Lateral wellbore completion apparatus and method

Information

  • Patent Grant
  • 10036234
  • Patent Number
    10,036,234
  • Date Filed
    Tuesday, May 21, 2013
    11 years ago
  • Date Issued
    Tuesday, July 31, 2018
    5 years ago
Abstract
A lateral wellbore completion apparatus may include a flow-through deflector having a deflector face and a junction string that includes a junction block cooperative to mate with the deflector face, a downhole device, and an inductive coupler electrically connected to the downhole device. A method may include anchoring the deflector in a main bore, making-up at the drilling surface a junction string that includes a junction block, a completion string section having a downhole device, and a secondary inductive coupler electrically connected to the downhole device, running the junction string into the main bore, deflecting the completion string section into the lateral bore, and landing the junction block on the deflector face thereby communicatively coupling the secondary and primary inductive couplers.
Description
BACKGROUND

This section provides background information to facilitate a better understanding of the various aspects of the disclosure. It should be understood that the statements in this section of this document are to be read in this light, and not as admissions of prior art.


Maximum and extreme reservoir contact wells are drilled and completed with respect to maximizing total hydrocarbon recovery. These wells may be long and horizontal, and in some cases may have multiple lateral branches. Sensors and flow control devices are often installed in these lateral branches to facilitate hydrocarbon recovery.


SUMMARY

The lateral wellbore completion apparatus and methods provide for completing a lateral bore and communicatively coupling the downhole devices located in the lateral wellbore with a primary inductive coupler located in the main bore. According to an embodiment, a lateral wellbore completion apparatus includes a flow-through deflector having a deflector face and a junction string that includes a junction block cooperative to mate with the deflector face, a downhole device, and an inductive coupler electrically connected to the downhole device. An embodiment of a method for completing a lateral wellbore includes anchoring a flow-through deflector in a main bore that has a primary inductive coupler; making-up at the drilling surface a junction string that includes a junction block, a downhole device, and a secondary inductive coupler electrically connected to the downhole device; running the junction string into the main bore; deflecting a completion string section with the downhole tool into the lateral bore; landing the junction block on the deflector face; and communicatively coupling the secondary inductive coupler with the primary inductive coupler in response to the landing. An embodiment of a well system includes a flow-through deflector located in a main bore and a junction string having a completion string section with a downhole device located in the lateral bore, a junction block landed on the flow-through deflector, and a secondary inductive coupler communicatively coupled with the primary inductive coupler, the secondary inductive coupler electrically connected to the downhole device by a conductor.


This summary is provided to introduce a selection of concepts that are further described below in the detailed description. This summary is not intended to identify key or essential features of the claimed subject matter, nor is it intended to be used as an aid in limiting the scope of claimed subject matter.





BRIEF DESCRIPTION OF THE DRAWINGS

Embodiments of lateral wellbore completion apparatus and methods are described with reference to the following figures. The same numbers are used throughout the figures to reference like features and components. It is emphasized that, in accordance with standard practice in the industry, various features are not necessarily drawn to scale. In fact, the dimensions of various features may be arbitrarily increased or reduced for clarity of discussion.



FIG. 1 illustrates a lateral wellbore completion apparatus installed in a lateral bore and providing electric communication between the lateral wellbore completion and a primary inductive coupler in a main bore in accordance to one or more embodiments.



FIGS. 2, 3, and 6 illustrate a well system being completed with a lateral wellbore completion in accordance with one or more embodiments.



FIG. 4 is an elevation view of a flow-through deflector of a lateral wellbore completion in accordance to one or more embodiments.



FIG. 5 is a top view of a flow-through deflector of a lateral wellbore completion in accordance to one or more embodiments.



FIG. 7 illustrates a junction block of a lateral wellbore completion in accordance to one or more embodiments.



FIG. 8 illustrates a well system completed with a lateral wellbore completion in accordance to one or more embodiments.



FIG. 9 illustrates a lateral intervention deflector device in accordance to one or more embodiments cooperative with a lateral wellbore completion.



FIG. 10 illustrates a main bore intervention device in accordance to one or more embodiments cooperative with a lateral wellbore completion.





DETAILED DESCRIPTION

It is to be understood that the following disclosure provides many different embodiments, or examples, for implementing different features of various embodiments. Specific examples of components and arrangements are described below to simplify the disclosure. These are, of course, merely examples and are not intended to be limiting. In addition, the disclosure may repeat reference numerals and/or letters in the various examples. This repetition is for the purpose of simplicity and clarity and does not in itself dictate a relationship between the various embodiments and/or configurations discussed.


As used herein, the terms “connect”, “connection”, “connected”, “in connection with”, and “connecting” are used to mean “in direct connection with” or “in connection with via one or more elements”; and the term “set” is used to mean “one element” or “more than one element”. Further, the terms “couple”, “coupling”, “coupled”, “coupled together”, and “coupled with” are used to mean “directly coupled together” or “coupled together via one or more elements”. Further, the terms “communicatively coupled” and similar terms may mean “electrically or inductively coupled” for purposes of passing data and power either directly or indirectly between two points. As used herein, the terms “up” and “down”; “upper” and “lower”; “top” and “bottom”; and other like terms indicating relative positions to a given point or element are utilized to more clearly describe son e elements. Commonly, these terms relate to a reference point as the surface from which drilling operations are initiated as being the top point and the total depth being the lowest point, wherein the well (e.g., wellbore, borehole) is vertical, horizontal or slanted relative to the surface.


Embodiments of lateral wellbore completions generally relate to the completion of wells (e.g., multilateral wells) having at least one lateral branch extending from a main wellbore section. The main bore and lateral bores may each include one or more zones that are isolated from other zones for example by the use of reservoir isolation devices (e.g., packers). One or more downhole devices, such as flow control devices (FCDs), pumps, and measurement sensors (e.g., pressure, temperature, flow rate, density, FCD position indicator, etc.) may be included in the completed zones.


One or more electric cables may be run from the drilling surface (e.g. surface controller) to provide communication and/or electrical power to primary inductive couplers located in the main bore. The primary inductive couplers may serves as stations at which secondary inductive couplers can communicatively couple downhole devices. According to some embodiments, a lateral wellbore completion can be installed to complete a lateral bore and electrically couple the downhole devices of the lateral wellbore completion with a primary inductive coupler completing a junction between the main bore and the lateral bore. The lateral wellbore completion may provide for later through-tubing intervention.



FIG. 1 illustrates an example of a lateral wellbore completion apparatus, generally denoted by the numeral 10, installed in a lateral bore 12 and providing electrical communication between lateral wellbore completion apparatus 10 devices and a casing inductive coupler 14, referred to from time to time herein as a primary inductive coupler 14, located in the main, or mother, bore 16.


According to one or more embodiments, lateral wellbore completion apparatus 10 includes a flow through deflector 18 (e.g., production deflector) set in main bore 16 proximate the junction 20 between lateral bore 12 and main bore 16 and a junction string 22. Junction string 22 includes a lateral completion string section 36 that is installed in lateral bore 12. Junction string 22 as depicted in FIG. 1 includes an anchor device 24, referred to as packer 24, to anchor a top end 25 of junction string 22 in main bore 16; a junction block 26 having a low-side window 76 (FIG. 7) to mate or align with production deflector face 68 (FIGS. 4, 5); a tubular extension 28 (e.g., space out extension) located between junction block 26 and packer 24 carrying a secondary inductive coupler 30 for mating with a primary inductive coupler 14 located above lateral bore 12 in this example, and an electrical cable 32 connected to secondary inductive couplet 30 and one or more downhole devices 34 located in the lateral completion string section 36 section of junction string 22; and an intervention profile 38 (e.g., landing device, mule shoe) for later landing and orienting through-tubing intervention devices, e.g., lateral intervention deflector device 88 (FIG. 9) and main bore intervention device 106 (FIG. 10). Downhole devices 34 can include without limitation sensors, flow control devices, valves, pumps and other devices that may transmit and/or receive electrical signals and/or receive electrical power via the connection of secondary inductive coupler 30 and primary inductive coupler 14.


In accordance with some embodiments, junction string 22 includes a selectable swivel 40 (e.g., swivel and controllable lock) located downhole of junction block 26 to permit junction block 26 to rotate free of lateral completion stung section 36 when orienting and landing junction block 26 with flow through deflector 18. In a locked position, swivel 40 rotationally locks junction block 26 with lateral completion string section 36.


Examples of methods of completing a lateral bore 12 with a lateral wellbore completion 10 in accordance to one or more embodiments is now described with reference to FIGS. 1 through 8. FIG. 2 illustrates a well system 42 having a main bore 16 extending into the ground from a surface 43 (e.g., drilling surface). Main bore 16 is completed with casing 44 (e.g., liner) having spaced apart casing inductive couplers 14, also referred to herein as primary inductive couplers 14, located at predetermined locations. The primary inductive couplers are generally identified by the numeral 14 and from time to time individually identified by 14A, 14B, 14C, etc. in reference to the illustrated examples. A single primary electrical cable 46, generally referred to as a conductor, is depicted extending exterior of casing 44 and is connected to each of the primary inductive couplers 14 to communicate for example control signals, data and electrical power between the primary inductive couplers 14 and a surface device 48. Surface device 48 may be a monitoring and/or control station for example. In some embodiments, surface device 48 may be located intermediate to surface 43 and primary inductive couplers 14. Surface device 48 may be a transmitter/receiver configured to allow for monitoring and control of the well from a remote site. Surface device 48 may be provided at a terrestrial or subsea location. Surface device 48 may comprise multiple components or a single component. Primary conductor 46 may be communicatively coupled to a surface device 48, depicted at surface 43, for example and without limitation via wireless connection with the upper most primary inductive coupler 14C, via wired pipe, primary conductor 46 extending to surface device 48, and an upper tubing conductor inductively coupling surface device 48 and a primary inductive coupler 14, e.g., FIG. 8. Downhole devices 34 are communicatively coupled with surface device 48 via the inductive coupling of secondary inductive couplers 30 with primary inductive couplers 14. Secondary inductive couplers are identified individually from time to time by 30A, 30B, 30C etc. in reference to the illustrated examples.


Casing string 44 includes indexed casing couplings (ICC), generally denoted by the numeral 50 and individually from time to time by 50A, 50B, etc. located at predetermined locations. Indexed casing couplings 50 provide a means for locating devices in main bore 16, for example, to align secondary inductive couplers 30 with primary inductive couplers 14. In another example, primary conductor 46 may be rotated, for example 90 degrees, at each casing 44 joint above an ICC 50 providing a means to mill a window in casing 44 without cutting primary conductor 46. Each indexed casing coupler may have a selective internal profile different from one or all of the other ICCs to facilitate positioning of specific landing tools.


Main bore 16 is drilled and casing 44, primary inductive couplers 14, primary conductor 46, and indexed casing couplers 50 may be cemented in place. In the depicted embodiment a lower branch 52 (e.g., bore) is drilled from the bottom 54 of casing 44. A lateral completion 56 is installed in lower branch 52. In the depicted embodiment, lateral completion 56 extends from packer 58 set in casing 44 to a sacrificial motor 60, and drill bit 62. Lateral completion 56 includes a secondary inductive coupler 30A communicatively coupled with primary inductive coupler 14A. An electrical conductor 32 extends from secondary inductive coupler 30A to one or more downhole devices 34 (e.g., FCDs, valves, sensors, pumps, etc.). After lower branch 52 is completed lateral bore 12 is drilled. Lateral bore 12 extends from a window 64 milled through casing 44.


Referring now to FIG. 3, flow-through deflector 18 of lateral wellbore completion 10 is depicted being deployed in main bore 16 on a tubular string 66. In this example, flow-through deflector 18 is deployed on an internal running tool. An example of flow-through deflector 18 is illustrated in FIGS. 4 and 5. Referring to FIG. 4, depicted flow-through deflector 18 is an elongated tubular member having a hollowed, tapered deflector face 68. Deflector face 68 may be concave shaped to accommodate the corresponding cooperative junction block 26, see, e.g., FIGS. 1, 6, 7; in particular for periphery 77 of low-side window 76 to mate with deflector face 68 to eliminate or limit gaps between junction block 26 and deflector face 68.


Flow-through deflector 18 is landed in a lower portion 16A of main bore 16 below window 64 for example by latching a landing tool 72 with indexed casing coupler 50A. Locating and landing flow-through deflector is with respect to indexed casing coupler 50A operationally positions deflector face 68 relative to window 64. Tubular string 66 (e.g., running string) may include a measurement-while-drilling tool (MWD) to orient flow-through deflector 18 relative to window 64. After flow-through deflector 18 is set in lower main bore portion 16A, running string 66 is disconnected and pulled out of main bore 16.



FIG. 6 illustrates a lateral wellbore completion 10 deployed in well system 42. Junction string 22 and lateral completion string section 36 are made-up at surface 43. Lateral completion string section 36 may include various components, including without limitation, a drill bit 62, motor 60, a downhole device 34 (e.g., FCDs, sensors), and formations isolation devices 74 (e.g., packers). In the depicted embodiment, a swivel 40 is connected between junction block 26 and lateral completion string section 36. A secondary inductive coupler 30B is electrically connected to downhole device(s) 34 for example via conductor 32. Junction block 26 is located between secondary inductive coupler 30B and downhole devices 34. Secondary inductive coupler may be located, for example, on a tubular extension 28 between junction block 26 and a packer 24. Secondary inductive coupler 30B is spaced so as to be communicatively coupled with primary inductive coupler 14B when junction block 26 is matingly landed with deflector face 68. Primary inductive coupler 14B is located in the upper main bore 16B. Intervention profile 38 is located in junction string 22 above junction block 26 so as to be disposed in main bore 16. Intervention profile 38 may be configured to locate and position through tubing intervention devices 88, 106 (FIGS. 9, 10) to access lateral bore 12 and/or lower main bore 16A and lower branch 52.



FIG. 7 illustrates a junction block 26 according to one or more embodiments. Junction block 26 is a substantially tubular member having a window 76 cut out of a side 78 of junction block 26. Side 78 is referred to as the low-side relative to the position of tubular block 26 with the cooperative flow-through deflector 18. The periphery 77 of window 76 is configured to mate with deflector face 68 (FIGS. 4, 5) to minimize or eliminate gaps therebetween. Junction block 26 may have an eccentric bore 80 providing enough wall thickness on the high-side 82 opposite from window 76 to form a groove 84 to dispose electrical conductor 32. Top end 27 and bottom end 29 may include threaded connections for connecting in junction string 22.


Referring back to FIG. 6, junction string 22 with lateral completion string section 36 is run into main bore 16 on tubular string 66. Swivel 40 may be in a locked position rotationally locking junction block 26 and lateral completion string section 36 together. Flow-through deflector 18 will deflects lateral completion string section 36 into lateral bore 12. Drilling fluid may be circulated through tubular string 66 to activate downhole motor 60. Swivel 40 may be activated, for example hydraulically, to an unlocked position allowing junction block 26 to rotate independent of lateral completion string section 36. Deflector face 68 and junction block 26 cooperate to orient low-side 78 (FIG. 7) against deflector face 68 (FIGS. 4, 5) such that periphery 77 of window 76 mates with deflector face 68 and positions secondary inductive coupler 30B in communicative coupling position with primary inductive coupler 14B. Accordingly, each of the downhole devices 34 of junction string 22 are communicatively coupled to primary conductor 46 and thus surface device 48 when junction block 26 is landed on cooperative flow-through deflector 18. It is not necessary for downhole devices 34 to be electrically tied back to primary inductive coupler 14B after junction string 22 is landed.


Communication between cooperative inductive couplers 14B, 30B is confirmed and packer 24 can be set to engage casing 44. Tubular string 66 may be disconnected from junction string 22 and removed from main bore 16.


Referring now to FIG. 8, well system 42 is depicted completed with a lateral wellbore completion 10. A tubular string 66 is extends from surface 43 into main bore 16 and is depicted connected to production packer 24 of lateral wellbore completion 10. Tubular string 66 is in selective fluid communication with lateral completion 56 disposed in lower lateral branch 52 and lateral branch 12. An electrical conductor 86 electrically connected to surface device 48 extends along tubular string 66 to a secondary inductive coupler 30C located adjacent primary inductive coupler 14C communicatively coupling surface device 48 and all of the primary inductive couplers 14 and downhole devices 34 that are communicatively coupled to primary inductive couplers 14 via secondary inductive couplers 30.



FIG. 9 illustrates a lateral intervention deflector device 88 according to one or more embodiments. Lateral deflector 88 is cooperative with intervention profile 38, see, e.g., FIG. 1, to facilitate through tubing intervention into lateral completion string section 36 and lateral bore 12. For example, lateral deflector 88 may provide for conducting through tubing interventions, such as and without limitation, stimulation, jetting, production logging, pressure build up data, mechanically shifting sleeves (e.g., device 34), and plug and abandonment operations via tubing, coiled tubing, electric line, wireline and slickline. Depicted lateral intervention device 88 includes a running profile 89 located toward top end 90. For example, running neck 89 (e.g., fishing neck) connectable with a running tool, for example a GS tool, and which may serve as a coiled tubing entry guide.


With reference also to FIGS. 1 and 8, lateral deflector 88 extends from a top end 90 to a bottom end 92. An internal bore 94 extends from top end 90 to a slide and glide skirt 96, deflector ramp 98, and guide nose 100. Lateral deflector 88 includes a latch mechanism 102 (e.g., collet) cooperative with selective internal profile 38 and an orientation key 104. To conduct an intervention in lateral bore 12, lateral deflector device 88 can be run, for example, into lateral wellbore completion apparatus 10 through tubular string 66. Lateral deflector device 88 is landed with latch 102 connecting with intervention profile 38. Intervention profile 38 and latch 102 may be selective to permit stacking of lateral wellbore completion apparatuses 10 and intervention devices 88. When landed, guide nose 100 may be disposed in bore 70 (FIG. 4) of flow-through deflector 18 positioning deflector ramp 98 to guide an intervention tool deployed on a conveyance (e.g., coiled tubing, electric line, slickline) into lateral completion string section 36.



FIG. 10 illustrates a main bore intervention device 106 (i.e., isolation device). Main bore intervention device 106 includes a through bore 108 extending from a top end 110 to a bottom end 112, a running neck 107, and a latch 114 (e.g., collet). Latch 114 is cooperative with intervention profile 38 (FIG. 1) to land main bore intervention device 106. Intervention profile 38 and latch 114 may be selective to permit stacking of lateral wellbore completion apparatuses 10 and intervention devices 106. With additional reference to FIGS. 1 and 8, when landed, latch 114 is connected with internal profile 38, bottom end 110 is positioned in bore 70 (FIGS. 4, 5) of flow-through deflector 18 isolating lateral bore 12 from main bore 16 through lateral wellbore completion 10. Accordingly, when an intervention tool is run into the well, the device is muted through main bore intervention device 106 across lateral bore 12 permitting intervention into main bore 16 below lateral bore 12.


The foregoing outlines features of several embodiments of lateral wellbore completion apparatus and methods so that those skilled in the art may better understand the aspects of the disclosure. Those skilled in the art should appreciate that they may readily use the disclosure as a basis for designing or modifying other processes and structures for carrying out the same purposes and/or achieving the same advantages of the embodiments introduced herein. Those skilled in the art should also realize that such equivalent constructions do not depart from the spirit and scope of the disclosure, and that they may make various changes, substitutions and alterations herein without departing from the spirit and scope of the disclosure. The term “comprising” within the claims is intended to mean “including at least” such that the recited listing of elements in a claim are an open group. The terms “a,” “an” and other singular terms are intended to include the plural forms thereof unless specifically excluded.

Claims
  • 1. A lateral wellbore completion apparatus, comprising: a flow-through deflector having a laterally concave, hollowed, tapered deflector face; anda junction string comprising an inductive coupler electrically connected to a downhole device and a junction block positioned between the inductive coupler and the downhole device, the junction block comprising a bore and a low-side having a window to the bore, wherein the low-side is cooperative to mate with the deflector face, wherein the junction block comprises a longitudinal groove formed on an outer surface of a high-side of the junction block, and wherein the inductive coupler is electrically connected to the downhole device by a conductor positioned in the longitudinal groove.
  • 2. The apparatus of claim 1, further comprising a swivel located between the junction block and the downhole device.
  • 3. The apparatus of claim 1, wherein the junction string comprises an intervention profile located on an opposite side of the junction block from the downhole device.
  • 4. The apparatus of claim 1, wherein the downhole device is located in a lateral completion string section of the junction string, the lateral completion string section further comprising: a drill bit;a downhole motor; anda formation isolation device.
  • 5. The apparatus of claim 4, further comprising a swivel located between the junction block and the lateral completion string section.
  • 6. The apparatus of claim 1, wherein the junction block comprises an eccentric bore that is closer to the low-side than the high-side.
  • 7. A well system, comprising: a main bore having primary inductive coupler configured to be communicatively coupled to a surface device;a lateral bore extending from the main bore;a flow-through deflector anchored in the main bore, the flow-through deflector having a laterally concave, hollowed, tapered deflector face; anda junction string comprising;a completion string section located in the lateral bore, the completion string section comprising a downhole device;a secondary inductive coupler communicatively coupled with the primary inductive coupler, the secondary inductive coupler electrically connected to the downhole device by a conductor; anda junction block landed on the flow-through deflector; wherein the junction block comprises: a bore and a low-side forming a window, wherein the low-side mates with a deflector face of the flow-through deflector; anda longitudinal groove formed on an outer surface of a high-side of the junction block disposing the conductor extending from the secondary inductive coupler and the downhole device.
  • 8. The well system of claim 7, wherein the junction string comprises a swivel positioned between the junction block and the completion string section.
  • 9. The well system of claim 7, wherein the junction string comprises an intervention profile located in the main bore.
  • 10. The well system of claim 7, wherein the completion string section comprises: a drill bit;a downhole motor; anda formation isolation device.
  • 11. The well system of claim 7, further comprising: a swivel positioned between the junction block and the completion string section;an intervention profile positioned in the main bore; anda drill bit, a downhole motor, and a formation isolation device located in the completion string section.
  • 12. The well system of claim 7, wherein the junction block comprises an eccentric bore that is closer to the low-side than the high-side.
  • 13. A method for completing a lateral wellbore, comprising: anchoring a flow-through deflector comprising a laterally concave, hollowed, tapered deflector face in a main bore proximate to a lateral bore, wherein the main bore comprises a primary inductive coupler;making-up at a drilling surface a junction string comprising a junction block cooperative with the laterally concave, hollowed, tapered deflector face, a completion string section comprising a downhole device, a secondary inductive coupler electrically connected by a conductor to the downhole device, wherein the conductor is disposed in a longitudinal groove formed on an outer surface of junction block, the secondary inductive coupler spaced from the junction block so as to be communicatively coupled to the primary inductive coupler when the junction block is landed on the deflector face;running the made-up junction string into the main bore toward the hollowed, tapered deflector face;deflecting the completion string section into the lateral bore in response to contacting the laterally concave, hollowed tapered deflector face;landing the junction block on the hollowed, tapered deflector face; andcommunicatively coupling the secondary inductive coupler with the primary inductive coupler in response to landing the junction block on the hollowed, tapered deflector face.
  • 14. The method of claim 13, further comprising unlocking a swivel positioned between the junction block and the completion string section whereby the junction block is rotationally unlocked from the completion string section when landing the junction block on the deflector face.
  • 15. The method of claim 13, wherein; the junction block a bore and a low-side forming a window; andthe landing the junction block comprises mating the low-side of the junction block with the deflector face.
  • 16. The method of claim 13, further comprising operating a downhole motor included in the completion string section after deflecting the completion string section into the lateral bore and before landing the junction block on the deflector face.
  • 17. The method of claim 13, wherein: the junction block comprises a bore and a low-side forming a window, the low-side configured to mate with the deflector face when the junction block is landed on the deflector face; andthe longitudinal groove is formed on a high-side of the junction block disposing the conductor that electrically connects the secondary inductive coupler and the downhole device.
  • 18. The method of claim 13, wherein the junction block comprises an eccentric bore.
US Referenced Citations (263)
Number Name Date Kind
2214064 Niles Sep 1940 A
2379800 Hare Jul 1945 A
2452920 Gilbert Nov 1948 A
2470303 Greenough May 1949 A
2782365 Castel Feb 1957 A
2797893 McCune et al. Jul 1957 A
2889880 Hughes Jun 1959 A
3011342 Simm Dec 1961 A
3199592 Jacob Aug 1965 A
3206537 Steward Sep 1965 A
3344860 Voetter Oct 1967 A
3363692 Bishop Jan 1968 A
3659259 Chaney, Jr. et al. Apr 1972 A
3913398 Curtis Oct 1975 A
4027286 Marosko May 1977 A
4133384 Allen et al. Jan 1979 A
4241787 Price Dec 1980 A
4415205 Rehm et al. Nov 1983 A
4484628 Lammon, II Nov 1984 A
4559818 Tsang et al. Dec 1985 A
4573541 Josse et al. Mar 1986 A
4597290 Bourdet et al. Jul 1986 A
4733729 Copeland Mar 1988 A
4806928 Veneruso Feb 1989 A
4850430 Copeland et al. Jul 1989 A
4901069 Veneruso Feb 1990 A
4945995 Tholance et al. Aug 1990 A
4953636 Mohn Sep 1990 A
4969523 Martin et al. Nov 1990 A
5183110 Logan et al. Feb 1993 A
5269377 Martin Dec 1993 A
5278550 Rhein-Knudsen et al. Jan 1994 A
5301760 Graham Apr 1994 A
5311936 McNair et al. May 1994 A
5318121 Brockman et al. Jun 1994 A
5318122 Murray et al. Jun 1994 A
5322127 McNair et al. Jun 1994 A
5325924 Bangert et al. Jul 1994 A
5330007 Collins et al. Jul 1994 A
5337808 Graham Aug 1994 A
5353876 Curington et al. Oct 1994 A
5388648 Jordan, Jr. Feb 1995 A
5398754 Dinhoble Mar 1995 A
5411082 Kennedy May 1995 A
5427177 Jordan, Jr. et al. Jun 1995 A
5435392 Kennedy Jul 1995 A
5439051 Kennedy et al. Aug 1995 A
5454430 Kennedy et al. Oct 1995 A
5457988 Delatorre Oct 1995 A
5458199 Collins et al. Oct 1995 A
5458209 Hayes et al. Oct 1995 A
5462120 Gondouin Oct 1995 A
5472048 Kennedy et al. Dec 1995 A
5474131 Jordan, Jr. et al. Dec 1995 A
5477923 Jordan, Jr. et al. Dec 1995 A
5477925 Trahan et al. Dec 1995 A
5499680 Walter et al. Mar 1996 A
5520252 McNair May 1996 A
5521592 Veneruso May 1996 A
5533573 Jordan, Jr. et al. Jul 1996 A
5542472 Pringle et al. Aug 1996 A
5597042 Tubel et al. Jan 1997 A
5655602 Collins Aug 1997 A
5680901 Gardes Oct 1997 A
5697445 Graham Dec 1997 A
5706896 Tubel et al. Jan 1998 A
5730219 Tubel et al. Mar 1998 A
5823263 Morris et al. Oct 1998 A
5831156 Mullins Nov 1998 A
5842528 Johnson Dec 1998 A
5871047 Spath et al. Feb 1999 A
5871052 Benson et al. Feb 1999 A
5875847 Forsyth Mar 1999 A
5915474 Buytaert et al. Jun 1999 A
5918669 Morris et al. Jul 1999 A
5941307 Tubel Aug 1999 A
5941308 Malone et al. Aug 1999 A
5944107 Ohmer Aug 1999 A
5944108 Baugh et al. Aug 1999 A
5944109 Longbottom Aug 1999 A
5945923 Soulier Aug 1999 A
5954134 Longbottom Sep 1999 A
5959547 Tubel et al. Sep 1999 A
5960873 Alexander et al. Oct 1999 A
5967816 Sampa et al. Oct 1999 A
5971072 Huber et al. Oct 1999 A
5975204 Tubel et al. Nov 1999 A
5979559 Kennedy Nov 1999 A
5992519 Ramakrishnan et al. Nov 1999 A
6003606 Moore et al. Dec 1999 A
6006832 Tubel et al. Dec 1999 A
6035937 Gano et al. Mar 2000 A
6046685 Tubel Apr 2000 A
6053254 Gano Apr 2000 A
6061000 Edwards May 2000 A
6065209 Gondouin May 2000 A
6065543 Gano et al. May 2000 A
6073697 Parlin et al. Jun 2000 A
6076046 Vasudevan et al. Jun 2000 A
6079488 Begg et al. Jun 2000 A
6079494 Longbottom et al. Jun 2000 A
6119780 Christmas Sep 2000 A
6125937 Longbottom et al. Oct 2000 A
6173772 Vaynshteyn Jan 2001 B1
6173788 Lembcke et al. Jan 2001 B1
6176308 Pearson Jan 2001 B1
6176312 Tubel et al. Jan 2001 B1
6192980 Tubel et al. Feb 2001 B1
6192988 Tubel Feb 2001 B1
6196312 Collins et al. Mar 2001 B1
6209648 Ohmer et al. Apr 2001 B1
6244337 Cumming et al. Jun 2001 B1
6302203 Rayssiguier et al. Oct 2001 B1
6305469 Coenen et al. Oct 2001 B1
6310559 Laborde et al. Oct 2001 B1
6318469 Patel Nov 2001 B1
6328111 Bearden et al. Dec 2001 B1
6349770 Brooks et al. Feb 2002 B1
6354378 Patel Mar 2002 B1
6360820 Laborde et al. Mar 2002 B1
6374913 Robbins et al. Apr 2002 B1
6378610 Rayssiguier et al. Apr 2002 B2
6415864 Ramakrishnan et al. Jul 2002 B1
6419022 Jernigan et al. Jul 2002 B1
6457522 Bangash et al. Oct 2002 B1
6481494 Dusterhoft et al. Nov 2002 B1
6510899 Sheiretov et al. Jan 2003 B1
6513599 Bixenman et al. Feb 2003 B1
6515592 Babour et al. Feb 2003 B1
6533039 Rivas et al. Mar 2003 B2
6568469 Ohmer et al. May 2003 B2
6577244 Clark et al. Jun 2003 B1
6588507 Dusterhoft et al. Jul 2003 B2
6614229 Clark et al. Sep 2003 B1
6614716 Plona et al. Sep 2003 B2
6618677 Brown Sep 2003 B1
6668922 Ziauddin et al. Dec 2003 B2
6675892 Kuchuk et al. Jan 2004 B2
6679324 Den Boer et al. Jan 2004 B2
6695052 Branstetter et al. Feb 2004 B2
6702015 Fielder, III et al. Mar 2004 B2
6727827 Edwards et al. Apr 2004 B1
6749022 Fredd Jun 2004 B1
6751556 Schroeder et al. Jun 2004 B2
6758271 Smith Jul 2004 B1
6768700 Veneruso et al. Jul 2004 B2
6776256 Kostyuchenko et al. Aug 2004 B2
6787758 Tubel et al. Sep 2004 B2
6789621 Wetzel et al. Sep 2004 B2
6789937 Haddad et al. Sep 2004 B2
6817410 Wetzel et al. Nov 2004 B2
6828547 Tubel et al. Dec 2004 B2
6830106 Cavender Dec 2004 B2
6837310 Martin Jan 2005 B2
6842700 Poe Jan 2005 B2
6845819 Barrett et al. Jan 2005 B2
6848510 Bixenman et al. Feb 2005 B2
6856255 Chalitsios et al. Feb 2005 B2
6857475 Johnson Feb 2005 B2
6863127 Clark et al. Mar 2005 B2
6863129 Ohmer et al. Mar 2005 B2
6864801 Tabanou et al. Mar 2005 B2
6896074 Cook et al. May 2005 B2
6903660 Clark et al. Jun 2005 B2
6911418 Frenier Jun 2005 B2
6913083 Smith Jul 2005 B2
6920395 Brown Jul 2005 B2
6942033 Brooks et al. Sep 2005 B2
6950034 Pacault et al. Sep 2005 B2
6975243 Clark et al. Dec 2005 B2
6978833 Salamitou et al. Dec 2005 B2
6980940 Gurpinar et al. Dec 2005 B1
6983796 Bayne et al. Jan 2006 B2
6989764 Thomeer et al. Jan 2006 B2
7000696 Harkins Feb 2006 B2
7000697 Goode et al. Feb 2006 B2
7007756 Lerche et al. Mar 2006 B2
7040402 Vercaemer May 2006 B2
7040415 Boyle et al. May 2006 B2
7055604 Jee et al. Jun 2006 B2
7063143 Tilton et al. Jun 2006 B2
7079952 Thomas et al. Jul 2006 B2
7083452 Eriksson et al. Aug 2006 B2
7093661 Olsen Aug 2006 B2
7866414 Patel Jan 2011 B2
20010013410 Beck et al. Aug 2001 A1
20020007948 Bayne et al. Jan 2002 A1
20020050361 Shaw et al. May 2002 A1
20020096333 Johnson et al. Jul 2002 A1
20020112857 Ohmer et al. Aug 2002 A1
20030137302 Clark et al. Jul 2003 A1
20030137429 Clark et al. Jul 2003 A1
20030141872 Clark et al. Jul 2003 A1
20030150622 Patel et al. Aug 2003 A1
20030221829 Patel et al. Dec 2003 A1
20040010374 Raghuraman et al. Jan 2004 A1
20040094303 Brockman et al. May 2004 A1
20040129458 Rodgers Jul 2004 A1
20040159435 Plucheck et al. Aug 2004 A1
20040164838 Hall et al. Aug 2004 A1
20040173350 Wetzel et al. Sep 2004 A1
20040173352 Mullen et al. Sep 2004 A1
20040194950 Restarick et al. Oct 2004 A1
20040238168 Echols Dec 2004 A1
20040262006 Dewey et al. Dec 2004 A1
20050072564 Grigsby et al. Apr 2005 A1
20050074210 Grigsby et al. Apr 2005 A1
20050083064 Homan et al. Apr 2005 A1
20050087368 Boyle et al. Apr 2005 A1
20050092488 Rodet et al. May 2005 A1
20050092501 Chavers et al. May 2005 A1
20050115741 Terry et al. Jun 2005 A1
20050149264 Tarvin et al. Jul 2005 A1
20050168349 Huang et al. Aug 2005 A1
20050178554 Hromas et al. Aug 2005 A1
20050194150 Ringgenberg Sep 2005 A1
20050199401 Patel et al. Sep 2005 A1
20050236161 Gay et al. Oct 2005 A1
20050274513 Schultz et al. Dec 2005 A1
20050279510 Patel et al. Dec 2005 A1
20060000604 Jenkins et al. Jan 2006 A1
20060000618 Cho et al. Jan 2006 A1
20060006656 Smedstad Jan 2006 A1
20060016593 Gambier Jan 2006 A1
20060042795 Richards Mar 2006 A1
20060060352 Vidrine et al. Mar 2006 A1
20060065444 Hall et al. Mar 2006 A1
20060077757 Cox et al. Apr 2006 A1
20060086498 Wetzel et al. Apr 2006 A1
20060090892 Wetzel et al. May 2006 A1
20060090893 Sheffield May 2006 A1
20060124297 Ohmer Jun 2006 A1
20060124318 Sheffield Jun 2006 A1
20060137874 Araque Jun 2006 A1
20060162934 Shepler Jul 2006 A1
20060196660 Patel Sep 2006 A1
20060225926 Madhavan et al. Oct 2006 A1
20060254767 Pabon et al. Nov 2006 A1
20060283606 Partouche et al. Dec 2006 A1
20070012436 Freyer Jan 2007 A1
20070027245 Vaidya et al. Feb 2007 A1
20070044964 Grigar et al. Mar 2007 A1
20070059166 Sheth et al. Mar 2007 A1
20070062710 Pelletier et al. Mar 2007 A1
20070074872 Du et al. Apr 2007 A1
20070102197 Rotthaeuser May 2007 A1
20070107907 Smedstad et al. May 2007 A1
20070110593 Sheth et al. May 2007 A1
20070116560 Eslinger May 2007 A1
20070142547 Vaidya et al. Jun 2007 A1
20070144738 Sugiyama et al. Jun 2007 A1
20070144746 Jonas Jun 2007 A1
20070151724 Ohmer et al. Jul 2007 A1
20070159351 Madhavan et al. Jul 2007 A1
20070162235 Zhan et al. Jul 2007 A1
20070165487 Nutt et al. Jul 2007 A1
20070199696 Walford Aug 2007 A1
20070213963 Jalali et al. Sep 2007 A1
20070216415 Clark et al. Sep 2007 A1
20070227727 Patel et al. Oct 2007 A1
20070235185 Patel et al. Oct 2007 A1
20070271077 Kosmala et al. Nov 2007 A1
20090008078 Patel Jan 2009 A1
Foreign Referenced Citations (46)
Number Date Country
795679 Sep 1997 EP
823534 Feb 1998 EP
1158138 Nov 2001 EP
0786578 Dec 2005 EP
2274864 Aug 1994 GB
2304764 Mar 1997 GB
2333545 Jul 1999 GB
2337780 Dec 1999 GB
2345137 Jun 2000 GB
2360532 Sep 2001 GB
2364724 Feb 2002 GB
2376488 Dec 2002 GB
2381281 Apr 2003 GB
2392461 Mar 2004 GB
2395315 May 2004 GB
2395965 Jun 2004 GB
2401385 Nov 2004 GB
2401430 Nov 2004 GB
2401889 Nov 2004 GB
2404676 Feb 2005 GB
2407334 Apr 2005 GB
2408327 May 2005 GB
2409692 Jul 2005 GB
2416871 Feb 2006 GB
2419619 May 2006 GB
2419903 May 2006 GB
2426019 Nov 2006 GB
2428787 Feb 2007 GB
2136856 Sep 1999 RU
2146759 Mar 2000 RU
2171363 Jul 2001 RU
2239041 Oct 2004 RU
199623953 Aug 1996 WO
1998050680 Nov 1998 WO
1998050680 Nov 1998 WO
199858151 Dec 1998 WO
199913195 Mar 1999 WO
200029713 May 2000 WO
200171155 Sep 2001 WO
200198632 Dec 2001 WO
2003023185 Mar 2003 WO
2004076815 Sep 2004 WO
2004094961 Nov 2004 WO
2005035943 Apr 2005 WO
2005064116 Jul 2005 WO
2006010875 Feb 2006 WO
Non-Patent Literature Citations (4)
Entry
Brown, G.A., SPE 62952. “Using Fibre-Optic Distributed Temperature Measurements to Provide Real-Time Reservoir Surveillance Data on Wytch Farm Field Horizontal Extended-Reach Wells” Society of Petroleum Engineers Inc. 2000, pp. 1-11.
Saputelli, L. et al. “Real-Time Decision-making for Value Creation while Drilling” SPE/IADC Middle East Drilling Technology Conference & Exhibition, Oct. 2003.
Lanier et al. “Brunei Field Trial of a Fibre Optic Distributed Temperature Sensor (DTS) System in 1,DOOm Open Hole Horizontal Oil Producer” SPE 84324; SPE Annual Technical Conference and Exhibition, Oct. 5-8, 2003.
International Search Report and Written Opinion dated Aug. 27, 2013 for International Patent Application No. PCT/US2013/042850, 14 pages.
Related Publications (1)
Number Date Country
20130327572 A1 Dec 2013 US
Provisional Applications (1)
Number Date Country
61657106 Jun 2012 US