| Title: "Construction Ingenuity Displayed at Diablo Dam", Publication: Engineering News-Record; date: Aug. 29, 1929, pp. 320-324. |
| Title: Grouted Gravel Fill and Precast Slobs Provide New Face for Barter Dam; Author: Davis et al.; Date: 2-1948, pp. 26-31; Publication: Civil Engineering. |
| Title: Three Types of Design Uses in California Flood Control Dam; Pub. Engineering News Record; date: 7/9/31; pp. 46-49; Author: Wadworth et al. |
| Title: Million Yards of Concrete Placed at Record Rate; Pub. Engineering News Record; date: 12/21/33; pp. 743-750. |
| Title: Ribbon Batch and Conveyor Placing System for Concrete Dams; Author: Robert Oury; paper from the Asilomer Dam Conference of 1970, pp. 281-295. |