Claims
- 1. In the longwall method of mining a sub-surface, substantially horizontal bed of trona by driving substantially parallel entries into the trona bed, connecting the entries by at least one primary passage to define a main trona pillar to be mined, and mining the exposed face of the trona pillar along the primary passage, the improvement which comprises prefracturing the trona in situ to substantially reduce slabbing of the trona at the longwall face by
- a. driving one or more holes into the trona pillar to be mined;
- b. introducing fracturing agent into the hole or holes, and
- c. causing the fracturing agent to fracture the trona in situ without substantial displacement of the trona so that the prefractured trona will continue to support the overburden and
- d. mining the exposed, prefractured face of the trona pillar along the primary passage.
- 2. The improvement of claim 1 wherein the fracturing agent is a blasting explosive.
- 3. The improvement of claim 1 wherein the fracturing is effected by introducing a hydraulic fracturing agent under pressure into the hole or holes.
- 4. The improvement of claim 3 wherein the hydraulic fracturing agent is an aqueous agent containing a surface active agent.
- 5. The improvement of claim 1 wherein the fracturing agent is a thermal fracturing agent.
- 6. The improvement of claim 5 wherein the thermal fracturing agent comprises means for localized heating of the trona.
- 7. The improvement of claim 5 wherein the thermal fracturing agent comprises means for localized cooling of the trona.
- 8. The improvement of claim 1 wherein the fracturing agent is an electrical fracturing agent.
CROSS-REFERENCE TO RELATED APPLICATION
This application is a continuation-in-part of copending application Ser. No. 526,771 filed Nov. 25, 1974, now abandoned and entitled "Improvement in Longwall Mining of Trona".
US Referenced Citations (4)
Continuation in Parts (1)
|
Number |
Date |
Country |
Parent |
526771 |
Nov 1974 |
|