Abstract
A method and apparatus for installation of a support pier for a structure comprises positioning a hollow tube apparatus in a soil matrix wherein the hollow tube apparatus has a hollow core and is susceptible to lateral and longitudinal movement, removing soil from the hollow core and then filling that core with an aggregate followed by raising and lowering of the hollow tube apparatus by a bottom mechanical device in a manner which compacts the aggregate and also applies lateral forces to the aggregate against the walls of the cavity in the soil matrix, pushing a portion of the aggregate into the soil matrix.
Description




BACKGROUND OF THE INVENTION




In a principal aspect the present invention relates to a pier construction for supporting structures in a soil matrix wherein the pier is formed with a special mechanical apparatus from an aggregate material by compacting successive lifts or sectors of the aggregate material located in a cavity in the matrix.




In U.S. Pat. No. 5,249,892, incorporated herewith by reference, a method and apparatus are disclosed for producing short aggregate piers in situ. The process includes forming a cavity in soil and then introducing successive layers of compacted aggregate material into the cavity to form a pier that can support a structure. The aggregate may be comprised of various materials. The lifts or layers of aggregate which are compacted during the pier forming process typically have a diameter of 1 to 3 feet and a vertical rise of similar dimension and range. Thus, such piers are made by drilling a hole or cavity in a soil matrix, placing aggregate or other select fill material in small discreet layers in the cavity, and then tamping each layer of the material in the cavity with a special mechanical tamper apparatus to provide impact or ramming energy to the layer of material. This apparatus and process produces a stiff and effective stabilizing element or pier. However, this method of pier construction has a limitation in terms of the depth to which the pier forming process can be accomplished economically. Typically the process described in the patent is limited to a depth of approximately 20 feet because of the equipment utilized, the time required to make a pier and the techniques that are available. Thus, there has developed a need for a mechanical apparatus, as well as a construction process, which can be successfully and economically utilized at greater depths yet have the attributes and benefits associated with the short aggregate pier method, apparatus and construction disclosed in U.S. Pat. No. 5,249,892.




SUMMARY OF THE INVENTION




Briefly, the present invention comprises a method for installation of a pier formed from layers of aggregate material in a soil matrix and includes the steps of positioning a hollow tube with a special mechanical bottom compacting apparatus in the soil matrix, removing the soil matrix from the core of the tube and the special mechanical bottom compacting apparatus followed by at least partially filling the tube and the special mechanical compacting apparatus with an aggregate material and then raising and lowering the tube and bottom apparatus within the soil matrix as the tube and bottom apparatus are incrementally raised in steps from the cavity. Raising and lowering of the tube and bottom apparatus enables a specially designed lower portion of the bottom apparatus to impact upon the aggregate material, thereby densifying the material, forcing the material laterally outward and simultaneously imparting lateral forces on the aggregate and the soil matrix and applying longitudinal forces on the aggregate. The tube with bottom apparatus may be vibrated while being incrementally raised and lowered depending upon conditions of the soil matrix and composition of the aggregate materials. The tube with bottom apparatus may also be pushed downward or driven downward during the “lowering” sequence to provide additional densification and lateral force energy. In this manner, compacted lifts are incrementally formed by the bottom apparatus as the tube is removed from the cavity in the soil matrix. The process is continuously repeated along the length of the soil cavity with a result that an elongate pier of separately compacted layers or lifts is formed within the soil matrix. A pier having a length or depth of fifty (50) feet or more can be constructed in this manner.




Numerous types of aggregate materials may be utilized in the practice of the process including a mixture of aggregate and dry cement. Such mixture has proven to be beneficial in creating a pier having significantly improved stiffness and integrity for support of a structure, especially when the soil matrix is very soft and weak.




The tube with bottom mechanical apparatus may be positioned within the soil matrix in the event the soil is soft by forcing the tube into the soil matrix with or without applying vibration energy. If the soil is hard, the soil matrix may be pre-drilled to form a cavity into which the tube apparatus is lowered or driven prior to filling the tube with aggregate. In any event, the soil contained within the hollow tube apparatus is removed from the tube apparatus once the tube apparatus is lowered, pushed, vibrated, driven or otherwise placed in the soil. A drill or other evacuation technique is used to remove the soil from the interior of the hollow tube apparatus. In soft soils, a removable cap or a sacrificial cap may be placed at the bottom of the hollow tube apparatus to prevent soil matrix from entering the tube. For such situations, removal of the soil matrix from within the hollow tube will not be necessary. Other steps described in the process of making the lateral displacement pier remain essentially the same. Other mechanical apparatus descriptions contained herein remain essentially the same.




In a preferred embodiment, the lower portion of the tube apparatus is designed with an inwardly extending bevel so that both lateral and longitudinal forces may be imparted to aggregate in the tube by the downward movement of the tube apparatus within the soil matrix cavity during incremental raisings and lowerings. The bevel may be effected by an internal thickening of material formed at the lower end of the tube apparatus. In that event, the drill or auger for removing the soil from the tube apparatus may have a special construction including reduced diameter section at the distal end of the drill or auger. The bevel may also be effected by an external thickening of material formed at the lower end of the tube apparatus. The bevel may also be effected by a combination of an internal thickening and an external thickening of material formed at the lower end of the tube apparatus.




During the practice of the method, the aggregate will be compacted and thus additional aggregate will necessarily be added to the tube apparatus as the aggregate is densified and compacted. Upon completion of the formation of the pier and total removal of the hollow tube apparatus from the soil matrix, the pier may be pre-loaded, for example, by placement of a static or dynamic load thereon, prior to placing a structure on the pier. This preloading process will stiffen the constructed aggregate pier and will cause prestressing and prestraining of the matrix soil in the vicinity of the pier, thus increasing the support capacity of the pier.




Thus, it is an object of the invention to provide a special hollow tube apparatus with a special designed bottom apparatus portion to create a compacted aggregate pier that extends to a greater depth and to provide an improved method for creating a pier that extends to a greater depth than typically enabled or practiced by prior short aggregate pier technology.




It is a further object of the invention to provide a method or process for installing a pier formed of aggregate material wherein the material has discrete compacted lifts along the length of the pier with the hollow tube apparatus and special designed bottom apparatus.




Yet a further object of the invention is to provide a method for forming an elongate pier having improved load bearing characteristics when incorporated in the soil matrix wherein the pier is formed of a compacted aggregate material and the compaction is effected by a hollow tube apparatus and special designed bottom apparatus which is placed within a soil cavity filled with the aggregate and may be vibrated, pushed downward, driven downward, or a combination of these.




Yet another object of the invention is to provide an improved method for forming a pier of aggregate material wherein the aggregate may be chosen from a multiplicity of options, including a mix of stone or other types of aggregate with dry cement.




Yet a further object of the invention is to provide an aggregate pier construction which is capable of being incorporated in many types of soil and which is further capable of being formed at greater depths than prior aggregate pier constructions.




These and other objects, advantages and features of the invention will be set forth in the detailed description which follows.











BRIEF DESCRIPTION OF THE DRAWING




In the detailed description which follows reference will be made to the drawing comprised of the following figures:





FIG. 1

is a schematic cross sectional view of a first step in the process of the invention;





FIG. 2

is a schematic cross sectional view of a further step in the process of the invention;





FIG. 3

is a schematic view of further step in the process of the invention;





FIG. 4

is a depiction in a schematic cross sectional view of a further step in the practice of the invention;





FIG. 5

is a schematic view of another step in the process of the invention;





FIG. 6

schematically depicts a further step in the practice of the invention;





FIG. 7

is an enlarged schematic cross sectional view of the special mechanical compacting apparatus which is used in the practice of the invention;





FIG. 8

is a cross sectional view of the active end of the hollow tube apparatus;





FIG. 9

is a cross sectional view of the hollow tube apparatus of

FIG. 7

along the line


9





9


as positioned in a soil matrix incorporating an element which is used to help assist in densifying the aggregate within the hollow tube apparatus;





FIG. 10

is a cross sectional view of the hollow tube apparatus and aggregate similar to

FIG. 9

wherein the element


30


has been removed;





FIG. 11

is a cross sectional view of a partially formed pier by the special mechanical compacting apparatus and the disclosed process;





FIG. 12

is a graph illustrating the comparative load testing of piers of the present invention as compared with various prior art constructions;





FIG. 13

is a cross sectional view of an alternative embodiment and method for the practice of the invention;





FIG. 14

is an enlarged cross sectional view of an alternative embodiment of the mechanical apparatus utilized in the practice of the invention; and





FIG. 15

is an enlarged cross sectional view of an alternative method for practice of the invention.











DESCRIPTION OF THE PREFERRED EMBODIMENT





FIGS. 1-7

illustrate the sequential steps in the performance of the method of the invention and the resultant pier construction. Referring to

FIG. 1

, the method is applicable to placement of piers and supports for structures in a soil matrix


14


which requires reinforcement. A wide variety of soils may require the practice of the invention. With the invention it is possible to provide a pier of aggregate material having greater stiffness and structural integrity than some prior art aggregate piers and which can extend to greater depths than some prior art aggregate piers thus enabling support thereon of more massive and more weighty structures.




As a first step, a cavity or hole


16


is drilled in the soil matrix


14


. It is unnecessary, however, to remove the loose soil


14


from the cavity. Rather, by predrilling the hole to a desired depth, for example, 50 feet, the soil


14


within the cavity is loosened so that a casing


18


may be inserted or driven into the cavity


16


. As shown in

FIG. 2

, the hollow tube apparatus


18


may comprise a cylindrical steel tube having a diameter, for example, in the range of 24-36 inches. In the event that the soil


14


has been predrilled in order to soften or agitate the soil


14


, the casing


18


can be vibrated as it is lowered into the drilled cavity


16


. Alternatively, it is possible to remove the soil


14


during the drilling operation and then place the hollow tube apparatus


18


within the generally hollow cavity. As a further alternative, in the event the soil


14


is adequately soft, the hollow tube apparatus may be driven or pushed or vibrated, or a combination of these, into the soil


14


to the desired depth without predrilling or otherwise loosening the soil


14


. The character of the soil


14


matrix will thus dictate, at least in part, the particular procedure adopted.




Typically, the hollow tube apparatus


18


is cylindrical although other shapes may be utilized. Typically, the diameter of the hollow tube apparatus is 24-36 inches, although other diameters may be utilized in the practice of the invention. Also typically, the hollow tube apparatus


18


will extend to the ultimate depth of the pier or within 36 inches or less of the ultimate depth of the pier. A portion of the hollow tube apparatus


18


will typically extend above the gradient or plane


20


of the soil matrix


14


as depicted in FIG.


2


. This enables the hollow tube apparatus


18


to provide a top opening


22


which may be engaged or gripped to vibrate the hollow tube apparatus


18


and which may also serve as an inlet spout to the interior or hollow core


24


of the hollow tube apparatus


18


.





FIG. 3

illustrates a further step in the practice of the invention. The soil


14


within the hollow core


24


of the tube apparatus


18


is removed after the tube apparatus


18


is positioned in soil


14


. As shown in

FIG. 3

, an auger


50


may be inserted within the hollow tube apparatus


18


to remove soil


14


from the hollow tube apparatus


18


. Typically, the auger


50


will remove the soil


14


only from the entire core or interior


24


of the hollow tube apparatus


18


. However, in circumstances such as depicted in

FIG. 3

, the auger


50


may project below the lower end


26


of the hollow tube apparatus


18


to remove soil


14


from the region below the hollow tube apparatus


18


. Additionally, in the event the hollow tube apparatus


18


includes a rim construction described below, auger


50


may have a special construction including a reduced diameter blade as depicted in FIG.


3


and as further discussed below, to remove loose soil


14


from beneath the hollow tube apparatus


18


.





FIG. 4

represents a subsequent sequential step in the practice of the invention. The step of

FIG. 4

is optional and may or may not be included depending upon the size or diameter of the hollow tube apparatus


18


, the depth of the hollow tube apparatus


18


in the soil matrix


14


and the aggregate or material which is used in the formation of the pier. As depicted in

FIG. 4

, an element


30


is positioned generally axially within the hollow tube apparatus


18


. The element


30


may have any desired cross sectional shape including a rod type shape or an I-beam shape. The element


30


, however, must be positioned and located so that it can be vibrated. In a preferred embodiment, the element


30


extends the entire longitudinal depth of the hollow tube apparatus


18


within the soil matrix


14


although it may extend for a lesser depth if so desired.

FIG. 9

illustrates, in cross sectional view, the element


30


and its operation as described below in more detail.




Next, referring to

FIG. 5

, aggregate material


25


is filled into the hollow core


24


of the tube apparatus


18


. The aggregate


25


is preferably clean stone material. An alternative aggregate


25


comprises clean stone without fines or graded stone with fines, and with dry cement. The combination of dry cement and stone has been found to be especially advantageous and preferable in the practice of the invention under certain soil matrix conditions such as very soft and weak soils. Note, however, that many alternative choices exist with respect to the material used as an aggregate


25


. Aggregate


25


should therefore be interpreted broadly to include various materials and mixtures including stone, recycled concrete, recycled asphalt, sand, chemical additives, other additives and materials including mesh materials, and mixtures thereof. The aggregate


25


typically, however, does not include viscous concrete, i.e, a slurry that is mixed, cured and then hardens. Rather, the aggregate


25


comprises separate particulate matter including multiple types of particulate and additives thereto all of which are compacted in layers in the process of forming the pier of the invention. The physically compacted materials are compressed longitudinally in the direction of the hollow tube apparatus


18


inserted into the soil matrix and forced laterally to engage and displace the sides of the soil matrix


14


.




As shown in

FIG. 5

, the optional element


30


is surrounded by the aggregate


25


which is placed in the hollow tube apparatus


18


. Typically, the aggregate


25


is filled to the top of the hollow tube apparatus


18


and as the aggregate material


18


is compacted, it may be necessary to add additional aggregate


25


to the hollow tube apparatus


18


. Also, it is possible that various types of aggregate


25


may be provided in various sections along the length of the casing. For example, dry stone material having a certain drainage gradation may be provided at the lower end of the pier within the hollow tube apparatus


18


. Thereafter, a mixture of stone and dry cement may be provided with ad-mixtures of chemicals, mesh materials and the like. Thus, the hollow tube apparatus


18


may include various alternative types of aggregate


25


along the length or depth of the formed cavity


18


.




The next step schematically shown in

FIG. 6

involves vibration of the insert element


30


and/or the hollow tube apparatus


18


, or both. As mentioned above, the insert element


30


is an optional element. Vibration of the element


30


will cause densification and settling of the aggregate material. This lateral vibration process is graphically illustrated in greater detail in

FIG. 9

with typical vibration positions illustrated in phantom. The element


30


is depicted in a cross sectional view in FIG.


9


and vibrates or oscillates from side to side as well as longitudinally or lengthwise (FIGS.


6


and


7


), or both, within the hollow tube apparatus


18


.




The element


30


may be retained within the hollow tube apparatus


18


preferably initially axially aligned with the centerline axis of the apparatus


18


. As the hollow tube apparatus


18


is withdrawn, element


30


is caused to oscillate or vibrate and further transfer and compact and densify the aggregate material


25


. Alternatively, the element


30


may be vibrated and then removed from the hollow tube apparatus


18


prior to initial upward movement of the hollow tube apparatus


18


within the soil cavity


14


. Also, the assembly of the element


30


and the hollow tube apparatus


18


may be simultaneously vibrated and removed from the soil


14


. All of these possibilities are available depending upon the soil


14


, the aggregate material


25


, the depth of the pier, the lateral width of the pier and other parameters. A choice can thus be made as to the most appropriate alternative for the particular construction project. The element


30


is, of course, optional or alternative in the method and practice of the invention.




Referring next to

FIG. 7

, the element


30


may be vibrated and removed and subsequently the hollow tube apparatus


18


may be vibrated both laterally and longitudinally. Typically, however, the casing (hollow tube apparatus)


18


is vibrated longitudinally. As depicted in

FIG. 8

, the lower portion


26


of the hollow tube apparatus


18


has a preferred mechanical shape or configuration. Specifically, the lower end


26


of the hollow tube apparatus


18


has a thickened ring portion with an inwardly beveled configuration defined by inwardly beveled surface


42


. The inwardly beveled surface


42


formed in the lower end


26


of the hollow tube apparatus


18


includes a rim member


44


welded or otherwise attached to the inside of the hollow tube apparatus


18


. Although the preferred method is to have the rim member permanently attached to the hollow tube apparatus, an option in that the rim member may be temporarily affixed to the hollow tube apparatus. A rim member


44


extends around the entire, interior circumference of the hollow tube apparatus


18


. The rim member may also extend around the entire, exterior circumference of the hollow tube apparatus as shown in FIG.


14


. Alternatively, rim members may extend around the entire internal and the entire external circumference of the hollow tube apparatus as also shown in FIG.


14


. In all cases, an inwardly beveled surface is created by the rim member, or by the rim member and the tube bottom itself, whether the rim member extends around the interior circumference, the exterior circumference, or both the interior and the exterior circumference of the hollow tube apparatus.




The rim member


44


defines a portion of surface


42


which, when the hollow tube apparatus


18


is vibrated, effects transfer of energy from the surface


42


to the aggregate material


25


and ultimately the surrounding matrix soil


14


. Thus, as the hollow tube apparatus


18


typically vibrates longitudinally or up and down in the figures causing, the surface


42


to impart a lateral vector force against aggregate material


25


as well as the soil


14


matrix as diagramatically depicted in FIG.


10


. Another vector force will simultaneously be imparted downwardly on the aggregate material


25


. The magnitude of the respective vector forces is dependent upon the angle of the bevel


42


as well as the frequency and amplitude of the vibration and the surface area of the beveled surface


42


. Additionally, the surface


42


may connect to a transverse surface


46


of rim


44


which will impart forces in the longitudinal direction on the aggregate material


25


. The design of these surfaces


42


,


26


and their extent thus become an important feature of the invention. Typically, for example, a hollow tube apparatus having a diameter of 30 inches will include an interior rim member


44


having a wall thickness of 1 to 1½ inches. That, in combination with the wall thickness of the hollow tube apparatus


18


will provide a total wall thickness of approximately 2 to 2½ inches. Such a wall will have a bevel surface


42


and a lower impact surface


46


. The bevel surface


42


will typically form an angle of 45 degrees within casing


18


axis though the angle may be varied, preferably in the range of between 15 and 75 degrees from horizontal as depicted in FIG.


8


.




In practice, the hollow tube apparatus


18


will be located at a fixed depth in cavity


16


and vibrated at a certain position within the cavity


16


. The hollow tube apparatus


18


will then be moved upwardly a certain distance equivalent, for example, to twice the height of a completed lift, e.g. about 24 inches. Lowering of the hollow tube apparatus, with or without vibration, will then cause impaction of material


25


once again. In this manner, a series of lifts along the length of the pier will be formed. Each lift will comprise a compacted material resulting in lift elements having a general configuration of the type depicted and described in U.S. Pat. No. 5,249,892, although bulging may not be as pronounced and interior portions of the pier may not be as densified as with the short aggregate pier described in U.S. Pat. No. 5,249,892. The elements, however, are formed in a manner that does not utilize a separate tamping tool. Rather, the hollow tube apparatus with special mechanically designed bottom portion


18


acts as a tamping mechanism and also as a vibrating mechanism, and the alternative vibrating element


30


further facilitates densification and tamping. The element


30


may also act as a tamping device when employed.




With the hollow tube apparatus


18


configuration depicted in

FIG. 8

, an auger


50


as shown in

FIG. 3

may be utilized to remove the original soil


14


from the hollow tube apparatus


18


. The auger


50


may include a reduced diameter blade


52


which will fit through the region incorporating the thickened mechanical rim


44


so that soil matrix


14


can be removed from beneath the end


26


of the hollow tube apparatus


18


. In this manner, when aggregate


25


is placed within the hollow tube apparatus


18


, it will initially form a bulb


27


in a compressed region of material


25


beneath the end


26


of the hollow tube apparatus


18


as depicted in FIG.


11


. The auger


50


further includes an increased diameter blade section


54


for evacuation of the interior or core of the hollow tube apparatus


18


.




The element


30


may also constitute a hollow tube with an end formed in the manner depicted in FIG.


8


. Thus, both the hollow tube apparatus


18


as well as the element


30


may receive and feed aggregate into the soil cavity and act to form and tamp the material


14


and form the respective lifts as the element


30


and hollow tube apparatus


18


are alternately lifted vertically and lowered with or without vibration, and with or without pushing or driving energy applied as described. beams to apply vertical compressive loads in increments. Load deflection readings were made of each pier, and the load deflection curves were plotted and are shown on FIG.


12


. Stiffness Modulus values were determined by dividing the stress values at top of pier by the corresponding pier movements (deflections). A similar load test was performed of the stone column pier. Results of that load test are also shown on FIG.


12


.




Deflections corresponding to top of pier stresses of 6,000, 8,000, 10,000, and 12,000 psf are shown on Table 1. Modulus values corresponding to the same top of pier stress are also shown on Table 1. Ratios of modulus values produced by the beveled lateral displacement pier to modulus values produced by the non-beveled lateral displacement pier are shown on Table 1, as well as ratios of the beveled lateral displacement pier modulus values to those of the stone column.




It can readily be seen that stiffness modulus values produced by the beveled lateral displacement pier are significantly greater than those of the non-beveled lateral displacement pier. For example, within the 6,000 to 8,000 psf top of pier stress range, modulus values of the beveled pier are about 3 times greater. It is further shown that stiffness modulus values of the beveled lateral displacement pier are significantly greater than the stone column pier. For the 6,000 to 8,000 psf top of pier stress range, modulus values of the beveled lateral displacement pier are about 4 times greater than those of the stone column pier.




The beveled lateral displacement pier produced stiffer elements than the other two piers. Deflections corresponding to applied to of pier stresses were less than corresponding deflections of the non-beveled and non-thickened hollow tube apparatus pier, and even greater differences were measured in comparing the beveled lateral displacement pier with the stone column pier.




Although the movement of the hollow tube apparatus


18


and the optional element


30


is described to be performed in incremental and generally equal steps, it is possible to vary the amount of movement of the hollow tube apparatus


18


and element


30


during each of the separate steps of longitudinal movement. Movement may also be simultaneous or non-simultaneous. Also, the direction, amplitude and frequency of vibration may be varied depending upon the material forming the aggregate pier and other factors. Also, the application of downward pushing energy or driving energy may be varied or may be omitted depending upon the material forming the aggregate pier and other factors. Also, the application of downward pushing energy or driving energy may be varied or may be omitted depending upon the material forming the aggregate pier and other factors. In any event, successive lifts


29


are formed as depicted in FIG.


11


.




Further, the aggregate may contain fluid materials or chemicals or the hollow tube apparatus


18


may be coated to facilitate aggregate flow and compaction. The hollow tube apparatus


18


may be precoated or fluids added during the vibration steps or otherwise as discussed hereinafter.




The process and resulting product piers or columns were built and tested in comparison to prior art stone columns. Two lateral displacement piers and one stone column pier were installed in May, 2001 on the same site and in similar soil conditions. Each of these three piers was of the same diameter and each was of the same length. The two lateral displacement piers were each constructed with a different apparatus, one with an outward-facing bevel at the bottom side wall and a thickened bottom apparatus attached to a hollow tube apparatus. The other Lateral Displacement Pier was constructed with the hollow tube apparatus extending full length, and without the beveled thickened bottom apparatus portion with the outward-facing beveled bottom.












TABLE 1











Table 1 reports the observed results.

















Top of Pier Stress




6,000 psf




8,000 psf




10,000 psf




12,000 psf




















1.




Deflections, inches











Beveled Lateral




0.50




0.86




1.43




2.29







Displacement Pier







(LDP)







Non-Beveled LDP




1.48




2.48




3.52




4.57







Stone Column




2.10




3.48




5.02




6.26






2.




Modulus Values, pci







Beveled LDP




83.3




64.6




48.6




36.4







Non-Beveled LDP




28.2




22.4




19.7




18.2







Stone Column




19.8




16.0




13.8




13.3






3.




Ratio of Modulus







Values







Beveled LDP




3.0




2.9




2.5




2.0







Non-Beveled LDP







Stone Column




4.2




4.0




3.5




2.7














Additional embodiments and variations of the invention, including the method of the invention and the apparatus for practice of such methods, are contemplated. Referring to

FIG. 13

, an alternative embodiment is depicted as well as an alternative method of practice of the invention. In particular, a casing


18


is provided with an end cap


80


. In the embodiment depicted, the end cap


80


has a pointed configuration and is held in place on the casing by means of a removable lock ring


82


. The lock ring


82


may be rotated, for example, to release the cap


80


for removal of the cap


80


upon the desired depth of penetration of casing


18


into a soil matrix. Alternatively, the cap


80


may be left in position within the ground or soil matrix by merely releasing the cap retaining ring


82


.




In any event, the apparatus of

FIG. 13

is provided to close the hollow tube in order to keep soil from entering the tube or casing


18


as it penetrates the soil matrix. The casing or hollow tube


18


can then be driven, vibrated, pushed or manipulated by a combination of the described methods to assume a desired depth in the soil matrix. The bottom cap


82


may then be left in place or removed through the hollow tube. The column or pier is then constructed in the manner previously described. The bottom cap


80


has the dual function of providing a means for effectively effecting penetration of the casing


18


while prohibiting ingress of the matrix into the casing


18


.





FIG. 14

illustrates an alternative embodiment of the end construction of casing


18


. This is an alternative to the construction illustrated, for example, in FIG.


8


. In the construction of

FIG. 14

, the casing or tube


18


includes an annular or circular rim


86


which preferably includes a lower beveled edge


88


and an upper beveled edge


90


to facilitate movement of the casing end


18


and ring


86


into and out of the soil. The ring


86


may be used in combination with an internal annular ring or member


44


of the type depicted in

FIG. 7

or in place of such an annular ring or member


44


.





FIG. 15

illustrates yet another method feature of the invention as an alternative. Specifically, the insert element


30


(or the auger


50


) may be utilized to provide insertion of mix materials into the casing


18


as the various lifts formed by the casing


18


are sequentially created. That is, the element


30


(or the auger


50


) may include exit passages


96


and mixing blades


98


. The exit passages


96


permit the insertion of a soil mixing compound such as lime or cement into the material forming the lifts. The blades


98


effect a mixing action upon vibration, rotation, or other movement of the insert element


30


. Thus, the material forming the lifts may be mixed in situ. Various additives may be included. The additives may be varied with respect to each of the separately formed lifts.




It is possible to vary the construction and method of operation of the invention without departing from the spirit and scope thereof. Alternative hollow tube apparatus configurations, sizes and lengths of piers may be utilized. The element


30


may be varied in its configuration and use. It is also an optional element and may or may not be used depending on the type of aggregate used and other factors. Therefore, the invention is to be limited only by the following claims and equivalents thereof.



Claims
  • 1. A method for installation of a pier comprising, in combination, the steps of:a) positioning a hollow tube apparatus having a longitudinal dimension and a lateral dimension in a soil matrix, said hollow tube apparatus including a hollow core and a shaped lower end for directing both lateral and longitudinal forces when raised and lowered longitudinally in said soil matrix; b) removing the soil matrix from the hollow core of the hollow tube apparatus; c) positioning a mechanical device in the hollow core of the hollow tube apparatus; d) at least partially filling the hollow tube apparatus hollow core with aggregate; e) moving the mechanical device in the aggregate to densify the aggregate; and f) raising and lowering the hollow tube apparatus incrementally to impart lateral forces on the aggregate and soil matrix simultaneously with longitudinal forces on the aggregate to thereby form compacted lifts as the hollow tube apparatus is removed in incremental steps from the soil matrix.
  • 2. The method of claim 1 wherein the step of filling the hollow tube apparatus comprises filling with a material selected from the group consisting of aggregate and dry cement, aggregate and recycled concrete, recycled concrete, recycled asphalt, aggregate and chemical additives, stone, drainage graded stone, stone and sand, aggregate and mesh and combinations thereof.
  • 3. The method of claim 1 wherein the mechanical device placed in the hollow tube apparatus extends substantially the longitudinal length of the hollow tube apparatus.
  • 4. The method of claim 1 including a step of removing the mechanical device from the hollow tube apparatus.
  • 5. The method of claim 1 wherein the hollow tube apparatus is positioned in a predrilled cavity.
  • 6. The method of claim 1 wherein the hollow tube apparatus is driven or pushed into the soil matrix.
  • 7. The method of claim 1 wherein the hollow tube apparatus includes a mechanical portion with a lower peripheral surface defining an angle intermediate the longitudinal and lateral directions.
  • 8. The method of claim 1 wherein the step of removing the soil matrix from the hollow tube apparatus comprises drilling.
  • 9. The method of claim 1 wherein removal of the soil matrix from the hollow tube apparatus is selected from the group consisting of excavation, vacuum suction, and combinations thereof.
  • 10. The method of claim 1 including vibrating the hollow tube apparatus after the step of moving.
  • 11. A pier formed by the process of any of the claims 1, 2, 3, 5-10.
  • 12. The method of claim 1 wherein the hollow tube apparatus is formed with an inwardly beveled lower edge end.
  • 13. The method of claim 1 wherein the hollow tube apparatus is cylindrical.
  • 14. The method of claim 1 wherein the hollow tube apparatus includes a uniform diameter hollow core, and a bottom mechanical device with an internal rim at the bottom of the hollow tube apparatus, said bottom mechanical device being beveled inwardly.
  • 15. The method of claim 1 wherein the soil matrix is preloaded and prestrained in the vicinity of the pier.
  • 16. The method of claim 1 wherein the step of filling the hollow tube apparatus comprises filling with a material selected from the group consisting of aggregate and dry cement, aggregate and recycled concrete, recycled concrete, recycled asphalt, aggregate and chemical additives, stone, drainage graded stone, stone and sand, aggregate and mesh and combinations thereof.
  • 17. Apparatus for formation of an aggregate material pier in a soil matrix comprising, in combination:(a) a hollow, elongate tube for generally vertical insertion into the soil matrix, said elongate tube including an open top end and an open bottom end, and a generally constant cross section hollow passage between the bottom end and the top end, said bottom end having a reduced area cross section and comprising a shaped rim for providing longitudinal and lateral forces simultaneously on the soil matrix as the tube is moved up and down longitudinally in the soil matrix; (b) an auger for placement in the tube to remove soil matrix from the tube, said auger sized to fit through the bottom end of the tube; (c) a shaped rod member for placement in the hollow tube upon removal of the auger; and (d) means for vibrating the rod member and incrementally lifting the tube and the rod member.
  • 18. A method for installation of a pier comprising, in combination, the steps of:a) predrilling a cavity in a soil matrix; b) positioning a hollow tube apparatus having a longitudinal dimension and a lateral dimension in the soil matrix, said hollow tube apparatus including a hollow core and a shaped lower end for directing both lateral and longitudinal forces when raised and lowered longitudinally in said soil matrix; c) removing the soil matrix from the hollow core of the hollow tube apparatus; d) positioning a mechanical device in the hollow core of the hollow tube apparatus; e) at least partially filling the hollow tube apparatus hollow core with aggregate; f) moving the mechanical device in the aggregate to densify the aggregate; and g) raising and lowering the hollow tube apparatus incrementally to impart lateral forces on the aggregate and soil matrix simultaneously with longitudinal forces on the aggregate to thereby form compacted lifts as the hollow tube apparatus is removed in incremental steps from the soil matrix.
  • 19. The method of claim 18 wherein the mechanical device placed in the hollow tube apparatus extends substantially the longitudinal length of the hollow tube apparatus.
  • 20. The method of claim 18 wherein the hollow tube apparatus includes a mechanical portion with a lower peripheral surface defining an angle intermediate the longitudinal and lateral directions.
  • 21. The method of claim 18 wherein the step of removing the soil matrix from the hollow tube apparatus comprises drilling.
  • 22. The method of claim 18 wherein removal of the soil matrix from the hollow tube apparatus is selected from the group consisting of excavation, vacuum suction, and combinations thereof.
  • 23. The method of claim 18 including vibrating the hollow tube apparatus.
  • 24. A pier formed by the process of claim 18.
  • 25. The method of claim 18 wherein the hollow tube apparatus is formed with an inwardly beveled lower edge end.
  • 26. The method of claim 18 wherein the hollow tube apparatus is cylindrical.
  • 27. The method of claim 18 wherein the hollow tube apparatus includes a uniform diameter hollow core, and a bottom mechanical device with an internal rim at the bottom of the hollow tube apparatus, said bottom mechanical device being beveled inwardly.
  • 28. The method of claim 18 wherein the soil matrix is preloaded and prestrained in the vicinity of the pier.
CROSS REFERENCE TO RELATED APPLICATION

This is a utility application based upon provisional application Serial No. 60/211,773, filed Jun. 15, 2000 and entitled “Displaced Aggregate Pier” for which priority is claimed and which is incorporated herewith by reference.

US Referenced Citations (9)
Number Name Date Kind
3869003 Yamada et al. Mar 1975 A
4165198 Farmer Aug 1979 A
4637758 Tamaki et al. Jan 1987 A
4657441 Horvath Apr 1987 A
4738568 Steding Apr 1988 A
4966498 Blum Oct 1990 A
5066168 Holdeman Nov 1991 A
5249892 Fox et al. Oct 1993 A
5423633 Verstraeten Jun 1995 A
Non-Patent Literature Citations (1)
Entry
Fintel, Mark, Handbook of Concrete Engineering, 1985, Second Edition, p. 268.
Provisional Applications (1)
Number Date Country
60/211773 Jun 2000 US