The present embodiments relate to apparatus and methods for re-conditioning cryogen liquid stored for use in tanks or vessels.
Liquid flow rates and therefore downstream processes are directly impacted by the quality or condition of the liquid in the storage tank and subsequently in the pipeline from the tank to the process. This is especially so for cryogen liquids.
Initially, a cryogen liquid is delivered at a subcooled temperature to a storage tank. Removal of the subcooled liquid from the tank while the liquid is at its initial subcooled temperature occurs at a relatively high flow rate toward downstream use of the liquid, i.e. application of the cryogen liquid to a product or a process. After a period of time has elapsed, the liquid in the storage tank begins to warm due to the normal heat leak at the tank such that the liquid approaches its saturation temperature. During this warming of the liquid, there will result a noticeable reduction in the flow rate of the liquid from the tank. This reduced flow rate is a result of the liquid vaporizing into a two-phase flow, i.e. cryogen liquid and cryogen vapor. The reduced flow rate can on occasion equate to only 1/3 to 1/5 of the flowrate at the same pressure as compared to when the liquid was subcooled.
Where liquid nitrogen (LIN) is the stored liquid for use, it will have a temperature at atmospheric pressure of −320° F. (−196° C.). Warming of the LIN due to heat leak at the tank causes the temperature of the LIN to rise to for example −290° F. (−179° C.), at which point the LIN will flash and the two-phase, reduced efficiency flow rate of the LIN will occur.
By re-conditioning or sub-cooling the LIN, the LIN flow from the tank can be returned to the original, high flow rate from the tank. This process used with a liquid tank, such as for example a LIN storage tank or vessel, is shown in
As the LIN b is drained from or forced out of the tank a under pressure over a period of time, which may be for example 3-7 days depending upon the volume of usage of the LIN, heat leak occurs at the tank and in the LIN, resulting in temperature stratification occurring throughout a volume of the tank, as shown in
The LIN b in the tank a of
The present apparatus and method embodiments provide for a computing device that can determine saturation and subcooled liquid conditions of the fluid in the storage tank and in turn control the liquid's properties to ensure processing conditions downstream are maximized for efficiency and/or disruptions minimized due to unwanted saturated liquid flow. This program logic controller (plc) or similar process controlling device can be remotely monitored and aided with human intervention if necessary to assist if deliveries are enroute, in order to delay an upcoming cycle. The controller will be optimized to remotely run a reconditioning cycle (during non-production periods) and will be equipped with alarms to notify the customer of an upcoming flow disruption due to the quality of liquid in the storage tank.
The present embodiments automatically re-condition the LIN by incorporating a remote control feature to predict when to do so on the basis of anticipated production rates, current LIN conditions in the bulk tank, weather conditions and delivery schedules.
Therefore, the present embodiments improve the downstream processing control of the LIN by substantially reducing slowdown or flow inconsistency from day to day in the process by considering and taking into account heat leak.
The present embodiments also address the so-called “100 inch problem”; an efficiencies issue that operators perceive is necessary in order to maintain the necessary head pressure in the tank to accommodate anticipated boil off of the cryogen liquid. That is, in so doing allows the supplier to utilize a larger portion of the tank. Instead of maintaining a level above 100 inches of tank pressure, the operator can instead utilize the majority of the tank to improve their cost efficiencies.
Accordingly, there is provided herein a method embodiment for conditioning a liquid cryogen in a tank which includes reducing a pressure of the liquid cryogen in the tank for reducing a temperature of the liquid cryogen and condensing any vapor boil-off in the tank for reclaiming the liquid cryogen in the tank.
Another embodiment includes the method including re-pressurizing the liquid cryogen in the tank.
Another embodiment includes the method, wherein the liquid cryogen is selected from the group consisting of liquid nitrogen (LIN), liquid oxygen (LOX), and liquid argon (LAR).
Another embodiment includes the method, wherein the pressure of the tank is 50 psig, and the reducing the pressure is reduced to 10 psig.
Another embodiment includes the method, wherein the re-pressurizing is resumed to the pressure of 50 psig.
Another embodiment includes the method, wherein after the re-pressurizing a temperature of the liquid cryogen is uniformly consistent throughout the tank.
Another embodiment includes the method, wherein the reducing the pressure and the re-pressurizing the liquid cryogen occurs automatically.
Another embodiment includes the method further including supporting the tank off an underlying surface for protecting the tank.
For a more complete understanding of the present invention, reference may be had to the following description of exemplary embodiments considered in connection with the accompanying drawing Figures, of which:
Before explaining the inventive embodiments in detail, it is to be understood that the invention is not limited in its application to the details of construction and arrangement of parts illustrated in the accompanying drawings, if any, since the invention is capable of other embodiments and being practiced or carried out in various ways. Also, it is to be understood that the phraseology or terminology employed herein is for the purpose of description and not of limitation.
In the following description, terms such as a horizontal, upright, vertical, above, below, beneath and the like, are to be used solely for the purpose of clarity illustrating the invention and should not be taken as words of limitation. The drawings are for the purpose of illustrating the invention and are not intended to be to scale.
The predictive and computational abilities of the apparatus and method embodiments of the present invention provide for an automated and/or remote ability to re-condition a cryogenic liquid, such as LIN, at for example a customer station.
Embodiments of the present invention are illustrated in
Referring to
As the LIN 12 is drained from or forced out of the tank 10 under pressure over a period of time, which may be for example 3-7 days depending upon the volume of usage of the LIN, heat leak occurs at the tank and in the LIN, resulting in temperature stratification occurring throughout a volume of the tank, as shown in
Still referring to
The tank 10 as described above with respect to
A fill connection pipe 31 may be used by a driver of a bulk delivery trailer (not shown) to fill the tank 10 being used as a customer storage tank for the LIN. The fill connection pipe 31 is branched or split at 32 into two separate lines, i.e. a top fill line 34 having an end 36 terminating in and in fluid communication with the head space 22 to provide the LIN to the top of the tank, and a bottom fill line 38 having an end 40 terminating in and in fluid communication with the LIN 12 in the tank near the bottom 14 to provide the LIN to the tank, or to fill the tank from the bottom up. The fill connection pipe 31 can have a standard coupling (not shown) constructed to releasably engage a corresponding coupling of a driver's tanker truck (not shown) delivering the LIN. The top fill line 34 is provided with a valve 42, and the bottom fill line 38 is provided with a valve 44. The valves 42,44 permit an operator of the tank 10 to determine into which volume of the LIN 12 in the tank 10 that the fresh, replenishing LIN is to be received. Top filling of the tank 10 may reduce the vapor pressure in same, and controls the tank storage pressure during the filling process.
A pressure-vent line 46 has an end 48 terminating in and in fluid communication with the head space 22 of the tank 10. An opposite end of the line 46 includes a valve 50, such as for example a solenoid valve, for controlling pressure at the head space 22 and therefore, in the tank 10 by being constructed to vent pressure in the tank in excess of what is needed in same. The valve 50 vents to atmosphere external to the tank 10 to prevent uncontrollable pressure increases in the tank, and to maintain pressure in the tank within a range of from +/−15 psig of the bulk tank set pressure, but set as close as possible to minimize the pressure differential.
A pressure line 52 includes a first end 54 terminating in and in fluid communication with the LIN 12 at the bottom 14 of the tank 10, and a second end 56 terminating in and in fluid communication with the head space 22 of the tank. A valve 58 is interposed in the line 52 to control pressure in the tank when such pressure gets too low. The pressure line 52 passes through and is in contact with a vaporizer 60. When pressure in the tank 10 drops to a lower, unacceptable level, the valve 58 is opened to draw the LIN 12 from the bottom 14 of the tank and causes the LIN to be vaporized when passing through the vaporizer 60 so that the vapour/gas is introduced into the top 18 of the tank through the second end 56 to be distributed into the head space 22 to increase pressure in the tank.
Struts 62 or legs support the tank 10 off an underlying surface (not shown), such as for example a floor, pad, skid, etc. The struts 62 may each be adjustable to accommodate any irregularities of the underlying surface.
By adding the remote control feature with respect to a flow disruption resulting from the quality of the liquid in the storage tank, the operator has the ability to remotely (online or at a remote delivery scheduling center) activate a re-conditioning cycle or de-activate a cycle if a new delivery is enroute. The remote control method, at its most basic level, will analyse properties of the LIN in the tank by measuring temperature, head space pressure, liquid pressure and liquid level. With these measurements, thermodynamic equations of equilibrium can be applied to understand if the LIN in the tank exists in a saturated or subcooled state. This in turn is one metric for providing guidance to an operator and the system itself in determining if it is necessary to perform a reconditioning cycle for the LIN.
The system through its processor can also “learn” about the customer usage rates and idle time of the tank 10. This is realized through monitoring the following variables over time: tank head space pressure, tank bottom pressure, LIN temperature, liquid level in tank, daily and weekly operating schedules of the customer, and weather conditions. Such can assist with predicting the next re-conditioning cycle of the LIN 12 by understanding the period of time necessary for a subcooled state of the LIN to last in the tank 10 before the LIN needs to be re-conditioned.
It will be understood that the embodiments described herein are merely exemplary, and that a person skilled in the art may make variations and modifications without departing from the spirit and scope of the invention. All such variations and modifications are intended to be included within the scope of the invention as provided in the appended claims. It should be understood that the embodiments described above are not only in the alternative, but can be combined.
Number | Name | Date | Kind |
---|---|---|---|
2576985 | Wildhack | Dec 1951 | A |
2978876 | Pastuhov | Apr 1961 | A |
3144036 | Rice, Jr. | Aug 1964 | A |
3245248 | Ritter | Apr 1966 | A |
3253611 | Cummins | May 1966 | A |
3864928 | Eigenbrod | Feb 1975 | A |
4018582 | Hinds | Apr 1977 | A |
4475348 | Remes | Oct 1984 | A |
5370112 | Perkins | Dec 1994 | A |
5373702 | Kalet | Dec 1994 | A |
5937655 | Weiler | Aug 1999 | A |
9395048 | Grayson | Jul 2016 | B1 |
20020157402 | Drube | Oct 2002 | A1 |
20060086099 | Dickerson | Apr 2006 | A1 |
20070006597 | Zia | Jan 2007 | A1 |
20080135108 | Zuck | Jun 2008 | A1 |
20080178610 | Whitcher | Jul 2008 | A1 |
20090071171 | Zia | Mar 2009 | A1 |
20110056238 | Mak | Mar 2011 | A1 |
20140041398 | Aoki | Feb 2014 | A1 |
20140158250 | Downie | Jun 2014 | A1 |
20150219393 | Sauer | Aug 2015 | A1 |
20160097489 | Made | Apr 2016 | A1 |
20160195116 | Foege | Jul 2016 | A1 |
20160252215 | Windmeier | Sep 2016 | A1 |
20170059242 | Boyd | Mar 2017 | A1 |
20170276054 | Shaaban | Sep 2017 | A1 |
20180016130 | Watts | Jan 2018 | A1 |
20180299072 | Oury | Oct 2018 | A1 |
20190248228 | Wallengren | Aug 2019 | A1 |
20190390822 | Brothers | Dec 2019 | A1 |
20200182459 | Schreiner | Jun 2020 | A1 |
20200240634 | Ekman | Jul 2020 | A1 |
20200256513 | Brooks | Aug 2020 | A1 |
Number | Date | Country |
---|---|---|
WO-2013081979 | Jun 2013 | WO |
Entry |
---|
Duroudier J.-P., Thermodynamics, 2016, Elsevier Ltd , pp. 51-106. |
Number | Date | Country | |
---|---|---|---|
20200182407 A1 | Jun 2020 | US |