Claims
- 1. A method for constructing a load carrying trussed frame for use in long span structures having the steps of:
- a. Providing at least one a hollow, tubular steel compression chord member having internal force transfer means attached thereto at predetermined intervals;
- b. Providing a rolled structural shape steel tension chord member;
- c. Providing rolled structural steel web members;
- d. Connecting said compression chord member, said tension chord member and said web members to form an initial structure of said trussed frame;
- e. Attaching each end of at least one high strength steel tendon at predetermined locations onto said trussed frame without attaching any other portions of said high strength steel tendon to said trussed frame;
- f. Filling said compression chord member with high strength concrete;
- g. Waiting a sufficient time to allow said concrete to attain a predetermined strength and to obtain a composite action with said tubular steel compression chord; and,
- h. Tensioning said high strength steel tendon in pre-determined increments to pre-compress said trussed frame.
- 2. The method of claim 1 wherein said high strength steel tendon is tightened in a predetermined first increment prior to filling said compression member with said high strength concrete.
- 3. A method for constructing a load carrying trussed frame for use in long span structures having the steps of:
- a. Providing at least one hollow, tubular steel compression chord member having internal force transfer means attached thereto at predetermined intervals;
- b. Providing a rolled structural shape steel tension chord member;
- c. Providing rolled structural steel web members;
- d. Connecting said compression chord member, said tension chord member and said web members to form an initial structure of said trussed frame;
- e. Filling said compression chord member with high strength concrete;
- f. Attaching each end of at least one high strength steel tendon at predetermined locations onto said trussed frame without attaching any other portions of said high strength steel tendon to said trussed frame;
- g. Waiting a sufficient time to allow said concrete to attain a predetermined strength and to obtain a composite action with said tubular steel compression chord; and,
- h. Tensioning said high strength steel tendon in pre-determined increments to pre-compress said trussed frame.
Parent Case Info
This application is a continuation of application Ser. No. 07/812,407, filed 12/23/91, now abandoned.
US Referenced Citations (12)
Foreign Referenced Citations (1)
Number |
Date |
Country |
913876 |
Sep 1946 |
FRX |
Continuations (1)
|
Number |
Date |
Country |
Parent |
812407 |
Dec 1991 |
|