This application claims the benefit of Korean Patent Application No. 10-2012-0058037, filed on May 31, 2012, Korean Patent Application No. 10-2012-0011745, filed on Feb. 6, 2012, Korean Patent Application No. 10-2012-0011744, filed on Feb. 6, 2012, Korean Patent Application No. 10-2012-0011743, filed on Feb. 6, 2012, Korean Patent Application No. 10-2012-0011746, filed on Feb. 6, 2012, Korean Patent Application No. 10-2012-0045237, filed on Apr. 30, 2012, and Korean Patent Application No. 10-2012-0058035, filed on May 31, 2012, each of which is hereby incorporated by reference as if fully set forth herein.
1. Field
The present disclosure relates to laundry machines, and more particularly to laundry machines having a drying function, e.g. washing machines having a drying function.
2. Discussion of the Related Art
Laundry machines include dryers for drying laundry, refreshers or finishers for refreshing laundry and washing machines for washing laundry. Generally, a washing machine is an apparatus that washes laundry using detergent and mechanical friction. Based upon configuration, and more particularly, based on the orientation of a tub that accommodates laundry, washing machines may be classified into a top-loading washing machine or a front-loading washing machine. In the top-loading washing machine, the tub is erected within a housing of the washing machine and has an entrance formed in a top portion thereof. Accordingly, laundry is put into the tub through an opening that is formed in a top portion of the housing and communicates with the entrance of the tub. In the front-loading washing machine, the tub faces upward within a housing and an entrance of the tub faces a front surface of the washing machine. Accordingly, laundry is put into the tub through an opening that is formed in a front surface of the housing and communicates with the entrance of the tub. In both the top-loading washing machine and the front-loading washing machine, a door is installed to the housing to open or close the opening of the housing.
The above described types of washing machines may have various other functions, in addition to a basic wash function. For example, the washing machines may be designed to perform drying as well as washing, and may further include a mechanism to supply hot air required for drying. Additionally, the washing machines may have a so-called laundry freshening function. To achieve the laundry freshening function, the washing machines may include a mechanism to supply steam to laundry. Steam is a vapor phase of water generated by heating liquid water; steam may have a high temperature and ensures easy supply of moisture to laundry. Accordingly, the supplied steam may be used, for example, for wrinkle-free, deodorization, and static charge elimination. In addition to the laundry freshening function, steam may also be used for sterilization of laundry owing to a high temperature and moisture thereof. When supplied during washing, steam creates a high temperature and high humidity atmosphere within a drum or a tub that accommodates laundry. This atmosphere may provide a considerable improvement in washing performance.
The laundry machines may adopt various methods to supply steam. For example, the laundry machines may apply a drying mechanism to steam generation. In the related art, there are laundry machines that do not require an additional device for steam generation, and thus can supply steam to laundry without an increase in production costs. However, since these laundry machines of the related art do not propose optimized control or utilization of a drying mechanism, they have a difficulty in efficiently generating a sufficient amount of steam as compared to an independent steam generator that is configured to generate only steam. For the same reason, furthermore, the laundry machines of the related art cannot efficiently achieve desired functions, i.e. laundry freshening and sterilization and creation of an atmosphere suitable for washing as enumerated above.
Accordingly, the present disclosure is directed to a laundry machine, in particular a washing machine, that substantially obviates one or more problems due to limitations and disadvantages of the related art.
One object is to provide a laundry machine, in particular a washing machine, capable of efficiently generating steam.
Another object is to provide a laundry machine, in particular a washing machine, capable of effectively performing desired functions via supply of steam.
Various advantages, objects, and features will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention. The objectives and other advantages may be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
To achieve these objects and other advantages and in accordance with the purpose of the invention, as embodied and broadly described herein, a laundry machine, such as a washing machine, includes a tub to store wash water and/or a drum to accommodate laundry, the drum being rotatably provided, a duct in communication with the tub and/or drum, a heater installed in the duct, a nozzle installed in the duct, the nozzle supplying water to the heater to generate steam, and a blower installed in the duct, the blower blowing air towards the heater.
According to another aspect, a laundry machine, such as a washing machine, includes a tub to store wash water and/or a drum to accommodate laundry, the drum being rotatably provided, a duct in communication with the tub and/or drum, a heater installed in the duct and configured to heat only a predetermined space within the duct, a nozzle installed in the duct, the nozzle directly supplying water to the heated predetermined space to generate steam, a blower installed in the duct, the blower blowing air toward the predetermined space to supply the generated steam into the tub and/or drum, and a recess formed in the duct to accommodate a predetermined amount of water such that the water in the recess is heated for steam generation.
According to another aspect, a laundry machine, such as a washing machine, includes a tub to store wash water and/or a drum to accommodate laundry, the drum being rotatably provided, a duct in communication with the tub and/or drum, a heater installed in the duct and configured to heat only a predetermined space within the duct, a nozzle installed in the duct and directly supplying water to the heated predetermined space so as to generate steam, the nozzle having a separate water swirling device fitted therein, and a blower installed in the duct, the blower blowing air toward the predetermined space so as to supply the generated steam into the tub and/or drum.
The nozzle may include a head having a water ejection opening and a body integrally formed with the head, the body being configured to guide water to the head. The swirling device may be fitted into the body.
The swirling device may include a conical core extending along the center axis of the swirling device, and a flow-path spirally extending around the core.
The nozzle may further include a positioning structure to determine a position of the swirling device. More specifically, the positioning structure may include a recess formed in any one of the nozzle and the swirling device, and a rib formed at the other one of the nozzle and the swirling device, the rib being inserted into the recess.
According to another aspect, a laundry machine, such as a washing machine, includes a tub to store wash water and/or a drum to accommodate laundry, the drum being rotatably, a duct in communicate with the tub and/or drum, a heater installed in the duct and adapted to be heated upon receiving power, at least one nozzle installed in the duct, the nozzle directly ejecting water to the heated heater by ejection pressure thereof, and a blower installed in the duct, the blower generating air flow within the duct, the air flow supplying steam into the tub, wherein the nozzle ejects water in approximately the same direction as the direction of air flow.
In this case, the nozzle may be provided between the heater and the blower.
Representing an installation position of the nozzle in consideration of an extending direction of the duct, the heater may be located at one longitudinal side of the duct, and the blower may be located at the other longitudinal side of the duct, and the nozzle may be located between the heater and the blower.
When the nozzle is provided between the heater and the blower, the nozzle may be spaced apart from the heater by a predetermined distance close to the blower. That is, the nozzle may be located between the heater and the blower, and may be located closer to the blower than the heater.
In other words, the nozzle may be installed close to a discharge portion through which air having passed through the blower is discharged.
The nozzle may be installed in a blower housing surrounding the blower.
Here, the blower housing may include an upper housing and a lower housing, and the nozzle may be installed in the upper housing.
To install the nozzle, the upper housing may have an aperture into which the nozzle is inserted.
The nozzle may include a body and a head, and the head may be inserted into the aperture and be located within the duct. In addition, a portion of the body close to the head may be inserted into the aperture and be located within the duct. In this case, the longitudinal direction of the body may coincide with the ejection direction of the nozzle.
The at least one nozzle may include a plurality of nozzles. Each of the plurality of nozzles may include a body and a head, and the plurality of nozzles may be connected to one another via a flange.
The flange may have a fastening hole facilitating connection to the duct. Accordingly, the flange may be fixed to the duct as a fastening member (for example, a screw or a bolt) is coupled into the fastening hole. As such, the plurality of nozzles coupled to the flange may be fixed.
The nozzle may directly eject mist to the heater. Although the nozzle may supply a water jet to the heater, mist may be ejected to the heater for more efficient and rapid steam generation. Also, the nozzle may enable steam generation without water loss by directly supplying water to the heater.
The nozzle may include a spirally extending flow-path therein.
The laundry machine may further include a recess formed in the duct to accommodate a predetermined amount of water such that the water in the recess is heated for steam generation.
The recess may be located below the heater. In this case, the recess may be located immediately below the heater.
At least a portion of the heater may have a bent portion that is bent downward toward the recess. In this case, the bent portion may be located in the recess. Accordingly, when water is collected in the recess, the bent portion may contact the water in the recess.
Differently from the method in which the heater directly contacts the water collected in the recess using the bent portion thereof, the water collected in the recess may be indirectly heated.
To realize the indirect heating, the laundry machine may further include a thermal conductive member coupled to the heater to transfer heat of the heater. In this case, at least a portion of the thermal conductive member may be located in the recess.
The thermal conductive member may include a heat sink mounted to the heater, at least a portion of the heat sink being located in the recess.
The recess may be located below a free end of the heater. This arrangement of the recess may be applied to both direct heating and indirect heating.
According to another aspect, a laundry machine, such as a washing machine includes a tub to store wash water and/or a drum to accommodate laundry, the drum being rotatably provided, a duct configured to communicate with the tub and/or drum, a heater installed in the duct and adapted to be heated upon receiving power, a nozzle installed in the duct, the nozzle directly ejecting water to the heated heater by ejection pressure thereof, and a blower installed in the duct, the blower generating air flow within the duct, the air flow supplying the generated steam to the tub, wherein the nozzle is located between the heater and the blower and ejects water in approximately the same direction as the direction of air flow.
Explaining the arrangement of the above described configuration along the direction of the air flow within the duct, the blower, the nozzle, and the heater may be arranged in sequence. That is, if air flow occurs by rotation of the blower, the air discharged from the blower may pass the installation position of the nozzle and may reach the heater. In this case, the air having passed through the heater may be supplied into the tub. In particular, the nozzle may be installed to an upper portion of the blower housing surrounding the blower, more specifically, to an upper housing of the blower housing.
The above described respective features of the laundry machine may be individually applied to the laundry machine, or combinations of at least two features may be applied to the laundry machine. The laundry machine may include a drying and/or washing machine.
It is to be understood that both the foregoing general description and the following detailed description are exemplary and explanatory and are intended to provide further explanation of the invention as claimed.
The accompanying drawings, which are included to provide a further understanding of the disclosure and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention, and together with the description serve to explain the principle of the invention. In the drawings:
Hereinafter, exemplary embodiments of the present invention provided to realize the above described objects will be described with reference to the accompanying drawings. Although the present disclosure is described with reference to a front-loading washing machine as illustrated in the drawings, the present disclosure may be applied to a top-loading washing machine without substantial modifications.
In the following description, the term ‘actuation’ refers to applying power to a relevant component to realize a function of the relevant component. For example, ‘actuation’ of a heater refers to applying power to the heater to realize heating. In addition, an ‘actuation section’ of the heater refers to a section in which power is applied to the heater. When interrupting power applied to the heater, this refers to shutdown of ‘actuation’ of the heater. This is equally applied to a blower and a nozzle.
As illustrated in
Referring to
To further improve washing performance of the washing machine, hot or warm wash water is required based on the kind and state of laundry. To this end, the washing machine of the present disclosure may include a heater assembly including a heater 80 and a sump 33 to generate hot or warm wash water. The heater assembly, as illustrated in
Referring to
Meanwhile, the washing machine may be configured to dry washed laundry for user convenience. To this end, the washing machine may include a drying mechanism to generate and supply hot air. As the drying mechanism, the washing machine may include a duct 100 configured to communicate with tub 30. Duct 100 is connected at both ends thereof to tub 30, such that interior air of tub 30 as well as interior air of drum 40 may circulate through duct 100. Duct 100 may have a single assembly configuration, or may be divided into a drying duct 110 and a condensing duct 120. Drying duct 110 is basically configured to generate hot air for drying of laundry, and condensing duct 120 is configured to condense moisture contained in the circulating air having passed through the laundry.
First, drying duct 110 may be installed within housing 10 so as to be connected to condensing duct 120 and tub 30. A heater 130 and a blower 140 may be mounted in drying duct 110. Condensing duct 120 may also be disposed within housing 10 and may be connected to drying duct 110 and tub 30. Condensing duct 120 may include a water supply device 160 to supply water so as to enable condensation and removal of moisture from the air. Drying duct 110 and condensing duct 120, i.e. duct 100, as described above, may be basically disposed within housing 10, but may partially be exposed to the outside of housing 10 as necessary.
Drying duct 110 may serve to heat air around heater 130 using heater 130, and may also serve to blow the heated air toward tub 30 and drum 40 disposed within tub 30 using blower 140. Heater 130 is installed so as to be exposed to the air within duct 100 (more specifically, within drying duct 110). As such, hot and dry air may be supplied from drying duct 110 into drum 40 by way of tub 30, in order to dry laundry. Also, since blower 140 and heater 130 are actuated together, new unheated air may be supplied to heater 130 by blower 140, and thereafter may be heated while passing through heater 130 so as to be supplied into tub 30 and drum 40. That is, supply of the hot and dry air may be continuously performed by simultaneous actuation of heater 130 and blower 140. Meanwhile, the supplied hot air may be used to dry the laundry, and thereafter may be discharged from drum 40 into condensing duct 120 through tub 30. In condensing duct 120, moisture is removed from the discharged air using water supply device 160, whereby dry air is generated. The resulting dry air may be supplied to drying duct 110 so as to be reheated. This supply may be realized by a pressure difference between drying duct 110 and condensing duct 120 that is caused by actuation of blower 140. That is, the discharged air may be changed into hot and dry air while passing through drying duct 110 and condensing duct 120. As such, the air within the washing machine is continuously circulated through tub 30, drum 40, and condensing and drying ducts 120 and 110, thereby being used to dry the laundry. In consideration of the circulation flow of the air as described above, an end of duct 100 that supplies the hot and dry air, i.e. an end or an opening of drying duct 110 that communicates with tub 30 and drum 40 may serve as a discharge portion or a discharge hole 110a of duct 100. The end of duct 100, to which wet air is directed, i.e. an end or an opening of the condensing duct 120 that communicates with tub 30 and drum 40 may serve as a suction portion or a suction hole 120a of duct 100.
Drying duct 110, and more specifically, discharge portion 110a, as illustrated in
Duct 100 is configured to accommodate various elements. To ensure easy installation of the elements, duct 100, i.e. drying and condensing ducts 110 and 120 may be composed of separable parts. In particular, most elements, for example, heater 130 and blower 140 are linked to drying duct 110, and therefore drying duct 110 may be composed of separable parts. Such a separable configuration of drying duct 110 provide easy removal of interior elements from drying duct 110 for the purpose of repair. More specifically, drying duct 110 may include a lower part 111. Lower part 111 substantially has a space therein, such that the elements may be accommodated in the space. Drying duct 110 may further include a cover 112 configured to cover lower part 111. Lower part 111 and cover 112 may be fastened to each other using a fastening member. Duct 100 may include a blower housing 113 configured to stably accommodate blower 140 that is rotated at high speeds. Blower housing 113 may also be composed of separable parts for easy installation and repair of blower 140. Blower housing 113 may include a lower housing 113a configured to accommodate blower 140 and an upper housing 113b configured to cover lower housing 113a. Except for upper housing 113b to be separated, lower housing 113a may be integrally formed with lower part 111 of drying duct 110 to reduce the number of elements of duct 100.
Moreover, the washing machine according to the present disclosure may be configured to supply steam to laundry, in order to provide the user with a wider array of functions. As discussed above in relation to the related art, supply of steam has the effects of wrinkle-free, deodorization, and static charge elimination, thus allowing laundry to be freshened. Also, steam may serve to sterilize laundry and to create an ideal atmosphere for washing. These functions may be performed during a basic wash course of the washing machine, whereas the washing machine may have a separate process or course optimized to perform the functions. The washing machine may include an independent steam generator that is designed to generate only steam, to realize the aforementioned functions via supply of steam. However, the washing machine may utilize a mechanism provided for other functions as a mechanism to generate and supply steam. For example, as described above, the drying mechanism includes heater 130 as a heat source, and duct 100 and blower 140 as transportation means of air to tub 30 and drum 40, and thus may also be utilized to supply steam as well as hot air. Nevertheless, to realize supply of steam, it is necessary to slightly modify a conventional drying mechanism. The drying mechanism modified for supply of steam will be described hereinafter with reference to
First, for supply of steam, it is necessary to create a high temperature environment suitable for steam generation. Accordingly, heater 130 may be configured to heat air within duct 100. As known, air has low thermal conductivity. Therefore, if the washing machine does not provide a means to forcibly transfer heat emitted from heater 130 to other regions of duct 100, for example, does not provide air flow by blower 140, heater 130 may function to heat only a space occupied by heater 130 and the surrounding space. Accordingly, heater 130 may heat a local space within duct 100 to a high temperature for supply of steam. That is, heater 130 may heat a partial space within duct 100, i.e. a predetermined space S to a higher temperature than that of the remaining space of duct 100. More specifically, to achieve such heating to a higher temperature, heater 130 may be adapted to heat only predetermined space S in a direct heating manner. In this case, predetermined space S may be referred to as heater 130. That is, heater 130 and predetermined space S may occupy the same space. Alternatively, predetermined space S may include a space occupied by heater 130 and the surrounding space within the duct 100 close to heater 130. That is, predetermined space S is a concept including heater 130. To achieve local and direct heating to a higher temperature, heater 130 may rapidly create an environment suitable for steam generation.
Heater 130 is installed in duct 100 (more particularly, in drying duct 110) and is heated upon receiving electric power. Heater 130, as illustrated in
Heater 130 may be fixed to the bottom of duct 100 (more specifically, to lower part 111 of drying duct 110) using a bracket 111b. In connection with bracket 111b, a boss 111a may also be provided at the bottom of duct 100. Boss 111a may protrude from the bottom of duct 100 by a predetermined length. A pair of bosses 111a may be provided at both sides of the bottom of duct 100 respectively. Bracket 111b may be fastened to boss 111a to fix heater 130. Moreover, bracket 111b may be configured to support body 131 of heater 130. Bracket 111b, as illustrated, may extend across body 131 to support body 131 and may be configured to surround body 131. Additionally, bracket 111b may have a bent portion that is bent to match the contour of body 131. The bent portion ensures that body 131 is firmly supported without a risk of unintentional movement. Bracket 111b has a through-hole, through which a fastening member penetrates to fasten bracket 111b to boss 111a. As such, when using both bracket 111b and boss 111a, heater 130 may be more stably fixed and supported within duct 100. Also, boss 111a serves to allow heater 130 to be spaced apart from the bottom of duct 100 by a predetermined distance, which ensures that heater 130 may contact a greater amount of air while achieving smooth air flow. Bracket 111b may be formed of a metal capable of withstanding heat of body 131.
A predetermined amount of water is required to generate steam in heater 130. Thus, a nozzle 150 may be added to duct 100 to eject water to heater 130.
In general, steam refers to vapor phase water generated by heating liquid water. That is, liquid water is changed into vapor phase water via phase change when water is heated above a critical temperature. On the other hand, mist refers to small particles of liquid water. That is, mist is generated by simply separating liquid water into small particles, and does not entail phase change or heating. Thus, steam and mist are clearly distinguishable from each other at least in terms of phase and temperature thereof, and have something in common only in terms of supplying moisture to an object. The mist consists of small particles of water and has a greater surface area than liquid water. Thus, mist can easily absorb heat and be changed into high temperature steam via phase change. For this reason, the washing machine may utilize, as a water supply means, nozzle 150 that can divide liquid water into small particles of water, instead of an outlet that directly supplies liquid water. Nevertheless, the washing machine may adopt a conventional outlet that supplies a small amount of water to heater 130. On the other hand, nozzle 150 may supply water, i.e. a water jet instead of mist by adjusting the pressure of water supplied to nozzle 150. In any cases, heater 130 creates an environment for steam generation, and thus may generate steam.
To generate steam, water may be supplied to heater 130 in an indirect manner. For example, nozzle 150 may supply water to a space within duct 100 rather than heater 130. The water may be transported to heater 130 via air flow provided by blower 140 for steam generation. However, since water may be adhered to an inner surface of duct 100 during transport, the supplied water does not completely reach heater 130. Also, since heater 130, as described above, has optimized conditions for steam generation by local and direct heating thereof, heater 130 may sufficiently change the supplied water into steam.
In consideration of the above mentioned reasons, for efficient steam generation, nozzle 150 may supply water to heater 130 in a direct manner. Here, nozzle 150 may supply water to heater 130 using self-ejection pressure thereof. Here, the self-ejection pressure is the pressure of water supplied to nozzle 150. The pressure of water supplied to nozzle 150 may allow water ejected from nozzle 150 to reach heater 130. That is, the water ejected from nozzle 150 is ejected to heater 130 by the ejection pressure of nozzle 150 without assistance of a separate intermediate medium. For the same reason, nozzle 150 may supply water only to heater 130. Moreover, nozzle 150 may eject mist to heater 130. As previously defined above, if nozzle 150 directly ejects mist to heater 130, effective steam generation even using ideal use of power may be achieved in consideration of an ideal environment created in heater 130. Also, if the direct ejection of mist is performed only in heater 130, this may ensure more effective steam generation.
Nozzle 150 may be oriented towards heater 130. That is, a discharge hole of nozzle 150 may be oriented towards heater 130. In this case, nozzle 150 may be arranged immediately above heater 130 or may be arranged immediately below heater 130, in order to directly supply water to heater 130. However, the water supplied from nozzle 150 (more specifically, mist), as illustrated in
Alternatively, nozzle 150 may be located at both ends of heater 130, i.e. at any one of regions A and B. As described above, once blower 140 is actuated, the interior air of duct 100 is discharged from blower 140 and passes through heater 130. In consideration of the flow direction of air, region A may correspond to a region at the front of heater 130 or to a suction region, and region B may correspond to a region at the rear of heater 130 or to a discharge region. Also, region A and region B may correspond to an entrance and an exit of heater 130 respectively. Accordingly, nozzle 150 may be located in the region at the front of heater 130 or in the suction region (i.e., in region A) on the basis of the flow direction of air within duct 100. On the other hand, nozzle 150 may be located in the region at the rear of heater 130 or in the discharge region (i.e., in region B) on the basis of the flow direction of air within duct 100. Even when nozzle 150 is located in region A or region B as described above, it may be difficult for the water supplied from nozzle 150 to completely reach predetermined region S, and some of the water may remain at the outside of predetermined region S. However, when nozzle 150 is located in the region at the rear of heater 130 or in discharge region B, the water that does not reach heater 130 remains near the region at the rear of heater 130 or near the discharge region B. Accordingly, if blower 140 is actuated, the water may be supplied into tub 30 rather than being changed into steam. On the other hand, when nozzle 150 is located in the region at the front of heater 130 or in suction region A, the water that does not reach heater 130 may enter heater 130 via air flow provided by blower 140. Accordingly, positioning nozzle 150 in region A may ensure efficient change of all supplied water into steam. As such, to achieve efficient steam generation, nozzle 150 may be located in region A, i.e. in the region at the front of heater 130 or in the suction region on the basis of the flow direction of air. Also, nozzle 150 located in region A is adapted to supply water in approximately the same direction as the flow direction of air within duct 100, whereas nozzle 150 located in region B is adapted to supply water in an opposite direction to the flow direction of air. Accordingly, for the same reason as discussed above, in terms of the flow direction of air, nozzle 150 may supply water to heater 130 (i.e. to predetermined region S including heater 130) in approximately the same direction as the flow direction of air within duct 100. Meanwhile, despite the above discussed reasons, nozzle 150 may be installed at any one region or two or more regions of the regions A and B, regions at both sides of heater 130, and regions immediately above and below heater 130 as necessary.
As discussed above, for efficient water supply and steam generation, nozzle 150 may be configured to directly supply water to heater 130 and may be oriented towards heater 130. For the same reason, nozzle 150 may supply water in approximately the same direction as the flow direction of air within duct 100. To satisfy the above described requirements, as previously determined, it is optimal that nozzle 150 be located in region A, i.e. in the region at the front of heater 130 or in the suction region on the basis of the flow direction of air.
In the description above, nozzle 150 has been described as being located in ‘approximately’ the same direction as the flow direction of air. Here, the term ‘approximately’ means that an ejection direction of nozzle 150 corresponds to a longitudinal direction of the rectangular duct 100. As illustrated in
Region A corresponds to a region between heater 130 and blower 140 in terms of a configuration of duct 100. Thus, nozzle 150 may be located between heater 130 and blower 140 in terms of a configuration of duct 100. In other words, nozzle 150 may be located between heater 130 and an air flow generation source. That is, heater 130 and blower 140 are located respectively at one side and the other side of duct 100 so as to be opposite to each other on the basis of a longitudinal direction of duct 100. In this case, nozzle 150 is located between heater 130 provided at one side of duct 100 and blower 140 provided at the other side of duct 100. Moreover, nozzle 150 may be located between the region at the front of heater 130 and the discharge region of blower 140 (herein, the terms ‘front’ and ‘rear’ in relation to heater 130 are explained on the basis of the flow direction of air within duct 100, and assuming that the air passes a first point and a second point within duct 100, the first point where the air first reaches is defined as the region at the front and the second point where the air reaches later is defined as the region at the rear). Also, as mentioned above, the water ejected from nozzle 150 is diffused by a predetermined angle. If nozzle 150 is arranged close to heater 130, more specifically, close to the suction region of heater 130, in consideration of the diffusion angle, a great part of the ejected water will be directly supplied to the inner wall surface of duct 100 rather than heater 130. Since heater 130 has the highest temperature in predetermined region S, it is advantageous, in terms of increase in steam generation efficiency, that the greatest possible amount of ejected water directly enter heater 130 of predetermined region S and spread throughout heater 130. Thus, to assist the greatest possible amount of water in directly entering heater 130, nozzle 150 may be spaced apart from heater 130 as much as possible. When nozzle 150 is spaced apart from heater 130, in consideration of diffusion of water, the supplied water will substantially be distributed throughout heater 130 starting from the suction region of heater 130, i.e. the entrance of heater 130, which may achieve efficient use of heater 130, i.e. efficient heat exchange and steam generation. The greater the distance between nozzle 150 and heater 130, the smaller the distance between nozzle 150 and blower 140. For this reason, nozzle 150 may be located close to blower 140, and simultaneously may be spaced apart from heater 130 by a predetermined distance. Also, to ensure that nozzle 150 is spaced apart from heater 130 as much as possible, nozzle 150 may be located close to a discharge side of blower 140. That is, nozzle 150 is preferably installed close to the discharge side of blower 140 from which the air having passed through blower 140 is discharged. When nozzle 150 is located close to the discharge side of blower 140, the supplied water may be directly affected by the air flow discharged from blower 140, i.e. by discharge force of blower 140, and may be moved farther so as to uniformly contact the entire heater 130. On the other hand, with assistance of the air flow, high water pressure may not be applied to nozzle 150, which may result in a lower price and increased lifespan of nozzle 150. Moreover, to realize arrangement closer to the discharge side of blower 140, as illustrated in
Referring to
Head 152, as illustrated in
When heater 130 generates steam, it may be necessary to transport the generated steam to tub 30 and drum 40 and finally to laundry, to realize desired functions. Thus, to transport the generated steam, blower 140 may blow air toward heater 130. That is, blower 140 may generate air flow to heater 130. The generated steam may be moved along duct 100 by the air flow, and may finally reach laundry by way of tub 30 and drum 40. In other words, blower 140 creates air flow within duct 100 and supplies the generated steam into tub 30 and drum 40. The steam may be used to perform desired functions, for example, laundry freshening and sterilization and creation of an ideal washing environment.
As described above, nozzle 150 has an optimized configuration to supply a sufficient constant amount of water to heater 130. That is, nozzle 150 has optimized arrangement and orientation, and other components of nozzle 150 are appropriately designed for the same purpose. Nevertheless, it may be difficult to supply a sufficient amount of water to the entire heater 130 using only the single nozzle 150 illustrated in
However, despite the above described advantages, the plurality of nozzles 150 requires a greater number of elements and processes as compared to the single nozzle 150 as described above. Thus, provision of the plurality of nozzles 150 may increase manufacturing costs of the washing machine. This problem may be easily solved by integrating elements of the plurality of nozzles 150 among various other methods. For example, all the elements of nozzle 150 including body 151 and head 152 may be molded into a single body. However, as described above, nozzle 150 has spiral flow-path 153 formed in body 151. Although spiral flow-path 153 may assign a great diffusion angle and longer traveling distance to the water to be supplied, a complex configuration of spiral flow-path 153 may make it difficult to fabricate the integral nozzle 150 having spiral flow-path 153. For this reason, as illustrated in
Swirling device 154 is basically configured to swirl water, similar to spiral flow-path 153. More specifically, as illustrated in
Swirling device 154, as illustrated, is fabricated separately from other elements of nozzle 150. Instead, due to separate fabrication of a complicated swirling structure, i.e. swirling device 154, as mentioned above, other elements of nozzle 150, more particularly, body 151 and head 152 may be integrally formed with each other as more clearly illustrated in
Meanwhile, to maximize utility of effects of water swirling, it is preferable that the eddy generated by swirling device 154 be directly supplied to and discharged from head 152. Thus, as illustrated in
As described above, swirling device 154 is configured to swirl water and is fabricated separately from nozzle 150 to thereby be fitted into nozzle 150. As such, swirling device 154 may effectively replace the above described spiral flow-path 153, and the other elements of the nozzle may be integrally formed with swirling device 154. For this reason, even when the plurality of nozzles 150 is provided, this may not increase the number of elements and processes, and consequently may not increase manufacturing costs of the washing machine while achieving improvement in steam generation performance.
Meanwhile, as illustrated in
Recess 114 may additionally generate steam using the water accommodated therein. Heating is required to change the accommodated water into steam. Thus, recess 114 may be located below heater 130 such that the water accommodated in recess 114 is heated using heater 130. That is, it can be said that recess 114 is located immediately below heater 130. Moreover, since the space within recess 114 is heated by heater 130, heater 130 may extend into the space within recess 114. That is, heater 130, as represented by a dotted line in
More specifically, as illustrated in
As illustrated in
Owing to bent portion 131a and thermal conductive member 133 or 111c as mentioned above, heater 130 may directly or indirectly contact the water in recess 114, thereby serving to more effectively heat the water. Heater 130 may heat the water in recess 114 to generate steam via heat transfer through air, even without the structure for direct or indirect contact.
Through use of the steam supply mechanism as described above with reference to
First, the method of controlling the refresh course may include a preparation operation S5 in which heating of heater 130 is performed. The heating may be realized by various devices, but particularly, by heater 130. Preparation operation S5 may basically create a high temperature environment that is suitable for steam generation. That is, preparation operation S5 is an operation of creating a high temperature environment for steam generation. As a result of performing preparation operation S5 to provide a high temperature environment before a steam generation operation S6 that will be described hereinafter, it is possible to facilitate steam generation in the following steam generation operation S6.
More specifically, in preparation operation S5, heater 130, which occupies a partial space within duct 100, may be heated to a higher temperature than that of the remaining space within duct 100. Preparation operation S5 requires heating for a considerably short time because a minimum space required for steam generation, i.e. only heater 130 is heated. Accordingly, preparation operation S5 may adopt temporal heating as well as local and direct heating, which may minimize power consumption. The heating of heater 130 may be performed for at least a partial duration of a preset duration of preparation operation S5 under the assumption that it can create an environment required for desired steam generation. Preferably, the heating of heater 130 may be performed for the duration of preparation operation S5.
If an external environment of heater 130 is changed during preparation operation S5, for example, if air flow occurs around heater 130, heat emitted from heater 130 may be forcibly transferred to other regions of duct 100, thereby causing unnecessary heating of these regions. Thus, local and temporal heating may be difficult. Further, it may be difficult to provide heater 130 with an environment suitable for steam generation, and excessive power consumption may be expected. For this reason, preparation operation S5 is preferably performed without occurrence of air flow around heater 130. That is, preparation operation S5 may include stopping actuation of blower 140 that generates air flow for a predetermined time. Additionally, when the air flow occurs in the entire duct 100, that is, when air circulates through duct 100, tub 30, drum 40, etc., this accentuates the above described results. Accordingly, preparation operation S5 may be performed without air circulation using duct 100. Meanwhile, the heater 130 may not be sufficiently heated during preparation operation S5, i.e. prior to completing preparation operation S5. If water is supplied to heater 130 during preparation operation S5, a great amount of water may not be changed into steam, and thus a desired amount of steam may not be generated. Accordingly, preparation operation S5 may be performed without supply of water to heater 130. That is, preparation operation S5 may include stopping actuation of nozzle 150 that ejects water for a predetermined time. Elimination of occurrence of air flow and/or supply of water, preferably, may be maintained for the duration of preparation operation S5. However, the disclosure is not necessarily limited thereto, and elimination of occurrence of air flow and/or supply of water may be maintained for a partial duration of preparation operation S5.
To ensure creation of a high temperature environment for steam generation, preferably, actuation of heater 130 is maintained for the duration of preparation operation S5. In addition, actuation of nozzle 150 stops for at least a partial duration of the implementation duration of preparation operation S5. Preferably, actuation of nozzle 150 stops for the implementation duration of preparation operation S5. Also, actuation of blower 140 may stop for at least a partial duration of the implementation duration of preparation operation S5. Actuation of blower 140 in preparation operation S5 will be described later in relation to a first heating operation S5a and a second heating operation S5b that will be described hereinafter.
Elimination of occurrence of air flow and/or supply of water as described above may be achieved via various methods. However, to achieve this elimination, the steam supply mechanism, i.e. the elements within duct 100 may be primarily controlled. Control of these elements is illustrated in
For example, blower 140 is a major element that may generate air flow and air circulation. Thus, as illustrated in
As discussed above, occurrence of air flow may basically prevent creation of an ideal high temperature environment for steam generation. Since the high temperature environment is the most important in aspect of preparation operation S5, it may be preferable that preparation operation S5 be performed at least without occurrence of air flow. For this reason, preparation operation S5 may include stopping at least blower 140. That is, preparation operation S5 may include stopping actuation of blower 140 while actuating nozzle 150. Also, in consideration of the quality of steam to be additionally generated, at least a partial duration of preparation operation S5 may do not include an occurrence of air flow and a supply of water. That is, preparation operation S5 may include shutting down both blower 140 and nozzle 150. In this case, stopping actuation of both blower 140 and nozzle 150 may be performed at the final stage of preparation operation S5. Accordingly, steam generation operation S6 that will be described hereinafter may be performed after stopping actuation of both blower 140 and nozzle 150 ends. Meanwhile, despite the importance of elimination of the occurrence of air flow, preparation operation S5 may be performed without the supply of water under occurrence of air flow. Accordingly, preparation operation S5 may include stopping only actuation of nozzle 150 without stopping actuation of blower 140 (i.e. include shutting down only nozzle 150 while actuating blower 140). That is, preparation operation S5 may include shutting down at least nozzle 150. In this case, shutdown of nozzle 150 may be performed at the final stage of preparation operation S5. Even while actuation of blower 140 and/or nozzle 150 selectively stops, heater 130 may be continuously actuated for the duration of preparation operation S5. That is, as illustrated in
Preparation operation S5 may be performed for a first set time. As described above, actuation of heater 130 may be maintained for at least a partial duration of the first set time of preparation operation S5. Preferably, actuation of heater 130 may be maintained for the first set time. Referring to
After completion of preparation operation S5, steam generation operation S6 in which water is supplied to heated heater 130 is performed. The supply of water may be realized by various devices, and more particularly, by nozzle 150. In steam generation operation S6, materials required for steam generation may be added to the previously created environment of heater 130.
To generate steam, water may be indirectly supplied to heater 130 using nozzle 150. The indirect supply of water may utilize other devices except for nozzle 150, for example, a typical outlet device. For example, water may be supplied into another space within duct 100, rather than being supplied to heater 130, using various devices, and then be transported to heater 130 for steam generation via air flow provided by blower 140. However, since water may be adhered to the inner surface of duct 100 during transport, the supplied water may do not completely reach heater 130. On the other hand, as described above, heater 130 has optimized conditions for steam generation via direct heating in preparation operation S5. Accordingly, in steam generation operation S6, water may be directly supplied to heater 130. The supply of water may be performed for at least a preset partial duration of steam generation operation S6 if it can generate a sufficient amount of steam for the preset partial duration. However, preferably, the supply of water may be performed for the duration of steam generation operation S6. Also, as described above, generation of a sufficient amount of high quality steam requires an ideal environment, i.e. a high temperature environment. Accordingly, steam generation operation S6 preferably begins or is performed after preparation operation S5 is performed for a required time, and more specifically for a preset time. That is, preparation operation S5 is performed for a preset time before steam generation operation S6 begins.
As defined above, steam refers to vapor phase water generated by heating liquid water. On the other hand, mist refers to small particles of liquid water. That is, mist can be changed into high temperature steam via a phase change by easily absorbing heat. For this reason, in steam generation operation S6, mist may be ejected to heater 130. As described above with reference to
Meanwhile, as the water supplied during steam generation operation S6 absorbs heat emitted from heater 130, the temperature of heater 130 may drop. Such temperature drop may prevent heater 130 from having an ideal environment for steam generation. Thus, it may be difficult to generate a sufficient amount of steam and to achieve high quality steam due to the presence of a great amount of liquid water. Accordingly, it is preferable that heater 130 be heated in steam generation operation S6 in order to maintain the ideal environment for steam generation during steam generation operation S6. For this reason, steam generation operation S6 may be performed along with heating of heater 130. In this case, the heating may be performed for a partial duration of steam generation operation S6, and moreover may be performed for the duration of steam generation operation S6. Nevertheless, since heater 130 has been sufficiently heated, steam may be generated to some extent in steam generation operation S6 even without additional heating. Thus, steam generation operation S6 may be performed without additional heating of heater 130.
Although elimination of occurrence of air flow and/or implementation of heating may be performed via various methods, it may be easily achieved by controlling the steam supply mechanism, i.e. the elements within duct 100. For example, as illustrated in
As discussed above, occurrence of air flow basically prevents generation of a sufficient amount of high quality steam. Since steam generation is the most important in aspect of steam generation operation S6, it may be preferable that steam generation operation S6 be performed at least without occurrence of air flow. Also, in consideration of a steam generation environment, steam generation operation S6 may be performed along with heating of heater 130 without occurrence of air flow. For these reasons, steam generation operation S6 may include stopping actuation of at least blower 140. Also, steam generation operation S6 may include stopping actuation of blower 140, but actuating heater 130.
Heater 130 has a limited size and may have difficulty in completely changing water into steam when excess water is supplied for a substantially long time. Thus, it is preferable that steam generation operation S6 be performed for a second set time that is shorter than the first set time. Actuation of nozzle 150 may be maintained for a partial duration of the second set time. Preferably, actuation of nozzle 150 is maintained for the duration of the second set time. As illustrated in
After completion of steam generation operation S6, air may be blown to heater 130 in order to move the generated steam (S7). That is, the air flow to heater 130 may occur to allow the generated steam to be supplied into tub 30 (S7). The occurrence of air flow may be performed by various methods, but more particularly, by rotating blower 140. Thus, steam supply operation S7 performed after steam generation operation S6 is an operation of supplying the generated steam into tub 30. Steam supply operation S7 is performed after steam generation operation S6 ends. As such, preparation operation S5, steam generation operation S6, and steam supply operation S7 are performed in sequence, and the next operation is performed after completion of the previous operation.
The generated steam is moved along duct 100 by the air flow, and is primarily supplied into tub 30. Thereafter, the steam may finally reach laundry by way of drum 40. The steam is used for desired functions, for example, laundry freshening and sterilization, or creation of an ideal washing environment. If the air flow can transport all of or a sufficient amount of the generated steam into tub 30, the air flow may occur for a partial duration of steam supply operation S7. However, and preferably, the air flow may occur for the duration of steam supply operation S7. Also, as described above, due to the fact that steam supply operation S7 has a precondition of generation of a sufficient amount of steam to be supplied into tub 30, it is preferable that steam supply operation S7 begins after steam generation operation S6 is performed for a desired time, preferably, for a preset time. That is, steam generation operation S6 is performed for a preset time before steam supply operation S7 begins. Also, since steam generation operation S6 is performed after preparation operation S5 is performed for a predetermined time, steam supply operation S7 begins after preparation operation S5 and steam generation operation S6 are sequentially performed for a predetermined time.
Meanwhile, the air within tub 30 and/or drum 40 has a lower temperature than the supplied steam. The supplied steam may be condensed into water via heat exchange with the air within tub 30 and/or drum 40. Accordingly, during steam supply operation S7, a certain amount of the generated steam may be lost during transport, and may not reach laundry. Moreover, it may be difficult to provide laundry with a sufficient amount of steam and to achieve desired effects. For this reason, water may be supplied to heater 130 during steam supply operation S7 to ensure continuous steam generation. That is, steam supply operation S7 may be performed along with supply of water to heater 130. In this case, in addition to steam generation operation S6, steam is continuously generated even during steam supply operation S7. As such, a sufficient amount of water to compensate for water loss during transport may be prepared within a short time. Accordingly, despite water loss during transport, the washing machine may provide laundry with a sufficient amount of steam that the user can visually perceive, which ensures reliable acquisition of desired effects using steam. The supply of water may be performed for at least a partial duration of steam supply operation S7. Preferably, to generate a greater amount of steam, the supply of water may be performed for the duration of steam supply operation S7. If the supply of water is performed only for a partial duration of steam supply operation S7, it is preferable that the supply of water is performed at the final stage of steam supply operation S7.
Since the water supplied during steam supply operation S7 is changed into steam by absorbing heat from heater 130, temperature drop may prevent heater 130 from acquiring an ideal environment for steam generation. Thus, to maintain the ideal environment for steam generation during steam supply operation S7, it is preferable to perform heating of heater 130 even during steam supply operation S7. For this reason, steam supply operation S7 may be performed along with heating of heater 130. By maintaining the ideal environment for steam generation via heating, steam generation during steam supply operation S7 may be more stably performed to achieve a sufficient amount of steam. In this case, the heating may be performed for at least a partial duration of steam supply operation S7, and preferably, may be performed for the duration of steam supply operation S7, in order to maintain the ideal environment for steam generation. When the supply of water (actuation of nozzle 150) is performed during steam supply operation S7, preferably, actuation of heater 130 may depend on actuation of nozzle 150. That is, when steam supply operation S7 includes actuation of nozzle 150 and heater 130, actuation of nozzle 150 is preferably performed simultaneously with actuation of heater 130.
Although the supply of water and/or the heating may be performed via various methods, it may be easily achieved by controlling the steam supply mechanism, i.e. the elements within duct 100. For example, nozzle 150 and heater 130 may be actuated for at least a partial duration of steam supply operation S7, in order to achieve the supply of water and heating. In this case, actuation of nozzle 150 and actuation of heater 130 are preferably performed at the final stage of steam supply operation S7. However, as illustrated in
As illustrated in
As described above with reference to
The above described steam supply operation S7 basically has a precondition in that air flow is generated within duct 100 to supply the steam generated in steam generation operation S6 into tub 30. Thus, actuation of blower 140 is maintained for at least a partial duration of steam supply operation S7, and preferably, is maintained for the duration of steam supply operation S7. In addition, actuation of heater 130 and actuation of nozzle 150 may be selectively performed in steam supply operation S7. With selective actuation of heater 130 and nozzle 150, in steam supply operation S7, only actuation of nozzle 150 may be maintained (without actuation of heater 130), only actuation of heater 130 may be maintained (without actuation of nozzle 150), or heater 130 and nozzle 150 may be actuated simultaneously. As described above, heater 130 is actuated for at least a partial duration of steam supply operation S7, and is preferably actuated for the duration of steam supply operation S7. nozzle 150 is actuated for at least a partial duration of steam supply operation S7, and is preferably actuated for the duration of steam supply operation S7.
In the case in which heater 130 and nozzle 150 are actuated simultaneously, it can be said that blower 140, heater 130 and nozzle 150 are actuated simultaneously in steam supply operation S7. In this case, actuation of blower 130, heater 130 and nozzle 150 may be performed for at least a partial duration of steam supply operation S7, and preferably, may be performed for the duration of steam supply operation S7. If actuation of blower 130, heater 130, and nozzle 150 is performed for a partial duration of steam supply operation S7, preferably, the simultaneous actuation is performed at the final stage of steam supply operation S7.
Meanwhile, water may be generated in tub 30 by the steam supplied in steam supply operation S7. For example, the air within tub 30 and/or drum 40 has a lower temperature than the supplied steam. Thus, the supplied steam may be condensed into water via heat exchange with the air within tub 30 and/or drum 40. Accordingly, even in steam generation operation S6, the generated steam may be condensed by heat exchange within duct 100, and the condensed water may be supplied into tub 30 via air flow. Thus, the condensed water may be finally gathered in tub 30. As illustrated in
Heater 130 has a limited size, and thus supplying all the steam generated in heater 130 into tub 30 does not take a great time. Thus, steam supply operation S7 may be performed for a third set time that is shorter than the second set time. Actuation of heater 130, nozzle 150, and blower 140 may be maintained for at least a partial duration of the third set time, and is preferably maintained for the duration of the third set time. In explanation based on only the actuation time of nozzle 150, the actuation time of nozzle 150 in steam generation operation S6 is set to longer than the actuation time of nozzle 150 in steam supply operation S7. In this case, the actuation time of nozzle 150 in steam supply operation S7 may be a half or a quarter of the actuation time of nozzle 150 in steam generation operation S6, and preferably may be a half or one third of the actuation time of nozzle 150 in steam generation operation S6. As illustrated in
As described above, heater 130 may be continuously actuated for the duration of operations S5 to S7. However, this continuous actuation may cause heater 130 to overheat. Thus, to prevent heater 130 from overheating, the temperature of heater 130 may be directly controlled. For example, if the temperature of air within duct 100 or the temperature of heater 130 rises to 85° C., heater 130 may be shut down. On the other hand, if the temperature of air within duct 100 or the temperature of heater 130 drops to 70° C., heater 130 may again be actuated.
Meanwhile, in steam supply operation S7, to effectively transport the generated steam into tub 30, it is necessary to generate sufficient air flow to heater 130. The sufficient air flow may occur when blower 140 is rotated at predetermined revolutions per minute or more, and it takes some time for blower 140 to reach appropriate revolutions per minute. In particular, it takes the greatest time to restart rotation of blower 140 in a state in which actuation of blower 140 completely stops. However, in consideration of other related operations, steam supply operation S7 is optimally set to be performed for a relatively short time. Therefore, the actuation time of blower 140 at appropriate revolutions per minute may be shorter than the duration of steam supply operation S7. Thus, sufficient air flow may not occur during steam supply operation S7, and thus effective transport of the generated steam may not be possible. For this reason, to maximize performance of blower 140 during steam supply operation S7, blower 140 may be preliminarily rotated, i.e. actuated before steam supply operation S7. If blower 140 is previously rotated before steam supply operation S7, steam supply operation S7 may begin during rotation of blower 140. Accordingly, the revolutions per minute of blower 140 may rapidly increase to appropriate revolutions per minute at the initial stage of steam supply operation S7, which may ensure continuous occurrence of sufficient air flow.
The preliminary rotation of blower 140 may be performed in steam generation operation S6. However, as discussed above, occurrence of air flow in steam generation operation S6 is not preferable because it causes deterioration in the quantity and quality of steam. Thus, the preliminary rotation of blower 140 may be performed in preparation operation S5. That is, as illustrated in
As mentioned above, occurrence of air flow is not preferable even in preparation operation S5, and therefore actuation of blower 140 is considerably limited. Blower 140 is turned on only for a predetermined time so as to be rotated under power. After the predetermined time has passed, blower 140 is directly turned off, and continues to rotate by inertia. Also, blower 140 may be rotated at low revolutions per minute for the predetermined turn-on time thereof. Preparation operation S5 may be divided into first heating operation S5a and second heating operation S5b based on actuation of blower 140. As illustrated in
The above described actuation involves actuation of blower 140 and occurrence of air flow. Therefore, preparation operation S5 including the above described actuation is performed without supply of water to heater 130 and actuation of nozzle 150. Also, since blower 140 is rotated at low revolutions per minute, air circulation through duct 100 does not occur. Thus, preparation operation S5 may be performed without air circulation through duct 100 even during actuation of blower 140. That is, actuation of blower 140 does not have a great effect on local heating and creation of the steam generation environment in preparation operation S5. If efficient supply of a desired amount of steam may be realized in steam supply operation S7 even without actuation of blower 140, actuation of blower 140 is preferably eliminated. As discussed above, in any cases, it is most effective to perform preparation operation S5 without supply of water and occurrence of air flow. That is, actuation of blower 140 is selective, and is not essential.
As described above, preparation operation S5, steam generation operation S6, and steam supply operation S7 are functionally associated with one another for steam supply. Thus, as illustrated in
The above described operations S5, S6, and S7 will hereinafter be described based on whether or not actuation of heater 130, of blower 140, and of nozzle 150 is performed.
Heater 130 may be actuated throughout preparation operation S5, steam generation operation S6, and steam supply operation S7. However, as in the above description of the respective operations, actuation of heater 130 is intermittently performed or stops in some operations or at least a partial duration of some operations.
Blower 140 may be actuated for at least a partial duration of steam supply operation S7, and is preferably actuated for the duration of steam supply operation S7. In addition, to achieve more rapid actuation of blower 140 in steam supply operation S7, actuation of blower 140 may be maintained for a predetermined time, i.e. for at least a partial duration of preparation operation S5, and preferably may be maintained at the final stage of preparation operation S5. In addition, actuation of blower 140 preferably stops in steam generation operation S6.
Nozzle 150 may be actuated for at least a partial duration of steam generation operation S6, and is preferably actuated for the duration of steam generation operation S6. Since actuation of nozzle 150 causes water ejection to heater 130, preferably, actuation of nozzle 150 stops in preparation operation S5 that creates a steam generation environment. Meanwhile, nozzle 150 may be actuated for at least a partial duration of steam supply operation S7, and is preferably actuated for the duration of steam supply operation S7. Although steam supply operation S7 is an operation of supplying the generated steam into tub 30, to assist the user in visually checking that a sufficient amount of steam is generated and is supplied into tub 30, actuation of heater 130, of nozzle 150, and of blower 140 may be simultaneously performed for at least a partial duration of steam supply operation S7. Preferably, actuation of heater 130, of nozzle 150, and of blower 140 may be simultaneously performed for the duration of steam supply operation S7.
In steam supply operation S6 in which nozzle 150 is actuated to generate steam without actuation of blower 140, the generated steam is invisible under an environment in which duct 100, tub 30 and drum 40 are kept at high temperatures. Thus, when only blower 140 is actuated to supply the generated steam into drum 40 after steam supply operation S6, the supplied steam is invisible even if the user views the interior of drum 40 through transparent door glass 21. Thus, the user cannot check supply of steam, which causes poor product reliability.
On the other hand, according to another embodiment of the present invention, in the case in which blower 140 is actuated during additional steam generation via actuation of nozzle 150 and heater 130 in steam supply operation S7, the interior of duct 100 and drum 40 (including tub 30) is kept at a relatively low temperature, causing at least some of the generated steam to be condensed, which has the effect of providing visible steam. That is, simultaneous actuation of nozzle 150, heater 130 and blower 140 is helpful to provide visible steam owing to creation of the relatively low temperature environment. Thus, the user can visually check the steam supplied through steam supply operation S7 through door glass 21. Allowing the user to visually check supply of steam may provide the user with product reliability.
Meanwhile, if the washing machine suitable for steam supply owing to employment of a steam supply mechanism can be previously prepared, steam supply process P2; S5 to S7 may be more efficiently performed. Thus, pre-treatment operations for preparation of the above described washing machine will be described hereinafter. In the pre-treatment operations, the above described operations S5 to S7 as well as all other operations that will be described hereinafter, if they are described as performing or eliminating any functions, this basically means that implementation or elimination of the functions is maintained for a preset duration of the corresponding operation or for a partial duration of the corresponding operation. Likewise, the same logic is applied to a description in which elements associated with the functions are actuated or shut down. Also, if any functions and/or actuation of any elements are not mentioned in the following respective operations, this may mean that the functions are not performed and the elements are not actuated, i.e. are shut down in the corresponding operation. As mentioned above, the described logic may be applied in common to all operations that are described herein.
The pre-treatment operations that will be described hereinafter may include a voltage sensing operation S1, a heater cleaning operation S2, a residual water discharge operation S3, a preliminary heating operation S4, and a water supply amount judging operation S12. The operations S1, S2, S3, S4, and S12 may be performed in common before steam supply process P2, or some of operations S1, S2, S3, S4, and S12 may be selectively performed before steam supply process P2. If at least two of operations S1, S2, S3, S4, and S12 are performed before steam supply process P2, the implementation sequence of the at least two pre-treatment operations may be changed according to an actuation environment of the washing machine.
In the following description, for convenience, voltage sensing operation S1, heater cleaning operation S2, and residual water discharge operation S3 are defined as constituting a pre-treatment process P1, and water supply amount judging operation S12 is defined as a check process P6.
First, as a pre-treatment operation, duct 100 may be preliminary heated before preparation operation S5 (S4). Preliminary heating operation S4 may be performed via various methods, but may be performed via circulation of high temperature air within duct 100 and tub 30 connected to duct 100. The air circulation may be easily achieved using the elements within duct 100 that constitute the steam supply mechanism. For example, referring to
As described above, since the entire duct 100 is primarily heated by preliminary heating operation S4, it is possible to substantially prevent the steam provided by steam supply process P2; S5 to S7 from being condensed in duct 100 prior to reaching tub 30 and drum 40. Also, since preliminary heating operation S4 attempts heating of the entire tub 30 and of the entire drum 40, it is possible to prevent condensation of the steam within tub 30 and drum 40. Accordingly, a sufficient amount of steam can be supplied without unnecessary loss, enabling effective implementation of desired functions. Preliminary heating operation S4 may be performed, for example, for 50 seconds as illustrated in
As described above, residual water of the washing machine, more particularly, within duct 100, tub 30, and drum 40 may prevent effective implementation of desired functions caused by steam supply. The residual water may also cause sudden condensation of the supplied steam and may cause dried laundry to be wetted again. For these reasons, discharge of the residual water from the washing machine may be performed (S3). Discharge operation S3 may be performed at any time before preparation operation S5. The water present in the washing machine may undergo heat exchange with high temperature air, which may deteriorate efficiency of preliminary heating operation S4. Thus, discharge operation S3, as illustrated in
During repeated actuations of the washing machine, impurities, such as lint, etc. may stick to a surface of heater 130. These impurities may prevent actuation of heater 130. For this reason, cleaning of the surface of heater 130 may be performed before preparation operation S5 (S2). Cleaning operation S2 may be performed at any time before preparation operation S5. However, cleaning operation S2 is designed to use a predetermined amount of water for efficient and rapid cleaning of heater 130, and may be performed before discharge operation S2 to enable discharge of water used for cleaning as illustrated in
To realize more efficient control, voltage applied to the washing machine may be sensed (S1). Control based on the sensing of voltage will be described in more detail in the relevant part of the disclosure.
As described above, operations S1 to S4 may create an ideal environment for the following operations S5 to S7, i.e. for steam supply process P2. That is, operations S1 to S4 function to prepare steam supply process P2. Thus, as illustrated in
Meanwhile, steam supplied in steam supply process P2 may serve to freshen laundry via wrinkle-free, static charge elimination and deodorization owing to a desired high temperature and high humidity thereof. Nevertheless, to maximize effects of the freshening function, certain post-treatments may be additionally required. Also, since the supplied steam provides laundry with moisture, for user convenience, a post-treatment to remove moisture from the freshened laundry may be required.
As such a post-treatment, a first drying operation S9 may first be performed after steam supply operation S7. As is known, a process of rearranging fibrous tissues is required to remove wrinkles. Rearrangement of fibrous tissues requires provision of a certain amount of moisture and slow removal of moisture in fibers for a sufficient time. That is, slow removal of moisture may ensure smooth restoration of deformed fibrous tissues to an original state thereof. If fibers are dried at an excessively high temperature, only moisture may be rapidly removed from fibers, which causes deformation of fibrous tissues. For this reason, to slowly remove moisture, first drying operation S9 may dry laundry by heating the laundry at a relatively low temperature. That is, first drying operation S9 may substantially correspond to low temperature drying.
Although first drying operation S9 may be performed via various methods, it may be performed by supplying the slightly heated air, i.e. the relatively low temperature air into tub 30 for a predetermined time. The supplied heated air may finally be supplied to laundry within drum 40. The supply of heated air may be easily achieved using the elements within duct 100 that constitute the steam supply mechanism. For example, referring to
As the slightly heated air, i.e. the relatively low temperature air is supplied to laundry by the above described first drying operation S9, fibrous tissues of the laundry may be slowly dried and rearranged. Thus, restoration of laundry having no wrinkles may be achieved. First drying operation S9 may be performed, for example, for 9 minutes and 30 seconds as illustrated in
Since the supplied steam causes the laundry to be wetted, it is necessary to completely remove moisture from the laundry. Accordingly, a second drying operation S10 is performed after first drying operation S9. To remove moisture from the laundry within a short time, second drying operation S10 may be performed to dry laundry to a high temperature, i.e. to at least a higher temperature than that in first drying operation S9. That is, second drying operation S10 may correspond to high temperature drying as compared to first drying operation S9.
Although second drying operation S10 may be performed via various methods, second drying operation S10 may be performed by supplying air having a considerably high temperature into tub 30. At least second drying operation S10 may supply air having a higher temperature than that in first drying operation S9. For example, as illustrated in
As the heated air, i.e. the high temperature air is supplied to laundry by the above described second drying operation S10, the laundry may be completely dried within a short time. Second drying operation S10 may be performed, for example, for a shorter time of 1 minute than that in first drying operation S9 as illustrated in
As described above, first and second drying operations S9 and S10 are associated with each other to provide a drying function as a post-treatment. Thus, as illustrated in
After steam supply process P2 is completed, a large amount of steam is present within the washing machine. As the steam is condensed, a thin water membrane is formed at surfaces of duct 100, tub 30, drum 40, and the internal elements thereof. As such, if drying operations S9 and S10 are performed after steam supply process P2, i.e. steam supply operation S7, the water membrane is easily evaporated and the resulting vapor is supplied to laundry, which may result in considerable deterioration of drying efficiency. Also, the water membrane may prevent actuation of some elements, and more particularly, of heater 130. For this reason, actuation of the washing machine is paused for a predetermined time before first drying operation S9 and after steam supply operation S7 (S8). That is, pause operation S8 is performed between steam supply operation S7 and first drying operation S9. In other words, pause operation S8 is performed between steam supply process P2 and drying process P4. As illustrated in
The laundry having passed through drying operations S9 and S10 acquires a high temperature by the heated air. This may burn the user by the heated laundry, and the user cannot wear the dried laundry despite completion of removal of moisture from the laundry. For this reason, the laundry may be cooled after second drying operation S10 (S11). More specifically, cooling operation S11 may supply unheated air to the laundry. For example, as illustrated in
The refresh course illustrated in
Meanwhile, if nozzle 150 is abnormally actuated or breaks down, the amount of water supplied to heater 130 in steam generation operation S6 of steam supply process P2 may be less than a preset value, or the supply of water may stop. Differently from other elements, abnormal actuation or breakdown of nozzle 150 may cause heater 130 to promptly overheat and damage to the washing machine. As mentioned above, abnormal actuation or breakdown of nozzle 150 may have a direct effect on the amount of water supplied into duct 100, and more specifically, the amount of water supplied into heater 130 (hereinafter referred to as ‘water supply amount’), and therefore abnormal actuation or breakdown of nozzle 150 may be judged by judging the water supply amount. For this reason, as illustrated in
In water supply amount judging operation S12, the amount of water ejected to heater 130 through nozzle 150 is judged. Water supply amount judging operation S12 enables direct measurement of the amount of water that is actually supplied. However, the direct measurement may require expensive devices and may increase manufacturing costs of the washing machine. Thus, water supply amount judging operation S12 may be performed by judging only whether or not a sufficient amount of water is supplied to heater 130. That is, judging operation S12 may adopt an indirect method of judging the water supply amount. As described above in relation to steam supply process P2, if water supplied from nozzle 150 is changed into steam, this naturally raises the temperature of air within duct 100. More specifically, if a preset amount of water is supplied, a sufficient amount of steam is generated and the temperature of air within duct 100 may rise to a certain level. On the other hand, if the water supply amount is reduced or the supply of water stops, a lower amount of steam may be generated and the temperature of air may drop. In consideration of this result, there is a direct correlation between the water supply amount and an increase rate in the temperature of air within duct 100. That is, a greater water supply amount causes a greater temperature increase rate, and a smaller water supply amount causes a smaller temperature increase rate. Thus, in water supply amount judging operation S12 using the indirect judgment method, the amount of water supplied to heater 130 may be judged based on a temperature increase rate within duct 100 for a predetermine duration.
As described above, a temperature increase rate caused by steam generation is judged for indirect judgment of the water supply amount in water supply amount judging operation S12. Thus, the judgment of the temperature increase rate essentially requires steam generation. For this reason, water supply amount judging operation S12 may basically include steam generation. As known, when water is changed into steam, the volume of water greatly expands. Thus, the generated steam is naturally discharged from space S occupied by heater 130. For this reason, to accurately measure a temperature increase rate, water supply amount judging operation S12 may measure and determine a temperature increase rate of air at a position close to heater 130 for a predetermined time. In other words, the temperature increase rate of air discharged from space S occupied by heater 130 for the predetermined time may be measured and determined. That is, in water supply amount judging operation S12, the temperature increase rate of air is measured based on air that is present at the outside of space S occupied by heater 130 and is mixed with and heated by the discharged steam. As the discharged air and steam directly enter discharge portion 110a of duct 110, the temperature increase rate of air in discharge portion 110a of duct 110 may be measured in water supply amount judging operation S12. That is, discharge portion 110a substantially means a region behind heater 130, and the temperature increase rate of air discharged rearward from heater 130 may be measured in water supply amount judging operation S12. To control drying of laundry, discharge portion 110a may be equipped with a sensor that measures the temperature of circulating hot air. In this case, the sensor may be used in both the drying operations S9 and S10 (including a typical laundry drying operation) as well as in water supply amount judging operation S12. Thus, the above described water supply amount judging operation S12 is very advantageous for reduction in the manufacturing costs of the washing machine. Moreover, water supply amount judging operation S12 may be performed at any time during the refresh course. Also, since steam generation operation S6 performs generation of steam required for measurement of the temperature increase rate, water supply amount judging operation S12 may be performed in steam generation operation S6 during steam supply process P2. However, to rapidly and accurately judge abnormal actuation of nozzle 150, water supply amount judging operation S12 may be performed immediately before steam supply process P2, i.e. immediately before preparation operation S5 as illustrated in
Water supply amount judging operation S12 will hereinafter be described in more detail with reference to
As described above, the water supply amount is judged using the temperature increase rate of air due to steam generation. Therefore, in water supply amount judging operation S12, first, steam is generated from heater 130 within duct 100 for a predetermined time. During steam generation, heater 130 within duct 100 is heated as described above in relation to steam supply process P2 (S12a). Also, water is directly ejected to the heated heater 130 for a predetermined time (S12a). That is, the heating and supply operation S12a is similar to preparation operation S5 and steam generation operation S6 of the above described steam supply process P2. To perform the heating and supply operation S12a, as illustrated in
If heating and supply operation S12a is performed, i.e. if steam generation begins, a first temperature may be measured (S12b). The first temperature corresponds to the temperature of air discharged rearward from heater 130. In other words, the first temperature corresponds to the temperature of air that is present at the outside of heater 130 and is mixed with and heated by the steam discharged from heater 130. As described above, the first temperature may correspond to the temperature of air at discharge portion 110a of duct 100. The steam is generated as soon as the heating and supply operation S12a begins and is naturally discharged from heater 130. Thus, measurement operation S12b may be performed at any time after the heating and supply operation S12a begins. However, to achieve reliability in the measurement of the temperature increase rate, measurement operation S12b is preferably performed immediately after implementation of the heating and supply operation S12a, i.e. immediately after steam generation. Meanwhile, the generation amount of steam is not significant at the initial stage of the heating and supply operation S12a, and smooth discharge of steam from space S occupied by heater 130 may not be achieved. Thus, as illustrated in
After completion of measurement operation S12b, a second temperature, which is the temperature of air discharged rearward from heater 130 after a predetermined time has passed, is measured (S12c). That is, after the first temperature has been measured and the predetermined time has passed, the second temperature is measured. The air, which is a measurement object in measurement operation S12c, is equal to the air as described above in relation to measurement operation S9b.
After completion of measurement operation S12c, the temperature increase rate may be calculated from the measured first and second temperatures (S12d). In general, the temperature increase rate may be acquired by subtracting the first temperature from the second temperature. The temperature increase rate of air discharged from heater 130 for the predetermined time may be determined by the above described operations S12b to S12d.
Thereafter, the calculated temperature increase rate may be compared with a predetermined reference value (S12e). If the calculated temperature increase rate is less than a predetermined reference value in comparison operation S12e, this means that the temperature increase is not sufficient. The result also means that the water supply amount is less than a predetermined value, and thus means that a sufficient amount of water is not supplied or supply of water stops, and thus a sufficient amount of steam is not generated. Accordingly, it may be judged that an insufficient amount of water less than a predetermined value is supplied if the calculated temperature increase rate is less than a predetermined reference value (S12f). On the other hand, if the calculated temperature increase rate is equal to or greater than the predetermined reference value in comparison operation S12e, this means that the temperature increase is sufficient. The result also means that the water supply amount exceeds a predetermined value, and thus a sufficient amount of water is not supplied and a sufficient amount of steam is generated. Accordingly, it may be judged that a sufficient amount of water that is at least greater than a predetermined value is supplied if the calculated temperature increase rate is equal to or greater than reference value (S12g). In comparison and judging operations S12f and S12g, the predetermined reference value may be experimentally or analytically acquired, and may be, for example, 5° C.
If it is judged in judging operation S12g that a sufficient amount of water greater than a predetermined value is supplied, normal actuation of nozzle 150 without breakdown may be judged.
Meanwhile, if it is judged in judging operation S12e that a sufficient amount of water greater than a predetermined value is supplied, a first algorithm to generate and supply steam into tub 30 may be performed. In addition, if it is judged in judging operation S12e that a sufficient amount of water less than the predetermined value is supplied, a second algorithm having no steam generation may be performed.
The first algorithm includes a steam algorithm to supply steam into tub 30, and a drying algorithm to supply hot air into tub 30. In this case, the steam algorithm includes the above described steam supply process P2, and the drying algorithm includes at least one of the above described first and second drying operations, and preferably includes both the first and second drying operations. The second algorithm include at least one of third and fourth drying operations that will be described hereinafter, and preferably includes both the third and fourth drying operations.
If it is judged in judging operation S12e of water supply amount judging operation S12 that a sufficient amount of water greater than the predetermined value is supplied, as illustrated in
After completion of water supply amount judging operation S12 using steam, a great amount of steam is present within duct 100. The steam may be condensed at the surface of the elements within duct 100, thereby preventing actuation of these elements. In particular, the condensed water may prevent actuation of heater 130 during steam supply process P2. For this reason, actuation of the washing machine is paused for a predetermined time after water supply amount judging operation S12 and before implementation of the first algorithm or the second algorithm (S13). That is, pause operation S13 is performed between water supply amount judging operation S12 and preparation operation S5 of the first algorithm. As illustrated in
As described above, in judging operation S12, it is possible to check whether or not nozzle 150 is normal by judging the water supply amount. Pause operation S13 is a post-treatment and minimizes the effect of judging operation S12 with respect to the following operations. Thus, judging and pause operations S12 and S13 are functionally associated with one another, and constitute a single process, i.e. a check process P6 as illustrated in
If it is judged in judging operation S12e that an insufficient amount of water less than a predetermined value is supplied (S12f), abnormal actuation or breakdown of nozzle 150 may be judged. The abnormal actuation of nozzle 150 may be caused by various reasons, and for example, includes the case in which the pressure of water supplied to nozzle 150 is abnormally low. The abnormal actuation or breakdown of nozzle 150, as mentioned above, may cause heater 130 to overheat and damage to the washing machine. Accordingly, if it is judged that a sufficient amount of water is not supplied as in judging operation S12f, actuation of the washing machine may stop for the reason of safety. Nevertheless, the refresh course may perform desired functions even in the abnormal state. In particular, if nozzle 150 can function to supply water although the water supply amount is small, the refresh course may be modified to perform desired functions. To this end,
As illustrated in
Third drying operation S14 may be performed by supplying the slightly heated air, i.e. the relatively low temperature air into tub 30 for a predetermined time. To supply the heated air, blower 140 and heater 130 may be actuated. Also, to supply the slightly heated air, i.e. the relatively low temperature air, heater 130 may be intermittently actuated (S14a). For example, heater 130 may be actuated for 40 seconds and be shut down for 30 seconds, and the actuation and shutdown may be repeated. Additionally, since third drying operation S10 is performed in a state in which high temperature steam is not supplied, the temperature of laundry and the temperature of the surrounding air in the third drying operation S10 are lower than those in the first drying operation S9. Accordingly, despite intermittent actuation of the same heater 130, the heater actuation time (40 seconds) in drying operation S14 is set to be longer than the heater actuation time (30 seconds) in first drying operation S9.
Similarly, stopping steam supply process P2 may not provide a sufficient amount of moisture to laundry in third drying operation S14. However, as described above, even in first drying operation S9, it is advantageous to supply a predetermined amount of moisture and remove the supplied moisture for effective removal of wrinkles. For this reason, moisture may be supplied to the laundry in third drying operation S14 (S14b). Supply of moisture to the laundry may be achieved by various ways. For example, vapor phase water or liquid water may be supplied to the laundry. However, as mentioned above, it is difficult to supply steam as vapor phase water in third drying operation S14. On the other hand, mist, which consists of small particles of liquid water, is sufficiently effective to supply moisture to the laundry. Thus, mist may be supplied to the laundry in moisture supply operation S14b. That is, the mist may be supplied into tub 30 so as to be supplied to at least the laundry. Supply of mist may be achieved by various ways. For example, if nozzle 150 can still be actuated although it is in an abnormal state, i.e. if nozzle 150 can still supply a small amount of water, nozzle 150 may eject mist. The air flow may continuously occur in order to supply heated air to laundry during third drying operation S14. That is, blower 140 may be continuously actuated during third drying operation S14. Accordingly, the mist ejected from nozzle 150 may be transported by the air flow provided by blower 140 and may reach laundry by way of duct 100, tub 30, and drum 40. The greater part of the ejected mist may be changed into steam while passing through heater 130, which ensures effective implementation of desired functions of the refresh course. As a warning for the case in which nozzle 150 completely breaks down, the washing machine may be equipped with a separate device to directly supply moisture to laundry, more particularly, to eject mist. The separate device may be actuated along with or independently of nozzle 150. The mist supplied by the separate device may be at least partially changed into steam by a high temperature environment within tub 30. Moreover, nozzle 150 and the separate device may directly supply liquid water, instead of mist, to supply moisture to laundry.
Moisture supply operation S14b may begin at any time during third drying operation S14. However, supplying moisture under a high temperature environment is basically advantageous to the following operation of removing the supplied moisture. Also, it is preferable that mist be ejected at as high a temperature as possible in order to partially change the supplied mist into steam. Accordingly, moisture supply operation S14b may be performed during heating of air to be supplied to laundry. That is, in moisture supply operation S14b, moisture may be supplied during actuation of heater 130 when heater 130 is intermittently actuated. That is, through intermittent actuation of heater 130, third drying operation S14 includes an actuation duration for actuation of heater 130 and a shutdown duration for shutdown of heater 130. In this case, moisture supply operation S14b may be performed for the actuation duration of heater 130. Moreover, to achieve more reliable effects, moisture supply operation S14b may be performed only while the air supplied to laundry is heated. That is, in moisture supply operation S14b, moisture may be supplied only for actuation of heater 130 as heater 130 is intermittently actuated. More specifically, moisture supply operation S14b is preferably performed for 40 seconds, for which heater 130 is actuated. More preferably, moisture supply operation S14b is performed for a partial duration of the final stage (for example, the last 10 seconds) of the actuation duration of heater 130, for which the highest temperature environment can be generated. If excess moisture is supplied, this causes laundry to be wetted rather than removing wrinkles from laundry. Accordingly, moisture supply operation S14b is performed only for a partial duration of third drying operation S14. For the same reason, preferably, moisture supply operation S14b is performed only for the first half of third drying operation S14. Third drying operation S14 is performed in a state in which high temperature steam is not supplied, and may be performed, for example, for 20 minutes to achieve a sufficient time for removal of wrinkles. The duration of third drying operation S14 is set to be longer than that of the similar first drying operation S9. Moisture supply operation S14b may be performed for the first half of the third drying operation S14 of 20 minutes, i.e. for 11 minutes after third drying operation S14 begins.
It is necessary to remove moisture from laundry as the laundry is wetted by the supplied moisture. Accordingly, the second algorithm includes a fourth drying operation S15 that is performed after third drying operation S14. Fourth drying operation S15 may be substantially equal to the above described second drying operation S10 in terms of functions and detailed operations. Accordingly, all features discussed in relation to second drying operation S10 may be directly applied to fourth drying operation S15, and thus an additional description thereof will be omitted.
The above described third and fourth drying operations S14 and S15 are associated with each other to perform the freshening function when supply of steam is impossible and to provide the drying function. Accordingly, as illustrated in
Since the laundry having passed through the above described drying operations have a high temperature due to the heated air, the laundry may be cooled after fourth drying operation S15 (S16). Cooling operation S16 may be substantially equal to the above described cooling operation S11 in terms of functions and detailed operations thereof. Accordingly, all the features discussed in relation to cooling operation S11 may be directly applied to cooling operation S16. Thus, an additional description thereof will be omitted hereinafter. Cooling operation S16 also performs an independent function, and may be referred to as a single cooling process P8 similar to the previously defined processes. As necessary, as illustrated in
The refresh course as illustrated in
Laundry may be tumbled in at least any one of the above described operations S1 to S13. For the laundry tumbling, as illustrated in
In general, power of standard voltage is supplied at home and various electronic appliances including the washing machine are fabricated to match the standard voltage. However, voltage of power supplied at home has a slight deviation with respect to the standard voltage. Moreover, voltage of supplied power may vary whenever the washing machine is actuated, and thus the deviation may also vary. The slight deviation has an effect on actuation of the washing machine, and in particular has an effect on performance of heater 130 that uses electric power. More specifically, heater 130 generates heat using electric resistance, and the electric resistance is affected by voltage of supplied power. Accordingly, if voltage of supplied power varies, this has an effect on the actual amount of heat generated by heater 130. That is, if voltage of power greater than the standard voltage is supplied for a unit time, heater 130 may generate greater heat than the expected amount of heat for a unit time. Also, if voltage of power less than the standard voltage is supplied for a unit time, heater 130 may generate less heat than the expected amount of heat for a unit time. However, as described above, supply of heat using heater 130, i.e. preparation operation S5 is basically set to a preset duration, i.e. a fixed duration. In this case, if voltage of power greater than the standard voltage is supplied to the washing machine when the washing machine begins at least implementation of the refresh course of
As described above, in the refresh course, since preparation operation S5 is basically set to have a fixed implementation time, adjustment operation S100 changes the preset implementation time of preparation operation S5 based on the actual voltage of power supplied to the washing machine. Similarly, as described above, a main function of preparation operation S5 heats heater 130. To this end, preparation operation S5 depends on heater 130. Thus, the implementation time of preparation operation S5 corresponds to the actuation time of heater 130. For the same reason, adjustment operation S100 may correspond to an operation of adjusting the actuation time of heater 130. Meanwhile, preparation operation S5 is divided into first and second heating operations S5a and S5b. First heating operation S5a is basically performed for 13 seconds that corresponds to the greater part of the actuation time of preparation operation S5. In first heating operation S5a, only heater 130 is heated without supply of water and occurrence of air flow (without actuation of nozzle 150 and blower 140). That is, only heater 130 is purely actuated for heating during first heating operation S5a. Thus, first heating operation S5a determines main performance of preparation operation S5 and is the most sensitive to change in the performance of heater 130. For this reason, adjustment operation S100 may adjust the implementation duration of first heating operation S5a. That is, adjustment operation S100 may be explained as an operation of adjusting a partial duration of preparation operation S5 that is performed without supply of water and occurrence of air flow (i.e. the time of heating operation S5a). On the other hand, adjustment operation S100 may be explained as an operation of adjusting the time for which only heater 130 is actuated (i.e. first heating operation S5a). However, although first heating operation S5a is a part of preparation operation S5, if the implementation time of first heating operation S5a is adjusted, the implementation of preparation operation S5 is also adjusted. Thus, in adjustment operation S100, adjustment of the implementation time of first heating operation S5a corresponds to adjustment of the implementation time of preparation operation S5. As such, if the implementation time of adjustment operation S100 is adjusted, thereafter, preparation operation S5, i.e. first heating operation S5a is performed for the adjusted implementation time.
Adjustment operation S100 will hereinafter be described in more detail with reference to
Referring to
If other elements are actuated during voltage measurement operation S110, power consumption occurs during actuation, and therefore it is difficult to measure the actual voltage of the supplied power. As illustrated in
After completion of voltage measurement operation S110, the measured voltage may be compared with the standard voltage of the supplied power (S121). The standard voltage is preset on a per country basis, and all electronic appliances including the washing machine are designed and controlled based on the standard voltage. The standard voltage is 220V in Korea and 110V in the Americas.
The actual implementation time of preparation operation S5 may be determined based on the comparison result of comparison operation S121.
If the measured voltage is less than the standard voltage, a sufficient amount of heat may not be supplied to the heater during preparation operation S5 even when preparation operation S5, and more specifically first heating operation S5a is performed for a preset time. Thus, the refresh course may fail to generate a sufficient amount of steam for laundry freshening. Accordingly, if the measured voltage is less than the standard voltage, the implementation time of preparation operation S5 may be increased (S131a). In increase operation S131a, as mentioned above, the implementation time of first heating operation S5a may be increased. Increase in the implementation time of first heating operation S5a may be adjusted in consideration of a difference between the actual voltage and the standard voltage. On the other hand, the implementation time of first heating operation S5a may be increased by a predetermined degree regardless of the magnitude of the difference between the actual voltage and the standard voltage. Meanwhile, if the measured voltage is equal to the standard voltage, preparation operation S5, and more particularly, first preparation operation S5 may be performed for a preset time.
Despite the fact that the measured voltage is greater than the standard voltage, if preparation operation S5, and more specifically, first heating operation S5a is performed for a preset time, heater 130 may overheat, or damage to heater 130 may occur, and moreover fire may occur. Thus, if the measured voltage is greater than the standard voltage, the implementation time of preparation operation S5 may be reduced (S131b). In reduction operation S131b, as mentioned above, the implementation time of first heating operation S5a may be reduced. Reduction in the implementation time of first heating operation S5a may be adjusted in consideration of an actual difference between the actual voltage and the standard voltage. The implementation time of first heating operation S5a may be reduced by a predetermined degree regardless of the difference between the actual voltage and the standard voltage.
As described above, in the increase and reduction operations S131a and S131b, the implementation time of preparation operation S5 is determined based on the result of comparison operation S121.
As mentioned above, in consideration of the actual magnitude of the difference between the actual voltage and the standard voltage, the implementation time of preparation operation S5 may be more accurately and appropriately adjusted. For example, if the difference between the actual voltage and the standard voltage is large, the implementation time of preparation operation S5 may be greatly adjusted, i.e. may be greatly increased or reduced based on the difference, and vice versa. To achieve more accurate adjustment, adjustment operation S100 as illustrated in
Referring to
After completion of voltage measurement operation S110, the implementation time corresponding to the measured voltage is checked from the table (S122). In check operation S122, the controller first searches for the range including the measured voltage from the table of
Accordingly, even if power of voltage less than the standard voltage is supplied and heater 130 generates less heat than the expected amount of heat, a sufficient amount of heat for generation of a desired amount of steam may be supplied by increasing the implementation time of operations S131a and S122/S132. Also, even if power of voltage greater than the standard voltage is supplied and heater 130 generates greater heat than the expected amount of heat, it may be possible to prevent heater 130 from overheating, or damage to heater 130 by reducing the implementation time of operations S131a and S122/S132. As such, even if performance of heater 130 is changed by the actual voltage of the supplied power, change of the performance and change in the amount of heat may be appropriately adjusted by adjustment operation S100 as illustrated in
As described above, the implementation time of the preparation operation S5 may be increased or reduced by adjustment operation S100, and adjusted preparation operation S5 is repeated as steam supply process P2 is repeated. As the implementation time of preparation operation S5 is repeatedly increased or reduced by adjustment operation S100 within steam supply process P2, the entire variable time is amplified, and thus the time of the refresh course greatly varies. However, the great variation of the time may confuse the user. For this reason, adjustment operation S100 may further include adjusting the time of the refresh course to a constant value based on the adjusted implementation time of the heating operation. The time of the refresh course may be adjusted by adjusting several operations except for preparation operation S5, i.e. first heating operation S5a. In particular, pause operation S8 has a longer implementation time than other operations, and therefore is suitable for adjustment of the time of the refresh course. Accordingly, adjustment operation S100 may further include adjusting the implementation time of pause operation S8 based on the adjusted implementation time of heating operation (S140).
The implementation time of pause operation S8 is increased if the actual voltage is greater than the standard voltage, and is reduced if the actual voltage is less than the standard voltage.
In adjustment operation S140, as illustrated in
In this case, the increased time (or the reduced time) of pause operation S8 preferably corresponds to the reduced time (or the increased time) of preparation operation S5. Thus, the sum of the variable implementation time of pause operation S8 and the variable implementation time of preparation operation S5 preferably has a constant value. Thus, the implementation time of the refresh course may be kept constant, which may provide the user with actuation reliability in the actuation time of the washing machine.
As described above, with adjustment operation S140, the refresh course may always be performed for a constant time regardless of adjustment of the implementation of the heating operation, which may increase user convenience and reliability of the refresh course.
Meanwhile, steam supply process P2: S3 to S5, as discussed above, may be directly applied to a basic wash course or other individual courses except for the refresh course owing to independent steam generation and supply functions thereof.
In general, the wash course may include a wash water supply operation S100, a washing operation S200, a rinsing operation S300, and a dehydration operation S400. If the washing machine has a drying structure as illustrated in
If the steam supply process is performed before wash water supply operation S100 and/or during wash water supply operation S100 (P2a and P2b), laundry may be previously wetted by supplied steam, and supplied wash water may be heated. If the steam supply process is performed before washing operation S200 and/or during washing operation S200 (P2c and P2d), supplied steam serves to heat air and wash water within tub 30 and drum 40, thereby creating a high temperature environment advantageous to washing. If the steam supply process is performed before rinsing operation S300 and/or during rinsing operation S300 (P2e and P2f), supplied steam similarly serves to heat air and rinse water so as to facilitate rinsing. If the steam supply process is performed before dehydration operation S400 and/or during dehydration operation S400 (P2g and P2h), supplied steam mainly serves to sterilize laundry. If the steam supply process is performed before drying operation S500 and/or during drying operation S500 (P2i and P2j), supplied steam serves to greatly increase the interior temperature of tub 30 and of drum 40, thereby causing easy evaporation of moisture from laundry. As necessary, to finally sterilize laundry, steam supply process P2k may be performed after drying operation S500. The above described steam supply process P2a to P2j basically functions to sterilize laundry using steam. Moreover, to assist the steam supply process, preparation process P1 may also be performed.
As described above, steam supply process P2 may create an atmosphere advantageous to washing by supplying a sufficient amount of steam, which may result in a considerable improvement of washing performance. Further, steam supply process P2 may realize sterilization of laundry, and for example, may eliminate allergens.
In consideration of the above described steam supply mechanism, refresh course and basic washing course, the washing machine utilizes a high temperature air supply mechanism, i.e. a drying mechanism for steam generation and steam supply with only minimum modifications. The control method, and in particular, steam supply process P2 provides optimized control of the drying mechanism, i.e. a modified steam supply mechanism. Accordingly, the laundry machine achieves minimum modification and optimized control for efficient generation and supply of a sufficient amount of high quality steam. For this reason, the laundry machine effectively provides laundry freshening and sterilization effects, improved washing performance, and various other functions with minimized increase in manufacturing costs.
Although embodiments have been described with reference to a number of illustrative embodiments thereof, it should be understood that numerous other modifications and embodiments can be devised by those skilled in the art that will fall within the spirit and scope of the principles of this disclosure. More particularly, various variations and modifications are possible in the component parts and/or arrangements of the subject combination arrangement within the scope of the disclosure, the drawings, and the appended claims. In addition to variations and modifications in the component parts and/or arrangements, alternative uses will also be apparent to those skilled in the art.
Number | Date | Country | Kind |
---|---|---|---|
10-2012-0011743 | Feb 2012 | KR | national |
10-2012-0011744 | Feb 2012 | KR | national |
10-2012-0011745 | Feb 2012 | KR | national |
10-2012-0011746 | Feb 2012 | KR | national |
10-2012-0045237 | Apr 2012 | KR | national |
10-2012-0058035 | May 2012 | KR | national |
10-2012-0058037 | May 2012 | KR | national |
Number | Name | Date | Kind |
---|---|---|---|
5839667 | Fishcer | Nov 1998 | A |
6129154 | Hoffmann et al. | Oct 2000 | A |
7040039 | Stein et al. | May 2006 | B1 |
20040250442 | Ryu | Dec 2004 | A1 |
20050223503 | Hong et al. | Oct 2005 | A1 |
20050223504 | Lee et al. | Oct 2005 | A1 |
20060005581 | Banba | Jan 2006 | A1 |
20060101588 | Park et al. | May 2006 | A1 |
20060162394 | Kim et al. | Jul 2006 | A1 |
20070006484 | Moschuetz et al. | Jan 2007 | A1 |
20070101773 | Park et al. | May 2007 | A1 |
20070199353 | Woo et al. | Aug 2007 | A1 |
20070283507 | Wong et al. | Dec 2007 | A1 |
20070283509 | Wong et al. | Dec 2007 | A1 |
20070283728 | Wong et al. | Dec 2007 | A1 |
20080006300 | Ahn et al. | Jan 2008 | A1 |
20080040868 | Wong et al. | Feb 2008 | A1 |
20080282750 | Yang et al. | Nov 2008 | A1 |
20080302138 | Bae et al. | Dec 2008 | A1 |
20090038084 | Lee et al. | Feb 2009 | A1 |
20090056036 | Herkle et al. | Mar 2009 | A1 |
20090265953 | Bae et al. | Oct 2009 | A1 |
20100115788 | Kim et al. | May 2010 | A1 |
20110126596 | Kim et al. | Jun 2011 | A1 |
20120159800 | Del Pos et al. | Jun 2012 | A1 |
Number | Date | Country |
---|---|---|
1534130 | Oct 2004 | CN |
1680648 | Oct 2005 | CN |
1680650 | Oct 2005 | CN |
1696384 | Nov 2005 | CN |
1969078 | May 2007 | CN |
101146945 | Mar 2008 | CN |
101158109 | Apr 2008 | CN |
101305123 | Nov 2008 | CN |
101307547 | Nov 2008 | CN |
100494551 | Jun 2009 | CN |
101466887 | Jun 2009 | CN |
201809639 | Apr 2011 | CN |
19743508 | Apr 1999 | DE |
102007060854 | Jun 2009 | DE |
1486605 | Dec 2004 | EP |
1584728 | Oct 2005 | EP |
1666655 | Jun 2006 | EP |
1873297 | Jan 2008 | EP |
1992730 | Nov 2008 | EP |
2031114 | Mar 2009 | EP |
2053155 | Apr 2009 | EP |
2208819 | Jul 2010 | EP |
2402498 | Jan 2012 | EP |
2471998 | Jul 2012 | EP |
2087029 | May 1982 | GB |
64-049801 | Feb 1989 | JP |
04-144598 | May 1992 | JP |
04-144599 | May 1992 | JP |
2005-296631 | Oct 2005 | JP |
2005-304619 | Nov 2005 | JP |
2006-109869 | Apr 2006 | JP |
2006-141986 | Jun 2006 | JP |
2007-229189 | Sep 2007 | JP |
2008534047 | Aug 2008 | JP |
2008-200485 | Sep 2008 | JP |
2008-307266 | Dec 2008 | JP |
2011-092428 | May 2011 | JP |
2012-000313 | Jan 2012 | JP |
1020050123317 | Dec 2005 | KR |
10-2006-0054887 | May 2006 | KR |
1020060046025 | May 2006 | KR |
10-2006-0102989 | Sep 2006 | KR |
1020060096712 | Sep 2006 | KR |
10-20060121403 | Nov 2006 | KR |
100662473 | Dec 2006 | KR |
10-2007-0003361 | Jan 2007 | KR |
10-0672489 | Jan 2007 | KR |
100698224 | Mar 2007 | KR |
10-0712274 | Apr 2007 | KR |
10-0762337 | Sep 2007 | KR |
10-2007-0122252 | Dec 2007 | KR |
1020070117911 | Dec 2007 | KR |
10-2008-0032378 | Apr 2008 | KR |
1020080101128 | Nov 2008 | KR |
10-2009-0079560 | Jul 2009 | KR |
10-2009-0105120 | Oct 2009 | KR |
1020100102491 | Sep 2010 | KR |
10-2011-0061115 | Jun 2011 | KR |
2471025 | Sep 2009 | RU |
2009077291 | Jun 2009 | WO |
2011000760 | Jan 2011 | WO |
Entry |
---|
Machine translation of DE 19743508 A1, no date. |
Number | Date | Country | |
---|---|---|---|
20130199250 A1 | Aug 2013 | US |