The present disclosure relates to a load device and a control method.
With the increased deployment of power generators such as solar and wind power generators, voltage rise in electric lines in electric power systems has been a problem.
Patent Literature 1 discloses calculating a reactive power output from an inverter required to make a power factor of an AC system and a consumer greater than or equal to a predetermined power factor based on the state quantity for calculating the power factor at an association point between the AC system and the consumer and thus controlling the inverter, thereby maintaining the power factor at or above the predetermined value.
Patent Literature 2 discloses, for multiple inverters provided in multiple solar cells, reducing a power factor of a first inverter whose corresponding solar cell is in a reduced electricity output state and increasing a power factor of a second inverter whose corresponding solar cell is not in the reduced electricity output state, thereby preventing a decrease in power generated from the entire solar power generation system.
A load device according to the present disclosure includes: processing circuitry configured to acquire supply information relating to supply of power to electric lines by a power generator for generating power and supplying the power to the electric lines; and a compensating power supply configured to supply reactive power to the electric lines according to the supply information acquired by the processing circuitry
An exemplary embodiment (hereinafter referred to as the “present embodiment”) is described below with reference to the appended drawings.
In the example in
The electric power system 90 includes the power plant 91 and generates power and supplies it to consumers. In the example in
The side where the power plant 91 is located with respect to the distribution lines 930 may be referred to as the “supply side,” and the side different from the supply side may be referred to as the “reception side.”
The power plant 91 is a facility that generates power to be distributed in the electric power system 90. In this example, the power plant 91 generates more power than devices (described below) connected to the service lines 96. More specifically, the power plant 91 generates the most power among the facilities and devices connected to the transmission line 93, distribution lines 930, and service lines 96.
Examples of the power plant 91 include thermal plants, hydroelectric plants, wind plants, solar power plants, geothermal plants, nuclear plants, and pumped-storage plants.
The supply-side substation 92 converts the voltage from the power plant 91 and outputs the converted voltage. More specifically, the supply-side substation 92 includes one or more substations located on the supply side relative to the reception-side transformers 95, and converts the voltage applied by installed transformers and outputs the converted voltage. Examples of the transformers installed in the supply-side substation 92 include those that convert the voltage from the power plant 91 into a voltage of 275,000 to 500,000 V, that convert the voltage of 275,000 to 500,000 V into 154,000 V, that convert the voltage of 154,000 V into 66,000 V, and that convert the voltage of 66,000 V into 22,000 V.
The transmission line 93 is a line through which the current produced by the voltage applied from the supply-side substation 92 flows. The transmission line 93 is connected to the distributing substation 97. The distributing substation 97 converts, for example, the voltage of 22,000 V into 6,600 V. The distribution lines 930 are lines through which the current produced by the voltage applied from the distributing substation 97 flows. The current flows from the distributing substation 97 to the distribution lines 930. In the example in
Each voltage regulator (static var compressor (SVC) or STATCOM) 94 adjusts the voltage of the corresponding distribution line 930. More specifically, each voltage regulator 94 detects the voltage of the corresponding distribution line 930 and, if the detected voltage is not in a predetermined range, adjust the voltage to fall within the predetermined range.
In the example in
The distribution lines 930 are connected to the distribution substation 97 to allow the current from the distributing substation 97 to flow therethrough. In the example in
The distribution lines 930 are connected to multiple reception-side transformers 95, so that the current flows into each of the reception-side transformers 95. In the example in
The reception-side transformers 95 convert the voltage from the respective distribution lines 930 and output the converted voltage. More specifically, the reception-side transformers 95 include one or more transformers located on the reception side relative to the supply-side substation 92, and convert the applied voltage and output the converted voltage. Examples of the reception-side transformer 95 include a transformer that converts a voltage of 6600 V into 100 V or 200 V. The reception-side transformers 95 may be pole transformers, or may be power reception facilities that convert a voltage of 6600 V into 100 V or 200 V at the consumer side.
The service lines 96 are lines through which the current produced by the voltage applied from the respective reception-side transformer 95 flows. In the example in
As described above, in the electric power system 90, power from the power plant 91 is converted by the supply-side substation 92 and branched off into each of the reception-side transformers 95 via the transmission line 93, the distributing substation 97, and the corresponding one of the distribution lines 930. The branched-off power is then converted by each of the reception-side transformers 95 and supplied to a corresponding one of the device groups N to which it is connected via the corresponding one of the service lines 96. In this way, the electric power system 90 distributes the power from the power plant 91 to the device groups N.
The transmission line 93, the distribution lines 930, and the service lines 96 are all examples of the electric lines according to the present embodiment. Hereafter, they may be referred to collectively as the “electric lines.”
The transmission line 93, the distribution lines 930, and the service lines 96 are equipped with respective electric line sensors 6 (6a, 6b, 6c, 6d, 6e, 6f, 6g, 6h) to detect a parameter(s) related to apparent power of the respective electric lines. The apparent power-related parameters are those that affect the apparent power. Examples of the apparent power-related parameters include apparent power, real power, reactive power, current, voltage, power factor, as well as the amount of apparent power, the amount of real power, and the amount of reactive power in a predetermined period. The apparent power-related parameters are examples of the electric line information relating to the apparent power of the electric lines.
The electric line sensors 6 detect the apparent power-related parameter(s) at, for example, predetermined time intervals. The predetermined time interval is, for example but not limited to, 60 seconds. The electric line sensors 6 transmit the detected parameter(s) and electric line identification information for identifying the corresponding electric line to the control device 10 (described below).
The parameters detected by the electric line sensors 6 are not limited to one type of parameters. The electric line sensor 6 may detect more than one of the aforementioned types of parameters, and may transmit information including more than one types of parameters detected to the control device 10. The electric line sensors 6 may detect the same type of parameter, or the electric line sensors 6 may detect mutually different types of parameters.
A device group N is a group of devices that is connected to the electric power system 90 via a common one of the service line 96. In other words, one or more devices belonging to a device group N are coupled to the electric power system 90 via a common one of the service lines 96. The example in
The devices in each of the device groups N may be owned by one consumer or by multiple consumers. Multiple devices belonging to different ones of the device groups N may be owned by one consumer.
Here, the point at which each of the device groups N is connected to the corresponding one of the service lines 96, namely the point at which the devices belonging to each of the device groups N are coupled to the electric power system 90 is referred to as a point of common coupling P. When distinctions are necessary between the points of common coupling P for the respective device groups N, each point of common coupling is denoted as a point of common coupling P1, labeled with the same number i as the device group N1. For example, the solar power generators 3 and the air conditioners 4 belonging to the device group N1 are coupled to the electric power system 90 at the point of common coupling P1.
In the example in
The solar power generator 3 is a device that generates power by converting light energy, such as sunlight, into electrical energy. The solar power generator 3 according to the present embodiment generates less power than the power plant 91. The phrase “generating less power” means that the maximum power that the solar power generator 3 can generate per unit time is smaller than the maximum power that the power plant 91 can generate per unit time, and does not mean that the power generated by the solar power generator 3 is always smaller than the power generated by the power plant 91.
The solar power generator 3 can supply the generated power to the air conditioners 4 or electric storage devices 5 in the corresponding one of the device groups N via the device connection line 7. The solar power generator 3 can also supply the generated power to the electric lines via the device connection line 7. The solar power generator 3 according to the present embodiment is an example of a power generator that supplies generated power to the electric lines.
The solar power generator 3 according to the present embodiment transmits power generator information to the management server 20 (described below) at predetermined time intervals, where the power generator information includes device identification information for identifying itself, information indicating the condition of the power source, information indicating the power generated by the solar power generator 3, information indicating the real power supplied to the electric lines, information indicating the reactive power supplied to the electric lines, and supply capacity information indicating the magnitude of reactive power that can be supplied to the electric lines. The predetermined time interval is, for example but not limited to, 60 seconds.
The information indicating the condition of the power source, the information indicating the generated power, the information indicating the real power supplied to the electric lines, and the information indicating the reactive power supplied to the electric lines included in the power generator information are all examples of the supply information relating to the supply of power from the solar power generator 3 to the electric lines.
The air conditioner 4 is a device equipped with a heat pump unit (described below with reference to
The air conditioner 4 also supplies reactive power to the electric lines via the device connection line 7 in response to the command from the control device 10. The air conditioner 4 according to the present embodiment is an example of the load device including a compensating power supply unit capable of supplying reactive power to the electric lines.
The electric storage device 5 is a device that stores the power received via the device connection line 7 and supplies the stored power upon request from a user. The electric storage device 5 includes a secondary battery (storage battery) such as a lithium battery (not shown), and can supply power through charging and discharging of the secondary battery. Using the secondary battery as a compensating power supply unit and in response to the command from the control device 10, the electric storage device 5 supplies reactive power to the electric lines via the device connection line 7. The electric storage device 5 according to the present embodiment is an example of the load device including a compensating power supply unit.
The air conditioner 4 or the electric storage device 5 according to the present embodiment transmits load device information to the management server 20 (described below) at predetermine time intervals, where the load device information includes device identification information for identifying itself, information indicating the condition of the power source, information indicating the operating status, information indicating the reactive power being supplied to the electric lines, and information about the supply capacity. The predetermined time interval is, for example but not limited to, 60 seconds.
The load device information may at least include information that can be used to estimate or calculate the supply capacity of the air conditioner 4 or the electric storage device 5, and is thus not limited to the examples listed above.
A group G is a group of devices that belong to the same one of the device groups N and are equipped with a compensating power supply unit. When distinctions are necessary between multiple groups G, each group is denoted as a group Gi, labeled with the same number i as the device group Ni, like G1, G2, G4 in
While the example in
As shown in
The power control system 1 according to the present embodiment controls the supply of reactive power to the electric lines from the compensating power supply units of the air conditioners 4 or electric storage devices 5, according to the information acquired from the solar power generators 3, the air conditioners 4, and the electric line sensors 6.
The control device 10 is an information processing device that provides commands to the air conditioners 4 or electric storage devices 5 about the supply of reactive power to the electric lines to thereby control the supply of reactive power from each device to the electric lines. In the present embodiment, the control device 10 obtains the power generator information about the solar power generators 3 via the management server 20, and obtains the apparent power-related parameters and the electric line identification information from the electric line sensors 6. Based on the obtained information, the control device 10 determines whether it is necessary to supply reactive power to the electric lines, and upon determining that the reactive power supply is necessary, the controller 90 commands the devices connected to the electric power system 90 to supply reactive power.
The management server 20 is an information processing device that manages the power generator information received from the solar power generators 3 and the load device information received from the air conditioners 4 or electric storage devices 5, and transmits the information it manages in response to the request from the control device 10.
In addition, in response to the control device 10 commanding the air conditioners 4 or electric storage devices 5 to supply reactive power, the management server 20 according to the present embodiment manages the content of the command as a control history.
The control device 10 and the management server 20 are implemented by computers, for example. The control device 10 and the management server 20 may each be configured with a single computer, or may be implemented by distributed processing by multiple computers. Alternatively, the control device 10 and the management server 20 may be implemented on virtual hardware provided by cloud computing.
In the present embodiment, the control device 10 and the management server 20 are implemented as separated devices. However, the control device 10 and the management server 20 may be implemented as a single device.
In the present embodiment, the control device 10, the management server 20, the electric line sensors 6, the solar power generators 3, and the air conditioners 4 are connected via a network (not shown). The management server 20, the solar power generators 3, and the air conditioners 4 are also connected via a network. The network for connection between the devices may be any network that enables an exchange of information, such as wired communication, wireless communication, or power line communication (PLC). The devices may be connected via multiple networks, communication lines, relay devices, etc.
When the power generated by the solar power generators 3 is small, the voltage rise in the electric lines will be small even if substantially all of the generated power is supplied as real power to the electric lines and the power factor approaches 100%. When, conversely, the power generated by the solar power generators 3 is large, the voltage rise in the electric lines will be large if substantially all of the generated power is supplied as real power to the electric lines and the power factor approaches 100%. Thus, at least when the power generated by the solar power generators 3 is large, it is necessary to control the power factor of the electric lines to inhibit the voltage rise.
The power control system 1 according to the present embodiment controls the supply of reactive power from the solar power generators 3, air conditioners 4, and electric storage device 5 to the electric lines based on the power generator information from the solar power generators 3. The power control system 1 thus controls the power factor of the electric lines, using the reactive power supplied by each device.
In the present embodiment, the same figure is used to describe the control device 10 and the management server 20 as having the same hardware configuration. However, the control device 10 and the management server 20 may have different hardware configurations.
As shown in the figure, the control device 10 and the management server 20 include a central processing unit (CPU) 10a, a read-only memory (ROM) 10b, a random access memory (RAM) 10c, a storage unit 10d, and a communication unit 10e (communication interface). In addition, the control device 10 and the management server 20 may also include input units such as a keyboard and a mouse for entering information and a display unit such as a liquid crystal display. These functional components are connected to a bus 10f and exchange data via the bus 10f.
The ROM 10b and the storage unit 10d store programs to be executed by the CPU 10a. The CPU 10a reads the programs stored on the ROM 10b and the storage unit 10d and executes them using the RAM 10c as a working area.
In the present embodiment, various functions of the control device 10 and the management server 20 are implemented as the CPU 10a executes the programs stored on the ROM 10b and the storage unit 10d.
The solar power generator 3 according to the present embodiment is configured with an information processing device 30 and a power generator 31.
As shown in the figure, the information processing device 30 includes a CPU 30a, a ROM 30b, a RAM 30c, a storage unit 30d, and a communication unit 30e (communication interface). These functional components are connected to a bus 30f. The hardware configuration of the information processing device 30 is similar to that of the control device 10 and the management server 20 (see
The power generator 31 includes a power conversion unit 31a, a power generation unit 31b, and a power supply path 31c connected to the device connection line 7 (see
The power generation unit 31b is a functional component including a so-called solar panel and a junction box. The power generation unit 31b converts the received light energy into DC electric power and stores it. The power conversion unit 31a is a so-called power conditioner, which converts the DC power stored by the power generation unit 31b into AC power and supplies it to the power supply path 31c. The power supplied to the power supply path 31c is supplied to the air conditioners 4 or electric storage devices 5 in the corresponding one of the device groups N via the corresponding device connection line 7. The power supplied to the power supply path 31c is also supplied to the electric lines via the corresponding device connection line 7.
In response to a control signal (described below with reference to
The air conditioner 4 according to the present embodiment is configured with an information processing device 40 and a heat pump device 41.
As shown in the figure, the information processing device 40 includes a CPU 40a, a ROM 40b, a RAM 40c, a storage unit 40d, and a communication unit 40e (communication interface). These functional components are connected to a bus 40f. The hardware configuration of the information processing device 40 is similar to that of the control device 10 and the management server 20 (see
The heat pump device 41 includes an active filter (AF) 41a, which is an example of the compensating power supply unit, a power conversion unit 41b, which is an example of the conversion unit, an adjustment unit 41c, which is an example of the heat pump unit, and a power receiving path 41d connected to the corresponding device connection line 7 (see
The adjustment unit 41c adjusts the temperature or humidity of the environmental air. The adjustment unit 41c includes a compressor (not shown) with an integrated motor operative by the received power and includes a heat exchanger (not shown). The motor integrated in the compressor transmits rotational motion to the compression section, which compresses the refrigerant. The refrigerant compressed to raise its pressure and temperature and thus liquefied is sent to the heat exchanger, which radiates heat to the outside air. This adjusts the temperature or humidity of the environmental air.
The power conversion unit 41b includes an inverter (not shown) and a converter (not shown). The power conversion unit 41b uses the inverter and the converter to convert the power received via the power receiving path 41d into power of a specific voltage and frequency. The specific voltage and frequency are the voltage and frequency required to operate the motor integrated in the compressor of the adjustment unit 41c. The power conversion unit 41B supplies the converted power to the adjustment unit 41C to operate the adjustment unit 41C.
The AF 41a is connected to the power receiving path 41d in electrically parallel with the power conversion unit 41b, and supplies power to the power receiving path 41d to adjust the apparent power of the power receiving path 41d. Thus, the AF 41a can adjust the apparent power of its own device. The AF 41a also supplies reactive power to the electric lines in response to a control signal (described below with reference to
The AF 41a also includes a circuit (not shown) configured with a capacitor as a voltage source. This capacitor and circuit have capacitance and are capable of supplying reactive power through charging and discharging.
In the present embodiment, the CPU 40a of the information processing device 40 is described as being used to execute various arithmetic processes in the air conditioner 4. However, in other embodiments, the AF 41a of the heat pump device 41 may include a CPU as a functional component, and various arithmetic processes may be executed by this CPU.
The programs to be executed by the CPUs 10a, 30a, 40a (see
For the sake of illustration,
The control device 10 includes a communication processing unit 101, a required amount calculation unit 102, a responsible device determination unit 103, a contribution determination unit 104, a command creation unit 105, and a billing determination unit 106.
The communication processing unit 101 exchanges information with other devices via the communication unit 10e (see
In addition, the communication processing unit 101 transmits the command information created by the command creation unit 105 to each destination device. The communication processing unit 101 also transmits, to the management server 20, the command information created by the command creation unit 105 and the information obtained from the corresponding electric line sensor 6 for creation of the command.
The required amount calculation unit 102 determines whether it is necessary to supply reactive power to an electric line and, if so, calculates the magnitude of reactive power that needs to be supplied (which may be referred to as the “required amount”). More specifically, the required amount calculation unit 102 manages information obtained from the electric line sensors 6, and determines whether it is necessary to supply reactive power to any of the relevant electric lines based on the information it manages and the power generator information about the solar power generators 3 obtained from the management server 20. Upon determining that the supply of reactive power is necessary, the required amount calculation unit 102 calculates the required amount based on the information it manages and the power generator information.
Referring now to
The required amount calculation unit 102 according to the present embodiment establishes links between pre-registered information relating to the electric lines and the information obtained from the electric line sensors 6 for each electric line using the electric line identification information, and manages them in the electric line management table T1. In
The following information is pre-registered with the required amount calculation unit 102 according to the present embodiment as the information relating to the electric lines: the electric line identification information, electric line location information, target power factor values of the electric lines, upper limits of the real power supplied to the electric lines, upper limits of the reactive power supplied to the electric lines, and upper limits of the current supplied to the electric lines.
The information relating to the electric lines to be registered may be, for example, directly entered into the control device 10. In one alternative example, the information to be registered may be obtained from communication with a computer system or the like used by the administrator of the electric power system 90.
The electric line location information indicates the location of each relevant electric line in the electric power system 90. In the present embodiment, as shown in
The target power factor value is a target value for power factor control that is predetermined for each electric line by the administrator of the electric power system 90 (power supplier). The target power factor value is an example of the power factor predetermined for the electric lines.
In the example in
The real power upper limit is an upper limit of the real power to be supplied, which is predetermined for each electric line by, for example, the administrator of the electric power system 90 (power supplier). The real power upper limit is, for example, determined from the correspondence between the real power supply to the relevant electric line and the voltage rise. More specifically, the real power upper limit is defined as a value the exceeding of which by the supplied real power causes a problem due to voltage rise or causes unacceptable effects from the voltage rise.
In the example in
Similarly to the real power upper limit, the reactive power upper limit and the current upper limit are upper limits of the reactive power and current to be supplied, which are predetermined for each electric line by the administrator or others.
From the relationship between the power factor, real power and reactive power, the reactive power upper limit can be determined according to the target power factor value and the real power upper limit for the electric line. Thus, the reactive power upper limit may be calculated by the control device 10 based on the pre-registered real power upper limit and power factor target value. Conversely, the control device 10 may calculate the real power upper limit based on the pre-registered reactive power upper limit and power factor target value.
Also, the apparent power upper limit can be determined from the relationship between the apparent power, real power, and reactive power. Then, the upper limit of the current can be determined by dividing this apparent power upper limit by the voltage of the electric line. Thus, the upper limit of the current may be calculated by the control device 10 based on the real power upper limit, the reactive power upper limit, and the voltage of the electric line.
In the example in
In this manner, the required amount calculation unit 102 according to the present embodiment uses the electric line management table T1 to manage the pre-registered information relating to the electric lines and the information obtained from the electric line sensors 6, on an electric line-by-electric line basis.
The required amount calculation by the required amount calculation unit 102 is now described.
While details are presented below with reference to
The responsible device determination unit 103 determines a device(s) responsible for supplying reactive power to an electric line. More specifically, the responsible device determination unit 103 identifies the reactive power supply capacity of each device connected to the electric power system 90 based on the load device information and the power generator information. Then, based on the identified supply capacity, the responsible device determination unit 103 identifies which of the devices should be responsible for supplying reactive power to secure the required amount calculated by the required amount calculation unit 102, thereby determining the devices responsible for supplying reactive power. Hereinafter, the device determined to be responsible for supplying reactive power may be referred to as a “responsible device.”
While details are presented below with reference to
The contribution determination unit 104 determines contributions from the responsible devices to the supply of reactive power. More specifically, the contribution determination unit 104 determines the magnitude of reactive power to be supplied from each responsible device determined by the responsible device determination unit 103.
Details of the contribution determination made by the contribution determination unit 104 will be provided below.
The command creation unit 105 creates command information commanding the supply of reactive power to the electric line. More specifically, the command creation unit 105 creates command information for each responsible device determined by the responsible device determination unit 103, commanding it to supply reactive power of the magnitude determined by the contribution determination unit 104, and causes the communication processing unit 101 to transmit the information to each responsible device.
The billing determination unit 106 determines the billing for the supply of reactive power from each device to the electric line. For example, the billing determination unit 106 determines the billing destination for the supply of reactive power based on e.g., location of the electric line to which the reactive power was supplied and information about the consumer who own the devices connected to the electric line. In response to the command from the control device 10, for example, the billing determination unit 106 also determines the billing amount charged to each billing destination based on e.g., the magnitude of reactive power supplied from each device to the electric line and the number of times the reactive power was supplied.
If the processing associated with billing is unnecessary, the billing determination unit 106 may be eliminated.
The management server 20 includes a communication processing unit 201, a device information management unit 202, a history management unit 203, and a billing determination unit 204.
The communication processing unit 201 exchanges information with other devices via the communication unit 10e (see
In addition, in response to the request from the administrator of the electric power system 90 or others, the communication processing unit 101 may also transmit history information (described below) managed by the history management unit 203 to a terminal of the administrator or other terminals.
The device information management unit 202 manages the power generator information received from the solar power generators 3 and the load device information received from the air conditioners 4 or electric storage devices 5, as information about the devices connected to the electric power system 90 (which may be referred to hereinafter as “device information”). More specifically, the device information management unit 202 manages the power generator information and load device information on a device-by-device basis, retrieves the information in response to the request from the control device 10, and has it transmitted by the communication processing unit 201.
Referring to
Information relating to the devices connected to the electric power system 90 is pre-registered, on a device-by-device basis, with the device information management unit 202 according to the present embodiment. The device information management unit 202 establishes links between the pre-registered information and the received power generator information and load device information using the device identification information, and manages them in the device management table T2. In
As the information relating to the devices connected to the electric power system 90, the device identification information, device location information, information about the group G to which the respective devices belong, and consumer identification information are pre-registered with the device information management unit 202 according to the present embodiment.
The device location information is information indicating the location of each device in the electric power system 90. In the present embodiment, as shown in
The consumer identification information is information for identifying each consumer who owns the device(s). In the example in
Information retrieved from the power generator information or load device information for each device is managed in the fourth through ninth columns of the device management table T2.
The fourth column “Power source” of the device management table T2 corresponds to information indicating the condition of the power source for each device. Powered-on devices are managed as being “ON,” and powered-off devices are managed as being “OFF.” When the power generator information or load device information cannot be obtained from the relevant device, or when the information indicating the condition of the power source obtained indicates that the relevant device is out of order, such a device is managed as having “Error,” which indicates that the device is in a fault condition. When a device is pre-registered as being in a fault condition, that device is also managed as having “Error.”
The fifth column “Operating status [KW]” of the device management table T2 corresponds to information indicating the operating status, which is included in the load device information. In the example in
The sixth column “Power generation status [KW]” of the device management table T2 corresponds to information indicating the power generated by each solar power generator 3, which is included in the power generator information. The seventh column “Real power supply [KW]” of the device management table T2 corresponds to information indicating the real power generated and supplied by each solar power generator 3 to the electric line, which is included in the power generator information.
The eighth column “Reactive power supply [kvar]” of the device management table T2 corresponds to information indicating the reactive power supplied by each device to the electric line, which is included in the power generator information or load device information. In the example in
The ninth column “Supply capacity [kVA]” of the device management table T2 corresponds to supply capacity information about each device, which is included in the power generator information or load device information. While in the present embodiment, the supply capacity information is described as being obtained from each device, it may be calculated or estimated by the control device 10 or management server 20 based on information such as the operating status of each device and the capacity of each device.
In this manner, the device information management unit 202 according to the present embodiment uses the device management table T2 to manage the pre-registered information relating to the devices and the information obtained from the devices, on a device-by-device basis.
The history management unit 203 manages the command information received from the control device 10 as a control history relating to the reactive power supply. More specifically, the history management unit 203 receives, from the control device 10, the command information and the information that the control device 10 obtained from the relevant electric line sensor 6 before and after the issuance of the command, and manages them as a control history.
The control device 10 may have a similar history management unit to manage the control history. When the history management is unnecessary, the history management unit 203 may be eliminated.
The billing determination unit 204 determines the billing to each consumer in the electric power system 90. For example, the billing determination unit 204 determines, for each device connected to the electric power system 90 and registered with the management server 20, the billing amount to be charged to each consumer who owns the device(s), based on the status of power reception and other factors.
If the processing associated with billing is unnecessary, the billing determination unit 204 may be eliminated.
The solar power generator 3 includes a communication processing unit 301, a signal generation unit 302, and an information management unit 303, which are functional blocks implemented by the information processing device 30.
The communication processing unit 301 exchanges information with other devices via the communication unit 30e (see
The signal generation unit 302 generates a control signal for the power generator 31 based on the command information received from the control device 10. More specifically, the signal generation unit 302 generates a control signal to control the power generator 31 to supply reactive power of the magnitude specified by the command information to the power supply path 31c, and transmits the signal to the power generator 31.
The information management unit 303 manages information relating to its own device. More specifically, the information management unit 303 manages the device identification information, information indicating the condition of the power source, information indicating the power generated by its own device, information indicating the real power to be supplied to the electric lines, information indicating the reactive power being supplied to the electric lines, and information about the supply capacity. The information management unit 303 transmits these information items to the management server 20 as the power generator information at predetermined time intervals.
Of the information items managed by the information management unit 303, those that change over time, such as information indicating the condition of the power source, information indicating the power generated by its own device, information indicating the real power to be supplied to the electric lines, information indicating the reactive power being supplied to the electric lines, and information about the supply capacity, are updated at predetermined update time intervals. The predetermined update time interval is preferably shorter than the predetermined time interval for transmitting the power generator information to the management server 20, and is 10 seconds, for example.
The air conditioner 4 includes a communication processing unit 401, a signal generation unit 402, and an information management unit 403, which are functional blocks implemented by the information processing device 40.
The communication processing unit 401 exchanges information with other devices via the communication unit 40e (see
The signal generation unit 402 generates a control signal for the heat pump device 41 based on the command information received from the control device 10. More specifically, the signal generation unit 402 generates a control signal to control the heat pump device 41 to supply reactive power of the magnitude specified by the command information to the power receiving path 41d from the AF 41a, and transmits the signal to the heat pump device 41.
The information management unit 403 manages information relating to its own device. More specifically, the information management unit 403 manages the device identification information, information indicating the condition of the power source, information indicating the operating status, information indicating the reactive power being supplied to the electric lines, and information about the supply capacity. The information management unit 403 transmits these information items to the management server 20 as the load device information at predetermined time intervals.
Of the information items managed by the information management unit 403, those that change over time, such as information indicating the condition of the power source, information indicating the operating status, information indicating the reactive power being supplied to the electric lines, and information about the supply capacity, are updated at predetermined update time intervals. The predetermined update time interval is preferably shorter than the predetermined time interval for transmitting the device information to the management server 20, and is 10 seconds, for example.
While
Referring now to
The following description primarily describes operations relating to the control of reactive power supply to an electric line. Since the operations of the electric storage device 5 (see
The air conditioner 4 transmits the load device information to the management server 20 at predetermined time intervals (S801). The solar power generator 3 transmits the power generator information to the management server 20 at predetermined time intervals (S802).
The management server 20 manages the received load device information and power generator information as the device information (S803). More specifically, the management server 20 updates and manages the device management table T2.
The control device 10 obtains electric line information from each electric line sensor 6 at predetermined time intervals (S804). After obtaining the electric line information, the control device 10 requests the device information from the management server 20 (S805).
In response to the request from the control device 10, the management server 20 transmits the latest device information (S806). More specifically, the management server 20 transmits the information it manages in the device management table T2 as the device information.
The control device 10 calculates the required amount of reactive power (S807). More specifically, the control device 10 determines whether it is necessary to control the power factor of any electric line based on the power generator information. Upon determining that control of the power factor of any electric line is necessary, the control device 10 determines whether the required amount is zero or not based on the power generator information and the electric line information. Upon determining that the required amount is not zero, the control device 10 calculates the required amount based on the power generator information and the electric line information.
If the control device 10 determines that no power factor control is necessary for the electric lines or determines that control of the power factor is necessary but the required amount is zero, the operations related to the control of reactive power supply to electric lines are terminated, and the sequence returns to S801.
The operations of S801 through S806 are not limited to the illustrated order; the control device 10 may obtain the power generator information and electric line information at least by the time it calculates the required amount at S807.
Upon calculating the required amount, the control device 10 determines responsible devices for supplying reactive power (S808) and the contributions from the respective responsible devices (S809). More specifically, the control device 10 according to the present embodiment determines the responsible devices and their contributions based on the electric line information, power generator information, and load device information.
Upon determining the responsible devices, the control device 10 transmits command information to the responsible devices to command them to supply reactive power (S810).
In response to receiving the command, the solar power generator 3 and the air conditioner 4 supply reactive power according to the command (S811, S812). More specifically, they supply reactive power of the magnitude specified by the command information to the electric line.
The control device 10 again obtains the electric line information from each electric line sensor 6 (S813). Then, the control device 10 transmits the command information transmitted at S810 and the electric line information obtained at S804 and S813 to the management server 20 (S814). In other words, the control device 10 transmits the content of the reactive power supply control it executed and the electric line information before and after the execution of the control to the management server 20.
The management server 20 manages the received command information and electric line information as a control history (S815).
Through the operations described above, the control device 10 calculates the required amount, determines the responsible devices and their contributions, and gives the command to the responsible devices, thereby controlling the reactive power supply from the responsible devices to the electric line. In response to the command from the control device 10, the responsible devices supply reactive power to the electric line, whereby the power factor of the electric line is controlled.
Referring to
As mentioned earlier, the required amount calculation unit 102 (see
The required amount calculation unit 102 determines whether the power factor control is necessary based on the device information received from the management server 20 (S901). More specifically, the required amount calculation unit 102 determines whether there exists a solar power generator 3 whose real power supplied to the electric lines exceeds a predetermined threshold (hereinafter referred to as a “target solar power generator 3”). If there are no target solar power generators 3 and the required amount calculation unit 102 determines that no power factor control is necessary for the electric lines, the operation for calculating the required amount is ended. If there exists a target solar power generator 3 and the required amount calculation unit 102 determines that the power factor of any electric line needs to be controlled (YES in S901), the operation moves to S902.
Let us assume that the predetermined threshold is 1000 kW. Referring to the device management table T2, the value of real power supply from the solar power generator 3-1-b is 1600 KW, exceeding the predetermined threshold of 1000 kW. Thus, the determination in S901 is YES.
Upon determining that the power factor of any electric line needs to be controlled, the required amount calculation unit 102 identifies a target electric line (S902). In the present embodiment, based on the electric line location information and the location information about the target solar power generator 3, the electric lines located on the supply side relative to the solar power generator 3 are chosen as candidates for the target electric line. Then, the required amount calculation unit 102 retrieves the real power upper limits from the electric line management table T1, and determines where the real power supplied to the candidate electric lines exceeds their respective upper limits. Any electric line that exceeds the upper limit is identified as the target electric line.
From the device management table T2, the solar power generator 3-1-b belongs to the device group N1. From the electric line management table T1, the electric lines located on the supply side relative to the device group N1 are the transmission line 93, the distribution line 930b, and the service line 96d. Thus, in this example, the transmission line 93, the distribution line 930b, and the service line 96d are candidates for the target electric line. Referring to
Once the target electric line is identified, the required amount calculation unit 102 determines whether the required amount is zero or not (S903). More specifically, the required amount calculation unit 102 retrieves the apparent power-related parameters and the target power factor value of the target electric line from the electric line management table T1, and determines whether the power factor would exceed the target value if the real power generated by the solar power generators 3 is supplied to the target electric line.
In this manner, the required amount calculation unit 102 according to the present embodiment calculates the required amount based on the apparent power-related parameters of the target electric line and information about the real power generated and supplied by the solar power generators 3 to the electric line, and controls the supply of reactive power from each device to the electric line. This improves the accuracy of power factor control, compared to controlling the supply of reactive power from each device regardless of the apparent power-related parameters.
If the power factor of the target electric line does not exceed the target value, the required amount calculation unit 102 determines that the required amount is zero (YES in S903), and the operation for determining the required amount is ended. Conversely, if the power factor of the target electric line exceeds the target value, the required amount calculation unit 102 determines that the required amount is not zero (NO in S903), and the operation moves to S904.
In the example in
Upon determining that the required amount is not zero, the required amount calculation unit 102 calculates the required amount (S904). More specifically, for each of the electric lines identified in S902, the required amount calculation unit 102 calculates the required amount based on Equation (1) using the electric line information and the device information.
The service line 96d is supplied with a total real power of 2100 kW from the solar power generators 3-1-a, 3-1-b, as shown in the device management table T2. As shown in the electric line management table T1, the target power factor value of the service line 96d is 90% (0.9). Populating Equation (1) with the real power P=2100 KW and the target power factor value F=0.9 yields the reactive power Q=1017 kvar (rounded down to the nearest integer). Thus, the required amount of reactive power is calculated to be 1017 kvar.
This completes the calculation of the required amount.
In this manner, the required amount calculation unit 102 according to the present embodiment calculates the required amount based on information about the real power generated and supplied by the solar power generators 3 to the electric line, and controls the supply of reactive power from each device to the electric line. Instead of information about the real power generated and supplied by the solar power generators 3 to the electric line, the supply of reactive power may be controlled based on information about the real power generated by the solar power generators 3. Alternatively, the real power generated by the solar power generators 3 may be estimated using information such as the weather conditions at the installation location of each solar power generators 3, the area of the light receiving portion of each solar power generator 3, and the intensity of sunlight measured by a radiometer, and the supply of reactive power may be controlled based on information about the estimation results. All of these information items are examples of the supply information.
Referring to
In
The responsible device determination unit 103 (see
Here, the target solar power generator 3-1-b belongs to the device group N1. Referring to the device management table T2, the supply capacities of the air conditioners 4-1-a, 4-1-b, 4-1-c, which belong to the same device group N1, are 50, 80, and 60 kVA, respectively. Thus, the supply capacity of the load devices belonging to the device group N1 is calculated to be 190 kVA.
Upon calculating the supply capacity of the load devices belonging to the same one of the device groups N, the responsible device determination unit 103 determines whether the calculated supply capacity is greater than or equal to the required amount (S1002). If the supply capacity is greater than or equal to the required amount (YES in S1002), the process moves to S1010 to determine the added load devices as the responsible devices. If the supply capacity is not greater than or equal to the required amount (supply capacity is smaller than the required amount) (NO in S1002), the process moves to S1003.
Here, the supply capacity of the load devices belonging to the device group N1 is 190 kVA, which is smaller than the required amount of 1017 kvar. Thus, in this example, the determination in S1002 is NO, and the process moves to S1003.
The responsible device determination unit 103 adds the supply capacity of load devices belonging to a closest one of the device groups N other than the one the target solar power generator 3 belongs to (S1003). The closest device group is identified based on, for example, the device location information.
In this example, the supply capacity of the load devices in the device group N2, which is closest to the device group N1 is added. Specifically, the supply capacities of 80 kVA and 0 kVA of the air conditioners 4-2-a, 4-2-b, respectively, belonging to the device group N2 are added to the supply capacity of 190 kVA of the load devices belonging to the device group N1, so that the supply capacity is calculated to be 270 kVA.
Upon adding the supply capacity of the closest one of the device groups N, the responsible device determination unit 103 again determines whether the supply capacity is greater than or equal to the required amount (S1004). If the supply capacity is greater than or equal to the required amount (YES in S1004), the process moves to S1010 to determine the added load devices to be the responsible devices. Then, the contribution determination unit 104 determines the contribution from each responsible device (S1011), and the responsible devices are commanded to supply reactive power accordingly (S1012). This completes the operation for determining the responsible devices. If the supply capacity is not greater than or equal to the required amount (supply capacity is smaller than the required amount) (NO in S1004), the process moves to S1005.
Here, the supply capacity is 270 kVA, which is smaller than the required amount of 1017 kvar. Thus, in this example, the determination in S1004 is NO, and the process moves to S1005.
The responsible device determination unit 103 adds the supply capacity of load devices belonging to a next closest one of the device groups N (S1005). The next closest device group is identified based on, for example, the device location information.
In this example, the device group N3, which is the next closest device group to the device group N1 after the device group N2, has no load devices. Thus, 0 kVA is added, so that the supply capacity is still calculated to be 270 kVA.
Upon calculating the supply capacity, the responsible device determination unit 103 again determines whether the supply capacity is greater than or equal to the required amount (S1006). If the supply capacity is greater than or equal to the required amount (YES in S1006), the process moves to S1010 to determine the added load devices to be the responsible devices. If the supply capacity is not greater than or equal to the required amount (supply capacity is smaller than the required amount) (NO in S1006), the responsible device determination unit 103 determines whether the immediately previously added one of the device groups N is the last one of the device groups N in the electric power system 90 (S1007). In other words, the responsible device determination unit 103 determines whether all device groups N connected to the electric power system 90 have been added. If the immediately previously added device group is the last one of the device groups N (YES in S1007), the process moves to S1008. If the immediately previously added device group is not the last one of the device groups N (NO in S1007), the process returns to S1005 and repeats S1005 through S1007 until the last one of the device groups N is added (until the determination in S1007 turns out to be YES).
Here, the supply capacity at the time when the load devices of the device group N3 have been added is 270 kVA, which is smaller than the required amount of 1017 kvar. Thus, in this example, the determination in S1006 is NO, and the process moves to S1007. Since the device group N3 is not the last one of the device groups N, the process returns to S1005, where the supply capacities of 50, 50, 0 KW of the air conditioners 4-4-a, 4-4-b, 4-4-c, respectively, in the next closest device group N4 are added, resulting in the supply capacity being calculated to be 370 kVA (<1017 kvar). Similarly, the supply capacity of 170 kVA of the electric storage device 5-5-a in the device group N5 is added, resulting in the supply capacity being calculated to be 540 kVA. Thus, the supply capacity is determined to be smaller than the required amount of 1017 kvar, and also the device group N5 is determined to be the last one of the device groups N (NO in S1006 and YES in S1007).
Upon determining that the immediately previously added device group is the last one of the device groups N, the responsible device determination unit 103 adds the supply capacities of the solar power generators 3 (S1008). The responsible device determination unit 103 then determines whether the calculated supply capacity is greater than or equal to the required amount (S1009). Although not illustrated in
In this example, adding the supply capacities of 200, 100, 150, and 200 kVA of the solar power generators 3-1-a, 3-1-b, 3-2-a, and 3-2-b, respectively, belonging to the device groups N1, N2 yields the supply capacity of 1190 kVA, which is greater than or equal to the required amount of 1017 kvar. Thus, in S1010, all load devices belonging to the device groups N1 to N5 and the solar power generators 3 belonging to the device groups N1, N2 are determined as the responsible devices.
If the supply capacity does not become greater than or equal to the required amount even after adding the solar power generators 3 belonging to the last one of the devices group N (NO in S1009), the responsible device determination unit 103 determines all solar power generators 3 and all load devices as the responsible devices (S1013). Then, the contribution determination unit 104 commands all responsible devices to supply reactive power in the maximum possible amount (S1014). This can make the power factor of the electric line closer to the target value, even if the supply capacity falls short of the required amount of reactive power.
In the above example, the air conditioners 4-1-a, 4-1-b, 4-1-c, which belong to the same device group N1 as the target solar power generator 3-1-b, are determined as the responsible devices. In other words, the power control system 1 controls the air conditioners 4-1-a, 4-1-b, 4-1-c, which are connected to the electric power system 90 at the same point as the point of common coupling P1 at which the solar power generator 3-1-b is connected to the electric power system 90, to supply reactive power to the electric line. This improves the accuracy of power factor control, compared to causing the air conditioners 4 or electric storage devices 5 that are connected at different points from the point of common coupling P1 to supply reactive power.
In the above example, the air conditioners 4-2-a, 4-2-b belonging to the device group N2, which is different from the device group to which the target solar power generator 3-1-b belongs, are determined as the responsible devices. In other words, the power control system 1 controls the air conditioners 4-2-a, 4-2-b, which are connected to the electric power system 90 at a different point from the point of common coupling P1 at which the solar power generator 3-1-b is connected to the electric power system 90, to supply reactive power to the electric line. This improves the flexibility in power factor control, compared to controlling only the air conditioners 4 or electric storage devices 5 that are connected at the same point as the point of common coupling P1. The air conditioners 4-2-a, 4-2-b are connected via the reception-side transformer 95e to the distribution line 930b, which is connected via the point of common coupling P1 to the solar power generator 3-1-b. This improves the accuracy of power factor control, compared to controlling the air conditioners 4 or electric storage devices 5 that are connected to a different distribution line, e.g., the distribution line 930c.
Preferably, the air conditioners 4 may be prioritized over the electric storage devices 5. The electric storage device 5 repeats charging and discharging every time it supplies reactive power to electric lines, which leads to an increase in the number of charge-discharge cycles. Here, the life of the secondary battery (storage battery) of the electric storage device 5 is determined by the number of charge-discharge cycles. Thus, as the number of times the electric storage device 5 supplies reactive power to electric lines increases and consequently the number of charge-discharge cycles of the secondary battery (storage battery) increases, the life of the electric storage device 5 shortens. In contrast, load devices that supply reactive power to electric lines by means different from rechargeable batteries (storage batteries), e.g., those that supply reactive power by the capacitance of capacitors and circuits, such as the air conditioners 4, are less susceptible to impact on their life from the number of charge-discharge cycles than load devices that supply reactive power by rechargeable batteries (storage batteries). In other words, even if the number of times the air conditioner 4 supplies reactive power to electric lines increases, there is less impact on the life of the air conditioner 4. Hence, in the present embodiment, it is preferable that the air conditioners 4 are prioritized over the electric storage devices 5.
In the above example, the supply capacities of the solar power generators 3 are added only when the required amount cannot be secured even by adding the supply capacities of all air conditioners 4 and electric storage devices 5. In other words, the air conditioners 4 or electric storage devices 5 are prioritized over the solar power generators 3 in determining the responsible devices. As mentioned earlier, the supply of real power to the electric lines by the solar power generator 3 according to the present embodiment is limited when it supplies reactive power to the electric lines. As in the example above, by setting the priorities based on the device type and prioritizing the air conditioners 4 or electric storage devices 5 over the solar power generators 3, the supply of real power by the solar power generator 3 is less likely to be limited compared to the absence of such priority setting.
To further illustrate, the power control system 1 according to the present embodiment controls the supply of reactive power by the solar power generators 3 to the electric lines in response to the fact that the required amount cannot be secured even by adding the supply capacities of all air conditioners 4 and electric storage devices 5. This improves the flexibility in power factor control, compared to controlling only the load devices. The fact that the required amount cannot be secured even by adding the supply capacities of all air conditioners 4 and electric storage devices 5 is an example of the predetermined conditions for the load device.
In the above example, it is not essential to set the priorities based on the device type. For example, the responsible devices may be determined based only on the points at which the respective devices are connected with respect to the point of common coupling P1 at which the target solar power generator 3-1-b is connected to the electric power system 90.
Alternatively, priorities may be set based on the consumer identification information associated with each device. More specifically, a higher priority may be given to the solar power generators 3, air conditioners 4, or electric storage devices 5 owned by the same consumer as the target solar power generator 3. For example, referring to the device management table T2, the target solar power generator 3-1-b in the above example is owned by the consumer identified by the consumer identification information C1. In this case, a higher priority may be given to the devices associated with the consumer identification information C1 (belonging to the device groups N1, N4) than to other devices (belonging to the other device groups N2, N3, N5) in determining the responsible devices.
Still alternatively, priorities may be set based on the supply capacity of each device. For example, a higher priority may be given to devices with larger supply capacity, and conversely, a lower priority may be given to devices with smaller supply capacity. By setting the priorities based on the supply capacity in this manner for determination of the responsible devices, the power factor of the electric line can be adjusted with a smaller number of devices, compared to determining the responsible devices regardless of the supply capacity.
Instead of the supply capacity, priorities may be set based on the operating status or power generation status of each device. For example, a higher priority may be given to devices with a higher operating status or power generation status value than to those with a lower operating status or power generation status value in determining the responsible devices.
Referring now to
As mentioned earlier, for securing the required amount calculated by the required amount calculation unit 102, the contribution determination unit 104 determines the magnitude of reactive power commanded to be supplied (which may be referred to hereinafter as a “commanded value”) for each responsible device.
The contribution determination unit 104 may, for example, determine the contributions based on the position of each responsible device with respect to the target electric line. More specifically, the contribution determination unit 104 may determine the contributions such that the responsible devices located closer to the target electric line are given greater commanded values than those located farther away from the target electric line. Alternatively, using the upper limits determined by the respective supply capacities as the commanded values, the contributions may be determined sequentially starting with the responsible device closest to the target electric line, and only the responsible device farthest from the target electric line may be given a commanded value lower than its upper limit. The term “position” as used herein refers to a position in the electrical connection, and a close/far position refers to a short/long distance of the electrical connection.
For example, the air conditioners 4-1-a, 4-1-b, 4-1-c, which are located closer to the target electric line, the service line 96d, are given larger commanded values. Conversely, the solar power generator 3-5-a and the electric storage devices 5-5-a, which are located farther away from the target electric line, are given smaller commanded values. In this example, the relationship between the commanded value for the air conditioner 4-1-a and the commanded value for the solar power generator 3-5-a is determined based on their positions. More specifically, due to the fact that the position of the air conditioner 4-1-a is closer to the target electric line than the position of the solar power generator 3-5-a is (this is an example of the predetermined conditions for the position of the load device), the air conditioner 4-1-a is given a higher commanded value, and due to the fact that the position of the solar power generator 3-5-a is farther away from the target electric line than the position of the air conditioner 4-1-a is (this is an example of the predetermined conditions for the position of the power generator), the solar power generator 3-5-a is given a smaller commanded value. Controlling the supply of reactive power based on the conditions relating to the positions of load devices and the conditions relating to the positions of power generators in this manner improves the accuracy of power factor control, compared to performing control regardless of the position of each device.
For example, the contribution determination unit 104 may determine the contributions using the aforementioned priorities based on the device type, priorities based on the consumer identification information, priorities based on the supply capacity, and priorities based on the operating status or power generation status. More specifically, the contribution determination unit 104 may determine the contributions such that the responsible devices with higher priorities are given greater commanded values than those with lower priorities. Alternatively, using the upper limits determined by the respective supply capacities as the commanded values, the contributions may be determined sequentially starting with the responsible device with a higher priority, and only the responsible device with the lowest priority may be given a commanded value lower than its upper limit.
The above embodiment is also understood as a control method for controlling the supply of reactive power from the air conditioners 4 to the electric lines. More specifically, the present embodiment can be viewed as a control method including steps of: acquiring supply information relating to the supply of power to the electric lines by the solar power generators 3; and controlling the supply of reactive power to the electric lines by the air conditioners 4 or electric storage devices 5 according to the supply information.
In the above embodiment, the power control system 1 has been described as having one control device 10 and one management server 20. However, the number of control devices and management servers 20 is not limited. The power control system 1 may have more than one control devices 10 and more than one management servers 20. For example, a control device 10 and a management server 20 may be provided for each of the device groups N. When the power control system 1 includes multiple control devices 10 and multiple management servers 20, these devices are connected by a network and configured as a system capable of exchanging information between the devices.
In the above embodiment, the air conditioner 4 has been described as an example of the load device including a compensating power supply unit, a conversion unit, and a heat pump unit. Other example load devices including a conversion unit and a heat pump unit include those used in heating, ventilation, and air conditioning (HVAC) systems, such as showcases that condition internal temperatures, coolers, refrigerating machines, and water heaters. Such load devices including a heat pump unit are provided with an AF 41a, which can be used as a compensating power supply unit, and a power conversion unit 41b, which can be used as a conversion unit, or similar functional components, and does not require new installation of a compensating power supply unit and a conversion unit. Thus, these load devices have reduced complexity compared to those that do not include a heat pump unit.
However, load devices are not limited to those including a heat pump unit, and may be various devices that are used in connection to the electric power system 90, such as lighting devices and display devices, for example.
As mentioned earlier, for load devices that use a secondary battery (storage battery) as a compensating power supply unit, such as the electric storage device 5, an increase in the number of times reactive power is supplied to the electric lines shortens their life. Hence, the compensating power supply unit of the load devices is preferably implemented by means different from the secondary battery (storage battery); for example, it may preferably be implemented by using a capacitor as a voltage source, like the AF41a of the air conditioner 4. This prevents the life of the load devices from being shortened due to the supply of reactive power to the electric lines.
The above embodiment has described using the solar power generators 3 connected on the reception side relative to the service line 96d. However, the solar power generators 3 may be connected at positions farther on the supply side. For example, the power generator may be a so-called mega-solar power generator, which generates and supplies power on a large scale. The power generators are not limited to solar power generators, and may be various power generators that employ renewable energy sources, such as wind power, hydroelectric power, geothermal power, biomass power, etc.
In the above embodiment, the power plant 91 has been described as generating the largest power among the facilities and devices connected to the electric lines. In other words, the power generators such as the solar power generators 3 have been described as generating less power than the power plant 91. However, the magnitude of power generated by the power generators is not limited; for example, the power generators may generate more power than the power plant 91. The power generators may be a device or facility that supplies the power generated at the power plant 91 to the transmission line 93.
The above embodiment has described calculating the required amount based on the target power factor value, which is an example of the predetermined power factor, and controlling the supply of reactive power from each device to the electric line. However, the control of the supply of reactive power by the control device 10 may at least be based on the supply information, and need not use the predetermined power factor. However, controlling the supply of reactive power from the load devices based on both the predetermined power factor and the supply information improves the accuracy of power factor control, compared to controlling the reactive power supply regardless of the predetermined power factor.
Reactive power supplied from each device may be lost before reaching a target electric line due to impedance of the path, resistance, intermediately connected loads, and other factors. Hence, the control device 10 may obtain loss information relating to the loss of reactive power on the path to the target electric line and control the supply of reactive power to the electric line based on this loss information. For example, in the example in
The loss information may be any information that can be used to calculate or estimate the loss on the path, such as the length and thickness of the distribution line serving as the path, the type of transformer, and the size of the load.
The above embodiment has described determining the responsible devices from among all devices connected to the electric power system 90 based on the location of each device or other factors. In other embodiments, some or all of the devices connected to the electric power system 90 may be designated in advance, and the designated devices may be determined as the responsible devices.
The above embodiment has described determining the commanded value for each device based on the location of each device or other factors. In other embodiments, the commanded value for each responsible device may be predetermined. For example, the same commanded value may be predetermined for all responsible devices. In another example, a commanded value may be predetermined for each device that will be used when that device is determined as the responsible device.
In the above embodiment, the target electric line for power factor control has been identified from candidate electric lines located on the supply side relative to the target solar power generator 3, based on the total real power supplied by the solar power generators 3 associated with each electric line and the real power upper limit for each electric line. In other embodiments, a predetermined voltage threshold may be established for each electric line, and any electric line that exceeds its voltage threshold may be identified as a target electric line. The required amount of reactive power may then be calculated, and the power generators and load devices associated with the identified electric line may be determined as responsible devices to make contributions to the supply of reactive power.
When there are multiple electric lines that meet the requirements for the target electric line, an electric line located farther on the supply side may be preferentially identified as the target electric line.
Furthermore, when the total real power supplied by power generators associated with an electric line exceeds a predetermined threshold, such an electric line may be chosen as a candidate for identification of the target electric line. The identification of the target electric line is based, for example, on the real power upper limit or voltage threshold for each electric line described above. The predetermined threshold for the total real power is, for example, the total coupled power, which is the maximum value of power that can be output to an electric line by the power generators associated with the electric line, multiplied by a certain ratio (e.g., 90%).
In other embodiments, one of the service lines 96 with which the target power generator is associated may be identified as the target electric line. The required amount may then be calculated from the real power and target power factor value of the identified one of the service lines 96, and the power generators and load devices associated with the identified electric line may be determined as the responsible devices to make contributions to the supply of reactive power.
In the above embodiment, the control device 10 separate from the load devices has been described as commanding them to supply reactive power. In other embodiments, the control device 10 and a load device may be configured as a single unit, and the various functions of the control device 10 may be implemented by an information processing device included in the load device. For example, the information processing device 40 in any of the air conditioners 4 in the electric power system 90 may command each device as well as its own device to supply reactive power. Alternatively, the management server 20 and a load device may be configured as a single unit, and the power generator information and load device information may be managed by the information processing device 40, for example. Still alternatively, the control device 10, the management server 20, and a load device may all be configured as a single unit. In other words, the control device 10 and the management server 20 may be implemented inside the information processing device 40 of one air conditioner 4. In order to implement the acquisition unit configured to acquire supply information relating to the supply of power to electric lines by a power generator for generating power and supplying the power to the electric lines and the control unit configured to control, according to the supply information acquired by the acquisition unit, the supply of reactive power to the electric lines by a load device including a compensating power supply unit capable of supplying reactive power to the electric lines, a simplest configuration can be one in which the control device 10 and the management server 20 are implemented inside an air conditioner 4 to cooperate with the corresponding solar power generator(s) 3.
Alternatively, the control device 10 and the management server 20 may be implemented inside the information processing device 30 of a solar power generator 3.
It should be noted that the configurations described above are not limited to the above embodiments and variations, and may be modified without departing from the spirit of the present disclosure. In other words, it will be understood that various modifications can be made to the forms and details without departing from the sprit and scope of the appended claims.
For example, part of the configurations described above may be omitted, or other features may be added to the configurations described above. Also, a configuration included in one configuration example of the multiple configuration examples described above may be replaced with a configuration included in another configuration example, or a configuration included in one configuration example may be added to another configuration example.
Number | Date | Country | Kind |
---|---|---|---|
2022-080457 | May 2022 | JP | national |
This application is a Continuation of PCT International Application No. PCT/JP2023/018225 filed on May 16, 2023, which claims priority under 35 U.S.C. § 119 (a) to Patent Application No. 2022-080457 filed in Japan on May 16, 2022, all of which are hereby expressly incorporated by reference into the present application.
Number | Date | Country | |
---|---|---|---|
Parent | PCT/JP2023/018225 | May 2023 | WO |
Child | 18910727 | US |