Claims
- 1. A method for installation of a pier comprising, in combination, the steps of:a) positioning a hollow tube apparatus having a longitudinal dimension and a lateral dimension in a soil matrix, said hollow tube apparatus including a hollow core and a shaped lower end for directing both lateral and longitudinal forces when raised and lowered longitudinally in said soil matrix; b) removing the soil matrix from the hollow core of the hollow tube apparatus; c) positioning a mechanical device in the hollow core of the hollow tube apparatus; d) at least partially filling the hollow tube apparatus hollow core with aggregate; e) moving the mechanical device in the aggregate to densify the aggregate; and f) raising and lowering the hollow tube apparatus incrementally to impart lateral forces on the aggregate and soil matrix simultaneously with longitudinal forces on the aggregate to thereby form compacted lifts as the hollow tube apparatus is removed in incremental steps from the soil matrix.
- 2. The method of claim 1 wherein the step of filling the hollow tube apparatus comprises filling with a material selected from the group consisting of aggregate and dry cement, aggregate and recycled concrete, recycled concrete, recycled asphalt, aggregate and chemical additives, stone, drainage graded stone, stone and sand, aggregate and mesh and combinations thereof.
- 3. The method of claim 1 wherein the mechanical device placed in the hollow tube apparatus extends substantially the longitudinal length of the hollow tube apparatus.
- 4. The method of claim 1 including a step of removing the mechanical device from the hollow tube apparatus.
- 5. The method of claim 1 wherein the hollow tube apparatus is positioned in a predrilled cavity.
- 6. The method of claim 1 wherein the hollow tube apparatus is driven or pushed into the soil matrix.
- 7. The method of claim 1 wherein the hollow tube apparatus includes a mechanical portion with a lower peripheral surface defining an angle intermediate the longitudinal and lateral directions.
- 8. The method of claim 1 wherein the step of removing the soil matrix from the hollow tube apparatus comprises drilling.
- 9. The method of claim 1 wherein removal of the soil matrix from the hollow tube apparatus is selected from the group consisting of excavation, vacuum suction, and combinations thereof.
- 10. The method of claim 1 including vibrating the hollow tube apparatus after the step of moving.
- 11. A pier formed by the process of any of the claims 1, 2, 3, 5-10.
- 12. The method of claim 1 wherein the hollow tube apparatus is formed with an inwardly beveled lower edge end.
- 13. The method of claim 1 wherein the hollow tube apparatus is cylindrical.
- 14. The method of claim 1 wherein the hollow tube apparatus includes a uniform diameter hollow core, and a bottom mechanical device with an internal rim at the bottom of the hollow tube apparatus, said bottom mechanical device being beveled inwardly.
- 15. The method of claim 1 wherein the soil matrix is preloaded and prestrained in the vicinity of the pier.
- 16. The method of claim 1 wherein the step of filling the hollow tube apparatus comprises filling with a material selected from the group consisting of aggregate and dry cement, aggregate and recycled concrete, recycled concrete, recycled asphalt, aggregate and chemical additives, stone, drainage graded stone, stone and sand, aggregate and mesh and combinations thereof.
- 17. Apparatus for formation of an aggregate material pier in a soil matrix comprising, in combination:(a) a hollow, elongate tube for generally vertical insertion into the soil matrix, said elongate tube including an open top end and an open bottom end, and a generally constant cross section hollow passage between the bottom end and the top end, said bottom end having a reduced area cross section and comprising a shaped rim for providing longitudinal and lateral forces simultaneously on the soil matrix as the tube is moved up and down longitudinally in the soil matrix; (b) an auger for placement in the tube to remove soil matrix from the tube, said auger sized to fit through the bottom end of the tube; (c) a shaped rod member for placement in the hollow tube upon removal of the auger; and (d) means for vibrating the rod member and incrementally lifting the tube and the rod member.
- 18. A method for installation of a pier comprising, in combination, the steps of:a) predrilling a cavity in a soil matrix; b) positioning a hollow tube apparatus having a longitudinal dimension and a lateral dimension in the soil matrix, said hollow tube apparatus including a hollow core and a shaped lower end for directing both lateral and longitudinal forces when raised and lowered longitudinally in said soil matrix; c) removing the soil matrix from the hollow core of the hollow tube apparatus; d) positioning a mechanical device in the hollow core of the hollow tube apparatus; e) at least partially filling the hollow tube apparatus hollow core with aggregate; f) moving the mechanical device in the aggregate to densify the aggregate; and g) raising and lowering the hollow tube apparatus incrementally to impart lateral forces on the aggregate and soil matrix simultaneously with longitudinal forces on the aggregate to thereby form compacted lifts as the hollow tube apparatus is removed in incremental steps from the soil matrix.
- 19. The method of claim 18 wherein the mechanical device placed in the hollow tube apparatus extends substantially the longitudinal length of the hollow tube apparatus.
- 20. The method of claim 18 wherein the hollow tube apparatus includes a mechanical portion with a lower peripheral surface defining an angle intermediate the longitudinal and lateral directions.
- 21. The method of claim 18 wherein the step of removing the soil matrix from the hollow tube apparatus comprises drilling.
- 22. The method of claim 18 wherein removal of the soil matrix from the hollow tube apparatus is selected from the group consisting of excavation, vacuum suction, and combinations thereof.
- 23. The method of claim 18 including vibrating the hollow tube apparatus.
- 24. A pier formed by the process of claim 18.
- 25. The method of claim 18 wherein the hollow tube apparatus is formed with an inwardly beveled lower edge end.
- 26. The method of claim 18 wherein the hollow tube apparatus is cylindrical.
- 27. The method of claim 18 wherein the hollow tube apparatus includes a uniform diameter hollow core, and a bottom mechanical device with an internal rim at the bottom of the hollow tube apparatus, said bottom mechanical device being beveled inwardly.
- 28. The method of claim 18 wherein the soil matrix is preloaded and prestrained in the vicinity of the pier.
CROSS REFERENCE TO RELATED APPLICATION
This is a utility application based upon provisional application Serial No. 60/211,773, filed Jun. 15, 2000 and entitled “Displaced Aggregate Pier” for which priority is claimed and which is incorporated herewith by reference.
US Referenced Citations (9)
Non-Patent Literature Citations (1)
Entry |
Fintel, Mark, Handbook of Concrete Engineering, 1985, Second Edition, p. 268. |
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/211773 |
Jun 2000 |
US |