The current assembly relates to pressurizing slurry for oil and gas extraction operations; and more particularly relates to a novel and improved apparatus and method for pressurizing and displacing liquid with solid particles which is conformable for use with blenders, fixed displacement and centrifugal pumps.
A hydraulic fracturing (“frac”) job consists of the delivery of great quantities of a fluid (water or oil based) into a well at pressures of up to 20,000 psi in order to fracture the reservoir rock, thus creating draining channels for the oil and or gas trapped in the formation to flow to the wellbore. In order to keep the draining channels open once the well is opened to allow the oil or gas to flow, a proppant such as sand, ceramics, bauxite, or others is added to the fluid injected in the well. The sand concentration of the fluid can vary from ½ lb. per gallon to 21 lbs. per gallon. It is not unusual for a frac job to inject 5,000,000 gals. of water and 15,000,000 lbs. of sand. In order to perform a frac job, large sand and water storage tanks are connected to a blender unit. The blender draws the fluid from the tanks and the sand from the storage bins through conveyor belts. As the blender mixes the water and sand, it may also add other chemicals, and delivers this mixture to the fixed displacement plunger pumps (frac pumps), at pressures between 50 and 120 psi, to be injected in the well at whatever pressure and rate is required to fracture the formation; anywhere between 3,000 and 20,000 psi.
The pumping of such a high volume of sand and water slurry results in a rapid wearing of pump valves, seats, fluid ends, packing and plungers and this is the most expensive aspect of any frac job. Without including the labor required to replace failed components during operations, the cost to maintain a frac pump may be as high as $300,000 per year on fluid ends, plungers, seats and valves replacements due to sand or other proppants erosion. Furthermore, due to these failures additional units must be dispatched to the job location as back-up for the units that must be taken off the line for repairs. As a result, substantial savings in operating expenses and capital equipment are to be had if sand is not introduced into the frac pumps.
There is a continuing but unmet need for an apparatus that can pressurize slurry while maintaining the integrity of the mechanical components during operation.
This apparatus is comprised of at least two identical high-pressure cylinders, capped with high pressure flanges, placed vertically, or at an angle no lower than 30 degrees from the horizontal, between the blender and the frac pumps. These two vessels will receive the slurry from the blender to be later pressurized by the frac pumps without the slurry ever reaching the valves and seats of the frac pumps. Each chamber has two, 3-inch or greater, connections at the bottom to use as inlet and outlet. One inlet at the bottom is connected to the blender and the other bottom outlet to the wellhead. At the top of the chambers, there are two, 3-inch or greater, connections wherein each of the lines coming from the top goes through a directional valve. One of the lines has a flowmeter located between its valve and the intake of the frac pump or pumps. This line and flowmeter will be exposed to the discharge pressure of the blender (between 50 and 120 psi). The other top line is piped to the high-pressure discharge of the same pump or pumps and will be exposed to pressures up to 15,000 psi and possibly higher. The directional valves can be either rotating or sliding. The two valves are set to be in opposite positions so that is one open and the other one is closed. These two valves are also mechanically connected in order to be certain that they both move together.
The directional valves on the lines connected to the top of each vessel are further mechanically connected to an actuator to ensure that all four valves move simultaneously. A logic control unit will read the low-pressure volume exiting the vessel being filled with slurry and at a preset volume it will operate the valves actuator and reverse the high-pressure flow to the other vessel and its slurry intake. The opposite will occur in the other vessel. The two chambers, if placed between the fixed displacement pumps and the discharge point of the slurry, will keep the abrasive solids away from the fixed displacement pumps. This will result in savings on valves and fluid ends in hydraulic fracturing operations due to less wear and tear on the equipment and may also be useful in other slurry pumping operations such as disposal of contaminants as well as dangerous and radioactive fluids.
There is provided an apparatus for pressurizing solid particles and fluid using a blender and frac pumps for discharge into a wellhead, comprising at least one pair of synchronized pressure chambers, each of first and second chambers adapted for vertical or relatively horizontal orientation, at least two inlet lines secured at a first end of each of the first and second chambers and to the blender, at least two high-pressure outlet lines secured at the first end of each of the chambers and in fluid communication with the wellhead, at least two outlet lines secured to a second end of each of the chambers and to the frac pumps, at least two high-pressure inlet lines secured to the second end of each of the chambers and to the frac pumps, first valve members operatively connected to the inlet lines and the high-pressure outlet lines proximal to the first end of each of the chambers, second valve members operatively connected to the outlet lines and the high-pressure inlet lines proximal to the second end of each of the chambers, and flow meters mechanically connected to each of the outlet lines and operatively connected to a logic control unit including at least one valve actuator.
There is also provided a method of pressurizing and discharging slurry into a wellhead, by first filling both chambers and frac pumps with clean fluid, the following simultaneous steps comprising the blender injecting slurry into a first chamber displacing its clean fluid, the frac pumps receiving the volume of clean fluid displaced and injecting it at high pressure into a second chamber in a synchronous operation displacing the volume of the second vessel into the wellhead. Once the entire volume of clean fluid of the first vessel has been displaced by slurry the actuator will reverse the directional valves forcing slurry into the second vessel displacing clean fluid into the frac pumps to inject the slurry of the first vessel into a wellhead. This system proposes the addition of two high pressure chambers to be placed vertically between the blender and the frac pumps to receive the slurry from the blender and to allow the frac pumps to pressurize it without the sand laden fluid ever reaching the valves and seats of the frac pumps.
It is therefore an object to provide for a novel method and apparatus for blending liquids and solid particles by counterflow of the liquid to prevent contact with the frac pumps and seats. In addition to the method and articles of manufacture described above, further aspects and embodiments will become apparent by reference to the drawings and by study of the following descriptions. Exemplary embodiments are illustrated in reference to Figures of the drawings. It is intended that the embodiments and Figures disclosed herein are to be considered illustrative rather than limiting.
Referring in more detail to
The chambers 13 and 15 are preferably trailer mounted for easy portability between sites, as shown in
The chambers 13 and 15 receive slurry S which is a mixture of sand A and clean fluid from the blender B through the low-pressure slurry line 17. Upper outlets 45, 47 and upper inlets 49, 51 of at least 3 inch or greater diameter are secured along second or upper ends 12, 14 of the chambers 13, 15, as shown in
The logic control unit comprises a programmable logic controller that is well known in the art and is used in conjunction with the actuator 61 to control the valves. The connection is preferably a wireless connection but the unit may be wired without departing from the scope of the disclosure. The unit assembly includes the flow meters 65 and 67 to measure a flow of liquid through the valves 57, 59 and the actuator 61 includes a module that receives data from the flow meters, and determines, based on data received from the flow meters, the position of the valves. For example, the valve 57 will be in an open position while valve 57′ will be in a closed position. In this manner, the volume of clean fluid removed from chamber 13 will be identical to the volume of pressurized fluid added to chamber 15. Once this cycle is complete, actuator 61 will reverse valves 57, 57′, 59 and 59′ allowing slurry S to enter chamber 15 displacing clean fluid to the frac pumps P for pressurization and pressurized fluid from the frac pumps will be transported to chamber 13 acting as a pressure plunger forcing the pressurized slurry into the wellhead. This pumping mechanism allows the clean fluid to recirculate from the top of the vessels into the frac pumps and back to the top of the adjacent vessel. As a result, the slurry is pressurized while preventing the sand laden fluid or slurry S from contacting the valves and seats of the frac pumps P. The pressurization of the slurry is accomplished by the frac pumps always injecting clean fluid into the top of either chamber preventing contact of the slurry with the frac pumps valves, seats and plungers. The chambers 13 and 15 are optimally operated in pairs for maximum efficiency on-site. Additional sets or pairs of chambers may be added to increase the volume of flow within a reduced period of time to the wellhead without departing from the scope of the disclosure.
In order for this system to work, it is imperative to be able to determine the exact volume of fluid in each chamber at all times. Having two identical chambers connected in the manner described herein greatly facilitates the measurement of the volume of fluid as the amount of slurry entering a given chamber is identical to the volume of clean fluid being pumped into the other chamber. This allows the exact determination of volumes present in each chamber by monitoring the low-pressure clean fluid exiting the valves 57, 59. This can be achieved through the use of flowmeters that will achieve a greater level of accuracy as they will always operate with low pressure clean fluid throughout the job.
In operation, clean fluid and sand are mixed in the blender B and the resulting slurry is delivered by the blender B to chamber 15 through the low-pressure slurry line 17 through check valve 33 and inlet 19. As the slurry is pumped in to chamber 15, the clean fluid is displaced through the outlet 47 and the low-pressure line 53. The directional valve 59 is set in open position so that the ‘clean’ fluid is discharged through the line 53, through flowmeter 67 and to the frac pumps P. The frac pumps P will energize the fluid to the necessary pressure, up to 15,000 psi, and it is then discharged through the high-pressure line 55 back to chamber 13 through synchronized valve 57 and the inlet 49.
In further detail, referring to
As the slurry is pumped into the chambers, the vertical or incline position of the chambers gravitationally forces the sand to the lower portion 27, 29 of each of the chambers 13, 15. As sand falls to the lower end of the chamber 27 or 29, the fluid on the top of the chamber will be free of sand, further reducing the possibility of contaminating the clean fluid injected by the frac pumps. Further, the clean fluid used to displace the slurry from one vessel is provided to the frac pump by the blender pumping slurry into the other vessel and displacing the clean fluid back into the frac pumps' suction. This prevents sand from reaching the frac pump valves, seats and fluid ends. This is further assisted by the vertical position of the vessels as gravity assist on keeping the sand away from the clean fluid. By displacing slurry into the well with the clean fluid coming from the adjacent vessel, a closed loop is created ensuring that the volume displaced into one vessel is identical to the volume pumped from the other vessel. The displacement of slurry with the clean fluid as it exits the vessel is controlled by the usage of low-pressure flowmeters.
Finally, as high-pressure clean fluid enters the top of a cylinder where the sand has accumulated at the bottom, even if it has achieved maximum concentration of 22.1 lbs./gals., the clean fluid will displace the slurry towards the wellhead as frac sand will always be permeable. The difference in pressure, if any, between the well pressure and the pressure required to open the discharge check valve of the cylinder will be proportional to the permeability of the sand being pumped into the well. This will provide a quality control of the sand being utilized. The clean fluid used in the system can also be of a different viscosity and composition if it is necessary to further separate the fluids.
For example, assuming that manufacturing the chambers from commercially available HHS tube of 20 in. diameter with 1.417 wall thickness and 100.1 inches in height, this system will pump 2.41 bbl./stroke. Introducing an 18 lbs./gal slurry it will require 1,000 strokes to pump 2,410 bbl. carrying 1,000,000 lbs. of sand or 1,000 lbs./stroke. To deliver the same amount of slurry by a standard plunger pump will require 185,295 strokes for a 4-inch diam plunger and 10-inch stroke pump and 231,619 strokes for a 4-inch diam plunger and 8-inch stroke pump. However, most frac jobs pump a much lower density slurry. Pumping a 3 lbs./gal. slurry it will take 9,014 bbl. of slurry to carry a 1,000,000 lbs. of sand requiring 613,404 strokes for the 10-inch stroke pump and 766,754 strokes for the 8 inches.
A second form of assembly is shown in
It is therefore to be understood that while different embodiments have been herein set forth and described, various modifications and changes may be made therein without departing from the spirit and scope of the present invention as defined by the appended claims.