Embodiments pertain to a load control module, and more particularly to a load control module that permits testing of power switching devices that are part of the load control module.
Most conventional load control modules include a test button that permits power switching devices (e.g., relays) located within the load control module to be exercised (i.e., functionally operated) upon operation of the push button.
One of the drawbacks with existing load control modules is such test buttons are located within an enclosure that houses the power switching devices. Since the test button is positioned inside the enclosure, the enclosure must be opened in order to operate the push button.
The need to open the enclosure is undesirable because a potentially unskilled user may be exposed to dangerously high voltage. In addition, a tool is commonly required in order to open the enclosure and expose the push button.
The following description and the drawings sufficiently illustrate specific embodiments to enable those skilled in the art to practice them. Other embodiments may incorporate structural, logical, electrical, process, and other changes. Portions and features of some embodiments may be included in, or substituted for, those of other embodiments. Embodiments set forth in the claims encompass all available equivalents of those claims.
In the example embodiment illustrated in
In some embodiments, each of the power switching devices 40 is a relay, although it is contemplated that that other types of power switching devices may be utilized in the load control module 20. It should be noted that the switch 60 may selectively activate the interface 50 to permit sequential testing of each relay 40 upon operation of the interface 50.
In the example embodiment that is illustrated in
It should be noted the commands for the switch to selectively activate the interface 50 to permit testing of the power switching device 40 may be in other locations besides the generator control 80. As an example, a switch control 100 may be located within the enclosure 30.
During operation of some embodiments of the power management system 10, the generator may need to be in a “run” condition in order for any of the controls described herein to generate commands relating to selective switch activation. As an example, the switch 60 may be activated in order to permit a qualified user to test (i.e., exercise) the power switching devices 40 without opening the enclosure 30 by using the interface 50 on the outside of the enclosure 30.
In the example embodiment that is illustrated in
The example load control modules 20 and power management systems 10 described herein may serve to prevent a potentially unskilled user from being exposed to dangerously high voltage when power switching devices 40 within an enclosure 30 need to be tested.
The Abstract is provided to comply with 37 C.F.R. Section 1.72(b) requiring an abstract that will allow the reader to ascertain the nature and gist of the technical disclosure. It is submitted with the understanding that it will not be used to limit or interpret the scope or meaning of the claims. The following claims are hereby incorporated into the detailed description, with each claim standing on its own as a separate embodiment.