Field
The present disclosure relates to a liquefied natural gas tank.
Discussion of the Related Technology
Generally, natural Gas (NG) is turned into a liquid (also called liquefied natural gas or LNG) in a liquefaction plant, transported over a long distance by an LNG carrier, and re-gasified by passing a floating storage and re-gasification unit (FSRU) or an unloading terminal on land to be supplied to consumers.
In case LNG is transported by an LNG re-gasification vessel (LNG-RV), LNG is re-gasified in the LNG-RV itself, not passing a FSRU or an unloading terminal on land, and then supplied directly to consumers.
As liquefaction of natural gas occurs at a cryogenic temperature of approximately −163° C. at ambient pressure, LNG is likely to be vaporized even when the temperature of the LNG is slightly higher than −163° C. at ambient pressure. Although an LNG carrier has a thermally insulated LNG storage tank, as heat is continually transferred from the outside to the LNG in the LNG storage tank, the LNG is continually vaporized and boil-off gas is generated in the LNG storage tank during the transportation of LNG. If boil-off gas is generated in an LNG storage tank as described above, the pressure of the LNG storage tank is increased and becomes dangerous.
Generally, to maintain a constant pressure within the LNG storage tank for an LNG carrier, the boil-off gas generated in the LNG storage tank is consumed as a fuel for propulsion of the LNG carrier. That is to say, LNG carriers for transporting LNG basically maintain the temperature of the LNG in the LNG storage tank at approximately −163° C. at ambient pressure by discharging the boil-off gas to the outside of the tank.
For example, a steam turbine propulsion system driven by the steam generated in a boiler by burning the boil-off gas generated in an LNG storage tank has a problem of low propulsion efficiency. Also, a dual fuel diesel electric propulsion system, which uses the boil-off gas generated in an LNG storage tank as a fuel for a diesel engine after compressing the boil-off gas, has higher propulsion efficiency than the steam turbine propulsion system. But it has difficulty in maintenance due to complicated integration of a medium-speed diesel engine and an electric propulsion unit in the system. In addition, this system employs a gas compression method which requires higher installation and operational costs than a liquid compression method. Further, such method using boil-off gas as a fuel for propulsion fails to achieve the efficiency similar to or higher than that of a two-stroke slow-speed diesel engine, which is used in ordinary ships.
There is also a method of re-liquefying the boil-off gas generated in an LNG storage tank and returning the re-liquefied boil-off gas to the LNG storage tank. However, this method of re-liquefying the boil-off gas has a problem of installing a complicated boil-off gas re-liquefaction plant in the LNG carrier.
Furthermore, when the amount of boil-off gas generated in an LNG storage tank exceeds the capacity of a propulsion system or a boil-off gas re-liquefaction plant, the excessive boil-off gas needs to be burnt by a gas combustion unit or gas burner. Consequently, such method has a problem of needing an auxiliary unit such as a gas combustion unit for treating excessive boil-off gas.
For example, as illustrated in
In a case of an LNG carrier having a capacity of 150,000 m3, boil-off gas burnt as described above amounts to 1500 to 2000 tons per year, which cost about 700,000 USD, and the burning of boil-off gas raises a problem of environmental pollution.
Korean Patent Laid-Open Publication Nos. KR 10-2001-0014021, KR 10-2001-0014033, KR 10-2001-0083920, KR 10-2001-0082235, and KR 10-2004-0015294 disclose techniques of suppressing the generation of boil-off gas in an LNG storage tank by maintaining the pressure of the boil-off gas in the LNG storage tank at a high pressure of approximately 200 bar (gauge pressure) without installing a thermal insulation wall in the LNG storage tank, unlike the low-pressure tank as described above. However, this LNG storage tank have a significantly high thickness to store boil-off gas having a high pressure of approximately 200 bar, and consequently it has problems of increasing manufacturing costs and requiring additional components such as a high-pressure compressor, to maintain the pressure of boil-off gas at approximately 200 bar. There is also a technique of a pressure tank, which is different from the above-mentioned technique. As highly volatile liquid is stored in a super high-pressure tank, for example, at a pressure higher that 200 bar and at the room temperature, this super high-pressure tank does not have a problem of treating boil-off gas, but has other problems that the tank should be small, and that the manufacturing costs are increased.
As stated above, an LNG storage tank for an LNG carrier, which maintains the pressure of cryogenic liquid constant near ambient pressure during the transportation of the LNG and allows generation of boil-off gas, has a problem of consuming a large amount of boil-off gas or installing an additional re-liquefaction apparatus. In addition, a method of transporting LNG using a tank, such as a high pressure tank, which withstands a high pressure at a high temperature, unlike a tank which transports said cryogenic liquid at a low atmospheric pressure, does not need to treat boil-off gas, but has a limitation on the size of the tank and requires high manufacturing costs.
The discussion in this section is to provide general background information and does not constitute an admission of prior art.
One aspect of the invention provides an LNG tank ship, comprising: at least one heat insulated tank configured to contain LNG in both liquid and gaseous phases therein, wherein the at least one tank has a volume; a primary engine of the ship for generating power to move the ship, wherein the engine is designed to use a fuel other than LNG such that the engine does not use LNG to reduce vapor pressure of the LNG within the tank; and at least one liquefier configured to convert at least a portion of gaseous phase LNG to liquid phase LNG, wherein the at least one liquefier has a processing capacity, which is the maximum amount of gaseous phase LNG to be processed by the at least one liquefier for one hour, wherein a ratio of the processing capacity to the volume is smaller than about 0.015 kg/m3.
In the foregoing ship, the ratio may be smaller than about 0.01 kg/m3. The ratio may be smaller than about 0.005 kg/m3. The ratio may be smaller than about 0.002 kg/m3. The volume may be greater than about 100,000 m3. The processing capacity may be smaller than about 3000 kg/hour. The ship may not comprise a conduit for in fluid communication between the at least one tank and the engine. The ship may comprise a first conduit and a second conduit, wherein the first conduit is configured to flow the portion of the gaseous phase LNG from the at least one tank to the at least one liquefier, wherein the second conduit is configured to flow liquid phase LNG from the at least one liquefier to the at least one tank. The ship may further comprise LNG contained in the tank, wherein a substantial portion of the LNG is in liquid, and wherein the LNG within the tank has a vapor pressure from about 0.3 bar to about 2 bar. The vapor pressure may be from about 0.5 bar to 1 bar.
Another aspect of the invention provides an LNG tank ship, comprising: at least one heat insulated tank configured to contain LNG in both liquid and gaseous phases therein; a primary engine of the ship for generating power to move the ship, wherein the engine is designed to use a fuel other than LNG such that the engine does not use LNG to reduce vapor pressure of the LNG within the tank; and at least one liquefier configured to convert at least a portion of gaseous phase LNG to liquid phase LNG, the at least one liquefier has a processing capacity, which is the maximum amount of gaseous phase LNG to be processed by the at least one liquefier for one hour, wherein the processing capacity is smaller than about 3000 kg/hour.
In the foregoing ship, the processing capacity may be smaller than about 1000 kg/hour. The ship may not comprise a conduit for in fluid communication between the at least one tank and the engine. The ship may further comprise a first conduit and a second conduit, wherein the first conduit is configured to flow the portion of the gaseous phase LNG from the at least one tank to the at least one liquefier, wherein the second conduit is configured to flow liquid phase LNG from the at least one liquefier to the at least one tank.
Still another aspect of the invention provides a liquefier-free LNG tank ship, comprising: at least one heat insulated tank configured to contain LNG in both liquid and gaseous phases therein; a primary engine of the ship for generating power to move the ship, wherein the engine is designed to use a fuel other than LNG such that the engine does not use LNG to reduce vapor pressure of the LNG within the tank; and wherein the ship does not comprise a liquefier that is configured to convert at least a portion of gaseous phase LNG to liquid phase LNG.
In the foregoing ship, the ship may not comprise a conduit for in fluid communication between the at least one tank and the engine. The ship may further comprise LNG contained in the tank, wherein a substantial portion of the LNG is in liquid, and wherein the LNG within the tank may have a vapor pressure from about 0.3 bar to about 2 bar. The vapor pressure may be from about 0.5 bar to 1 bar. The ship may further comprise a flowing device configured to flow a portion of the LNG from one location within the tank to another location within the tank. The flowing device may comprise a conduit which is located inside the tank.
Yet another aspect of the invention provides a method of receiving LNG from an LNG tank containing LNG, the method comprising: providing a receiving tank; connecting between the receiving tank and an LNG tank containing LNG such that a fluid communication between the receiving tank and the LNG tank is established; and receiving at least part of the LNG into the receiving tank from the LNG tank, in which the LNG has a vapor pressure from about 0.3 bar to about 2 bar.
In the foregoing method, the vapor pressure within the LNG tank may be from about 0.4 bar to about 1.5 bar. The vapor pressure within the LNG tank may be from about 0.5 bar to about 1 bar. The vapor pressure within the LNG tank may be from about 0.65 bar to about 0.75 bar. The vapor pressure within the LNG tank may be greater than that within the receiving tank. The LNG tank may be integrated with a ship, and wherein the receiving tank is located on a shore. The LNG tank may be integrated with a ship, and wherein the receiving tank is located inland substantially away from a shore. The method may further comprises: providing an additional receiving tank; connecting between the additional receiving tank and the LNG tank such that a fluid communication between the additional receiving tank and the LNG tank is established; and receiving at least part of the LNG into the additional receiving tank from the LNG tank, wherein receiving into the additional receiving tank is simultaneously performed with receiving into the receiving tank for at least some time.
A further aspect of the invention provides a method of unloading LNG from an LNG tank containing LNG to a receiving tank, the method comprising: providing an LNG tank comprising LNG, which has a vapor pressure from about 0.3 bar to about 2 bar; connecting between the LNG tank and a receiving tank such that a fluid communication between the receiving tank and the LNG tank is established; and unloading at least part of the LNG from the LNG tank to the receiving tank.
In the foregoing method, the vapor pressure within the LNG tank may be from about 0.4 bar to about 1.5 bar. The vapor pressure within the LNG tank may be from about 0.5 bar to about 1 bar. The vapor pressure within the LNG tank may be from about 0.65 bar to about 0.75 bar. The vapor pressure within the LNG tank may be greater than that within the receiving tank. The LNG tank may be integrated with a ship, and wherein the receiving tank is located on a shore. The LNG tank may be integrated with a ship, and wherein the receiving tank is located inland substantially away from a shore. The method may further comprises: providing an additional receiving tank; connecting between the additional receiving tank and the LNG tank such that a fluid communication between the additional receiving tank and the LNG tank is established; and receiving at least part of the LNG into the additional receiving tank from the LNG tank, wherein receiving into the additional receiving tank is simultaneously performed with receiving into the receiving tank for at least some time.
A still further aspect of the invention provides an apparatus for containing LNG, the apparatus comprising: a heat insulated tank; and LNG contained in the tank; wherein a substantial portion of the LNG is in liquid, and wherein the LNG within the tank has a vapor pressure from about 0.3 bar to about 2 bar.
In the foregoing apparatus, the tank may comprise heat insulation sufficient to maintain a substantial portion of the liquefied natural in liquid for an extended period. The vapor pressure may be from about 0.4 bar to about 1.5 bar. The vapor pressure may be from about 0.5 bar to about 1 bar. The vapor pressure may be from about 0.65 bar to about 0.75 bar. The LNG within the tank may have a temperature from about −159° C. to about −146° C. The tank may have a volume greater than about 100,000 m3. The apparatus may further comprise a flowing device configured to flow a portion of the LNG from one location within the tank to another location within the tank. The flowing device may comprise a conduit which is located inside the tank. The flowing device may comprise a conduit, at least part of which is located outside the tank. The tank may comprises an interior wall defining an interior space configured to contain LNG; an exterior wall substantially surrounding the interior wall; and the heat insulation interposed between the interior wall and the exterior wall. The apparatus may further comprise a safety valve configured to release part of LNG from the tank when a vapor pressure within the tank reaches a cut-off pressure of the safety valve.
A ship may comprise the foregoing apparatus, wherein the tank may be integrated with a body of the ship. A vehicle may comprise the foregoing apparatus, wherein the tank is integrated with a body of the vehicle. The vehicle may be selected from the group consisting of a train, a car and a trailer.
A yet further aspect of the invention provides a method of operating a LNG containing apparatus, the method comprising: providing the foregoing LNG containing apparatus; monitoring the amount of the LNG within the tank; and changing the cut-off pressure from a first value to a second value when the amount of the LNG within the tank is decreased, wherein the second value is greater than the first value, wherein the second value is from about 0.3 bar to about 2 bar. The second value may be from about 0.5 bar to about 1 bar.
A still another further aspect of the invention provides a method of operating a LNG containing apparatus, the method comprising: providing the foregoing LNG containing apparatus; and monitoring a vapor pressure of the LNG in the tank wherein the vapor pressure is from about 0.3 bar to 2 bar. The method may further comprise comparing the vapor pressure to a reference pressure so as to determine whether to initiate a safety measure, wherein the reference pressure is from about 0.3 bar to about 2 bar. The reference pressure may be from about 0.5 bar to about 1 bar.
One aspect of the present invention provides a somewhat high-pressure (near ambient pressure) tank for transporting LNG in a cryogenic liquid state. Another aspect of the present invention provides an LNG storage tank having a large capacity which can be manufactured without increasing manufacturing costs and which can reduce the waste of boil-off gas, and to provide a method for transporting LNG, or a method for treating boil-off gas, using said LNG storage tank.
Hereinafter, various embodiments of the invention will be described with reference to the accompanying drawings.
Embodiments of the present invention provides a somewhat high-pressure (near ambient pressure) LNG storage tank for transporting LNG in a cryogenic liquid state, characterized in that some degree of change in the pressure in the LNG storage tank is allowed during the transportation of LNG.
One embodiment of the present invention provides, in an LNG carrier having boil-off gas treatment means for treating the boil-off gas generated in an LNG storage tank, an LNG carrier and a method characterized in that the vapor pressure in the LNG storage tank and the temperature of the LNG are allowed to be increased during the transportation of the LNG in the LNG storage tank.
In general, the methods known as means for treating boil-off gas are as follows: (a) using the boil-off gas generated from an LNG storage tank for a boiler (e.g. a steam turbine propulsion boiler); (b) using the boil-off gas as a fuel of a gas engine such as a DFDE and MEGI; (c) using the boil-off gas for a gas turbine; and (d) re-liquefying the boil-off gas and returning the re-liquefied boil-off gas to the LNG storage tank (see Korean Patent Laid-Open Publication No. 2004-0046836, Korean Patent Registration Nos. 0489804 and 0441857, and Korean Utility Model Publication No. 2006-0000158). These methods have problems of waste of boil-off gas by a boil-off gas combustion means such as a gas combustion unit (GCU) for excessive boil-off gas exceeding the capacity of a general boil-off gas treating means (e.g. after LNG is loaded), or the boil-off gas when the boil-off gas cannot be treated by the boil-off gas treating means, e.g. when an LNG carrier enters or leaves port and when it passes a canal.
Embodiments of the present invention have an advantage of eliminating such waste of boil-off gas by improving flexibility in boil-off gas treatment. The LNG carrier according to an embodiment of the present invention may not require a GCU, or may require a GCU for improving flexibility in treating, handling or managing boil-off gas in an emergency.
The LNG carrier according to an embodiment of the present invention is equipped with boil-off gas treating means such as a boiler, re-liquefaction apparatus, and gas engine for treating the boil-off gas generated from an LNG storage tank by discharging the boil-off gas to the outside of the LNG storage tank.
An embodiment of the present invention provides, in a method for controlling a safety valve provided at an upper portion of an LNG storage tank for an LNG carrier, a method for setting the safety valve characterized in that the cut-off pressure of the safety valve during the loading of LNG differs from the cut-off pressure of the safety valve during the voyage of the LNG carrier. An embodiment of the present invention also provides a safety valve, an LNG storage tank, and an LNG carrier having said feature.
Generally, the pressure in an LNG storage tank is safely managed by installing a safety valve at an upper portion of the LNG storage tank for an LNG carrier which transports LNG in a cryogenic liquid state. Some exemplary methods of safely managing the pressure in an LNG storage tank are as follows: (a) safeguarding against a possible explosion of an LNG storage tank by means of a safety valve; and (b) treating the boil-off gas generated from the LNG storage tank, after LNG is loaded, by the above-mentioned methods including using the boil-off gas for a boiler (e.g. a steam turbine propulsion boiler), using the boil-off gas as a fuel of a gas engine such as a DFDE and MEGI, using the boil-off gas for a gas turbine, and re-liquefying the boil-off gas and returning the re-liquefied boil-off gas to the LNG storage tank. These methods have problems of waste of boil-off gas by a boil-off gas combustion means such as a GCU for excessive boil-off gas which exceeds a capacity of a general boil-off gas treating means after LNG is loaded in an LNG carrier), or the boil-off gas when an LNG carrier enters or leaves a port, and when it passes a canal. The pressure in an LNG storage tank for an LNG carrier is maintained within a predetermined range by the above discussed methods.
Volume of LNG and Cut-Off Pressure of Safety Valve
In an LNG carrier, when the set value or cut-off pressure of a safety valve is 0.25 bar, about 98% of the full capacity of an LNG storage tank in volume can be loaded with LNG in liquid phase and the remaining about 2% is left as an empty space. If more than about 98% of the full capacity of an LNG storage tank is loaded with LNG, when the vapor pressure of the LNG storage tank reaches 0.25 bar, the LNG in the LNG storage tank may overflows from the dome at an upper portion of the tank. As shown in an embodiment of the present invention, if the pressure of LNG in an the LNG storage tank is continually allowed to be increased after the LNG is loaded, even when a small amount of LNG is loaded, the LNG in the LNG storage tank may overflow due to the expansion of the LNG caused by an increase in the temperature of the LNG at the cut-off pressure of the safety valve according to an embodiment of the present invention. For example, Applicants have found that, when the vapor pressure in an LNG storage tank is 0.7 bar, even if 97% of the full capacity of the LNG storage tank is loaded with LNG, the LNG in the LNG storage tank may overflow. This directly results in reducing the amount of LNG to be loaded.
Control of the Cut-Off Pressure of Safety Valve
Accordingly, instead of uniformly fixing the cut-off pressure of a safety valve provided at an upper portion of an LNG storage tank to a somewhat high pressure near ambient pressure, it is possible to reduce the waste of boil-off gas or increase the flexibility in treatment of boil-off gas without reducing an initial LNG load, by fixing the cut-off pressure of a safety valve to a lower pressure, e.g. about 0.25 bar, as in an LNG carrier, during loading of LNG, and then increasing the cut-off pressure of the safety valve, as in an embodiment of the present invention, when the amount of LNG in the LNG storage tank is reduced by using some boil-off gas (e.g. using the boil-off gas as a fuel of a boiler or engine) after the LNG carrier starts voyage. An embodiment of the present invention, if applied to an LNG carrier equipped with boil-off gas treating means (e.g. a boiler, a re-liquefaction apparatus, or a gas engine) for treating the boil-off gas generated from an LNG storage tank by discharging the boil-off gas to the outside of the LNG storage tank, has a great effect in eliminating the waste of boil-off gas.
Accordingly, in an embodiment of the present invention, the cut-off pressure of a safety valve is increased after the amount of LNG in an LNG storage tank is reduced by discharging the boil-off gas generated in the LNG storage tank to the outside thereof. Preferably the cut-off pressure during the loading of LNG is set at about 0.25 bar or lower; and the pressure during the voyage of the LNG carrier is set from a value greater than 0.25 bar to about 2 bar, and more preferably, from a value greater than 0.25 bar to about 0.7 bar. Here, the cut-off pressure of a safety valve during the voyage of an LNG carrier may be increased gradually, e.g. from about 0.4 bar to about 0.7 bar, according to the amount of boil-off gas used according to the voyage conditions.
Accordingly, in an embodiment of the present invention, the expression “during the voyage of an LNG carrier” means when the volume of LNG in an LNG storage tank is somewhat reduced by use of some boil-off gas after the LNG carrier starts voyage with LNG loaded therein. For example, it is desirable to set the cut-off pressure of a safety valve at 0.25 bar when the volume of LNG in liquid phase in an LNG storage tank is about 98.5%, at about 0.4 bar when the volume of LNG in liquid phase is about 98.0%, about 0.5 bar when the volume of LNG in liquid phase is about 97.7%, and about 0.7 bar when the volume of LNG is about 97.1%.
An embodiment of the present invention provides an LNG storage tank for an LNG carrier for transporting LNG in a cryogenic liquid state, characterized in that the cut-off pressure of a safety valve provided at an upper portion of the LNG storage tank is set from higher than about 0.25 bar to about 2 bar, preferably from higher than about 0.25 bar to about 0.7 bar, and more preferably approximately 0.7 bar. An embodiment of the present invention also provides a method for setting a safety valve, an LNG storage tank, and an LNG carrier having said technical feature. In one embodiment, the cut-off pressure of the safety valve is about 0.3 bar to about 2 bar. In certain embodiments, the cut-off pressure of the safety valve is about 0.26 bar, about 0.3 bar, about 0.35 bar, about 0.4 bar, about 0.45 bar, about 0.5 bar, about 0.55 bar, about 0.6 bar, about 0.65 bar, about 0.7 bar, about 0.75 bar, about 0.8 bar, about 0.9 bar, about 1 bar, about 1.2 bar, about 1.5 bar, about 2 bar, about 3 bar. In some embodiments, the cut-off pressure may be within a range defined by two of the foregoing cut-off pressures.
Certain embodiments of the present invention allows setting of cut-off pressure of the safety valve from about 0.3 bar to about 2 bar, and thus, allows some increases of the vapor pressure in the LNG storage tank and the temperature of the LNG in the LNG tank during the voyage.
Vapor Pressure of within the Tank
An embodiment of the present invention provides an LNG storage tank for an LNG carrier for transporting LNG in a cryogenic liquid state, characterized in that the vapor pressure in the LNG storage tank is controlled within near-ambient pressure, and that the vapor pressure in the LNG storage tank and the pressure of the LNG in the LNG storage tank are allowed to be increased during the transportation of the LNG. The LNG storage tank is also characterized in that the vapor pressure in the LNG storage tank ranges from a value greater than 0.25 bar to about 2 bar, preferably from higher than 0.25 bar to 0.7 bar, and more preferably, approximately 0.7 bar. In one embodiment, the vapor pressure is about 0.3 bar to about 2 bar. In certain embodiments, the vapor pressure is about 0.26 bar, about 0.3 bar, about 0.35 bar, about 0.4 bar, about 0.45 bar, about 0.5 bar, about 0.55 bar, about 0.6 bar, about 0.65 bar, about 0.7 bar, about 0.75 bar, about 0.8 bar, about 0.9 bar, about 1 bar, about 1.2 bar, about 1.5 bar, about 2 bar, about 3 bar. In some embodiments, the vapor pressure may be within a range defined by two of the foregoing vapor pressures.
Uniform Temperature Distribution
In addition, the LNG storage tank is characterized in that the boil-off gas at an upper portion of the LNG storage tank is mixed with the LNG at a lower portion of the LNG storage tank so as to maintain a uniform temperature distribution in the LNG storage tank. On one hand, as more LNG is likely to be vaporized when the temperature of one part of the LNG storage tank is higher than the temperature of the other part thereof, it is desirable to maintain a uniform temperature distribution of the LNG or boil-off gas in the LNG storage tank. On the other hand, as the boil-off gas at an upper portion of the LNG storage tank has a smaller heat capacity than the LNG at a lower portion of the LNG storage tank, local sharp increase in the temperature at an upper portion of the LNG storage tank due to the heat ingress from the outside into the LNG storage tank may result in a sharp increase in the pressure in the LNG storage tank. The sharp increase in the pressure in the LNG storage tank can be avoid by mixing the boil-off gas at an upper portion of the LNG storage tank with the LNG at a lower portion of the LNG storage tank.
Operation of LNG Tank in View of Unloading Condition
Also, according to an embodiment of the present invention, the vapor pressure in an LNG storage tank for an LNG carrier can be controlled to match the pressure in an LNG storage tank or reservoir for receiving the LNG at an LNG terminal. For example, in case where the pressure in an LNG storage tank or reservoir of an LNG unloading terminal, an LNG-RV, or a FSRU is relatively high (e.g. from approximately 0.4 bar to about 0.7 bar), the vapor pressure in the LNG storage tank for an LNG carrier is continually increased during the voyage of the LNG carrier. Otherwise, in case where the pressure in an LNG storage tank or reservoir of an LNG unloading terminal is low (approximately 0.2 bar), the pressure in the LNG storage tank for an LNG carrier may be controlled to match the pressure of the LNG storage tank for receiving the LNG by using the flexibility in boil-off gas treatment with reducing the waste of boil-off gas according to an embodiment of the present invention.
Configurations of the LNG Tank
In addition, an embodiment of the present invention provides a method for transporting LNG in a cryogenic liquid state having said technical feature, and an LNG carrier having said LNG storage tank. In particular, according to an embodiment of the present invention, the membrane LNG storage tank having a somewhat high pressure near ambient pressure to transport LNG in a cryogenic liquid state is characterized in that some degree of change in the pressure in the LNG storage is allowed during the transportation of LNG. The membrane tank according to an embodiment of the present invention may be a cargo space of an LNG tank as defined in IGC Code (2000). In an embodiment, a membrane tank is a non-self-supporting tank having a thermal insulation wall formed in a body and having a membrane formed at an upper portion of the tank. In an embodiment, the term “membrane tank” is used to include a semi-membrane tank. Some examples of the membrane tank are GTT NO 96-2 and Mark III as described below, and tanks as described in Korean Patent Nos. 499710 and 644217.
In an embodiment of the invention, a membrane tank can be designed to withstand the pressure up to about 0.7 bar (gauge pressure) by reinforcing the tank. However, it is generally prescribed that a membrane tank should be designed to have the pressure not exceeding 0.25 bar. Thus, all typical membrane tanks comply with this regulation, and are managed so that the vapor pressure in the tank is 0.25 bar or lower, and that the temperature and pressure of the LNG are almost constant during the voyage. On the contrary, an embodiment of the present invention is characterized in that the tank is configured to be sustainable to a vapor pressure greater than 0.25, preferably from about 0.3 bar to about 2 bar, and preferably from about 0.3 bar to about 0.7 bar, and the vapor pressure in the tank and the temperature of the LNG are allowed to be increased until the vapor pressure becomes the sustainable pressure discussed in the above. Also, the LNG storage tank according to an embodiment of the present invention is characterized by an apparatus for maintaining a uniform temperature distribution in the LNG storage tank.
According to an embodiment of the present invention, a large LNG carrier has an LNG storage capacity or volume about 100,000 m3 or more. In one embodiment, the storage capacity is greater than about 50,000 m3. In certain embodiments, the storage capacity is about 50,000 m3, about 70,000 m3, about 80,000 m3, about 90,000 m3, about 100,000 m3, about 110,000 m3, about 120,000 m3, about 130,000 m3, about 15,000 m3, about 170,000 m3, about 200,000 m3 or about 300,000 m3. In some embodiments, the storage capacity may be within a range defined by two of the foregoing capacities. In case of manufacturing a tank having a relative pressure of approximately 1 bar, near atmospheric pressure, as in an embodiment of the present invention, the manufacturing costs are not sharply increased, and also the tank can transport LNG, substantially withstanding the pressure generated by boil-off gas and not treating the boil-off gas.
The LNG storage tank according to an embodiment of the present invention is applicable to an LNG carrier, an LNG floating and re-gasification unit (FSRU), an unloading terminal on land, and an LNG re-gasification vessel (LNG-RV), etc. The LNG storage tank has advantages of reducing the waste of boil-off gas by allowing increase in the pressure and temperature in the LNG storage tank and solving a problem of treating boil-off gas, and of increasing flexibility in LNG treatment, such as transporting and storing LNG, because it is possible to store LNG in said all kinds of LNG storage tanks for a long time, taking into account LNG demand.
LNG Tank Allowing Vapor Pressure Increase
Relationship Between Pressure and Temperature
With regard to temperature, LNG which generally contains many impurities has a lower boiling point than that of pure methane. The pure methane has a boiling point of about −161° C. at about 0.06 bar, and LNG for transportation which contains impurities such as nitrogen, ethane, etc., has a boiling point of approximately −163° C. Assuming the LNG essentially consists of pure methane, LNG in an LNG storage tank after being loaded into the LNG storage tank has a temperature of approximately −161° C. at about 0.06 bar. If the vapor pressure in the LNG storage tank is controlled to be about 0.25 bar, taking into account the transportation distance and the consumption of boil-off gas, the temperature of the LNG is increased to approximately −159° C.; if the vapor pressure in the LNG storage tank is controlled to be about 0.7 bar, the temperature of the LNG is approximately −155° C.; if the vapor pressure in the LNG storage tank is controlled to be about 2 bar, the temperature of the LNG is increased up to approximately −146° C.
Heat Insulated LNG Tank Sustainable to High Pressure
The LNG storage tank for an LNG carrier according to the present an embodiment of invention comprises a thermal insulation wall and is designed by taking into account the pressure increase caused by the generation of boil-off gas. That is, the LNG storage tank is designed to have sufficient strength to withstand the pressure increase caused by the generation of boil-off gas. Accordingly, the boil-off gas generated in the LNG storage tank 1 for an LNG carrier is accumulated therein during the voyage of the LNG carrier.
The LNG storage tank 1 for an LNG carrier according to embodiments of the present invention preferably comprises a thermal insulation wall, and is designed to withstand the pressure from a value higher than 0.25 bar to about 2 bar (gauge pressure), and more preferably, the pressure of about 0.6 to about 1.5 bar (gauge pressure). Taking into account the transportation distance of LNG and the current IGC Code, it is desirable to design the LNG storage tank to withstand the pressure from a value higher than 0.25 bar to about 0.7 bar, particularly, approximately 0.7 bar.
In addition, as the LNG storage tank 1 for an LNG carrier according to an embodiment of the present invention can be sufficiently embodied by designing the LNG storage tank 1 to have a great thickness during an initial design, or simply by suitably reinforcing an general LNG storage tank for an LNG carrier through addition of a stiffener thereto without making a big change in the design of the LNG storage tank, it is economical in view of manufacturing costs.
Various LNG storage tanks for LNG carriers with a thermal insulation wall therein are as described below. The LNG storage tank installed in an LNG carrier can be classified into an independent-type tank and a membrane-type tank, and is described in detail below. GTT NO 96-2 and GTT Mark III in Table 1 below was renamed from GT and TGZ, respectively, when the Gaz Transport (GT) Corporation and Technigaz (TGZ) corporation was incorporated into GTT (Gaztransport & Technigaz) Corporation in 1995.
GT type and TGZ type tanks are disclosed in U.S. Pat. Nos. 6,035,795, 6,378,722, and 5,586,513, US Patent Publication US 2003-0000949, Korean Patent Laid-Open Publication Nos. KR 2000-0011347, and KR 2000-0011346.
Korean Patent Nos. 499710 and 0644217 disclose thermal insulation walls embodied as other concepts. The above references disclose LNG storage tanks for LNG carriers having various types of thermal insulation walls, which are to suppress the generation of boil-off gas as much as possible.
Safety Valve
An embodiment of the present invention can be applied to LNG storage tanks for LNG carriers having various types of thermal insulation functions as stated above. Exemplary LNG storage tanks for LNG carriers including the tank disclosed in the references are designed to withstand the pressure of 0.25 bar or lower, and consume the boil-off gas generated in the LNG storage tanks as a fuel for propulsion of the LNG carriers or re-liquefy the boil-off gas to maintain the pressure in the LNG storage tank at about 0.2 bar or lower, e.g. about 0.1 bar, and burn part or all of the boil-off gas if the pressure in the LNG storage tank is increased beyond the value. In addition, these LNG storage tanks have a safety valve therein, and if the LNG storage tanks fail to control the pressure therein as stated above, boil-off gas is discharged to the outside of the LNG storage tanks through the safety valve (mostly, having cut-off pressure of 0.25 bar).
On the contrary, in an embodiment of the present invention, the pressure of the safety valve is set from a value higher than 0.25 bar to about 2 bar, preferably from a value higher than 0.25 bar to about 0.7 bar, and more preferably approximately 0.7 bar.
Circulation of LNG within the Tank
In addition, the LNG storage tank according to an embodiment of the present invention is configured to reduce the pressure in the LNG storage tank by reducing the local increase in temperature and pressure of the LNG storage tank. The LNG storage tank maintains a uniform temperature distribution thereof by spraying the LNG in liquid phase, having a lower temperature, at a lower portion of the LNG storage tank, toward the boil-off gas, having a higher temperature, at an upper portion of the LNG storage tank, and by injection of the boil-off gas, having a higher temperature, at an upper portion of the LNG storage tank, toward the LNG, having a lower temperature, at a lower portion of the LNG storage tank.
In
Such reduction of generation of boil-off gas is particularly useful for gradually increasing the pressure in the LNG storage tank because the generation of boil-off gas in an LNG carrier without having boil-off gas treating means has direct connection with the increase in pressure in the LNG storage tank. In case of an LNG carrier having boil-off gas treating means, if the pressure in the LNG storage tank is increased, a certain amount of boil-off gas is discharged to the outside, thereby controlling the pressure in the LNG storage tank, and consequently, spray of LNG or injection of boil-off gas may not be needed during the voyage of the LNG carrier.
Loading of LNG
If LNG is loaded in a sub-cooled liquid state into an LNG carrier at a production terminal where LNG is produced, it is possible to reduce the generation of boil-off gas (or the increase in pressure) during the transportation of LNG to a destination. The pressure in the LNG storage tank for an LNG carrier may be a negative pressure (0 bar or lower) after LNG is loaded in a sub-cooled liquid state at a production terminal. To prevent the pressure from being decreased to a negative pressure, the LNG storage tank may contain nitrogen.
Unloading of LNG
During the voyage of an LNG carrier, the LNG storage tank 1 for an LNG carrier according to an embodiment of the present invention allows a pressure increase in the LNG storage tank 1 without discharging the boil-off gas generated in the LNG storage tank 1, thereby increasing the temperature in the LNG storage tank 1, and accumulating most of the heat influx as internal energy of LNG including a gaseous portion of LNG in the LNG storage tank, and then treating the boil-off gas accumulated in the LNG storage tank 1 for an LNG carrier at an unloading terminal when the LNG carrier arrives at a destination.
As a large amount of boil-off gas is accumulated in the LNG storage tank 1 for an LNG carrier, the boil-off gas in the LNG storage tank 1 is generally compressed to a pressure from about 70 bar to about 80 bar by the high-pressure compressor 3a at unloading terminals and then supplied directly to consumers. Part of the boil-off gas accumulated in the LNG storage tank 1 for an LNG carrier may generally be compressed to approximately 8 bar by the low-pressure compressor 3b, then re-condensed by passing the re-condenser 4, and then re-gasified by the vaporizer 5 so as to be supplied to consumers.
When LNG is unloaded from the LNG storage tank for an LNG carrier to be loaded into an LNG storage tanks or reservoirs for an unloading terminal, additional boil-off gas is generated due to inflow of LNG having a higher pressure into the LNG storage tanks for an unloading terminal because the pressure of the LNG storage tank for an LNG carrier is higher than that of the LNG storage tank for an unloading terminal. To minimize the generation of additional boil-off gas, LNG can be supplied to consumers by transmitting the LNG from the LNG storage tank for an LNG carrier directly to an inlet of a high-pressure pump at an unloading terminal. The LNG storage tank for an LNG carrier according to an embodiment of the present invention, as the pressure in the LNG storage tank is high during the unloading of LNG, has an advantage of shortening an unloading time by about 10% to about 20% over LNG storage tanks.
Instead of being supplied to the LNG storage tanks 2 for an unloading terminal at an unloading terminal, the LNG stored in the LNG storage tank 1 for an LNG carrier may be supplied to the re-condenser 4 to re-condense boil-off gas and then re-gasified by the vaporizer 5, thereby being supplied directly to consumers. On the other hand, if a re-condenser is not installed at an unloading terminal, LNG may be supplied directly to a suction port of the high-pressure pump P.
As stated above, if the plurality of LNG storage tanks 2 for an unloading terminal are installed at an unloading terminal and LNG is evenly distributed from the LNG storage tank 1 for an LNG carrier to each of the plurality of LNG storage tanks 2 for an unloading terminal, the effect of generation of boil-off gas in the LNG storage tanks for an unloading terminal can be minimized due to dispersion of boil-off gas to the plurality of the LNG storage tanks 2 for an unloading terminal. As the amount of boil-off gas generated in the LNG storage tanks for an unloading terminal is small, the boil-off gas is generally compressed by the low-pressure compressor 3b to approximately 8 bar and then re-condensed by passing the re-condenser 4, and then re-gasified by the vaporizer 5, to be supplied to consumers.
According to embodiments of the present invention, as the LNG storage tank for an LNG carrier is operated at a pressure greater than 0.25 bar, a process of filling boil-off gas in the LNG storage tank for an LNG carrier is not required to maintain the pressure in the LNG storage tank for an LNG carrier during the unloading of LNG. Further, if a LNG storage tank for an LNG terminal or, for a floating storage and re-gasification unit (FSRU) are modified, or a new configuration of LNG storage tank for an unloading terminal or for a floating storage and re-gasification unit (FSRU) are constructed such that the pressure of the LNG storage tank provided in the unloading zone corresponds to the pressure of the LNG storage tank for an LNG carrier according to an embodiment of the present invention, no additional boil-off gas is generated during the unloading of LNG from the LNG carrier, and consequently an unloading technique can be applied.
According to an embodiment of the present invention, an LNG floating storage and re-gasification unit (FSRU) has more flexibility in management of boil-off gas and thus may not need a re-condenser. According to an embodiment of the present invention, the flash gas generation during unloading to the LNG floating storage and re-gasification unit (FSRU) from LNGC will be greatly reduced or absent and the operation time will be greatly reduced due to time saving of the flash gas handing. And accordingly there is much more flexibility for the cargo tank pressure of the unloading LNGC. According to an embodiment of the present invention, an LNG re-gasification vessel (LNG-RV) may have merits of both an LNG carrier and an LNG floating storage and re-gasification unit (FSRU) as stated above.
Operational Modes of the Tank
S mode or V mode shown in
V mode is to enlarge the range of the pressure in the LNG storage tank for an LNG carrier, and has an advantage of reducing the waste of boil-off gas by storing the excessive boil-off gas exceeding the amount of boil-off gas consumed by boil-off gas treating means, in the LNG storage for an LNG carrier. For example, when an LNG carrier passes a canal, boil-off gas is not consumed because propulsion means using the boil-off gas as a fuel, such as a DFDE, MEGI, and gas turbine, does not operate. Accordingly, the boil-off gas generated in the LNG storage tank for an LNG carrier can be stored therein, and thus the pressure of the LNG storage tank for an LNG carrier increases to a pressure from about 0.7 bar to about 1.5 bar. After an LNG carrier passes a canal, the propulsion means using boil-off gas as a fuel is fully operated, thereby increasing the consumption of boil-off gas, and decreasing the pressure of the LNG storage tank for an LNG carrier to a pressure smaller than about 0.4 bar.
The operation types of an LNG storage tank for an LNG carrier can vary depending on whether or not a flash gas treatment facility for treating a large amount of flash gas is installed at an LNG unloading terminal. In case a flash gas treatment facility for treating a large amount of flash gas is installed at an LNG unloading terminal, the pressure of the LNG storage tank for an LNG carrier is operated in an F mode; in case a flash gas treatment facility for treating a large amount of flash gas is not installed at an LNG unloading terminal, the pressure of the LNG storage tank for an LNG carrier is operated according to the S mode or V mode.
Another Example of Circulation of LNG within the Tank
As illustrated in the left side of
The apparatus for reducing the pressure increase in the LNG storage for an LNG carrier is configured to reduce the local increase in the temperature and pressure of the LNG storage tank, thereby reducing the pressure of the LNG storage tank. The generation of boil-off gas can be reduced by injecting the boil-off gas, having a higher temperature, at an upper portion of the LNG storage tank 1 for an LNG carrier toward a lower portion of the LNG storage tank 1 for an LNG carrier having a lower temperature, thereby maintaining uniform temperature distribution of the LNG storage tank for an LNG carrier, that is, preventing the local increase in the temperature in the LNG storage tank.
Control of Safety Valve
In case of an LNG carrier provided with a safety relief valve (SRV) or safety valve of the LNG storage tank therein, the cut-off pressure of the safety valve is initially set low so as to maximize the cargo loading, but can be increased during the voyage according to the LNG volume decrease due to the consumption of boil-off gas.
The increased SRV cut-off pressure can be obtained by volume and density of remained LNG according to IGC code 15.1.2. The LNG density can be accurately calculated by measuring LNG temperatures.
Monitoring the Level of LNG within the Tank
As the measured values such as the level of LNG in the LNG storage tank are frequently changed during the voyage, an embodiment of the present invention comprises a system for eliminating outside noise and fluctuation caused by dynamic movement of a ship through an appropriate data processing, a system for calculating an allowable cut-off pressure of the safety valve of the LNG storage tank by calculating the actual volume of the LNG in the LNG storage tank 1 by using the processed data, and an apparatus for displaying the results.
The system for confirming a cut-off pressure of the safety valve of the LNG storage tank according to the embodiment, as illustrated in the left side of
On the other hand, it is possible to measure the flow rate of the fuel gas supplied from the LNG storage tank 1 to fuel gas propulsion means of an LNG carrier, compare the initial load of LNG with the amount of the used boil-off gas to calculate the current volume of the LNG in the LNG storage tank, and reflect the volume of the LNG calculated from the flow rate of the fuel gas measured as described above in the volume of the LNG calculated by the LNG volume processing module 63. The allowable cut-off pressure of the safety valve of the LNG storage tank and the volume of the LNG in the LNG storage tank calculated as described above are displayed on a display panel 65.
In an exemplary configuration shown in
That is to say, to measure a large range of the flow rate of fuel gas, the effective measurement range can be simply expanded by arranging at least two orifices in series, each orifice having a different measurement range, and selecting and using the appropriate measurement values of the orifices according to the flow rate. In
The effective measurement range can be simply expanded by installing the selector 75, which is selectable according to the measurement range as described above, between the differential pressure measurer 73 and the flow meter 77, and selecting and using the appropriate measurement values of the orifices according to the flow rate.
In an exemplary system, the capacity of a fuel gas orifice is set near NBOG (natural boil-off gas). Accordingly, in case of an LNG carrier whose consumption of boil-off gas is small, the accuracy in measurements is low. To make up for this inaccuracy, an embodiment of the present invention provides a method of additionally installing small orifices in series. This method can measure the level of the LNG in the LNG storage tank, thereby measuring the level, amount or volume, of the LNG in the LNG storage tank from the amount of LNG consumed. In order to improve accuracy, the composition of boil-off gas may be analyzed. For this, the composition of boil-off gas may be considered by adding gas chromatography.
Further, if the measurement of the level of LNG in the LNG storage becomes accurate by the above-mentioned methods, it can improve the efficiency of the boil-off gas management method and apparatus according to an embodiment of the present invention which maintains the pressure of the LNG storage tank at a somewhat higher than the prior art. That is, accurate measurement of the volume of LNG in an LNG storage tank can facilitate changing the setting of a safety valve of the LNG storage tank into multiple settings, and reduce the consumption of boil-off gas.
Another Example of Circulation of LNG within the Tank
To do this, a boil-off gas branch line L2 for returning the boil-off gas to the LNG storage tank 1 is installed in the middle of a fuel gas supply line L1 for compressing the boil-off gas at an upper portion of the LNG storage tank 1 for an LNG carrier and supplying the compressed boil-off gas to the fuel gas propulsion means. In addition, a compressor 41 is installed in the middle of the fuel gas supply line L1 upstream of a meeting point of the fuel gas supply line L1 and the boil-off gas branch line L2.
A buffer tank 43 is installed in the middle of the boil-off gas branch line L2. As there is a difference between the pressure of the boil-off gas passing the compressor 41 and the pressure of the LNG storage tank 1, it is desirable to temporarily store the boil-off gas passing the compressor 41 in the buffer tank 43 and control the pressure of the boil-off gas to match the pressure of the LNG storage tank 1 and then return the boil-off gas to the LNG storage tank 1. In one embodiment, it is desirable to operate an apparatus for reducing pressure increase in the LNG storage tank for an LNG carrier at an interval of about 10 minutes per 2 hours. Some examples of the fuel gas propulsion means are a double fuel diesel electric propulsion system (DFDE), a gas injection engine, and a gas turbine.
An LNG carrier, to which a DFDE, a gas injection engine, or a gas turbine is applied, uses the concept of compressing boil-off gas by a boil-off gas compressor and then sending the compressed boil-off gas to an engine to burn the boil-off gas. However, an LNG carrier which is configured to eliminate or reduce the discharge of boil-off gas of an LNG storage tank, as in an embodiment of the present invention, if no or a small amount of fuel gas is consumed in fuel gas propulsion means, to prevent a severe pressure increase due to a local increase in temperature in an LNG storage tank, compresses boil-off gas and then return the compressed boil-off gas to a lower portion of the LNG storage tank through a boil-off gas branch line, without sending the compressed boil-off gas to the gas engine.
Embodiment of Ship Consuming LNG from the Tank
An embodiment of the present invention provides a fuel gas supply system for gasifying the LNG of the LNG storage tank and supplying the gasified LNG as a fuel gas to fuel gas propulsion means. The system according to the embodiment may not use boil-off gas at all.
The LNG storage tank 1 for an LNG carrier used in the fuel gas supply system according to this embodiment is designed to have strength to withstand pressure increase due to boil-off gas so as to allow pressure increase due to boil-off gas generated in the LNG storage tank during the voyage of the LNG carrier.
The fuel gas supply system in
LNG whose temperature is increased by exchanging heat with the boil-off gas in the heat exchanger 53 is supplied to the fuel gas propulsion means, and boil-off gas which has been liquefied by exchanging heat with the LNG is returned to the LNG storage tank 1. A second pump 54 is installed in the fuel gas supply line L11 downstream of the heat exchanger 53 so as to supply LNG to the fuel gas propulsion means after the LNG exchanges heat with the boil-off gas in the heat exchanger 53 and is compressed to meet the flow rate and pressure demands of the fuel gas propulsion means. A heater 55 is installed in the fuel gas supply line L11 downstream of the second pump 54 so as to heat LNG which has exchanges heat with the boil-off gas in the heat exchanger 53 to supply the LNG to the fuel gas propulsion means.
A boil-off gas compressor 56 and a cooler 57 are sequentially installed in the boil-off gas liquefaction line L12 upstream of the heat exchanger 53 so as to compress and cool the boil-off gas extracted from the LNG storage tank and then exchange heat between the boil-off gas and LNG.
In case the fuel gas pressure demand of the fuel gas propulsion means is high (e.g. about 250 bar), LNG is compressed to about 27 bar by the first pump 52, the temperature of the LNG, while passing the heat exchanger 53, is increased from approximately −163° C. to approximately −100° C., and the LNG is supplied in a liquid state to the second pump 54 and compressed to approximately 250 bar by the second pump 54 (as it is in a supercritical state, there is no division between liquid and gas states), then gasified, while being heated in the heater 55, and then supplied to the fuel gas propulsion means. In this case, though the temperature of LNG, while passing the heat exchanger 53, is increased, LNG, is not gasified because the pressure of LNG supplied to the heat exchanger is high.
On the other hand, in case the fuel gas pressure demand of the fuel gas propulsion means is low (e.g. about 6 bar), LNG is compressed to about 6 bar by the first pump 52, part of the LNG is gasified while passing the heat exchanger 53, supplied to the heater 55 and heated in the heater 55, and then supplied to the fuel gas propulsion means. In this case, the second pump 54 is not necessary.
According to this fuel gas supply system of an LNG carrier, LNG is extracted from the LNG storage tank, the extracted LNG is compressed to meet the flow rate and pressure demands of the fuel gas propulsion means, and the compressed LNG is supplied to the fuel gas propulsion means, but the supply of LNG to the fuel gas propulsion means is done after heat exchange between the LNG and boil-off gas extracted from the LNG storage tank. Accordingly, the fuel gas supply system has advantages of simplifying the configuration, reducing the required power, and preventing a severe increase in pressure of the LNG storage tank due to accumulation of boil-off gas therein, in supplying a fuel gas from an LNG carrier to the fuel gas propulsion means.
Liquefier
In one embodiment, a boil-off gas re-liquefaction apparatus or liquefier may be provided. The liquefier may use cold energy of LNG can be added. That is, boil-off gas is compressed and exchanges heat with the LNG of the fuel gas supply line, thereby being cooled (by the re-condenser, there is no N2 refrigerator). In this case, only 40-60% of NBOG is re-liquefied, but there is no problem because the LNG carrier according to an embodiment of the present invention is configured to eliminate or reduce the discharge of boil-off gas in the LNG storage tank. Further, if necessary, a small boil-off gas re-liquefaction apparatus having a processing capacity of approximately 1 ton/hour can be installed particularly for ballast voyage. The processing capacity is the maximum amount of gaseous phase LNG to be processed by the liquefier for one hour.
In one embodiment, the capacity processing of the liquefier is smaller than about 3,000 kg/hour. In certain embodiments, the processing capacity of the liquefier is about 50 kg/hour, about 100 kg/hour, about 200 kg/hour, about 300 kg/hour, about 500 kg/hour, about 700 kg/hour, about 900 kg/hour, about 1000 kg/hour, about 1200 kg/hour, about 1500 kg/hour, about 2000 kg/hour or about 3000 kg/hour. In some embodiments, the processing capacity may be within a range defined by two of the foregoing processing capacities.
In one embodiment, a ratio of the processing capacity to the storage capacity is smaller than about 0.015 kg/m3. In certain embodiments, the ratio is about 0.001 kg/m3, about 0.002 kg/m3, about 0.003 kg/m3, about 0.004 kg/m3, about 0.005 kg/m3, about 0.007 kg/m3, about 0.009 kg/m3, about 0.010 kg/m3, about 0.011 kg/m3, about 0.013 kg/m3, about 0.015 kg/m3, about 0.018 kg/m3 or about 0.02 kg/m3. In some embodiments, the ratio may be within a range defined by two of the foregoing ratios.
As stated above, embodiments of the present invention has advantages of reducing the waste of boil-off gas and increasing the flexibility in treatment of boil-off gas by allowing an increase in the vapor pressure and LNG temperature in an LNG storage tank for an LNG carrier having boil-off gas treating means during the transportation of the LNG.
In particular, according an embodiment of to the present invention, even when the amount of boil-off gas generated during the transportation of LNG exceeds the amount of boil-off gas consumed, the excessive boil-off gas can be preserved in the LNG storage tank without any loss of the boil-off gas, thereby improving the economic efficiency. For example, in case of an LNG carrier provided with an engine for treating boil-off gas as illustrated in
Further, in one embodiment, in case the LNG carrier uses a dual fuel gas injection engine or gas turbine, the fuel gas can be supplied by a liquid pump, not by a boil-off gas compressor, thereby greatly reducing installation and operation costs.
Although embodiments of the present invention have been shown and described herein, it should be understood that various modifications, variations or corrections may readily occur to those skilled in the art, and thus, the description and drawings herein should be interpreted by way of illustrative purpose without limiting the scope and sprit of the present invention.
Number | Date | Country | Kind |
---|---|---|---|
10-2007-0014405 | Feb 2007 | KR | national |
10-2007-0042103 | Apr 2007 | KR | national |
This application is a continuation application of U.S. patent application Ser. No. 11/829,012 filed Jul. 26, 2007, which claims priority to and the benefit of Korean Patent Application Nos. 10-2007-0014405 filed Feb. 12, 2007 and 10-2007-0042103 filed Apr. 30, 2007, the disclosures of which are incorporated herein by reference in their entirety.
Number | Name | Date | Kind |
---|---|---|---|
1995320 | Murray | Mar 1935 | A |
2784560 | Johnson et al. | Mar 1957 | A |
2952984 | Marshall, Jr. | Sep 1960 | A |
3123981 | Carney et al. | Mar 1964 | A |
3150495 | Reed et al. | Sep 1964 | A |
3282060 | Hays | Nov 1966 | A |
3407052 | Huntress et al. | Oct 1968 | A |
3420068 | Petit | Jan 1969 | A |
3434492 | Yearwood et al. | Mar 1969 | A |
3453836 | Kerr | Jul 1969 | A |
3733838 | Delahunty | May 1973 | A |
3763658 | Gaumer, Jr. et al. | Oct 1973 | A |
3828709 | Bognaes et al. | Aug 1974 | A |
3837172 | Markbreiter et al. | Sep 1974 | A |
3837821 | Buffiere et al. | Sep 1974 | A |
3842613 | Becker | Oct 1974 | A |
3857245 | Jones | Dec 1974 | A |
3874185 | Etzbach | Apr 1975 | A |
3886758 | Perrotin et al. | Jun 1975 | A |
3919852 | Jones | Nov 1975 | A |
4033135 | Mandrin | Jul 1977 | A |
4041721 | Kniel | Aug 1977 | A |
4054433 | Buffiere et al. | Oct 1977 | A |
4065278 | Newton et al. | Dec 1977 | A |
4083318 | Verolme | Apr 1978 | A |
4095546 | Kane | Jun 1978 | A |
4129432 | Garside | Dec 1978 | A |
4315408 | Karl | Feb 1982 | A |
4345861 | Aarseth | Aug 1982 | A |
4382524 | Kvamsdal | May 1983 | A |
4417878 | Koren | Nov 1983 | A |
4598554 | Bastian | Jul 1986 | A |
4826354 | Adorjan | May 1989 | A |
4846862 | Cook | Jul 1989 | A |
4924822 | Asai et al. | May 1990 | A |
5114451 | Rambo et al. | May 1992 | A |
5137558 | Agrawal | Aug 1992 | A |
5139547 | Agrawal et al. | Aug 1992 | A |
5226931 | Combier | Jul 1993 | A |
5325673 | Durr et al. | Jul 1994 | A |
5373702 | Kalet et al. | Dec 1994 | A |
5375547 | Abe et al. | Dec 1994 | A |
5531178 | Abe et al. | Jul 1996 | A |
5542255 | Preston et al. | Aug 1996 | A |
5572875 | Gustafson | Nov 1996 | A |
5586513 | Jean et al. | Dec 1996 | A |
5685159 | Kooy et al. | Nov 1997 | A |
5711270 | Pedersen | Jan 1998 | A |
5727492 | Cuneo et al. | Mar 1998 | A |
6023942 | Thomas et al. | Feb 2000 | A |
6035795 | Dhellemmes et al. | Mar 2000 | A |
6089022 | Zednik et al. | Jul 2000 | A |
6237347 | Rigby et al. | May 2001 | B1 |
6378722 | Dhellemmes | Apr 2002 | B1 |
6449983 | Pozivil | Sep 2002 | B2 |
6530241 | Pozivil | Mar 2003 | B2 |
6564579 | McCartney | May 2003 | B1 |
6732881 | Gulati | May 2004 | B1 |
6829901 | Harley et al. | Dec 2004 | B2 |
6964180 | Shivers, III | Nov 2005 | B1 |
6964181 | Milios et al. | Nov 2005 | B1 |
7100261 | Gulati | Sep 2006 | B2 |
7165408 | Immel | Jan 2007 | B2 |
7201002 | Brown | Apr 2007 | B1 |
7219502 | Nierenberg | May 2007 | B2 |
7322387 | Landry et al. | Jan 2008 | B2 |
7404301 | Huang et al. | Jul 2008 | B2 |
7438012 | Kackur | Oct 2008 | B2 |
7448223 | Darling, IV et al. | Nov 2008 | B2 |
7464734 | Liu | Dec 2008 | B2 |
7493778 | Engdahl | Feb 2009 | B2 |
7644676 | Lee et al. | Jan 2010 | B2 |
7726359 | Hartono et al. | Jun 2010 | B2 |
7841288 | Lee et al. | Nov 2010 | B2 |
8028724 | Lee et al. | Oct 2011 | B2 |
20010042377 | Pozivil | Nov 2001 | A1 |
20030000949 | Dhellemmes | Jan 2003 | A1 |
20030014981 | Kimble et al. | Jan 2003 | A1 |
20030054307 | Gerstendorfer et al. | Mar 2003 | A1 |
20030106324 | Bishop | Jun 2003 | A1 |
20040068993 | Irie et al. | Apr 2004 | A1 |
20040221718 | Grodal | Nov 2004 | A1 |
20050016185 | Emmer | Jan 2005 | A1 |
20050042035 | de Baan | Feb 2005 | A1 |
20050126220 | Ward | Jun 2005 | A1 |
20060053806 | Tassel | Mar 2006 | A1 |
20060086412 | Spittael | Apr 2006 | A1 |
20060156744 | Cusiter | Jul 2006 | A1 |
20070009369 | Dany | Jan 2007 | A1 |
20070125122 | Mak et al. | Jun 2007 | A1 |
20070128957 | Korsgaard | Jun 2007 | A1 |
20070149838 | Chretien | Jun 2007 | A1 |
20070214831 | Nanda | Sep 2007 | A1 |
20080008602 | Pozivil et al. | Jan 2008 | A1 |
20080034769 | Engdahl | Feb 2008 | A1 |
20080110181 | Werner | May 2008 | A1 |
20080127673 | Bowen et al. | Jun 2008 | A1 |
20080148771 | Yengle et al. | Jun 2008 | A1 |
20080153369 | Hartono | Jun 2008 | A1 |
20080190117 | Lee et al. | Aug 2008 | A1 |
20080190118 | Lee et al. | Aug 2008 | A1 |
20080190352 | Lee et al. | Aug 2008 | A1 |
20080245101 | Dubettier-Grenier et al. | Oct 2008 | A1 |
20090126400 | Pozivil | May 2009 | A1 |
20090199591 | Lee et al. | Aug 2009 | A1 |
20090199759 | Lee et al. | Aug 2009 | A1 |
20090211262 | Lee et al. | Aug 2009 | A1 |
20090259081 | Lee et al. | Oct 2009 | A1 |
20090266086 | Lee et al. | Oct 2009 | A1 |
20100012015 | Lee et al. | Jan 2010 | A1 |
20100122542 | Choi et al. | May 2010 | A1 |
20120017608 | Lee et al. | Jan 2012 | A1 |
20120260674 | Lee et al. | Oct 2012 | A1 |
Number | Date | Country |
---|---|---|
85105351 | Apr 1987 | CN |
0293832 | Dec 1988 | EP |
0535752 | Apr 1993 | EP |
1561683 | Aug 2005 | EP |
46-20123 | Jun 1971 | JP |
54-159720 | Dec 1979 | JP |
58-046299 | Mar 1983 | JP |
58-072800 | Apr 1983 | JP |
10-028837 | Feb 1998 | JP |
2005-320311 | Nov 2005 | JP |
2007-527445 | Sep 2007 | JP |
10-1990-0005143 | Apr 1990 | KR |
10-0184706 | May 1999 | KR |
10-1999-0046828 | Jul 1999 | KR |
10-2000-0011346 | Feb 2000 | KR |
10-2000-0011347 | Feb 2000 | KR |
10-2001-0014021 | Feb 2001 | KR |
10-2001-0014033 | Feb 2001 | KR |
10-0289546 | May 2001 | KR |
10-2001-0049264 | Jun 2001 | KR |
10-2001-0060256 | Jul 2001 | KR |
10-2001-0082235 | Aug 2001 | KR |
10-2001-0083920 | Sep 2001 | KR |
10-2001-0088406 | Sep 2001 | KR |
10-2001-0089142 | Sep 2001 | KR |
10-2004-0015294 | Feb 2004 | KR |
10-2004-0018265 | Mar 2004 | KR |
10-2004-0046835 | Jun 2004 | KR |
10-2004-0046836 | Jun 2004 | KR |
10-0441857 | Jul 2004 | KR |
10-0489804 | May 2005 | KR |
10-0499710 | Jul 2005 | KR |
10-2005-0094798 | Sep 2005 | KR |
10-2005-0094799 | Sep 2005 | KR |
20-0394721 | Sep 2005 | KR |
10-2005-0102681 | Oct 2005 | KR |
10-2006-0036441 | Apr 2006 | KR |
10-2006-0083727 | Jul 2006 | KR |
10-0618735 | Aug 2006 | KR |
10-0644217 | Nov 2006 | KR |
20-0431697 | Nov 2006 | KR |
20-2006-0000158 | Dec 2006 | KR |
10-0674451 | Jan 2007 | KR |
10-2007-0020162 | Feb 2007 | KR |
10-2007-0045172 | May 2007 | KR |
10-2007-0084510 | Aug 2007 | KR |
10-2007-0091323 | Sep 2007 | KR |
10-2007-0100760 | Oct 2007 | KR |
10-2009-0086916 | Aug 2009 | KR |
WO 9000589 | Jan 1990 | WO |
WO 9843029 | Oct 1998 | WO |
WO 9859084 | Dec 1998 | WO |
WO 9859085 | Dec 1998 | WO |
WO 0023164 | Apr 2000 | WO |
WO 0025061 | May 2000 | WO |
WO 2002-32810 | Apr 2002 | WO |
WO 03002921 | Jan 2003 | WO |
2005003621 | Jan 2005 | WO |
WO 2005015100 | Feb 2005 | WO |
WO 2005047761 | May 2005 | WO |
WO 2005056377 | Jun 2005 | WO |
WO 2005071333 | Aug 2005 | WO |
Entry |
---|
International Safety Guide for Inland Navigation Tank-barges and Terminals, Edition 1—2010, Chapter 3. |
Co-pending U.S. Appl. No. 12/556,418, filed Sep. 9, 2009. |
Co-pending U.S. Appl. No. 12/567,639, filed Sep. 25, 2009. |
Chinese Second Office Action, re CN Application No. 200910223692.5, dated Jan. 13, 2012, with translation. |
Notice of Allowance dated Jun. 15, 2011 from the U.S. Patent Office in the U.S. Appl. No. 11/829,026—8 pages. |
Office Action dated Apr. 15, 2011 from the U.S. Patent Office in the U.S. Appl. No. 11/828,999. |
Office Action dated Apr. 18, 2011 from the U.S. Patent Office in the U.S. Appl. No. 11/829,012. |
Office Action dated Feb. 28, 2011 from the U.S. Patent Office in the U.S. Appl. No. 11/829,026. |
International Search Report, and its English Translation, dated Sep. 16, 2009 of corresponding PCT Application No. PCT/KR2009/000623; filed Feb. 11, 2008 (5 pages). |
Written Opinion, and its English Translation, dated Sep. 16, 2009 of corresponding PCT Application No. PCT/KR2009/000623; filed Feb. 11, 2008 (11 pages). |
Extended European Search Report dated Dec. 1, 2016 of corresponding European Patent Application No. 07017905.6—20 pages. |
Dr. K-D. Gerdsmeyer et al., On-Board Reliquefaction for LNG Ships, 2005. |
International Code for the Construction and Equipment of Ships Carrying Liquefied Gases in Bulk (IGC Code), 1993, pp. 31-34, IMO, London. |
International Code for the Construction and Equipment of Ships Carrying Liquefied Gases in Bulk (IGC Code), 2000, Chapter 15, IMO, London. |
International Search Report dated Sep. 16, 2009 of corresponding PCT Application No. PCT/KR2009/000623 filed on Feb. 11, 2008—3 pages. |
N.G. Krillov, Analysis of Modern Natural Gas Liquefaction Technologies, Chemical and Petroleum Engineering, 2004, vol. 40, Issue 7-8, pp. 401-406. |
Search Report from the corresponding European Patent Application No. 07007424.0 dated Jul. 11, 2007. |
Written Opinion dated Sep. 16, 2009 of corresponding PCT Application No. PCT/KR2009/000623 filed on Feb. 11, 2008—4 pages. |
Number | Date | Country | |
---|---|---|---|
20130306643 A1 | Nov 2013 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 11829012 | Jul 2007 | US |
Child | 13952466 | US |