs
future



distribution
Generate recommended
111, and/or
predictions



system.
change in status for
equipment 112
regarding the




corresponding branch
Notifications to
likelihood of




circuit 121, smart plugs
neighbor/
the same or




111, and/or equipment 112.
adjacent
similar event





property owner
occurring.





based on





notification





template.


Flood
External
Depending on the location
Those
After event


warning or
Sensors 110:
of the detected water:
designated in
collection of


detection of
Water
Switch off entire breaker
notification
information


water in
outside
panel 115 for
template for
about flooding


building/
building.
designated period of
this class of
severity for


infrastructure
Water on
time
event.
assessing



adjacent
Switch off individual

restoration of



property.
smart plugs 111,

electrical



Internal
equipment 112 and/or

power.



Sensors 114:
circuit breakers 117

Analysis



Water.
associated with

preferably



Communicated
particular rooms or

done by cloud



flood warnings
areas

service 101 if




Depending on the severity

electricity




of the event, policy can be

disrupted




recommended or




automatic.


Earthquake
Communicated
Depending on the event:
Those
After event


on short
warnings.
Switch off entire breaker
designated in
collection of


warning
External
panel 115 for
notification
information


(<one minute).
Sensors 110:
designated period of
template for
about flooding


Series of
Ground
time
this class of
severity for


earthquakes
motion
Switch off individual
event.
assessing


detected.
outside
smart plugs 111,

restoration of



building.
equipment 112 and/or

electrical



Ground
circuit breakers 117

power, gas,



motion on
associated with

and water.



adjacent
particular rooms or

Analysis



property.
areas.

preferably



Internal
Shut off natural gas

done by cloud



Sensors 114:
supply.

service 101 if



Structural
Shut off water supply.

electricity



motion
Depending on the severity

disrupted.




of the event, policy can be




recommended or




automatic. Automatic




action preferred in the




event of a short warning.

















TABLE 2





Action
Subsystems Invoked







Recommend buying action, e.g.,
Cloud service 101


change utility company, chance
Building Server 103/Unit Server 105


utility pricing program, replace
Pseudo-breakers 113


equipment.
Breaker panel controller 116



Breakers 117


Recommend usage change to
Cloud service 101


reduce hazard risk.
Building Server 103/Unit Server 105



Breakers 117


Recommend maintenance,
Cloud service 101


replacement or inspection
Building Server 103/Unit Server 105


actions.
External sensors 110



Internal sensors 114



Breakers 117



Equipment 112


Recommended policy change for
Cloud service 101


risk management.
Building Server 103/Unit Server 105



Internal sensors 110



Smart plugs 111



Equipment 112



Pseudo-breakers 113



Breaker panel controller 116



Breakers 117


Suggest immediate action to
Cloud service 101


mitigate hazard risk or reduce
Building Server 103/Unit Server 105


energy usage.


Suggest immediate action to
Cloud service 101


mitigate hazard risk or to reduce
Building Server 103/Unit Server 105


energy usage with move to


automated action within specified


time window.


Automated Immediate Action to
Cloud service 101


address emergency, mitigate
Building Server 103/Unit Server 105


risk, or reduce energy usage.
Smart plugs 111



Pseudo-breakers 113



Equipment 112



Internal sensors 110



Breaker panel controller 116



Breakers 117


Automated Action and First
Cloud service 101


Responder Notification to
Building Server 103/Unit Server 105


address emergency.


Automated Action, First
Cloud service 101


Responder Notification, and
Building Server 103/Unit Server 105


Adjacent Notifications to address
External sensors 110


notification.


Prescription.
Cloud service 101



Building Server 103/Unit Server 105



Smart plugs 111



Pseudo-breakers 113



Equipment 112



External sensors 110



Internal sensors 114



Breaker panel controller 116



Breakers 117























TABLE 3





Event
Alt 1
Alt 2
Alt 3
Alt 4
Alt 5
Alt 6
Alt 7







Arc fault
Ignore/
Soft
Hard
Soft break
Add to
Compare
Look for



Notification
break
break
with timer
analysis
to bench-
related



Only


interval set
time series
marks
sensor and









messaging









activity


Ground fault
Ignore/
Soft
Hard
Soft break
Add to
Compare
Look for



Notification
break
break
with timer
analysis
to bench-
related



Only


interval set
time series
marks
sensor and









messaging









activity


Lightning pre-
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


strike
Notification
break
break
shutdown
equipment
plug
power bar


detection
Only



shutdown
shutdown
shutdown


Circuit
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


temperature
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Smoke and
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


fire
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Flooding,
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


internal
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Equipment
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


vibration
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


CO2
Ignore/
Soft
Hard
Building
Specific
Specific
Specific



Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


CO
Ignore/
Soft
Hard
Building
Specific
Specific
Specific



Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Radon
Ignore/
Soft
Hard
Building
Specific
Specific
Specific



Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Ground
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


movement
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Ground
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


movement
Notification
break
break
shutdown
equipment
plug
power bar


multiple
Only



shutdown
shutdown
shutdown


earthquakes


















TABLE 4





Category
Use Case
Factors Considered







Notification
Fire prevention
Smoke detectors, temperature of circuit, arc or ground




fault, gas leak, adjacent risk, predicted extreme weather,




predicted lightning strike


Notification
Fire notice
Fire alarm, smoke detector, temperature, circuit




temperature, electrical circuit or plug off line


Notification
Occupant and
Inventory of occupants and pets in system 100 system,



pet status notice
mobile app for reporting exits from building, accessible to




first responders


Notification
Difficult to detect
Recommendation based upon pattern recognition



problem
applied to faults, usage and adjacent data


Notification
Multi-factor
Elevated risk rating due to multiple signs of problem



problem


Notification
Earthquake
Automatic mitigation based upon short lead time



notification short
earthquake notification



lead time


Notification
Recommended
Recommendation based upon series of earthquakes and



earthquake
predicted risk of earthquakes of particular size



series mitigation


Notification
Non-electrical
Report that sensor reading is out of tolerances, or



system sensor
prescription requirements not being filled


Notification
Pipes at risk
Notification that trend or current temperature in building




temperature may threaten expensive pipe freezing and




breakage


Notification
Pets at risk
Notification that trend in building temperature may




threaten expensive pipe freezing and breakage


Notification
People and pets
Listing of building people and pet occupants



at risk report


Notification
Priority item
List of key items for removal in emergency and their



removal
location


Notification
Initiate backup
Risk profiles suggests immediate back up of data on one




or more devices


Notification
Paranoid parent
Unusual pattern of electricity or sensor readings



report
suggests problem at home, e.g. leaving electric stove on,




gas leak, too many lights on, electric or hybrid vehicle




not charging, electrical system has too many trips, etc.


Notification
Mitigation report
Recent automated and manual mitigation activities


Notification
Mitigation history
Log of automated and manual mitigation activities



report


Notification
Costing by circuit
Cost of electric consumption by circuit sent on request or




according to a schedule


Notification
Costing by plug
Cost of electric consumption by plug sent on request or




according to a schedule


Notification
Costing by
Cost of electric consumption by piece of equipment or



equipment
grouping of equipment items on a plug or circuit sent on




request or according to a schedule


Notification
Demand
Automatic demand response energy reduction for given



response action
time period



report


Notification
Graceful
Recent circuit, plug or equipment energy reduction



degradation
actions made



report


Notification
First responder
Notifications to first responders (commercial services or



actions taken
public services) plus responses from services and




actions taken, status of people and pet removal from




building/unit


Notification
Equipment
Equipment efficiency by period and trend



efficiency report


Notification
Recommended
Recommended notification



servicing action


Notification
Estimated
Recommended service plus predicted cost savings



savings from



servicing


Notification
Filter
Recommended replacement plus predicted cost saving



replacement



recommendation

















TABLE 5A





Status
Possible States







Event
Event/No Event


Automated remediation
Executed, Pending, None


Notification
Notified with confirmation, notified



with no confirmation, not notified


Manual Remediation
Executed, pending, rejected


Risk Level
100 point scale


Setup
100 point scale


Security and permissions setup
100 point scale


Individual equipment
Working and communicating, working,



and not communicating


Analytics
Completed, not completed


Pending recommendation
For each recommendation, accepted,



pending, rejected


Backup
Setup and current, setup and not



current, not setup


Recent Test
Acceptable, not acceptable


Recent communications test
Acceptable, not acceptable


Stakeholder queue
For each stakeholder, notification status


First responder
Setup, setup and tested, setup tested and



in communication

















TABLE 5B





Status
Possible States







Event
Event/No Event


Automated remediation
Executed, Pending, None


Notification
Notified with confirmation, notified with



no confirmation, not notified


Manual Remediation
Executed, pending, rejected


Risk Level
100 point scale


Setup
100 point scale


Security and permissions
100 point scale


setup

















TABLE 5C





Status
Possible States







Event
Event/No Event


Automated remediation
Primary network functioning, second



network substituted, no network working


Notification
Network status communicated to cloud and



controller/server, not communicated


Risk Level
100 point scale


Individual equipment
Working and communicating, working, and not



communicating

















TABLE 5D





Status
Possible States







Event
Circuit event yes/no


Automated remediation
Hard trip status yes/no; soft trip status yes/no


Notification
Communicated, not communicated


Manual Remediation
Executed, pending, rejected


Risk Level
100 point scale


Individual equipment
Working and communicating, working, and not



communicating

















TABLE 5F





Status
Possible States







Event
Circuit event yes/no


Automated
Event code type: arc faults, multiple arc faults, ground


remediation
faults, lightning, temperature, natural gas, gas mains,



smoke, multiple circuit arc faults, multiple circuit multiple



arc faults, multiple circuit lightning, multiple circuit



temperature, multiple circuit natural gas, multiple circuit



gas mains, multiple circuit smoke, adjacent arc faults,



adjacent multiple arc faults, adjacent ground faults,



adjacent lightning, adjacent temperature, adjacent



natural gas, adjacent gas mains, adjacent smoke


Notification
Communicated, not communicated


Manual
Executed, pending, rejected


Remediation


Risk Level
100 point scale


Individual
Working and communicating, working, and not


equipment
communicating



















TABLE 5G







Status
Possible States









Event
Mobile device active or inactive



Notification
Communicated, not communicated



Risk Level
100 point scale




















TABLE 6






Second Source
Second Source
Second Source


First Source
Detection -
Detection - Increased
Detection Potentially


Detection
Neutral
Risk
Large Increase In Risk







Arc Fault
CO2
Arc Fault




CO
Ground Fault



Radon
Lightning Pre-strike




conditions




Circuit Temperature




Smoke and Fire




Flooding (Internal)




Equipment Vibration




Ground Movement


Ground Fault
CO2
Arc Fault



CO
Ground Fault



Radon
Lightning Pre-strike




conditions




Circuit Temperature




Smoke and Fire




Flooding (Internal)




Equipment Vibration




Ground Movement


Lightning Pre-
CO2
Arc Fault


strike conditions
CO
Lightning Pre-strike



Radon
conditions



Ground Fault
Flooding (Internal)



Circuit
Equipment Vibration



Temperature
Ground Movement



Smoke and Fire


Circuit
CO2
Ground Fault
Arc Fault


Temperature
CO
Flooding (Internal)
Circuit Temperature



Radon
Equipment Vibration
Smoke and Fire



Lightning Pre-
Ground Movement



strike conditions


Smoke and Fire
CO2
Ground Fault
Arc Fault



CO
Circuit Temperature
Circuit Temperature



Radon
Smoke and Fire
Smoke and Fire



Lightning Pre-
Flooding (Internal)



strike conditions
Equipment Vibration




Ground Movement


Flooding
CO2
Arc Fault
Lightning Pre-strike


(Internal)
CO
Ground Fault
conditions



Radon
Smoke and Fire
Flooding (Internal)




Circuit Temperature




Equipment Vibration




Ground Movement


Equipment
CO2
Arc Fault


Vibration
CO
Ground Fault



Radon
Lightning Pre-strike



Ground Fault
conditions



Circuit
Circuit Temperature



Temperature
Smoke and Fire



Smoke and Fire
Flooding (Internal)




Equipment Vibration




Ground Movement


CO2
Arc Fault



Ground Fault



Lightning Pre-



strike conditions



Circuit



Temperature



Smoke and Fire



Flooding (Internal)



Equipment



Vibration



Ground Movement



CO2



CO



Radon


CO
Arc Fault



Ground Fault



Lightning Pre-



strike conditions



Circuit



Temperature



Smoke and Fire



Flooding (Internal)



Equipment



Vibration



Ground Movement



CO2



CO



Radon


Radon
Arc Fault



Ground Fault



Lightning Pre-



strike conditions



Circuit



Temperature



Smoke and Fire



Flooding (Internal)



Equipment



Vibration



Ground Movement



CO2



CO



Radon


Ground
CO2
Arc Fault
Ground Movement


Movement
CO
Ground Fault



Radon
Lightning Pre-strike




conditions




Circuit Temperature




Smoke and Fire




Flooding (Internal)




Equipment Vibration




Ground Movement


















TABLE 7





Epic Short




Name
Epic Description
Possible States







Subsystem
Setting up system to recognize subsystems
Factory Default, User



to be monitored
Default, Edited,




Published (Current)


Subsystem
Setting up subsystem controller account and
Factory Default, User


Controller
user level
Default, Edited,


Account

Published (Current)


Delegation
Setting up controller delegation on individual
Factory Default, User


Switch
subsystem and subsystem policies.
Default, Edited,




Published (Current)


Cloud -
Link subsystem controller to cloud account
Factory Default, User


Subsystem
and setting up syncing parameters.
Default, Edited,


Controller

Published (Current)


Account


Subsystem
Security permissions set up and modification
Factory Default, User


Security

Default, Edited,




Published (Current)


Reporting -
Reporting - querying status of system for
Factory Default, User


System Status
building approval or by general user
Default, Edited,




Published (Current)


Reporting -
Reporting - querying status of system for
Factory Default, User


Subsystem
subsystem monitoring with reporting to
Default, Edited,



building manufacturer, service provider or
Published (Current)



contractor/reseller.


Event Policy
Policy setting for managing system, including
Factory Default, User



setting of soft trip limits.
Default, Edited,




Published (Current)


Subsystem
Editing of subsystem in system including
Factory Default, User


Orchestration
enabling, disabling, or changing specific
Default, Edited,



subsystem policies.
Published (Current)


Smoke/Fire
Smoke/fire source listing, status listing,
Factory Default, User


Event
notification policy, contactee information and
Default, Edited,



availability
Published (Current)


Electrical Event
Electrical problem policy setting, notification
Factory Default, User



policy, contactee information and availability
Default, Edited,




Published (Current)


Earthquake
Earthquake event policy setting, notification
Factory Default, User


Event
policy, contactee information and availability
Default, Edited,




Published (Current)


Radon Event
Radon event policy setting, notification policy,
Factory Default, User



contactee information and availability
Default, Edited,




Published (Current)


CO/CO2 Event
CO/CO2 or other gas (excluding natural gas)
Factory Default, User



event policy setting, notification policy,
Default, Edited,



contactee information and availability
Published (Current)


Temperature
Temperature event policy setting, notification
Factory Default, User


Event
policy, contactee information and availability
Default, Edited,




Published (Current)


Natural Gas
Natural event policy setting, notification
Factory Default, User



policy, contactee information and availability
Default, Edited,




Published (Current)


Add New Sensor
New sensor event policy setting, notification
Factory Default, User


Type
policy, contactee information and availability
Default, Edited,




Published (Current)


Adjacent Policy
Adjacent policy setting for building potentially
Factory Default, User



affected by specify problem
Default, Edited,




Published (Current)


Arc Fault Policy
Risk rating framework for arc fault
Factory Default, User




Default, Edited,




Published (Current)


Arc Series Fault
Risk rating framework patterns of arc fault
Factory Default, User


Policy

Default, Edited,




Published (Current)


Ind Equip Policy
Risk rating framework for specific piece of
Factory Default, User



subsystem
Default, Edited,




Published (Current)


Equip Arc Fault
Risk rating framework for combinations of
Factory Default, User


Matrix Policy
subsystem and arc fault interactions
Default, Edited,




Published (Current)


Earthquake
Risk rating framework for earthquake
Factory Default, User


Policy

Default, Edited,




Published (Current)


Radon Policy
Risk rating framework for radon
Factory Default, User




Default, Edited,




Published (Current)


CO/CO2 Policy
Risk rating framework for CO/CO2
Factory Default, User




Default, Edited,




Published (Current)


Temperature
Risk rating framework for temperature with
Factory Default, User


Policy Matrix
different policies for different parts of
Default, Edited,



electrical system and different location in
Published (Current)



home, different subsystem, etc.


Natural Gas
Risk rating for natural gas detection,
Factory Default, User


Policy Matrix
measurement of natural gas flow, varying by
Default, Edited,



location and co-location of subsystem
Published (Current)


Notification
Notification policy for different events
Factory Default, User


Policy Template

Default, Edited,


Definition

Published (Current)


Trigger
Notification templates for triggering by
Factory Default, User


Definitions
different events including whom to notify, how
Default, Edited,



fast to notify, obtaining confirmation of
Published (Current)



notification, second tier notifications,



triggering of automated responses,



notification around automated reponses


Automated
Triggers (sets of conditions) for automated
Factory Default, User


Trigger Criteria
mitigation actions including soft breaks and
Default, Edited,



hard breaks
Published (Current)


Soft Restart
Reset polices and criteria for restarting soft
Factory Default, User


Policy
breaks
Default, Edited,




Published (Current)


Maintenance
Rules for identifying patterns of arc faults,
Factory Default, User


Rules
subsystem problems, preemptive
Default, Edited,



maintenance, removal or replacement of
Published (Current)



wiring, breakers, subsystem, etc.


Subsystem
Subsystem check.
Factory Default, User


Check

Default, Edited,


Procedure

Published (Current)


Subsystem
System reboot. Subsystem reboot.
Factory Default, User


Reboot

Default, Edited,




Published (Current)


Backup and
System backup and restore. Individual piece
Factory Default, User


Restore
of subsystem back-up and restore.
Default, Edited,




Published (Current)


Device
Register subsystem on network, machine


Registration
address, IP address


Device
Search for subsystem on network


Discovery and


Inventory


Check for
Send message to device to verify version of


Firmware
firmware and update firmware if required


Updates


Test
Ping subsystem on network to test for ability


Communication
to exchange information


Network


Test Backup
Use backup network to test sending


Network
commands and receiving data


Test Mesh
Run test on network which removes elements


Network
of network forcing use of different link path


Test Pseudo
Test messaging and delegation from pseudo-


Breaker
breaker to see that tripping is fired on


Delegation
delegated subsystem


Test Notification
Run a test of the notification template with


Templates
actual recipients or to a testbed gathering



point for emails, instant messages and voice



calls.


Test Sample
Put subsystem in test mode, send sample


Events
data and trap responses at testbed


Test Sensors
Put sensor in test mode and send back



sample information


Test Internet
Run notification templates to testbed or


Notifications
actual recipients


















TABLE 8





Epic Short




Name
Epic Description
Possible States







Parameter
Editing parameters in subsystems to change
Factory Default, User


Tuning -
tolerances and sensitivities
Default, Edited,


Sensitivities

Published (Current)


Parameter
Editing Internet notification policies
Factory Default, User


Tuning - Internet

Default, Edited,


Sources

Published (Current)


Report - Risk
Create risk profile report for one-time or
Factory Default, User


Profile
scheduled use.
Default, Edited,




Published (Current)


Test - Risk
Create prototype report with current data
Factory Default, User


Profile Report

Default, Edited,




Published (Current)


Report - Time
Create report for designated risks over time
Factory Default, User


Series on Risk

Default, Edited,




Published (Current)


Report - Circuit
Usage, risk and spike information over
Factory Default, User


Specific
requested time period
Default, Edited,




Published (Current)


Report - Smart
Usage, risk and spike information over
Factory Default, User


Plug
requested time period
Default, Edited,




Published (Current)


Report - Smart
Usage, risk and spike information over
Factory Default, User


Powerbar
requested time period
Default, Edited,




Published (Current)


Report - Ind
Usage, risk and spike information over
Factory Default, User


Equip/Appliance
requested time period
Default, Edited,




Published (Current)


Report - Arc
Categorizations of repeating or evolving arc
Factory Default, User


Fault Pattern
faults
Default, Edited,


Recognition

Published (Current)


Report - Usage
Using pricing plan information, rule based
Factory Default, User


Pattern
recommendations on savings and safety
Default, Edited,


Recommendation

Published (Current)


Report - Pricing
Comparison of usage information between
Factory Default, User


Model
different pricing plans or different electricity
Default, Edited,


Recommendation
suppliers
Published (Current)


Configure
Identify high priority circuits for particular time
Factory Default, User


Graceful
periods or for different extreme events
Default, Edited,


Degradation by

Published (Current)


Circuit


Configure
Identify high priority plugs for particular time
Factory Default, User


Graceful
periods or for different extreme events
Default, Edited,


Degradation by

Published (Current)


Circuit and Smart


Plug


Configure
Identify high priority plugs and/or equipment
Factory Default, User


Graceful
for particular time periods or for different
Default, Edited,


Degradation by
extreme events
Published (Current)


Circuit and Smart


Plug and


Equipment


Switch off
In case of a detected event, have pseudo-
Factory Default, User


Subbranch Using
breaker send message to plugs or equipment
Default, Edited,


Pseudo Breaker
in problem circuit brand to switch off
Published (Current)



electricity supply using a soft or hard trip


Link Utility
Provide access information to controller and
Factory Default, User


Account to
cloud for accessing utility account information
Default, Edited,


Controller
and smart meter information
Published (Current)


Show Allocated
Calculate cost of circuit based upon a
Factory Default, User


Cost By Circuit
designated pricing plan
Default, Edited,




Published (Current)


Show Allocated
Calculate cost of circuits for a specific smart
Factory Default, User


Cost By Circuit
meter connection, assuming multiple smart
Default, Edited,


and Smart Meter
meters
Published (Current)


Show Allocated
Calculate cost of equipment usage using a
Factory Default, User


Cost By
specific pricing plan
Default, Edited,


Equipment

Published (Current)


Compare Pricing
Compare two pricing plans
Factory Default, User


Models

Default, Edited,




Published (Current)


Compare Energy
Compare two energy suppliers and their
Factory Default, User


Suppliers
pricing plans
Default, Edited,




Published (Current)


















TABLE 9





Abstraction
Graph database objects
Notes







Equipment
Smart meter 109
Requires link to one or more




breaker panels


Equipment
Breaker panel 115
Optionally linked to Smart




meter 109


Equipment, controller
Breaker panel controller 116
Operating with breaker


hierarchy

panel 115


Equipment
Breaker
Operating with breaker




panel 115


Equipment
Smart breaker 117
Operating with breaker




panel 115


Equipment, controller
Smart breaker controller
Within breakers 117


hierarchy


Equipment
Clamp on pseudo breaker
Operates with virtualized




breaker functionality of




pseudo-breakers 113


Equipment
Smart plugs 111 with communications



capability


Equipment, controller
Smart plugs 111 with breaker


hierarchy
functionality and communications



capabilities


Equipment
Smart plug 111 with communications



capability only


Equipment
Equipment 112 with communications



capability


Equipment, controller
Equipment 112 with embedded


hierarchy
breaker


Controller hierarchy
Standalone controller


Controller hierarchy
Building Server 103/Unit Server 105


Controller hierarchy
Cloud service 101


Analytics
Analytics package running on at least



one of cloud service 101, building



server 103, or unit server 105


Security
User


Security
User permissions


Security
User notification policies


Security
User contact information
Email, SMS, voice, varying




suppliers for each


Analytics
Utility price plan
Time of day, usage,




demand management, other


Analytics
Information source
Categorized by relevance to




different sensors and events


Sensor
External sensor 110 outside building
Categorized by relevance to



location
different sensors and events


Sensor
Internal sensor 114 external to
Categorized by relevance to



electrical system
different sensors and events


Sensor
Electrical system internal sensor
Categorized by relevance to




different sensors and events


Group membership
Room


Group membership
Outlet


Group membership
Receptacle


Group membership
Powerbar


Group membership
Powerbar plug


Group membership
Equipment category


Priority
Equipment priority


Priority
Receptacle priority


Priority
Outlet priority


Priority
Circuit priority


Priority
Customer priority


Priority
Microgrid priority


Priority
Region priority


Location type
Type of room: residential types,



business types, industrial types,



infrastructure types


Location risk profile
Electrical arc fault, ground fault,



temperature, natural gas, radon, CO2,



earthquake


Location risk profile
Loss of life, property value, business



interruption costs, family interruption,



time period of interruption, insurance



consequences


Location risk profile
Business brand and value cost from



event


Location risk profile
Cost of investigation from event


Location risk profile
Impact upon neighbors costs of event


Location risk profile
Legal costs of event


Location risk profile
Customer impact of event


Location risk profile
Supplier impact of event


Adjacency risk
Condition assessment for spread of



problem from Location A to Location



B internal


External adjacency
Spread of problem from owned/rented



location to third parties


Electricity data time
Electricity consumption total


series


Electricity data time
Electricity consumption for circuit


series


Electricity data time
Electricity consumption by smart plug


series


Electricity data time
Electricity consumption by receptacle


series


Electricity data time
Electricity consumption by individual


series
equipment


Electricity data time
Initial spike pattern


series


Electricity data time
Close spike pattern


series


Electricity data time
Electricity consumption for circuit


series upper and
tolerances


lower bounds


Electricity data time
Electricity consumption by smart plug


series upper and
tolerances


lower bounds


Electricity data time
Electricity consumption by receptacle


series upper and
tolerances


lower bounds


Electricity data time
Electricity consumption by individual


series upper and
equipment tolerances


lower bounds


Electricity data time
Initial spike pattern tolerances


series upper and


lower bounds


Electricity data time
Close spike pattern tolerances


series upper and


lower bounds


Threshold level
Circuit breaker voltage setting


current setting


Threshold level
Circuit breaker hard break setting


current setting


Threshold level
Circuit breaker soft break setting


current setting
current


Threshold levels over
Circuit breaker soft break setting time


time
series


Threshold levels over
Circuit breaker policy time series


time


Threshold level when
Circuit breaker policy setting event


event occurred


Policy template
Circuit breaker policy action



automated


Notification log
Notification activity


Notification log
Post notification event


Event log
Event occurrence


Recommendation
Recommendation


template


Recommendation
Recommendation log


event log


Recommendation
Recommendation status


status log


Sensor
Flood sensor 110/114


Sensor
CO2 sensor 110/114


Sensor
CO sensor 110/114


Sensor
Radon sensor 110/114


Sensor
Equipment vibration sensor 110/114


Sensor
Temperature sensor 110/114


Sensor
Ground movement sensor 110/114


Sensor
Building movement sensor 110/114


Sensor
Wind speed sensor 110/114


Sensor
Pre-lightning strike sensor 110/114


Sensor
Electric or hybrid vehicle in-vehicle



charging sensor 110


Sensor
Charging station sensor 110


Sensor
Unspecified sensor 110/114


Sensor
Home weather station sensor



(multiple types) 110/114


Security
User permissions


Security
Device authentication state


Security
User role type


Security
Authenticated user devices for



communication


Security
Authenticated user contacts email


Security
Authenticated user contacts SMS


Security
Authenticated user voice line


Security
Double authentication of information



exchange with third party one way


Security
Double authentication of information



exchange with third party two way


Supplier
Adjacent party list
List of adjacent parties at




risk from event in user




property


Supplier
Adjacent party list
List of properties sharing




sub-region of utility or




microgrid


Supplier
Utility suppliers major
Major suppliers


Supplier
Utility suppliers local
Local energy generation




providing energy to sub-




region or microgrid


Location risk profile,
Utility network map
Map/listing of local utility


supplier

grid and transmission




hierarchy


Sensor
Smart meter details
Product, location, API, etc.




information for relevant




smart meter


Template
Template
Contact information for




notification


Template
Policy template
Triggers and policies to be




executed, with notifications


Template
Prescription
Set of conditions and




parameters for particular




time period which if not




found should trigger a policy




template(s) and




notification(s)


Template
Trigger
A reusable description of an




action or set of actions


Log
Log
A log of events, actions,




results and user




assessments of events,




actions, and results




including notifications



















TABLE 10





Task
Persona(s)
Key Information
Equipment







Design Configuration
Electrical
Inventory of equipment
All installed



contractor
Location of electrical
subsystems and



Home owner
circuit
edge apparatus




Rooms serviced by




electrical circuit




Smart plugs 111 per




room




Power bars per smart




plug 111




Equipment per




receptacle


Verification of design
Electrical
Matching equipment
All installed



contractor
information and
equipment covered



Building inspector
parameters to building
by building code for



Home owner
code requirements
building inspector,





and all subsystems





and edge





apparatus for other





users


Parameter
Electrical
Policies, triggers,
All subsystem and


adjustment
contractor
prescriptions,
edge apparatus



Home owner
notifications
with policies,





triggers,





prescriptions, and





notifications


On the fly parameter
Utilities
Demand management
Circuit level or


adjustment

programs accepted by
subsystem level




an owner, user, or




authorized party


User authentication
User designated as
Verified contact
Cloud service 101,



administrator
information, including
building server




but not restricted to
103, unit server




phone numbers at
105, or any




particular periods,
subsystem or edge




emails, short messaging
apparatus that can




and instant messaging
originate a




services
notification,





execute or





delegate a policy.


Permission granting
User designated as
Specific individual users
All subsystems and



administrator
and their membership in
edge apparatus in




rights classes. Rights
secure zone.




classes mapped to




subsystems and edge




apparatus


System security and
User designated as
Mapping of subsystem
All subsystems and


authentication
administrator
and edge apparatus
edge apparatus in




addresses, and
secure zone




subsystem and edge
Authorized




apparatus
machines for




authentication.
notification




Encryption token and
receivers




keys


Share information
User designated as
Permission to share
All subsystems and



administrator.
information.
edge apparatus



Authorized
Emergency access for
Authenticated



decision maker in
first responders to
devices for



external
access and/or shutdown
stakeholders.



stakeholders i.e.
components of system
Authenticated



adjacent

external



units/building and

stakeholders



first responders


Receive notifications
User designated as
Authorizes subscription
Cloud service 101,



administrator
to emergency
building server




notification services
103, and/or unit





server 105


Provide template
Publisher,
Provide pre-filled
All subsystems and



manufacturer,
template for import into
edge apparatus



service company,
system to save users
with policies,



contract service
time
prescriptions,



company, utility,

notifications, etc.



building code from



building inspector


Prioritize usage for
Home owner in
Prioritize circuits,
Potentially any


graceful degradation
negotiation with
regions of circuits (using
element in system


or demand response
utility
a pseudo-breaker 113),


management
Contractor in
smart plug 111,


programs
negotiation with
receptacle, smart power



home owner
bar, receptacle on smart




power bar, electricity




consuming device


Notify user of extreme
Any user specified
No action other than
Sensors 110 and


event but confirm no
in notification policy
notification or schedule
114


action scheduled to

for review of information


be taken























TABLE 3





Event
Alt 1
Alt 2
Alt 3
Alt 4
Alt 5
Alt 6
Alt 7







Arc fault
Ignore/
Soft
Hard
Soft break
Add to
Compare
Look for



Notification
break
break
with timer
analysis
to bench-
related



Only


interval set
time series
marks
sensor and









messaging









activity


Ground fault
Ignore/
Soft
Hard
Soft break
Add to
Compare
Look for



Notification
break
break
with timer
analysis
to bench-
related



Only


interval set
time series
marks
sensor and









messaging









activity


Lightning pre-
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


strike
Notification
break
break
shutdown
equipment
plug
power bar


detection
Only



shutdown
shutdown
shutdown


Circuit
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


temperature
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Smoke and
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


fire
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Flooding,
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


internal
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Equipment
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


vibration
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


CO2
Ignore/
Soft
Hard
Building
Specific
Specific
Specific



Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


CO
Ignore/
Soft
Hard
Building
Specific
Specific
Specific



Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Radon
Ignore/
Soft
Hard
Building
Specific
Specific
Specific



Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Ground
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


movement
Notification
break
break
shutdown
equipment
plug
power bar



Only



shutdown
shutdown
shutdown


Ground
Ignore/
Soft
Hard
Building
Specific
Specific
Specific


movement
Notification
break
break
shutdown
equipment
plug
power bar


multiple
Only



shutdown
shutdown
shutdown


earthquakes



















TABLE 6






Second Source
Second Source
Second Source


First Source
Detection -
Detection - Increased
Detection Potentially


Detection
Neutral
Risk
Large Increase In Risk







Arc Fault
CO2
Arc Fault




CO
Ground Fault



Radon
Lightning Pre-strike




conditions




Circuit Temperature




Smoke and Fire




Flooding (Internal)




Equipment Vibration




Ground Movement


Ground Fault
CO2
Arc Fault



CO
Ground Fault



Radon
Lightning Pre-strike




conditions




Circuit Temperature




Smoke and Fire




Flooding (Internal)




Equipment Vibration




Ground Movement


Lightning Pre-
CO2
Arc Fault


strike
CO
Lightning Pre-strike


conditions
Radon
conditions



Ground Fault
Flooding (Internal)



Circuit
Equipment Vibration



Temperature
Ground Movement



Smoke and Fire


Circuit
CO2
Ground Fault
Arc Fault


Temperature
CO
Flooding (Internal)
Circuit Temperature



Radon
Equipment Vibration
Smoke and Fire



Lightning Pre-
Ground Movement



strike conditions


Smoke and
CO2
Ground Fault
Arc Fault


Fire
CO
Circuit Temperature
Circuit Temperature



Radon
Smoke and Fire
Smoke and Fire



Lightning Pre-
Flooding (Internal)



strike conditions
Equipment Vibration




Ground Movement


Flooding
CO2
Arc Fault
Lightning Pre-strike


(Internal)
CO
Ground Fault
conditions



Radon
Smoke and Fire
Flooding (Internal)




Circuit Temperature




Equipment Vibration




Ground Movement


Equipment
CO2
Arc Fault


Vibration
CO
Ground Fault



Radon
Lightning Pre-strike



Ground Fault
conditions



Circuit
Circuit Temperature



Temperature
Smoke and Fire



Smoke and Fire
Flooding (Internal)




Equipment Vibration




Ground Movement


CO2
Arc Fault



Ground Fault



Lightning Pre-



strike conditions



Circuit



Temperature



Smoke and Fire



Flooding (Internal)



Equipment



Vibration



Ground Movement



CO2



CO



Radon


CO
Arc Fault



Ground Fault



Lightning Pre-



strike conditions



Circuit



Temperature



Smoke and Fire



Flooding (Internal)



Equipment



Vibration



Ground Movement



CO2



CO



Radon


Radon
Arc Fault



Ground Fault



Lightning Pre-



strike conditions



Circuit



Temperature



Smoke and Fire



Flooding (Internal)



Equipment



Vibration



Ground Movement



CO2



CO



Radon


Ground
CO2
Arc Fault
Ground Movement


Movement
CO
Ground Fault



Radon
Lightning Pre-strike




conditions




Circuit Temperature




Smoke and Fire




Flooding (Internal)




Equipment Vibration




Ground Movement








Claims
  • 1. A system for hazard mitigation in a structure having an electrical distribution system including a circuit, comprising: a subsystem coupled to the circuit;a first set of nodes for monitoring operating conditions associated with the circuit and generating data in response;a second set of nodes for monitoring environmental conditions not associated with said circuit and generating data in response; anda data processing system operable to: process the data generated by said first set of nodes and said second set of nodes and identify a trigger representing a condition requiring an action be taken; andprocess the trigger in accordance with a predetermined policy to initiate an action by the subsystem.
  • 2. The system of claim 1, wherein said first set of nodes is embedded within the subsystem.
  • 3. The system of claim 1, wherein the data processing system includes a processor embedded within the subsystem.
  • 4. The system of claim 1, wherein said first set of nodes comprises at least one sensor for monitoring an electrical parameter of electricity flow from the circuit to the subsystem.
  • 5. The system of claim 4, wherein the electrical parameter is selected from the group consisting of voltage, current, arc faults, frequency, noise, and ground faults.
  • 6. The system of claim 1, wherein said second set of nodes comprises at least one sensor for monitoring an environmental condition within the structure.
  • 7. The system of claim 6, wherein the environmental condition is selected from the group consisting of the presence of water, the presence of smoke, and the presence of a gaseous substance.
  • 8. The system of claim 1, wherein the subsystem further comprises tripping circuitry for controlling electrical current flow from the circuit, wherein the data processing system is operable to trip the tripping circuitry and halt current flow in response to the trigger in accordance with the policy.
  • 9. The system of claim 8, wherein the data processing system includes a data processor in another subsystem within the system and the subsystem further comprises communications circuitry for receiving a command from the data processor of the another subsystem to trip the tripping circuitry of the subsystem.
  • 10. The system of claim 9, wherein the another subsystem comprises a pseudobreaker.
  • 11. The system of claim 1, wherein the data processing system further comprises a supervisory data processor for communicating at least one trigger definition and at least one policy to the data processor to the subsystem.
  • 12. The system of claim 1, wherein the data processor is operable to process the trigger in accordance with the predetermined policy and initiate an automatic action by the subsystem.
  • 13. The system of claim 1, wherein the data processor is operable to process the trigger in accordance with the predetermined policy and initiate transmission of a message recommending user action be taken with respect to the subsystem.
  • 14. The system of claim 13, wherein the data processor is further operable to process the trigger in accordance with the predetermined policy and initiate an automatic action by the subsystem when no user action is taken within a predetermined time window.
  • 15. A system for mitigating risk associated with an electrical distribution system comprising: a communications network;a first set of sensors coupled to the communications network for monitoring conditions associated with the electrical distribution system and generating data in response;a second set of sensors for monitoring environmental conditions not associated with the electrical distribution system circuit and generating data in response;a set of subsystems coupled to the electrical distribution system, each subsystem including a data processor and communications circuitry coupled to the communications network, wherein in response to data from said first set of sensors and said second set of sensors, the data processor of a selected subsystem identifies a trigger representing a condition requiring an action be taken and processes the trigger in accordance with a policy to initiate an action; anda supervisory subsystem coupled to the communications network for providing trigger definitions and policies to at least the data processor of the selected subsystem.
  • 16. The system of claim 15, wherein at least one subsystem of the set of subsystems comprises a circuit breaker controlling a power distribution circuit within the electrical distribution system, wherein the data processor of the circuit breaker identifies a trigger in response to data from said first set of sensors and said second set of sensors and selectively trips in accordance with the policy to break the power distribution circuit.
  • 17. The system of claim 15, the set of subsystems comprises: a first subsystem including a circuit breaker controlling electricity flow from the electrical distribution system; andsecond subsystem, wherein the data processor of the second subsystem identifies the trigger and initiates tripping of the circuit breaker of the first subsystem in accordance with the policy.
  • 18. The system of claim 17, wherein the second subsystem comprises a pseudobreaker.
  • 19. The system of claim 15, wherein a selected subsystem of the set of subsystems includes at least one electrical plug and a circuit breaker for controlling electrical flow through the plug, wherein the data processor of the selected subsystem is operable to trip the circuit breaker in response to the trigger in accordance with the policy.
  • 20. The system of claim 15, wherein a selected subsystem of the set of subsystem comprises equipment a circuit breaker for controlling electrical flow to the equipment, wherein the data processor of the selected subsystem is operable to trip the circuit breaker in response to the trigger in accordance with the policy.
  • 21. The system of claim 15, wherein a selected sensor of said first set of sensors is embedded within a subsystem of the set of subsystems.
  • 22. The system of claim 15, wherein a selected sensor of said first set of sensors monitors an electrical parameter of a circuit of the electrical distribution system.
  • 23. The system of claim 15, wherein the electrical distribution system is associated with a structure and at least one sensor of the set of sensors monitors an environmental condition within the structure.
  • 24. The system of claim 15, wherein the electrical distribution system is associated with a structure and at least one sensor of said second set of sensors monitors an environmental condition outside of structure.
  • 25. The system of claim 15, wherein the data processor of the selected subsystem in response to the trigger sends a message to a user in accordance with the policy.
  • 26. The system of claim 15, wherein the data processor of the selected subsystem in response to the trigger initiates automatic action by at least one subsystem.
  • 27. The system of claim 15, wherein the data processor of the selected system in response to the trigger sends a message to a user and in response to a lack of user action within a time window initiates automatic action by the at least one subsystem in accordance with the policy.
  • 28. The system of claim 15, wherein at least one subsystem of the set of the set of subsystem transmits operational data to the supervisory processing system for analysis and selective update of the trigger definitions and policies.
  • 29. The system of claim 15, wherein the supervisory processing system comprises a server.
  • 30. The system of claim 15, wherein the communications network is further operable to receive information from an external network and the data processor of the selected subsystem is further operable, in response to the information received from the external network, to identify a trigger representing a condition requiring an action be taken and process the trigger in accordance with a policy to initiate an action.
  • 31. A method for mitigating hazards in a structure having an electrical distribution system including a circuit, comprising: monitoring operating conditions associated with the circuit with a first set of nodes communicating with a network;monitoring environmental conditions not associated with the circuit with a second set of nodes communicating with said network;collecting data generated by said first set of nodes and said second set of nodes and representing the monitored operating conditions and monitored environmental conditions with a processor communicating with the network;identifying with the processor a trigger from the collected data representing a condition requiring an action be taken; andprocessing the trigger with the processor in accordance with a predetermined policy to initiate a control action by at least one of the set of nodes.
  • 32. The method of claim 31, wherein monitoring operating conditions associated with the circuit comprises monitoring a parameter associated with electrical flow through the circuit with at least one of the set of nodes.
  • 33. The method of claim 32, wherein the parameter is selected from the group consisting of voltage, current, arc faults, frequency, noise, and ground faults.
  • 34. The method of claim 31, wherein monitoring environmental conditions comprises monitoring an environmental condition within the structure.
  • 35. The method of claim 34, wherein the environmental condition is selected from the group consisting of the presence of water, the presence of smoke, and the presence of a gaseous substance.
  • 36. The method of claim 31, wherein processing the trigger with the processor in accordance with a predetermined policy to initiate a control action by at least one of comprises initiating tripping a circuit breaker by at least one of the set of nodes.
CROSS-REFERENCE TO RELATED APPLICATION

The present application claims the benefit of U.S. Provisional Patent Application Ser. No. 62/089,353, filed Dec. 9, 2014, which is incorporated herein by reference for all purposes.

US Referenced Citations (7)
Number Name Date Kind
6686838 Rezvani Feb 2004 B1
20060052905 Pfingsten Mar 2006 A1
20090216349 Kwon Aug 2009 A1
20110043958 Nakamura Feb 2011 A1
20140067137 Amelio Mar 2014 A1
20140327995 Panjwani Nov 2014 A1
20140375440 Rezvani Dec 2014 A1
Related Publications (1)
Number Date Country
20160163186 A1 Jun 2016 US
Provisional Applications (1)
Number Date Country
62089353 Dec 2014 US