The present invention relates to a load transferring subsea structure for temporary guiding and permanently relieve forces within a pipe connection that is subjected to bending moments, when connection is completed by a connector that keeps the pipe ends together, which load transferring structure includes one basically stationary structure that retains the first pipe end and one basically manoeuvrable structure that retains the second pipe end, which second pipe end is to be connected to the first, stationary pipe end.
Such a load transferring subsea structure is part of a connection system for pipes on the seabed. The load transferring subsea structure can be considered as a permanent tool that is used during remote controlled connection and disconnection of horizontally extending pipes and pipeline bundles located on the seabed. Connecting rigid to rigid pipes and flexible to rigid pipes are performed by use of the load transferring subsea structure.
In order to deploy, install and operate the load transferring subsea structure, a working vessel having position and motion compensated systems is used on the surface
The load transferring subsea structure includes equipments that constitute permanent components in the complete interconnected system. Equipment used during the connection and disconnection, are tools that are not part of the finished interconnected system. Tools, mechanically or hydraulically activated, that are used during the interconnection, are operated by remotely controlled and operated subsea vessels (ROV).
One main idea behind the present invention is that by the load transferring subsea structure a predetermined share of loads are routed past (“bypass”) the connection itself and further into underlying structures. The loads are controlled by means of tolerances. Thus connectors of low capacity can be used even at large bending moments from external piping. The load transferring subsea structure is so rigid that the structure can handle and control external pipe hubs, or porches, within the guide-in tolerances of the actual connectors.
As far as we know, this has never been done before, just because any contact between an internal structure and an external structure when the connection is made up, shall normally not exist. This means that all loads traditionally have been transmitted through the joint connection and mainly into the internal piping. By the present load transferring subsea structure the internal piping and the connections or joints can be relieved.
In this description the word “stationary” is used about a structure which is stationary relative to a mobile or operable structure, but necessarily not relative to the ground or the seabed.
Based on the above stated, and according to the present invention, a load transferring subsea structure of the introductory said kind is provided, which is distinguished in that the stationary structure includes portions having predetermined configuration including fitted surfaces for interaction during mating with complementary portions having predetermined configuration including fitted surfaces on the mobile structure for creation of a load path external of the pipe ends, which portions with fitted surfaces are processed to controllable tolerances that provide moment transferring means during possible loads or strain within said pipe ends.
In one embodiment of the invention the stationary structure includes a back plate that defines a plate plane that retains the first pipe end in the form of a projecting pipe hub, two projecting guide structures extending substantially perpendicular on the plane of the back plate and extends in the same direction as the projecting pipe hub, a connecting plate that extends substantially in parallel with the back plate and spaced apart therefrom and interconnects the two guide structures.
In one preferable version the manoeuvrable structure includes a front plate part and a rear plate part that together retains the second pipe end, which plate parts extend substantially in parallel and spaced apart from each other and are interconnected by two bracing structures, and further includes guide portions to cooperate with said guide structures of the stationary structure.
Suitably the guide portions of the manoeuvrable structure and the guide structures of the stationary structure include said portions having predetermined configuration with controllable tolerances that provide the moment transferring means that come into action during loading of said pipe ends.
Further, the said portions having predetermined configuration with fitted surfaces for each guide structure of the stationary structure can include a front portion in the form of a projecting pin extending from the interconnecting plate, and a rear portion in the form of a processed or machined portion.
Moreover the said portions having predetermined configuration with fitted surfaces for each guide portion of the mobile structure can include a front portion in the form of a substantially horseshoe formed cut out in the front plate part, and a rear portion in the form of a projecting pipe hub extending from the rear plate part.
Preferably the projecting hub, during mating and subsequent to connection, cooperates with the projecting pipe hub and the machined portion cooperates with the substantially horseshoe formed cut out, said portions being made with tolerances relative to each other which provide the moment transferring means that come into action during loading of said pipe ends.
Preferably each guide structure of the stationary structure includes an intermediate portion having incisions located somewhere between the projecting pin and the machined portion, which incision eases the access for the horseshoe formed cut out in the front plate part during landing on the guide structure, and connects these to each other during advancement of the mobile structure towards the stationary structure.
Further the load transferring subsea structure can include a catch/guide tool for temporary attachment to the stationary structure for assistance during the connecting operation.
In one suitable embodiment of the load transferring subsea structure the manoeuvrable structure may include swivel means that allows rotation of the pipeline relative to the manoeuvrable structure about the longitudinal axis of the pipeline. This feature shall enable relieve of any torsional stresses that could be present in the pipeline.
Other and further objects, features and advantages will appear from the following description of preferred embodiments of the invention, which is given for the purpose of description, and given in context with the appended drawings where:
The manoeuvrable structure 2 is connected to the end E2 of the pipeline by means of a swivel 16. The swivel 16 allows rotation of the pipeline relative to manoeuvrable structure 2 about the longitudinal axis A of the pipeline. This connection between manoeuvrable structure 2 and the pipeline is made up by means of a non rotatable bolt flange 17 when this constitutes a pipe bundle or cable. The pipeline terminates in a flange or connecting profile 18 which is complementary to a corresponding surface of the mechanical clamp connector 3. The clamp connector 3 is able to transform radially tightened forces to axially acting forces. Such clamp connectors 3 are commonly known per se and will not be described in detail here. In this case, the clamp connector 3 is fixed to that structure (here 2), which is easiest accessible to retrieve from the seabed.
The manoeuvrable structure 2 has means that constitute contact/landing/positioning/guiding and force transferring areas against the stationary structure 1. More precisely the guiding means constitute one substantially horseshoe formed cut out 15 in the front plate part 11, and a projecting pipe sub 14 extending from the rear plate part 12. These are in turn included by the said portions having predetermined configuration with controllable tolerances providing the moment transferring means coming into action during loadings of the pipe ends.
By studying
It is further to be observed that each guide structure 6 of the stationary structure 1 has an intermediate part with notches or incisions 6c located somewhere between the projecting portion 6a and the machined portion 6b. These notches 6c enable the access for the horseshoe formed cut out 15 in the front plate part 11 during landing on the guide structure 6. During subsequent advancement of the mobile structure 2 towards the stationary structure 1, this connects the structures 1, 2 to each other.
With reference to
The stationary structure 1 is connected to the subsea equipment which is initially installed. This can be a template on a larger structural unit, a pipeline end or a pipeline branch. The pipe of the subsea installation terminates in a flange having a connection profile bolted onto the structure 1. As before, this connection profile is complementary to a corresponding surface of the mechanical clamp connector 3. The stationary structure 1 is secured to the frame of the subsea installation as a cantilevered unit. Such takes place through the main plate 4 together with the connected pipe E1. In addition the pipe can be secured at the end of the cantilevered unit to an outer plate dependent on functional requirements to force and moment transfer.
The sequence of installation and the relative connecting motion of the structures 1 and 2 are adapted to the operation and entire installation. The structures 1, 2 are guided towards each other by relative movements. If the movements are large, a catch/guiding tool 20 can be installed to cushion and stabilize, possibly guide the movements.
The manoeuvrable structure 2 is landed onto the stationary structure 1 in that the front main plate 11 of the manoeuvrable structure 2 is inclined and is guided towards the notches 6c of the rounded guide structures 6 of the structure 2. The horseshoe formed and downwardly facing pockets or cut outs 15 of the main plate 11, nest onto the rounded profiles of the guide structures 6. This takes place at the same time as the rounded profiles of the bracing structures 13 of the manoeuvrable structure 2 is guided towards circular and upwardly facing pockets or saddles 5 in the front interconnecting plate 7 of the stationary structure 1. In this position the structures 1, 2 can be secured against axial relative motion.
The catch/guiding tool 20 is then removed, as shown on
As illustrated in
During pull-in, the guide portions 6a, 6b of the structure 1 and the means 14, 15 of the structure 2 will cooperate and the rounded brace profiles 13 of the structure 1 lift clear off the arched pockets or saddles 5 in the plate 7 of the structure 1.
In the final part of the movement, the tightening of the clamp connector 3 will provide clearance between the downwardly facing horseshoe formed cut outs 15 in the front plate 11 of the structure 2 and the rounded portions 6b of the structure 1. The clamp connector 3 will as mentioned finish the last part of the connecting operation by use of separate actuation tool which operate the bolt 9.
If the loads are low after the connection is made up, clearance will exist all places between the structures 1 and 2. If the loads are large, contact will exist between the structures 1 and 2 and part of the loads pass directly from structure 1 via the guide means through the rounded profiles in the structure 2 and into the main plate 4 and out into the installation structure. The load transfer then will primarily take place via the projecting pipe subs having guiding means 14 and the guide structures 6, i.e. that the guide portions 6a touch within the guide means 14. In principle, it is not desired (statically undetermined system) that the horseshoe cut outs 15 shall touch the guide structures 6, i.e. the portions 6b, when the connection is made up.
How much of the loads that pass through the load carrying structure along this route, is dependent of the tolerances one has decided for. This can be adapted to the capacity of the clamp connector 3 such that this load path can relieve the connector 3. This in contrast to the traditional systems where the clamp connector is to take all loads and lead the loads through the pipe system. The pipe system may include components that are sensible to such forces, for example valves.
What is characteristic for the load transferring subsea structure 10, is the distribution of the loads before and after the connection is made up with the clamp connector 3. The load transferring subsea structure 10 can take care of loads/moments in order to relieve the clamp connector 3 by a predetermined force/moment distribution ratio.
The result is a more safe connection with less risk for leakages in the clamp connector 3, which otherwise would have used all capacity to other purposes than making a tight and safe connection.
It is further to be understood that the tolerances discussed here between the guide portions are in order of magnitude a few tenths of millimetres.
With reference to
As shown on the figures this module 1′ is designed for installation between two manoeuvrable structures 2′ of the nature already described above in connection with fig. 1-7. The retrievable/replaceable module l′ only has a few of the originally constructional features as the unit 1 has. The retrievable/replaceable module 1′ includes two oppositely facing pipe ends E1′, E1″. The subsea unit 1″ is equipped with two projecting guide structures 6′ having respective portions with predetermined configuration and with fitted surfaces 6a′, 6b′ for interaction, during mating, with complementary portions 11′, 12′ having predetermined configuration with fitted surfaces 14′, 15′ on each individual mobile structure 2′. As before, these structures form a load path external of the pipe ends E1′, E2′; E1″, E2″ when the pipes are subjected to bending moments. As before, the portions 14′, 15′ with fitted surfaces are processed or machined to controllable tolerances that provide moment transferring means during possible loadings or strain within said pipe ends E1′, E2′; E1″, E2″.
Moreover, it is to be noted that the part corresponding to the back plate 4 of the previous embodiments, is divided into two back plate parts 4a′ and 4b′ along a substantially horizontal partition line D. In addition guiding means O of suitable nature are arranged in order to align the plate parts 4a′, 4b′ relative to each other. The upper part of the back plate 4a′ follows the module to the surface, while the lower back plate part 4b′ remains on the seabed together with the projecting guide structures 6′.
The respective back plate parts 4a′, 4b′ retain its respective pipe end E1′, E2′ which appear as projecting pipe subs. As shown in
As before, the respective portions of each subsea unit 1″ are in the form of projecting guide structures 6′ erected substantially perpendicular to the back plate 4b′, 4b″ and extend inn the same direction as the projecting pipe subs E1′, E1″. An interconnecting plate 7′ extends in parallel with the back plate 4b′, 4b″ and spaced apart from these and connects two guide structures 6′.
The retrievable/replaceable module 1′ will typically be a valve unit.
It is to be understood that when a module 1′ is to be retrieved, the connector 3′ firstly needs to be released. Then the hydraulic/mechanical tool 19 is used, now by pushing the structure 2′ away from the module 1′ along the guides 6′ on the seabed unit 1″. Then the module 1′ can be retrieved along the posts P and along the wires W.
Number | Date | Country | Kind |
---|---|---|---|
20093011 | Sep 2009 | NO | national |
Filing Document | Filing Date | Country | Kind | 371c Date |
---|---|---|---|---|
PCT/NO10/00338 | 9/15/2010 | WO | 00 | 3/6/2012 |