Electric utility grids have traditionally been supplied by large centralized power plants. These large power plants are interconnected by high capacity transmission lines that provide improved grid stability, increased fault tolerance, and increased flexibility in load profile management. In these traditional systems, power is distributed outward from the centralized power plants through a hierarchy of power line networks to multiple points of usage.
The increasing use of renewable power sources, however, has introduced distributed generation (DG) capacity to power grids. DG power sources may be located anywhere on the grid, typically close to a local power load. Examples of DG power sources include photovoltaic (PV) panels and wind turbines which are scattered at customer locations throughout the grid. DG sources can vary in size from a few watts to several mega-watts. The amount of power available from these sources can vary based on various factors such as available solar irradiation and wind speeds. At certain times, all of the power from these sources may be consumed by local building loads, while at other times, excess power is fed back into the grid. Thus, utility grids have become complex, interconnected structures with power flowing in multiple directions depending on the availability of power from multiple sources and demand from multiple loads at any specific time.
“Islanding” is a condition in which a portion of a grid containing some power generation capacity and some amount of load becomes isolated from the remainder of the grid, but continues to operate independently because the phase-locked loop (PLL) or other synchronization functionality continues to provide a reference for the power flowing in the isolated portion of the grid. Depending on the specific conditions, islanding may be problematic because the local power generation capacity loses synchronization with the grid. Moreover, when an islanding condition is detected, an assumption is typically made that there is no point in harvesting power from the local power generation capacity because the power cannot be fed back into the grid. Thus, if an islanding condition is detected, the local power generation capacity is disabled and disconnected from the grid. This is referred to as anti-islanding (AI) protection, and the detection of islanding conditions is an ongoing challenge.
Although islanding is typically considered a condition to be avoided, in some situations, it may actually be an acceptable or even desirable condition. For example, if a local electrical load is present and capable of consuming power, it may be wasteful to disable the local power generation capacity and let otherwise useful and available energy go unharvested. Moreover, in locations such as developing nations where power grids may be unreliable, harvested energy from solar, wind, and other sources may continue to be used locally when the utility grid is down.
Therefore, according to some inventive principles of this patent disclosure, a local grid-tied power source may continue to operate even when an islanding condition is detected. This continued operation may be used, for example, to provide power to a local load, a local energy storage device, etc. The continued operation may be facilitated with a local electronic reference to provide a frequency and/or phase reference for the local power source or sources. Smart communications may also be used on the installed system to coordinate the operation of the components.
In situations where multiple local power sources may be islanded together in a common isolated area, one local reference may serve as a master reference while the references for the other local power sources may synchronize to the master reference. Thus, multiple distributed generators may be able to form a self-sustaining island without relying on the grid.
Islanded operation according to some inventive principles of this patent disclosure may be augmented with the use of power-line communications (PLC) and/or wireless communications among the power sources, as well as smart circuit breakers on the main feed lines or at the point of common connection (PCC).
A gateway 21 may be included to concentrate data and/or interface the system components to other network functionality such as Internet access, data-servers, remote network management, etc. For example, the gateway may enable the implementation of a system-wide control algorithm as described below with respect to
The local power source 10 may include a PV panel or array of PV panels, and centralized or panel-attached or panel-integrated microinverters. The PV array in its entirety, or in parts, can operate in an islanded environment. The inventive principles may also be applied to other types of power sources including wind turbines, geothermal sources, fuel cells, battery arrays, etc.
In the embodiment of
Various types of monitoring feedback apparatus may also be included. For example, the embodiment of
In some embodiments, some or all of the local load or loads may be implemented with one or more power converters such as an AC-to-DC converter to charge batteries or other energy storage devices, such as device 42 illustrated in
Additionally, a local power source 10 as shown in
In some embodiments, a smart communication interface may be included in some or all of the components to enable the implementation of various centralized and/or distributed control schemes according to some inventive principles of this patent disclosure. For example, in the embodiment of
An in-rush limiting circuit such as the one illustrated in
In the embodiment of
In general, there may be multiple complex objectives, which may optionally have priorities. For example, the algorithm may implement one or more of the following objectives simultaneously and/or individually under different operating conditions: (1) maximizing the local use of power from the local power sources; (2) minimizing the overall cost of energy; (3) maximizing the amount of locally stored energy; and (4) optimizing the use of locally stored energy to maximize the up-time of local loads when sufficient energy is not available from the utility grid and the local power sources, e.g., during an islanding event.
The algorithm 50 may operate as a software loop that begins by executing a process 58 for processing the various inputs. Examples of processing inputs include checking for updates to local load priorities, checking for updates to the desired up-time of various local loads, checking for updates to the optimization priorities, using meteorology data to update the effects of weather on current and predicted future local load levels and energy available from local power sources, determining the amount of energy currently available from local power sources, predicting the future energy available from local power sources for the longest possible duration into the future, determining the amount of energy currently available in local storage, determining the additional remaining local energy storage capacity, requesting the utility grid load shedding profile, requesting load tariff rates, and requesting feed-in tariff rates for the longest possible duration into the future.
After processing the inputs, algorithm executes a process 60 to determine the current energy flow between the various system elements. Examples include energy flow from the local power sources to the utility grid, from the local power sources to local storage, from the local power sources to local loads, from the utility grid to the local loads, from the utility grid to local storage, from local storage to the local loads, and from local storage to the utility grid.
Next, the algorithm executes a process 62 to determine the cost of energy transfer between the system elements. This may include the cost of the same examples of energy transfer described above with respect to process 60.
After determining the cost of energy transfer, the algorithm executes a process 64 to determine the optimum local load levels based on the local load priorities, desired up-times of various local loads, and/or the optimization objectives.
Next, the algorithm executes a process 66 to determine the optimum target energy flow between the system elements. This may include the same examples of energy transfer described above with respect to process 60.
After determining the optimum target energy flow, the algorithm executes a process 67 to determine and minimize system losses.
Finally, the algorithm generates the load control signals 52 to energize or de-energize specific local loads and prepare and set the new target energy flow between the system elements based on the determinations in the previous processes. The target local loads and target energy flows may optionally be achieved using optimum transient behavior characteristics.
The processes 58 through 66 may be repeated in a continuous loop running at any suitable repetition rate.
The inventive principles of this patent disclosure have been described above with reference to some specific example embodiments, but these embodiments can be modified in arrangement and detail without departing from the inventive concepts. Such changes and modifications are considered to fall within the scope of the claims following the Appendices.
This application claims priority from U.S. Provisional Patent Application Ser. No. 61/417,875 titled Islanded Operation of Grid-Tied Power Sources filed Nov. 29, 2010.
Number | Name | Date | Kind |
---|---|---|---|
5638295 | Lagree | Jun 1997 | A |
6882904 | Petrie et al. | Apr 2005 | B1 |
7457688 | Szepek et al. | Nov 2008 | B2 |
20030080741 | LeRow et al. | May 2003 | A1 |
20050057950 | Colby et al. | Mar 2005 | A1 |
20070010916 | Rodgers | Jan 2007 | A1 |
20080071427 | Szepek et al. | Mar 2008 | A1 |
20080094860 | Falk | Apr 2008 | A1 |
20080157538 | Lewis | Jul 2008 | A1 |
20080231114 | Tolnar et al. | Sep 2008 | A1 |
20090000654 | Rotzoll et al. | Jan 2009 | A1 |
20100073175 | Lontka | Mar 2010 | A1 |
20100106641 | Chassin et al. | Apr 2010 | A1 |
20100259955 | Shimada | Oct 2010 | A1 |
20100309692 | Chisenga et al. | Dec 2010 | A1 |
20100315850 | J'Neva Devi et al. | Dec 2010 | A1 |
20110043160 | Serban | Feb 2011 | A1 |
20110071697 | Torre et al. | Mar 2011 | A1 |
20110187200 | Yin et al. | Aug 2011 | A1 |
20110298305 | Chisenga et al. | Dec 2011 | A1 |
20120080942 | Carralero | Apr 2012 | A1 |
20140324235 | Miller | Oct 2014 | A1 |
Entry |
---|
Mynam, V. et al. “Islanding Detection and Adaptive Load Shedding,” Schweitzer Engineering Laboratories, Inc. Application Note, AN2009-59, 2009, 2 pages. |
Mulhausen, J. et al., “Anti-Islanding Today, Successful Islanding in the Future,” IEEE, Mar. 29, 2010, 8 pages. |
Hirodontis, S. et al., “Dynamic Study for Islanded Distribution Network,” The International Conference on Electrical Engineering, Oct. 31, 2009, 6 pages. |
Tantimaporn, T. et al., “Islanding Operation of Mini-Hydro Generation in Real Distribution Network,” Energy and Sustainable Development: Issues and Strategies, Abstract, Jun. 2, 2010, 1 page. |
Li, X. et al., “On-line Islanding Operation Based on CSP,” Power and Energy Engineering Conference, Asia-Pacific, Mar. 28, 2010, Abstract, 1 page. |
Issicaba, D. et al., “Islanding Operation of Active Distribution Grids Using an Agent-based Architecture,” Innovative Smart Grid Technologies Conference Europe, Oct. 11, 2010, Abstract, 1 page. |
Zhang, S. et al., “Impact Study on International Islanding Strategies of Distribution Networks Based on Distributed Generation,” International Conference on Computer Design and Applications, Jun. 25, 2010, Abstract, 1 page. |
Koch, S. et al., “Mitigation of Cascading Failures by Real-Time Controlled Islanding and Graceful Load Shedding,” Symposium on Bulk Power System Dynamics and Control, Aug. 1, 2010, Abstract, 1 page. |
Ng, E. J. et al., “Multi-Microgrid Control System,” Power and Energy Society General Meeting, Jul. 25, 2010, Abstract, 1 page. |
Mahat, P. et al., “Control Strategies for Gas Turbine Generators for Grid Connected and Islanding Operations,” Transmission and Distribution Conference and Exposition, Apr. 19, 2010, Abstract, 1 page. |
Lei, Q. et al., “Islanding Control of DG in Microgrids,” Power Electronics and Motion Control Conference, May 17, 2009, Abstract, 1 page. |
Hirodontis, S. et al., “An Adaptive Load Shedding Method for Intentional Islanding,” Conference on Clean Electrical Power, Abstract, Jun. 9, 2009, 1 page. |
Dola, H. M. et al., “Intentional Islanding and Adaptive Load Shedding to Avoid Cascading Outages,” IEEE, 2006, 8 pages. |
Wikipedia, “Definition of Islanding,” downloading from Internet Oct. 1, 2011, 8 pages. |
Walker, G.R. et al., “PV String Per-Module Maximum Power Point Enabling Converters,” School of Information Technology and Electrical Engineering, The University of Queensland, 2003, 6 pages. |
Number | Date | Country | |
---|---|---|---|
61417875 | Nov 2010 | US |