This application is a 371 application of International PCT application serial no. PCT/CN2019/075863, filed on Feb. 22, 2019, which claims the priority benefit of Chinese application no. 201811027251.3, filed on Sep. 4, 2018. The entirety of each of the abovementioned patent applications is hereby incorporated by reference herein and made a part of this specification.
The present invention belongs to the field of coal pillar recovery, and particularly relates to an internally injected replacement support room-type coal pillar recovery method, particularly suitable for the replacement support recovery of a room-type coal pillar with an aspect ratio greater than 0.6 left after coal mining.
Room-type mining methods in China are mostly applied to the northwestward region, mainly concentrated in the mining areas such as Shaanxi, Inner Mongolia and Shanxi with wide resource distribution, simple geological structure and shallow coal seams. Although the room-type coal pillar has the characteristics of low investment, simple management and high production efficiency, the remaining coal pillars after mining will directly affect the mine safety and threaten the surrounding ecological environment. Recovery of room-type mining coal pillars can simultaneously solve problems such as coal resource waste, ecological environment and geological disasters.
At present, domestic room-type coal pillar recovery methods are mainly divided into traditional recovery methods and filling recovery methods. The traditional recovery methods such as splitting and pocket and wing recovery methods are low in recovery rate and mechanization degree, and the filling recovery methods such as casting and filling recovery and comprehensive mechanization filling recovery methods require high filling material costs and equipment input costs.
Therefore, it is a major technical issue in coal mining to study a room-type coal pillar recovery method that can ensure the recovery efficiency, the roof stability, and reasonable investment.
Object of the invention: in order to solve the problem of safe, efficient and low-cost recovery of remaining coal pillars after the room-type mining, the object of the present invention is to provide an internally injected replacement support room-type coal pillar recovery method with simple operation and high resource recovery rate.
Technical solution: in order to achieve the foregoing object, the present invention adopts the following technical solution:
An internally injected replacement support room-type coal pillar recovery method, including the following steps:
1) dividing a room-type coal pillar into a peripheral reserved coal pillar and an internal pre-mined coal pillar, a reserved coal pillar gap being formed on one side of the reserved coal pillar;
2) stoping the internal pre-mined coal pillar by means of the reserved coal pillar gap;
3) blocking the reserved coal pillar gap after the pre-mined coal pillar is mined, and injecting a cemented filling material into a goaf surrounded by the reserved coal pillar for filling; and
4) replacing the coal pillar for support after the cemented filling material is stabilized, and then recovering the reserved coal pillar.
Further, the room-type coal pillar has an aspect ratio greater than 0.6.
Further, in step 1), the displacement and stress conditions of the roof when the reserved coal pillar is in the support stage are obtained according to a calculation result of a mechanical model of the reserved coal pillar in the support overburden stage; and the theoretical reserve-width of the reserved coal pillar is obtained according to the first strength theory of the roof and the criterion of ultimate strength of the reserved coal pillar, so that the room-type coal pillar is divided into the reserved coal pillar and the pre-mined coal pillar.
Further, the width of the reserved coal pillar is calculated by a process as follows:
a. intercepting a half-plane of the room-type coal pillar for analysis, and setting the overburden stratum acting force on the roof to be a uniform load q, a foundation coefficient of the reserved coal pillar to be k, the spacing of the adjacent room-type coal pillars to be c, the width of the reserved coal pillar to be b, the width of the pre-mined coal pillar to be a, and then the total width of the room-type coal pillars to be 2(a+b), wherein a differential equation of the deflection curve of each section of the roof in the analyzed area is:
in the formula, EI is the flexural rigidity, in N/m;
x is the distance between any point on the foundation surface and the coordinate origin of the half-plane, in m; and
ω1(x), ω2(x), and ω3(x) are the deflections of x at sections [0, a], [a, a+b], [a+b, a+b+c] of the roof, respectively, in m;
b. solving the formula (i), and letting
to obtain an equation of the deflection curve of the roof:
in the formula, d1, d2, d3, d4, . . . and d12 are constant coefficients; and
obtaining parameters d1-d12 according to a model continuity condition and a symmetry boundary condition;
c. solving to obtain an equation of bending moment of the roof:
in the formula, M1(x), M2(x), and M3(x) are the bending moments of x at sections [0, a], [a, a+b], and [a+b, a+b+c] of the roof, respectively, in m; wherein
the width b of the reserved coal pillar needs to simultaneously satisfy the first strength theory of the roof and the ultimate strength theory of the coal pillar, namely, simultaneously satisfying that the width b of the reserved coal pillar is greater than or equal to the minimum reserve-width b1 under the conditions of the first strength theory of the roof and the minimum reserve-width b2 under the conditions of the ultimate strength theory of the coal pillar, specifically as shown in the following steps d and e:
d. simplifying the roof to a simply supported beam with an overburden uniform load q and a support load with the width b1 at the bottom, wherein it is found through analysis that the maximum bending moment Mmax on the roof occurs in one side of the beam span that deviates from the bottom support load and is spaced apart from the model origin by xm=a+b1+3EI·d9/q, and a value thereof is obtained by M3(xm) in the formula (iii), and the maximum tensile stress of the roof is obtained according to the rectangular beam theory:
in the formula, h is the roof height, in m;
the following formula shall be satisfied according to the first strength theory of the roof, so that the roof is not broken:
σmax≤[σt] (v)
in the formula, [σt] is the allowable tensile stress of the roof, in MPa; and
since the spacing c between the adjacent room-type coal pillars and the width 2(a+b) of the room-type coal pillar are known, the minimum reserve-width b1 of the reserved coal pillar under the conditions of the first strength theory of the roof is obtained according to the judgment condition of the formula (iv);
e. making the minimum reserve-width b2 of the reserved coal pillar under the conditions of the ultimate strength theory of the coal pillar satisfy its own non-destruction at the same time, and satisfying according to the ultimate strength theory:
σF≤σP (vi)
in the formula, σ is the force acting on the coal pillar, σ=k∫aa+b ω2(x)dx, in m;
F is a safety coefficient, which may be 2; and
σp is the ultimate strength of the reserved coal pillar, in MPa;
calculating the minimum reserve-width of the reserved coal pillar under the conditions of the ultimate strength theory of the coal pillar to be b2 according to the formula (vi); and
f. finally calculating the minimum reserve-width of the reserved coal pillaro be b=max {b1, b2}.
Further, in step 2), a continuous miner is used to stope the pre-mined coal pillar, and the mined coal is transported onto a belt conveyor by means of a forklift and transported out of a mining area by means of the belt conveyor.
Further, in step 3), a blocking wall is piled up to block the reserved coal pillar gap, and the cemented filling material is pumped, by a filling pump through a pumping port reserved on the blocking wall, to the goaf of the room-type coal pillar for filling.
Advantageous effects: compared with the prior art, the internally injected replacement support room-type coal pillar recovery method provided by the present invention has the following advantages: the present invention is particularly suitable for safe, efficient, and low-cost recovery of the remaining coal pillars with an aspect ratio greater than 0.6 after the room-type mining, and uses the cemented filling material to replace the remaining coal pillars for support. Under the premise of ensuring safety, the method recovers coal resources and reduces the recovery cost. In addition, replacing the coal pillar with the cemented filling material for support can effectively support the overburden strata, prevent the rise of water flowing fractures and large-scale leakage of surface water, and reduce the impact of room-type coal pillar recovery on surface water and surrounding ecological environment. Moreover, replacing the room-type coal pillar with the cemented filling material for support also reduces the risk of fire and spontaneous combustion in the goaf. The method is convenient, reliable, and applicable, and thus has wide application prospects.
In the drawings: 1 room-type coal pillar; 2 reserved coal pillar; 3 pre-mined coal pillar; 4 reserved coal pillar gap; 5 blocking wall; 6 cemented filling material; 7 continuous miner; 8 forklift; 9 belt conveyor.
The present invention discloses an internally injected replacement support room-type coal pillar recovery method. During the recovery of room-type coal pillars, the room-type coal pillars with an aspect ratio greater than 0.6 are divided into two parts: reserved coal pillars and pre-mined coal pillars. After the mining of the pre-mined coal pillars, a cemented filling material is injected into a goaf surrounded by the reserved coal pillars, and then is stabilized to replace the coal pillars for support, and the reserved coal pillars are then recovered. A mechanical model of the reserved coal pillars in the support overburden stage is established based on the Winkler beam theory, to obtain the displacement and stress conditions of a roof of the reserved coal pillar in the support stage. The theoretical reserve-width of the reserved coal pillars is obtained according to the first strength theory of the roof and the criterion of ultimate strength of the reserved coal pillars. The method can not only efficiently recover valuable coal resources and reduce waste of coal resources, but also effectively support the overburden and prevent a series of mine safety problems.
The present invention is further described below with reference to the accompanying drawings and embodiments.
An internally injected replacement support room-type coal pillar recovery method of the present invention:
As shown in
a.
in the formula, EI is the flexural rigidity, in N/m;
x is the distance between any point on the foundation surface and the coordinate origin of the half-plane, in m; and
ω1(x), ω2(x), and ω3(x) are the deflections of x at sections [0, a], [a, a+b], [a+b, a+b+c] of the roof, respectively, in m.
b. Formula (i) is solved, and let
to obtain an equation of the deflection curve of the roof:
in the formula, d1, d2, d3, d4, . . . and d12 are constant coefficients; and
parameters d1-d12 are obtained according to a model continuity condition and a symmetry boundary condition.
c. An equation of bending moment of the roof is solved:
in the formula, M1(x), M2(x), and M3(x) are the bending moments of x at sections [0, a], [a, a+b], and [a+b, a+b+c] of the roof, respectively, in m.
The width b of the reserved coal pillar (2) needs to simultaneously satisfy the first strength theory of the roof and the ultimate strength theory of the coal pillar, namely, simultaneously satisfying that the width b of the reserved coal pillar (2) is greater than or equal to the minimum reserve-width b1 under the conditions of the first strength theory of the roof and the minimum reserve-width b2 under the conditions of the ultimate strength theory of the coal pillar, specifically as shown in the following steps d and e.
d. The roof is simplified to a simply supported beam with an overburden uniform load q and a support load with the width b1 at the bottom, wherein it is found through analysis that the maximum bending moment Mmax on the roof occurs in one side of the beam span that deviates from the bottom support load and is spaced apart from the model origin by xm=a+b1+3EI·d9/q, and a value thereof is obtained by M3(xm) in the formula (iii), and the maximum tensile stress of the roof is obtained according to the rectangular beam theory:
in the formula, h is the roof height, in m;
the following formula shall be satisfied according to the first strength theory of the roof, so that the roof is not broken:
σmax≤[σt] (v)
in the formula, [σt] is the allowable tensile stress of the roof, in MPa;
since the spacing c between the adjacent room-type coal pillars (1) and the width 2(a+b) of the room-type coal pillar are known, the minimum reserve-width b1 of the reserved coal pillar (2) under the conditions of the first strength theory of the roof is obtained according to the judgment condition of the formula (iv).
e. The minimum reserve-width b2 of the reserved coal pillar (2) under the conditions of the ultimate strength theory of the coal pillar satisfies its own non-destruction at the same time, and the following formula shall be satisfied according to the ultimate strength theory:
σF≤σP (vi)
in the formula, σ is the force acting on the coal pillar, σ=k∫aa+bω2(x)dx, in m;
F is a safety coefficient, which may be 2; and
σP is the ultimate strength of the reserved coal pillar, in MPa;
the minimum reserve-width of the reserved coal pillar (2) under the conditions of the ultimate strength theory is calculated to be b2 according to the formula (vi).
Finally, the minimum reserve-width of the reserved coal pillar (2) is calculated to be b=max {b1, b2}.
According to the foregoing solving methods, taking the geological conditions of a mine in the Northwest China as an example, the roof thickness of the mine is 2 m, the mining height is 4 m, the length of the coal pillar is about 10 m, the length of the coal room is about 7 m, the elastic modulus of the roof is 0.9 GPa, and the coal foundation coefficient is 2×106 N/m3, the allowable tensile stress of the roof is 2.8 MPa, the ultimate strength of the reserved coal pillar is 49.3 MPa, and the uniform load q is 2 MPa. According to the formula (v), the bending moment distribution of the roof is as shown in
The contents above are only preferred embodiments of the present invention, and it should be noted that a person of ordinary skill in the art can make several modifications and improvements, without departing from the principle of the present invention. These improvements and modifications should also be construed within the protection scope of the present invention.
Number | Date | Country | Kind |
---|---|---|---|
201811027251.3 | Sep 2018 | CN | national |
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2019/075863 | 2/22/2019 | WO | 00 |
Publishing Document | Publishing Date | Country | Kind |
---|---|---|---|
WO2020/048095 | 3/12/2020 | WO | A |
Number | Name | Date | Kind |
---|---|---|---|
4198097 | Fondriest | Apr 1980 | A |
20200318480 | Zhou | Oct 2020 | A1 |
Number | Date | Country |
---|---|---|
101725352 | Jun 2010 | CN |
103527196 | Jan 2014 | CN |
105240014 | Jan 2016 | CN |
107514259 | Dec 2017 | CN |
109139100 | Jan 2019 | CN |
Entry |
---|
“International Search Report (Form PCT/ISA/210) of PCT/CN2019/075863,” dated Apr. 30, 2019, pp. 1-5. |
Number | Date | Country | |
---|---|---|---|
20200378255 A1 | Dec 2020 | US |