Malfunction test apparatus for fuel vapor purge system

Information

  • Patent Grant
  • 6405718
  • Patent Number
    6,405,718
  • Date Filed
    Tuesday, July 11, 2000
    23 years ago
  • Date Issued
    Tuesday, June 18, 2002
    22 years ago
Abstract
A fuel vapor purge system connects a fuel tank with a canister and collects fuel vapor generated in the fuel tank by the canister. The purge system purges the collected fuel vapor to an intake passage of an internal combustion engine through a purge passage. A change of pressure due to fuel vapor generation in the fuel tank is measured while the purge passage is sealed. The pressure in the purge passage is differentiated from the pressure outside the purge passage and the purge passage is sealed. In this state, a change of the pressure in the purge passage is measured. After measuring the amount of generated fuel vapor, a test for leakage in the purge passage is performed based on the change of pressure due to the fuel vapor generation when measuring changes of pressure in the purge passage during a predetermined period.
Description




BACKGROUND OF THE INVENTION




The present invention relates to a malfunction test apparatus for a fuel vapor purge system used in an internal combustion engine of a vehicle such as an automobile.




Fuel vapor purge systems for sending fuel vapor in a fuel tank to an intake passage have been proposed. Specifically, a fuel vapor purge system collects fuel vapor in a fuel tank to a canister and purges the collected fuel vapor to the intake passage as necessary to prevent fuel vapor from being emitted to the atmosphere. Such a purge system includes a canister, a fuel vapor passage and a vapor line. The canister collects fuel vapor in the fuel tank. The fuel vapor passage connects the fuel tank with the canister. The purge line connects the canister with an intake passage. A purge control valve is located in the purge line to adjust the opening size of the purge line. The canister has an atmospheric control valve, through which the canister is selectively exposed to the atmosphere.




When there is a puncture in piping or when a pipe is dislocated, fuel vapor is emitted into the atmosphere from the canister and the fuel tank. Preferably, such leakage is automatically discovered.




Therefore, a leakage test system that differentiates the pressure in a purge system from the outside pressure of the exterior and monitors changes of the purge system pressure has been introduced. For example, the system exposes the interior of the purge system to the negative pressure in an intake system of an engine and closes inlet and outlet passages to seal the purge system. Then, the system monitors changes of the internal pressure of the purge system.




When testing the purge line, the pressure in the purge line is lowered to a negative pressure and changes in the pressure are monitored. To test the purge system, the amount of fuel vapor needs to be in a certain range. If the amount of fuel vapor is out of the range, it cannot be judged whether an increase in the pressure in the purge line is due to atmospheric pressure introduced through puncture or to an excessive amount of fuel vapor.




Japanese Unexamined Patent Publication No. 6-74104 discloses a purge system, n which a canister is constantly connected to the interior f a fuel tank. When diagnosing the system, inlets and out Lets must be closed by valves to seal the purge line to measure the amount of fuel vapor in the system. Thus, purging must be stopped when measuring the amount of fuel vapor, which decreases the amount of purged fuel vapor. The purged fuel vapor may therefore be insufficient.




SUMMARY OF THE INVENTION




Accordingly, it is an objective of the present invention to provide a malfunction test apparatus for fuel vapor purge systems that shortens time required for testing and improves the purging effectiveness.




To achieve the foregoing and other objectives and in accordance with the purpose of the present invention, a malfunction test apparatus for a fuel vapor purge system is provided. The apparatus includes a purge system and testing means. The purge system connects a fuel tank with a canister and collects fuel vapor generated in the fuel tank in the canister. The purge system purges the collected fuel vapor to an intake passage of an internal combustion engine through a purge passage. The purge passage includes the fuel tank. The testing means seals the purge passage and measures a change of pressure due to fuel vapor generation in the fuel tank. The testing means measures a rate of change of the pressure in the purge passage after differentiating the pressure in the purge passage from the pressure outside the purge passage and after sealing the purge passage. The testing means determines whether there is a leak in the purge passage based on the change of pressure due to fuel vapor generation and on the measured rate of change of the pressure in the purge passage. After measuring the change of pressure due to fuel vapor generation, the testing means determines that there is a leak in the purge passage only if the change of pressure due to fuel vapor generation satisfies a predetermined condition.




The present invention may also be embodied in a method for determining whether a malfunction has occurred in a fuel vapor purge system. The purge system connects a fuel tank with a canister and collects fuel vapor generated in the fuel tank by the canister. The purge system purges the collected fuel vapor to an intake passage of an internal combustion engine through a purge passage. The purge passage includes the fuel tank. The method includes measuring a change of pressure due to fuel vapor generation in the fuel tank while sealing the purge passage, and determining whether there is a leak in the purge passage based on the change of pressure due to fuel vapor generation and based on the rate at which the pressure in the purge passage approaches atmospheric pressure when the purge passage is sealed.











BRIEF DESCRIPTION OF THE DRAWINGS




The features of the present invention that are believed to be novel are set forth with particularity in the appended claims. The invention, together with objects and advantages thereof, may best be understood by reference to the following description of the presently preferred embodiments together with the accompanying drawings in which:





FIG. 1

is a diagrammatic view illustrating a fuel vapor purge system according to a first embodiment;




FIGS.


2


(


a


) and


2


(


b


) are diagrammatic views showing operation of the atmospheric control valve of the system shown in

FIG. 1

;





FIG. 3

is a flowchart illustrating a control routine for measuring pressure change executed by the ECU of the system shown in

FIG. 1

;





FIG. 4

is a flowchart illustrating a routine for measuring pressure change of the system shown in

FIG. 1

;





FIG. 5

is a flowchart illustrating a malfunction test routine according to the first embodiment;





FIG. 6

is a timing chart showing a malfunction test executed by the system of

FIG. 1

;





FIG. 7

is a timing chart showing a malfunction test executed by the system of

FIG. 1

;





FIG. 8

is a diagrammatic view showing an atmospheric control valve according to a second embodiment;





FIG. 9

is a timing chart showing a malfunction test according to the second embodiment;





FIG. 10

is a diagrammatic view illustrating a fuel vapor purge system according to a third embodiment;





FIG. 11

is a diagrammatic view showing an internal pressure control valve according to the third embodiment;





FIG. 12

is a graph showing the relationship between a negative pressure and the amount of the atmospheric air entering the internal pressure control valve;





FIG. 13

is a diagrammatic view illustrating a fuel vapor purge system according to a fourth embodiment;





FIG. 14

is a timing chart showing a malfunction test according to the fourth embodiment;





FIG. 15

is a diagrammatic view illustrating a fuel vapor purge system according to a fifth embodiment;





FIG. 16

is a diagrammatic view showing an atmospheric control valve according to the fifth embodiment;





FIG. 17

is a timing chart showing an example of a drive signal sent to a purge control valve according to the fifth embodiment;





FIG. 18

is a timing chart showing a malfunction test according to the fifth embodiment;





FIG. 19

is a timing chart showing an example of a drive signal sent to the purge control valve according to the fifth embodiment;





FIG. 20

is a graph showing the relationship between the engine load and the maximum duty guard of a signal sent to the purge control valve according to the fifth embodiment; and





FIG. 21

is diagrammatic view showing a fuel vapor purge system according to a sixth embodiment.











DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS




A malfunction test apparatus for a fuel vapor purge system according to a first embodiment of the present invention will now be described with reference to

FIGS. 1

to


7


.





FIG. 1

is a diagrammatic view illustrating a fuel vapor purge system of the first embodiment. The purge system is used for a gasoline engine of a vehicle.




A fuel tank


1


of the gasoline engine is connected to a canister


2


by a fuel vapor passage


3


. A float


3




a


is located in the vicinity of the port of the passage


3


in the fuel tank


1


. Fuel vapor in the fuel tank


1


is drawn to the canister


2


by the fuel vapor passage


3


. The passage


3


is connected to the canister


2


through a pressure buffer chamber


4


located on top of the canister


2


. An orifice


4




a


in the chamber


4


constantly communicates the interior of the tank


1


with the interior of the canister


2


to equalize the pressure in the tank


1


with the pressure in the canister


2


.




A differential valve


5


is located above the fuel tank


1


. The differential valve


5


is connected to the canister


2


by a breather passage


7


. When fuel is being supplied to the fuel tank


1


, the differential valve


5


is opened. When the valve


5


is open, fuel vapor in the fuel tank


1


flows to the canister


2


through the breather passage


7


.




The canister


2


is connected to a surge tank


9




a


by a purge line


8


. The surge tank


9




a


forms part of an engine intake passage


9


. A purge control valve


11


is located in the purge line


8


. The purge control valve


11


is actuated by a drive circuit


11




a


. The drive circuit


11




a


is controlled by signals from an electronic control unit (ECU)


10


, which is a microcomputer.




For example, the purge control valve


11


adjusts the amount of purged fuel from the canister


2


to the intake passage


9


during a purge control procedure. The purge control valve


11


seals and opens the purge line


8


during a malfunction test. The purge control valve


11


is, for example, a vacuum switching valve (VSV).




The interior of the canister


2


is divided into two chambers by a vertical partition wall


15


. That is, the partition wall


15


defines a main chamber


16


and an auxiliary chamber


17


. The main chamber


16


is located below the pressure buffer chamber


4


and the auxiliary chamber


17


is located below an atmospheric control valve


14


. The volume of the auxiliary chamber


17


is less than that of the main chamber


16


. Spaces


18




a


,


18




b


are formed in the chambers


16


,


17


, respectively. Adsorbent layers


20




a


,


20




b


are located below the spaces


18




a


,


18




b


, respectively. The adsorbent layers


20




a


,


20




b


include activated carbon adsorbent


19




a


,


19




b


, respectively.




A filter


20




c


is located on top of the adsorbent layers


20




a


,


20




b


. A filter


20




d


is located underneath the adsorbent layers


20




a


,


20




b


. The adsorbent


19




a


,


19




b


fill the space between the filters


20




c


,


20




d


. The space below the filter


20




d


is a diffusion chamber


21


. The diffusion chamber


21


communicates the main chamber


16


with the auxiliary chamber


17


.




One end of the breather passage


7


is connected to part of the upper surface of the canister


2


that corresponds to the main chamber


16


. The purge line


8


is also connected to the main chamber


16


at a location near the breather passage


7


as shown in FIG.


1


.




When the purge control valve


11


is open and the pressure in the canister


2


is negative, the surge tank


9




a


is connected to the fuel tank


1


through the interior of the purge line


8


, the pressure buffer chamber


4


and the fuel vapor passage


3


. Since the interior of the breather passage


7


is constantly connected to the main chamber


16


, the breather passage


7


is connected to the purge line


8


. These connected spaces function as a purge passage when the canister


2


has a negative pressure. The malfunction test apparatus monitors whether there is leakage from the purge passage.




A port


25


is located above the auxiliary chamber


17


. The atmosphere control valve


14


is connected to the port


25


. A block valve


25




a


is located in the port


25


. The block valve


25




a


is normally maintained open. During a malfunction test, the ECU


10


actuates the valve


25




a


. The valve


25




a


is, for example, a vacuum switch valve.




As shown in FIGS.


2


(


a


),


2


(


b


), the atmospheric control valve


14


includes a release control valve


12


and an atmosphere introduction control valve


13


. The release control valve


12


has a diaphragm


12




a


, which defines an atmospheric chamber


12




b


to its left as viewed in the drawings. The introduction control valve introduction control valve


13


has a diaphragm


13




a


, which defines a negative pressure chamber


13




b


to its right as viewed in the drawings. The space between the diaphragms


12




a


,


13




a


is divided into two chambers by a partition wall


28


. One of the chambers is a positive pressure chamber


12




d


of the release control valve


12


. The other chamber is an atmospheric pressure chamber


13




d


of the introduction control valve


13


.




A pressure port


28




a


is formed in the partition wall


28


. The port


28




a


is opened and closed by the diaphragm


13




a


. The atmospheric pressure chamber


13




d


is connected to an atmosphere introducing passage


27


. The diaphragm


13




a


is pressed against the opening of the pressure port


28




a


by a spring


13




c


located in the negative pressure chamber


13




b


. Normally, the spring


13




c


closes the introduction control valve


13


.




A buffer valve


40


is located between the negative pressure chamber


13




b


and the purge line


8


. The purge line


8


is connected with the negative pressure chamber


13




b


through the buffer valve


40


. As shown in FIG.


2


(


a


), the interior of the buffer valve


40


is divided into two pressure chambers


42


,


43


by a partition wall


41


. The pressure chamber


42


is connected to the negative pressure chamber


13




b


. The pressure chamber


43


is connected to the purge line


8


. An orifice


44


is formed in the partition wall


41


to connect the chambers


42


,


43


with each other. Also, a check valve


45


is located in the wall


41


to permit flow from the chamber


42


to the chamber


43


. When the pressure in the chamber


43


, or the pressure in the purge line


8


, is higher than the pressure in the chamber


42


, or the pressure in the negative pressure chamber


13




b


, the check valve


45


is closed and the pressure in the chamber


43


is transmitted to the chamber


42


by the orifice


44


. Therefore, the pressure in the chamber


42


is gradually increased. The pressure in the chamber


43


becomes equal to the pressure in the chamber


43


after a certain time lag. When the pressure in the chamber


43


, or the pressure in the purge line


8


, is lower than the pressure in the chamber


42


, or the pressure in the negative pressure chamber


13




b


, the check valve


45


is opened. Thus, the pressure in the chamber


42


is transmitted to the chamber


43


through the orifice


44


and the check valve


45


. Accordingly, the pressure in the chamber


42


is rapidly decreased to match that of the chamber


43


.




When the engine is running, negative pressure is created in the surge tank


9




a


. The negative pressure in the surge tank


9




a


purges fuel adsorbed in the canister


2


to the intake passage


9


. At this time, the check valve


45


is opened. Therefore, the negative pressure Pn


1


in the purge line


8


is quickly equalized with the negative pressure Pn


2


in the negative pressure chamber


13




b


. When the force of the negative pressure Pn


2


is more than the force of the spring


13




c


, the diaphragm


13




a


is separated from the opening of the atmosphere introducing passage


27


, which opens the atmosphere introduction control valve


13


. Accordingly, atmospheric air flows into auxiliary chamber


17


in the canister


2


through the passage


27


and the port


25


. The atmospheric air causes fuel vapor adsorbed in the activated carbon adsorbents


19




a


,


19




b


to flow to the purge line


8


. The fuel vapor is then purged to the surge tank


9




a.






When testing for a malfunction, negative pressure is applied to the fuel tank


1


. To monitor the pressure change in the fuel tank


1


, the purge control valve


11


is closed and the pressure block valve


25




a


is opened such that the pressure in the tank


1


becomes equal to the atmospheric pressure. When the block valve


25




a


is opened, the negative pressure Pn


1


in the purge line


8


and the negative pressure Pn


2


in the negative pressure chamber


13




b


are the same, and the force based on the negative pressure Pn


2


is greater than the force of the spring


13




c


. This greatly displaces the diaphragm


13




a


and widely opens the distal opening of the atmosphere introducing passage


27


, which introduces a significant amount of atmospheric air through the passage


27


. Accordingly, the pressure in the purge line


8


quickly increases toward the atmospheric pressure, thus the negative pressure Pn


1


decreases (Negative pressures Pn


1


and Pn


2


are referred to in terms of their absolute values). At this time, the check valve


45


is closed. Thus, the negative pressure Pn


1


of the purge line


8


is transmitted to the negative pressure chamber


13




b


through the orifice


44


, which gradually decreases the negative pressure Pn


2


in the negative pressure chamber


13




b


. Therefore, the pressure in the purge line


8


is quickly equalized with the atmospheric pressure.




An exposure port


29


is formed in the upper portion of the atmospheric control valve


14


. The exposure port


29


is connected to the atmospheric pressure chamber


12




b


of the release control valve


12


to constantly expose the chamber


12




b


to the atmospheric pressure. A discharge port


26


is formed in the control valve


14


. The discharge port


26


discharges air from which fuel has been removed by the canister


2


. To improve the fuel vapor recovery efficiency, the discharge port


26


has substantially the same cross-sectional area as the breather passage


7


. The distal opening of the discharge port


26


is opened and closed by the diaphragm


12




a


of the release control valve


12


. The diaphragm


12




a


is urged against the opening of the port


26


by the force of a spring


12




c


located in the atmospheric pressure chamber


12




b


. Thus, as long as the pressure in the canister


2


is below a certain level, the release control valve


12


is closed.




When the fuel tank


1


is being filled, pressure is applied to the canister


2


through the breather passage


7


, which increases the pressure in the pressure chamber


12




d


of the release control valve


12


. When the difference between the pressure in the chamber


12




d


and the atmospheric pressure, which is applied to the chamber


12




b


through the exposure port


29


, reaches a predetermined level, the release control valve


12


is opened. Accordingly, air, from which fuel vapor has been moved in the main and auxiliary chambers


16


,


17


, is discharged through the port


25


and the discharge port


26


.




A hole


31


is formed in the upper wall of the fuel tank


1


. A cylindrical breather pipe


32


is fixed to the hole


31


to form part of the breather passage


7


. A float valve


33


is located in the lower portion of the breather pipe


32


. The differential valve


5


is located above the fuel tank


1


to cover the upper opening of the breather pipe


32


. The interior of the differential valve


5


is divided into two chambers by a diaphragm


5




a


. The upper chamber is a first chamber


5




b


and the lower chamber is a second chamber


5




c


. A spring


5




d


is located in the first chamber


5




b


to press the diaphragm


5




a


against the upper opening


7




a


of the breather passage


7


, which is located in the second chamber


5




c


. The diaphragm


5




a


opens and closes the upper opening


7




a


of the breather passage


7


.




A filler pipe


36


is connected to the fuel tank


1


. The filler pipe


36


is connected to the first chamber


5




b


of the differential valve


5


by a pressure passage


34


. A throttle


36




a


is formed in the lower end of the filler pipe


36


. When fuel flows through the throttle


36




a


, fuel vapor in the filler pipe


36


flows only from an inlet


36




b


to the fuel tank


1


. Thus, fuel vapor is prevented from being emitted to the outside. The upper portion of the fuel tank


1


is connected to the upper portion of the filler pipe


36


by a circulation line pipe


37


. The pipe


37


circulates fuel vapor between the tank


1


and the filler pipe


36


when fuel is being supplied to the tank


1


, which permits fuel to smoothly flow into the tank


1


.




A pressure sensor


1




a


is located in the upper portion of the fuel tank


1


to detect the pressure in the fuel tank


1


.




The pressure sensor


1




a


detects the pressure of the fuel tank


1


and spaces communicated with the fuel tank


1


in relation to the atmospheric pressure. That is, the pressure sensor


1




a


defines atmospheric pressure as zero. Signals from the pressure sensor


1




a


are sent to the ECU


10


, which controls purging and malfunction testing. The ECU


10


also receives signals from other sensors such as an air flowmeter


9




c


located in the intake passage


9


.




The above described fuel vapor purge system operates in the following manner.




Fuel in the tank


1


evaporates, which increases the pressure in the tank


1


. When the pressure in the tank


1


reaches a predetermined value, fuel vapor flows from the tank


1


to the canister


2


through the fuel vapor passage


3


. Therefore, fuel vapor flows into the canister


2


through the orifice


4




a


of the buffer chamber


4


. In this case, the pressures in the first chamber


5




b


and the second chamber


5




c


of the differential valve


5


are equal. Therefore, the valve


5


is closed and the breather passage


7


is disconnected from the fuel tank


1


.




Fuel vapor reaches the canister


2


through the passage


3


. Fuel in the vapor is adsorbed by the activated carbon adsorbent


19




a


in the adsorbent layer


20




a


of the main chamber


16


. Fuel vapor then flows to the diffusion chamber


21


through the layer


20




a


. Thereafter, the fuel vapor is guided to the auxiliary chamber


17


. The remaining fuel in the vapor is adsorbed by the adsorbent layer


20




b


in the auxiliary chamber


17


. In this manner, the fuel vapor flows along a U-shaped path in the canister


2


, which extends the time during which the fuel vapor contacts the activated carbon adsorbents


19




a


,


19




b


. Fuel in the vapor is thus effectively removed.




Most of fuel in the fuel vapor is removed by the adsorbents


19




a


,


19




b


in the layers


20




a


,


20




b


. The gas then opens the release control valve


12


and is discharged to the outside through the discharge port


26


. At this time, the pressure in the negative pressure chamber


13




b


of the atmosphere introduction control valve


13


is positive and higher than the pressure in the atmospheric pressure chamber


13




d


. Therefore, the control valve


13


is not opened. Thus, gas is not emitted to the outside through the control valve


13


and the introducing passage


27


.




The fuel collected by the canister


2


is supplied to the intake passage


9


in the following manner. When the engine is started, the pressure in the vicinity of the opening of the purge line


8


in the surge tank


9




a


becomes negative. Every time the ECU


10


commands the purge control valve


11


to open, fuel vapor flows in the purge line


8


from the canister


2


to the surge tank


9




a.






Therefore, the pressure in the canister


2


becomes negative. In this state, the control valve


13


is opened, which causes air to enter the auxiliary chamber


17


of the canister


2


through the introducing passage


27


. Accordingly, fuel adsorbed in the activated carbon adsorbents


19




a


,


19




b


is separated from the adsorbents


19




a


,


19




b.






In this manner, the fuel vapor is carried to the purge line


8


by the introduced air and is released into the surge tank


9




a


through the purge control valve


11


. In the surge tank


9




a


, the fuel vapor is mixed with air drawn through an air cleaner


9




b


, the air flowmeter


9




c


and a throttle valve


9




d


, and is supplied to the cylinders (not shown). Together with fuel discharged by a fuel injector


39


through the fuel pump


38


, fuel vapor in the intake air is burned in the cylinders.




When the vehicle is parked at one place for a relatively long period, the tank


1


is cooled and fuel vapor is no longer generated. When the pressure in the tank


1


is lower than the pressure in the canister


2


, the pressure in the buffer chamber


4


is negative. Therefore, fuel vapor in the canister


2


is returned to the fuel tank


1


through the fuel vapor passage


3


and the orifice


4




a.






Malfunction testing of the fuel vapor purge system performed by the ECU


10


will now be described.

FIGS. 3

to


5


are flowcharts illustrating the malfunction test. One example of the procedure is illustrated in the timing charts of

FIGS. 6 and 7

.




Necessary initial settings for the testing procedure are completed after the ECU


10


is turned on. Thereafter, the testing procedure is performed when predetermined conditions are satisfied. When the conditions are satisfied, the fuel vapor purge system can be exposed to the intake negative pressure for testing. For example, if the pressure sensor


1




a


and other sensors are normally functioning, the conditions are satisfied when a certain period has elapsed after the engine is started and the engine speed is stable.




The flowchart of

FIG. 3

illustrates a control routine for measuring pressure changes in the fuel tank


1


. The ECU


10


executes this routine at predetermined intervals.




When the engine speed is stable, the ECU


10


judges whether the temperature of engine coolant is lower than a predetermined value THW


0


, which is for example, forty degrees centigrade, in step


200


. If the coolant temperature lower than the value THW


0


, the ECU


10


moves to step


240


. If the coolant temperature is equal to or higher than the value THW


0


, the ECU


10


moves to step


210


.




In step


210


, the ECU


10


judges whether a purge history flag is ON in the current trip. One trip refers to a period from when the engine is accelerated from an idling state to when the engine is back to an idling state. If the history flag is ON, the ECU


10


moves to step


240


. If the history flag is OFF, that is, if purging has not been executed in the current trip after the engine is started, the ECU


10


moves step


220


. In step


220


, the ECU


10


measures a pressure change amount ΔP


1


in the fuel tank


1


.




The flowchart of

FIG. 4

describes a routine of step


220


for measuring a pressure change in the fuel tank


1


.




In step


221


, the ECU


10


opens the block valve


25




a


and shuts the purge control valve


11


. If the pressure in the fuel tank


1


is negative, the atmosphere introduction control valve


13


is opened and the atmospheric air enters the canister


2


and the fuel tank


1


through the introducing passage


27


. Accordingly, the pressure in the fuel tank


1


is quickly increased to the atmospheric pressure.




In step


222


, the ECU


10


judges whether the pressure P


i


of the fuel tank


1


detected by the pressure sensor


1




a


is lower than 0 kPa (0 mmHg), which is atmospheric pressure in this description. If the pressure P


i


is lower than 0 kPa, the ECU


10


temporarily suspends the current routine. If the pressure P


i


is higher than 0 kPa, the ECU


10


moves to step


223


.




In step


223


, the ECU


10


closes the block valve


25




a


and the purge control valve


11


. In step


224


, the ECU


10


increments a ΔP


1


measuring counter.





FIG. 6

illustrates the state of the valves and changes of the pressure in the fuel tank


1


after the engine is started when the coolant temperature is equal to or lower than a predetermined temperature. The pressure in the tank


1


is maintained to 0 kPa until a certain period has elapsed after the engine is started, or until a time t


0


. After the time t


0


, the pressure in the tank


1


changes in accordance with the generation of fuel vapor.




In step


225


, the ECU


10


determines whether the time measured by the ΔP


1


measuring counter is less than a predetermined period T


1


, which is, for example, fifteen seconds. If the measured time is less than the period T


1


, the ECU


10


temporarily suspends the current routine. If the measured time is equal to or more than the period T


1


, the ECU


10


moves to step


226


and subtracts the pressure P


i−1


of the time period T


1


earlier from the current pressure P


i


. The resultant is defined as a pressure change amount ΔP


1


.




Therefore, as shown in

FIG. 6

, the pressure change amount ΔP


1


in the fuel tank


1


is computed at a time t


1


. At the time t


1


, the block valve


25




a


and the purge control valve


11


are opened to initiate purging.




In step


227


, the ECU


10


clears the ΔP


1


measuring counter and terminates the current routine. The ECU


10


then moves to step


230


. In step


230


, the ECU


10


sets the ΔP


1


measuring completion flag to ON. The value ON of the completion flag indicates that the measurement of ΔP


1


is completed. The ECU


10


then moves to step


240


.




In step


240


, the ECU


10


determines whether the completion flag is OFF. If the flag is OFF, the ECU


10


temporarily suspends the current routine. If the flag is ON, the ECU


10


moves to step


250


and increments a post-completion counter.




In step


260


, the ECU


10


determines whether the time measured by the post-completion counter is less than a predetermined period T


0


, which is, for example, three minutes. If the measured time is less than the period T


0


, the ECU


10


temporarily suspends the current routine. If the measured time is more than the period T


0


, the ECU


10


moves to step


270


and clears the pressure change amount ΔP


1


, which was measured in step


226


.




In step


280


, the ECU


10


sets the completion flag to OFF. In step


290


, the ECU


10


clears the post-completion counter.




The flowchart of

FIG. 5

illustrates a malfunction test routine for detecting a malfunction in the fuel vapor purge system. The ECU


10


executes this routine at predetermined intervals.




When entering this routine, the ECU


10


determines whether conditions for performing the test are satisfied in step


300


. Specifically, the conditions are satisfied when the leakage test for the purge line has not been completed, purging is being executed, the altitude of the vehicle is equal to or below a certain height (for example 2400 m), or the atmospheric pressure is equal to or higher than a certain level, the coolant temperature when the engine is started is in a certain range, for example, between minus ten and plus thirty-five degrees centigrade, the vehicle is not moving uphill or downhill. The conditions are satisfied when all the listed conditions are satisfied.




If all the conditions are satisfied in step


300


, the ECU


10


moves to step


310


. If one or more conditions are not satisfied, the ECU


10


temporarily stops the current routine.




In step


310


, the ECU


10


determines whether the leakage detection has been completed. If the decision outcome of step


310


is positive, the ECU


10


moves to step


370


. If the decision outcome of step


310


is negative, the ECU


10


moves to step


320


.




In step


320


, the ECU


10


closes the block valve


25




a


and opens the purge control valve


11


. Accordingly, outside air does not enter the purge system, and the canister


2


is exposed to the negative pressure in the surge tank


9




a


through the purge line


8


. Also, the fuel tank


1


is exposed to the negative pressure through the canister


2


, the orifice


4




a


and the fuel vapor passage


3


.




Thus, as shown in

FIG. 6

, the purge system is exposed to negative pressure at time t


2


. Thereafter, the pressure detected by the pressure sensor


1




a


falls rapidly. At time t


3


, the purge control valve


11


is temporarily closed, which maintains the negative pressure in the purge line


8


. If there is no malfunction, or leakage, the pressure in the purge system is increased by vaporization of fuel in the tank


1


and finally approaches a pressure at which the air and fuel vapor in the purge system reach equilibrium. However, if there is a leak in the purge system, the pressure in the purge system rapidly approaches atmospheric pressure.




In step


330


, the ECU


10


measures the rate of pressure change (mmHg/second or kPa/second) at time t


31


, or when the pressure in the purge passage reaches a predetermined level (−2.0 kPa=−15 mmHg). The pressure change rate at the time


31


is represented by ΔP(−15).




In step


340


, the ECU


10


determines whether the measured pressure change rate ΔP(−15) is equal to or less than a normality determination value Pa. If the rate ΔP(−15) is equal to or less than the value Pa, the ECU


10


moves to step


350


. If the rate ΔP(−15) is more than the value Pa, the ECU


10


moves to step


360


. In step


350


, the ECU


10


determines that there is no leakage and moves to the step


410


.




In step


360


, the ECU


10


determines whether the rate ΔP(−15) is equal to or less than a malfunction determination value Pb. If the rate ΔP(−15) is equal to or less than the value Pb, the ECU


10


moves to step


410


without judging whether there is a malfunction. If the rate ΔP(−15) is more than the value Pb, the ECU


10


moves to step


370


.




In step


370


, the ECU


10


determines whether the ΔP measurement completion flag is ON. If the flag is ON, the ECU


10


moves to step


390


. If the flag is OFF in step


370


, the ECU


10


moves to step


380


.




In step


380


, the ECU


10


measures the pressure change amount ΔP


1


as in step


220


. As shown in

FIG. 6

, the pressure in the tank


1


increases above 0 KPa (0 mmHg) at time t


5


due to vaporization of fuel. At time t


6


, the ECU


10


computes the pressure change amount ΔP


1


in the tank


1


.




In step


390


, the ECU


10


determines whether the pressure change amount ΔP


1


is more than a value P


0


, which is for example 0.27 kPa, or 2 mmHg. Step


390


is executed to determine the cause of the pressure increase. That is, the ECU


10


determines whether the pressure change amount ΔP


1


is more than the value Pb because of leakage in the purge passage or because of an excessive amount of vaporization in the fuel tank


1


. If the pressure change amount ΔP


1


is more than the value P


0


in step


390


, the ECU


10


moves to step


410


without determining whether there is a malfunction. If the pressure change amount ΔP


1


is equal to or less than the value P


0


, the ECU


10


moves to step


400


.




In step


400


, the ECU


10


determines that there is a leak and moves to step


410


. The ECU


10


terminates the leakage test in step


410


. At time t


6


, the ECU


10


opens the block valve


25




a


. The ECU


10


also opens the purge control valve


11


to start purging.




When measuring the pressure change amount ΔP


1


in step


380


, the ECU


10


opens the block valve


25




a


at the time t


4


while maintaining the purge control valve


11


closed, which equalizes the tank pressure with the atmospheric pressure.




When the block valve


25




a


is opened, the negative pressure Pn


1


in the purge line


8


is equal to the negative pressure Pn


2


in the negative pressure chamber


13




b


and the force based on the negative pressure Pn


2


is more than the force of the spring


13




c


. Accordingly, the diaphragm


13




a


is greatly displaced to increase the opening size of the introducing passage


27


and a great amount of atmospheric air flows into the passage


27


. This rapidly increases the pressure in the purge line


8


and the negative pressure Pn


1


is decreased. At this time, the check valve


45


is closed, which gradually decreases the negative pressure Pn


2


in the negative pressure chamber


13




b


. The force of the negative pressure Pn


2


eventually becomes less than the force of the spring


13




c


at a time t


4




b


, and the control valve


13


is closed. In this manner, the pressure in the purge line


8


is quickly equalized with atmospheric pressure in a short period from the time t


4


to the time t


5


.




If the introduction control valve


13


is directly connected to the purge line


8


, the pressure in the fuel tank


1


changes as illustrated by a broken line in FIG.


7


. In this case, the negative pressure in the purge line


8


changes in the same manner as the negative pressure in the negative pressure chamber


82




b


. The force of the negative pressure Pn


2


becomes less than the force of the spring


82




c


at a time t


4




a


, which is later than the time t


4


. The control valve


82


is closed at the time t


4




a


. Therefore, it takes a relatively long time, or from the time t


4


to the time t


7


, for the pressure in the purge line


8


to be equalized with the atmospheric pressure.




This embodiment has the following advantages.




If the pressure change rate ΔP


1


(−15) is greater than the malfunction determination value Pb in step


360


, and the pressure change amount ΔP has been measured within the predetermined time T


0


(for example, three minutes) before the malfunction test is started, the malfunction test can be performed by using the pressure change amount ΔP Therefore, the pressure change amount ΔP


1


need not be measured after the malfunction test, which reduces the time required for the malfunction test. Since the pressure change amount ΔP


1


need not be measured, purging is not stopped for a significantly long time, which allows sufficient purging of the fuel vapor in the canister


2


.




In this embodiment, the fuel tank


1


is connected to the canister


2


through the orifice


4




a


, which constantly equalizes the pressure in the tank


1


with the pressure in the canister


2


. Therefore, when testing the purge system and when the pressure change amount ΔP


1


in the tank


1


is measured, the tank


1


and the canister


2


are connected in the same manner. Thus, when the pressure change rate ΔP(−15) is equal to or less than the value Pa in step


340


, the malfunction test need not be continued. Also, the pressure change amount ΔP


1


need not be measured again, which reduces the time required for testing. Further, since the pressure change amount ΔP


1


need not be measured, purging is not stopped for a significantly long time, which allows sufficient purging of the fuel vapor in the canister


2


.




When measuring the pressure change amount ΔP


1


, the pressure increase in the negative pressure chamber


13




b


is delayed by the buffer valve


40


relative to the pressure increase in the purge line


8


, which extends the opening time of the introduction control valve


13


. Accordingly, the pressure in the fuel tank


1


and the pressure in the canister


2


are rapidly increased to atmospheric pressure, which reduces the time required for the test of the purge system. As a result, the purging time is extended.




A second embodiment of the present invention will now be described with reference to

FIGS. 8 and 9

. Like or the same reference numerals are given to those components that are like or the same as the corresponding components of the first embodiment. The differences from the first embodiment will mainly be discussed below.




Instead of the pressure buffer valve


40


, which connects the introduction control valve


13


with the purge line


8


, an introduction control valve


48


, which is vacuum switching valve (VSV), is used. Otherwise, the construction is the same as that of the first embodiment.




Normally, the control valve


48


is open. The valve


48


is closed based on a control signal from the ECU


10


when the pressure in the fuel tank


1


is equalized with the atmospheric pressure for measuring the amount of fuel vapor in the tank


1


based on the pressure change amount ΔP


1


.




Accordingly, the purge line


8


is disconnected from the negative pressure chamber


13




b


of the control valve


13


. As a result, the negative pressure Pn


2


of the negative pressure chamber


13




b


is maintained regardless of changes of the pressure in the purge line


8


.




When measuring the pressure change amount ΔP


1


in the fuel tank


1


, the ECU


10


opens the block valve


25




a


at the time t


4


while maintaining the purge control valve


11


closed, which increases the fuel tank pressure to the atmospheric pressure. At this time, the ECU


10


closes the control valve


48


to disconnect the purge line


8


from the negative pressure chamber


13




b


to maintain the negative pressure Pn


2


in the negative pressure chamber


13




b


regardless of changes in the pressure in the purge line


8


. When the block valve


25




a


is opened, the negative pressure Pn


1


in the purge line


8


is equal to the negative pressure Pn


2


in the negative pressure chamber


13




b


, and the force based on the negative pressure Pn


2


is more than the force of the spring


13




c


, which greatly displaces the diaphragm


13




a


. This widely opens the distal opening of the introducing passage


27


and a great amount of atmospheric air enters the passage


27


. Therefore, the pressure in the purge line


8


rapidly increases to atmospheric pressure and the negative pressure Pn


1


is decreased. At this time, the negative pressure Pn


2


in the negative pressure chamber


13




b


is maintained. The control valve


48


is opened at a time t


4




c


, or when the pressure in the fuel tank


1


reaches atmospheric pressure. Therefore, it takes a short period, from the time t


4


to the time t


4




c


, for the pressure in the purge line


8


to reach atmospheric pressure. The time t


4




c


is earlier than the time t


5


.




If the introduction control valve


13


is directly connected to the purge line


8


, the pressure in the fuel tank


1


changes as illustrated by a broken line in FIG.


9


.




In addition to the advantages of the first embodiment, the second embodiment has the following advantages. That is, since the introduction control valve


13


is open for a relatively long period, the pressure in the fuel tank


1


and the pressure in the canister


2


are rapidly increased to atmospheric pressure compared to the first embodiment, which the buffer valve


40


is used. This reduces the time required for testing the purge system. As a result, the purging time is extended.




A third embodiment of the present invention will now be described with reference to

FIGS. 10

to


12


. Like or the same reference numerals are given to those components that are like or the same as the corresponding components of the first embodiment. The differences from the second embodiment will mainly be discussed below.




The purge system of the third embodiment is the same as that of the second embodiment except that an inner pressure control valve


50


is located between the introducing passage


27


and the auxiliary chamber


17


. The control valve


50


bypasses the introduction control valve


13


.




As shown in

FIG. 11

, the control valve


50


includes a check ball


51


, which is located downstream of the flow of the atmospheric air. The check ball


51


is urged by a spring


53


and contacts a vale seat


52


. The force of the spring


53


is slightly more than the force generated by a target negative pressure when testing for a malfunction, which is, for example, −2.67 kPa, or −20 mmHg. When opened, the valve


50


permits air to flow therethrough and the amount of the air is equal to or more than the maximum airflow of the purge control valve


11


(see FIG.


12


).




If the control valve


48


malfunctions and cannot be opened, the negative pressure chamber


13




b


is not exposed to the negative pressure Pn


1


in the purge line


8


when purging is being performed, which holds the valve


13


closed. Accordingly, the negative pressure in the tank


1


and the negative pressure in the canister


2


become excessive. This may collapse the fuel tank


1


and the canister


2


. However, according to the third embodiment, if the negative pressure in the fuel tank


1


is equal to or greater than the target negative pressure, the control valve


50


is opened to draw atmospheric air into the canister


2


. Therefore, the fuel tank


1


and the canister


2


do not collapse.




The purge system of the third embodiment has the same advantages of the purge system according to the second embodiment.




A fourth embodiment of the present invention will now be described with reference to

FIGS. 13 and 14

. Like or the same reference numerals are given to those components that are like or the same as the corresponding components of the first embodiment. The differences from the second embodiment will mainly be discussed below.




The purge system of the fourth embodiment is the same as that of the second embodiment except that the control valve


48


between the control valve


13


and the purge line


8


is omitted. The control valve


13


is directly connected to the purge line


8


. Also, the purge system of the fourth embodiment has an introduction control valve


57


, which is a vacuum switching valve (VSV). The control valve


57


bypasses the introduction control valve


13


.




The control valve


57


is normally closed. The control valve


57


is opened based on control signals from the ECU


10


when the pressure in the fuel tank


1


is equalized with atmospheric pressure for measuring the pressure change amount ΔP


1


.




Therefore, when measuring the pressure change amount ΔP


1


, the ECU


10


opens the block valve


25




a


at a time t


4


in

FIG. 14

, while keeping the purge control valve


11


closed. Accordingly, the pressure in the fuel tank


1


is equalized with atmospheric pressure. At this time, the introduction control valve


57


is opened, which permits a great amount of atmospheric air to enter the canister


2


through the introducing passage


27


. Thus, the pressure in the purge line


8


rapidly approaches atmospheric pressure, which decreases the negative pressure Pn


1


. The pressure in the fuel tank


1


reaches atmospheric pressure at a time t


4




c


. At the time t


4




c


, the control valve


57


is closed. Therefore, it only takes a short period from the time t


4


to t


4




c


for the pressure in the purge line


8


to reach the atmospheric pressure. The time t


4




c


is earlier than the time t


5


.




If the introduction control valve


13


is directly connected to the purge line


8


, the pressure in the fuel tank


1


changes as illustrated by a broken line in FIG.


14


.




According to the fourth embodiment, the control valve


57


is opened when measuring the pressure change amount ΔP


1


in the fuel tank


1


during the malfunction test. Thus, a great amount of atmospheric air is drawn into the canister


2


, which rapidly increases the pressure in the fuel tank


1


and the pressure in the canister


2


to the atmospheric pressure. This reduces the time required for testing the purge system. As a result, the purging time is extended.




A fifth embodiment of the present invention will now be described with reference to

FIGS. 15 and 20

. Like or the same reference numerals are given to those components that are like or the same as the corresponding components of the purge system of FIG.


1


. The differences from the second embodiment will mainly be discussed below.




The purge system of the fifth embodiment is the same as that of the second embodiment except that the control valve


48


between the control valve


13


and the purge line


8


is omitted. The purge system of the fifth embodiment has a three-way valve


60


. One of the ports of the valve


60


is connected to the negative pressure chamber


13




b.






During purging, the three-way valve


60


is controlled based on signals from the ECU


10


. Specifically, the ECU


10


transmits a signal having a predetermined duty ratio to the valve


60


. When the signal from the ECU


10


is an OFF signal, the valve


60


connects the surge tank


9




a


with the negative pressure chamber


13




b


of the control vale


13


through the purge line


8


and disconnects the canister


2


from the surge tank


9




a


. Accordingly, the negative pressure chamber


13




b


is exposed to the negative pressure in the surge tank


9




a


. When the signal from the ECU


10


is an ON signal, the valve


60


connects the canister


2


with the surge tank


9




a


through the purge line


8


and disconnects the negative pressure chamber


13




b


from the surge tank


9




a


. If the force of the negative pressure Pn


2


in the chamber


13




b


is greater than the force of the spring


13




c


, the diaphragm


13




a


is greatly displaced, which widely opens the distal opening of the passage


27


. Thus, the atmospheric air enters the passage


27


, which executes purging.




When measuring the pressure change amount ΔP


1


in the fuel tank


1


, the ECU


10


opens the block valve


25




a


at the time t


4


, while keeping the purge control valve


60


closed, which increases the fuel tank pressure to atmospheric pressure. At this time, the ECU


10


connects the negative pressure chamber


13




b


to the surge tank


9




a


to expose the chamber


13




b


to the negative pressure of the surge tank


9




a


. This greatly displaces the diaphragm


13




a


and widely opens the distal opening of the passage


27


. Accordingly, a great amount of air enters the passage


27


, which rapidly increases the pressure in the purge line


8


and decreases the negative pressure Pn


1


. The ECU


10


opens the purge control valve


60


at a time t


5


, which is a predetermined period (fifteen seconds) after the fuel tank pressure reaches the atmospheric pressure. Therefore, it takes a short period from the time t


4


to the time t


4




c


for the pressure in the purge line


8


to reach atmospheric pressure.




If the introduction control valve


13


is directly connected to the purge line


8


, the pressure in the fuel tank


1


changes as illustrated by a broken line in FIG.


18


.




Thus, when there is no leakage between the negative pressure chamber


13




b


and the purge control valve


60


, the negative pressure in the chamber


13




b


is maintained and the introduction control valve


13


is opened to execute purging. Therefore, the duty ratio of the signal from the ECU


10


can be raised to 100%.




A greater duty ratio of a signal from the ECU


10


represents a shorter OFF time of the purge control valve


60


. Therefore, if there is a little leakage between the chamber


13




b


and the purge control valve


60


, a greater duty ratio of the signal from the ECU


10


prevents the chamber


13




b


from receiving sufficient negative pressure. As a result, the negative pressure in the chamber


13




b


is decreased and the pressure in the purge line


8


is rapidly increased toward atmospheric pressure. This may close the introduction control valve


13


. If the valve


13


is closed, purging cannot be executed, which may collapse the canister


2


and the fuel tank


1


.




Therefore, as shown in

FIG. 17

, the maximum value of the duty ratio may set to, for example, 80%. This will permit the negative pressure chamber


13




b


to be exposed to the negative pressure of the surge tank


9




a


during OFF times, which are 20%. In this case, the duty ratio of the control valve


60


cannot be increased to 100% and the control valve


60


cannot execute purging by the maximum flow rate. Thus, a relatively large valve is preferred to be used as the control valve


60


.




If the purge control valve


60


is controlled by a duty ratio equal to or more than 90%, two different cycles W


1


and W


2


of the duty ratio may be alternately executed as shown in FIG.


19


. Specifically, the duty ratio is 100% in the cycle W


1


and the duty ratio is 60% in the cycle W


2


. In this case, purging is temporarily executed by the maximum flow rate of the purge control valve


60


. Therefore, the control valve


60


need not be replaced with a valve having a greater flow rate.




In general, a higher engine load represents a smaller negative pressure (a higher pressure) in the surge tank


9




a


. Therefore, when setting a maximum value of duty ratio, the OFF times must be extended to generate the needed negative pressure in the negative pressure chamber


13




b


. Thus, as shown in

FIG. 20

, the maximum duty ratio may be decreased as the engine load is increased. When alternating the duty ratio between two different cycles W


1


, W


2


as shown in

FIG. 19

, the cycle W


2


may be repeatedly executed for a certain period. This compensates for lack of negative pressure in the surge tank


9




a.






The purge system according to the fifth embodiment has the same advantages as the purge system of the second embodiment.




A sixth embodiment of the present invention will now be described with reference to FIG.


21


. Like or the same reference numerals are given to those components that are like or the same as the corresponding components of the purge system of FIG.


1


. The differences from the first embodiment will mainly be discussed below.




The purge system according to the sixth embodiment has a vapor introducing port


63


, which is located above the main chamber


16


of the canister


2


. The vapor introducing port


63


draws fuel vapor from the fuel tank


1


to the canister


2


. Also, a check ball type vapor relief valve


64


is located to the right of the vapor port


63


as viewed in FIG.


21


. When the pressure in the fuel tank


1


is negative, the relief valve


64


opens.




A tank pressure control valve


62


is located on the canister


2


to cover the vapor introducing port


63


. The control valve


62


has a diaphragm


62




a


to close the distal opening of the vapor introducing port


63


. The diaphragm


62




a


also vertically separates the interior of the valve


62


. The upper space of the diaphragm


62




a


is a back pressure chamber


62




b


and the lower space is a positive pressure chamber


62




c


. A port


65


is formed in the sidewall of the back pressure chamber


62




b


to expose the chamber


62




b


to atmospheric pressure. The positive pressure chamber


62




c


is connected to the fuel tank


1


through the fuel vapor passage


3


.




A spring


62




d


is located in the back pressure chamber


62




b


to press the diaphragm


62




a


against the opening of the vapor introducing port


63


. Therefore, the control valve


62


is closed as long as the pressure in the fuel tank


1


is less than a predetermined level.




A port


25


is formed above the auxiliary chamber


17


in the canister


2


. An atmospheric control valve


14


covers the port


25


. The negative pressure chamber


13




b


of the control valve


13


is connected to the main chamber


16


of the canister


2


through a pressure passage


72


. A buffer valve


73


is located in the pressure passage


72


. The buffer valve


73


has the same structure as the buffer valve


40


of the first embodiment.




When the engine is running, negative pressure is generated in the surge tank


9




a


. The negative pressure in the surge tank


9




a


purges adsorbed fuel in the canister


2


to the intake passage


9


of the engine. At this time, the negative pressure chamber


13




b


is exposed to the intake pressure through the pressure passage


72


. When the difference between the intake pressure in the chamber


13




b


and the atmospheric pressure in the chamber


13




d


reaches a predetermined level, the control valve


13


is opened. Accordingly, the atmospheric air is drawn into the auxiliary chamber


17


of the canister


2


through the pressure port


28




a


and the port


25


. The introduced atmospheric air causes fuel vapor adsorbed in the activated carbon adsorbents


19




a


,


19




b


in the main and auxiliary chambers


16


,


17


to flow to the purge line


8


. The vapor fuel is therefore purged into intake air in the surge tank


9




a.






A block valve


27




a


is located in the introducing passage


27


. The block valve


27




a


is normally open. During a malfunction test, the ECU


10


actuates the valve


27




a


. The valve


27




a


is, for example, a vacuum switch valve.




When fuel is being supplied to the fuel tank


1


, pressure is applied to the canister


2


through the breather passage


7


, which increases pressure in the positive pressure chamber


12




d


of the release control valve


12


. When the difference between the pressure in the chamber


12




d


and the atmospheric pressure, which is introduced into the chamber


12




b


through the exposure port


29


, reaches a predetermined level, the release control valve


12


is opened. Accordingly, air from which fuel vapor is removed in the main and auxiliary chambers


16


,


17


is discharged through the port


25


and the discharge port


26


.




The positive pressure chamber


62




c


of the control valve


62


is connected to the auxiliary chamber


17


of the canister


2


through a bypass passage


70


. The fuel tank


1


is connected to the canister


2


through the bypass passage


70


, the positive pressure chamber


62




c


of the control valve


62


and the introducing passage


3


. A bypass valve


71


is located in the bypass passage


70


. The bypass valve


71


is normally closed. During a malfunction test, the ECU


10


actuates the bypass valve


71


to adjust the opening size of the bypass passage


70


. The bypass valve


71


is, for example, a vacuum switch valve.




The other structure of the purge system according to the sixth embodiment is the same as that of the first embodiment.




The purge system according to the sixth embodiment operates in the following manner.




Fuel in the fuel tank


1


evaporates, which increases the pressure in the tank


1


. When the pressure in the fuel tank


1


reaches a predetermined level, the tank pressure control valve


62


is opened. Then, vapor fuel flows in the passage


3


from the fuel tank


1


to the canister


2


. Therefore, fuel vapor in the fuel tank


1


is drawn into the canister


2


through the control valve


62


.




When reaching the canister


2


, the vapor fuel is adsorbed by the activated carbon adsorbent


19




a


,


19




b


as in the first embodiment.




Most of fuel in the fuel vapor is removed by the adsorbents


19




a


,


19




b


in the layers


20




a


,


20




b


. The gas then opens the release control valve


12


and is discharged to the outside through the discharge port


26


. At this time, the pressure in the negative pressure chamber


13




b


of the atmosphere introduction control valve


13


is positive and is higher than the pressure in the atmospheric pressure chamber


13




d


. Therefore, the control valve


13


is not opened. Thus, fuel vapor does not leak to the outside through the control valve


13


and the introducing passage


27


.




When the vehicle is parked at one place for a relatively long period, the tank


1


is cooled and fuel vapor is no longer generated. When the pressure in the tank


1


is lower than the pressure in the canister


2


, the pressure in the positive pressure chamber


62




c


of the control valve


62


is negative. Therefore, the check ball of the vapor relief valve


64


is moved upward to open the valve


64


, which returns fuel vapor in the canister


2


to the fuel tank


1


through the fuel vapor passage


3


.




The malfunction test is performed when the pressure change amount ΔP


1


is less than a predetermined value. To measure the pressure change amount in the fuel tank


1


, the pressure in the fuel tank


1


is equalized with atmospheric pressure. Then, the pressure at a certain time is subtracted from the pressure at another time to compute the pressure difference, or the pressure change amount. To introduce negative pressure, the block valve


27




a


is closed, and the purge control valve


11


and the bypass valve


71


are opened. The bypass valve


71


is opened such that the fuel tank


1


is connected with the canister


2


. The purge control valve


11


is opened to expose the fuel tank


1


and the canister


2


to the negative pressure of the surge tank


9




a


. Accordingly, the pressure in the fuel tank


1


and that of the canister


2


are the same negative pressure. The pressure change rate is measured when the negative pressure in the fuel tank


1


reaches a predetermined level for testing.




If the pressure in the fuel tank


1


fluctuates due to the condition of the road surface after introducing the negative pressure, the malfunction test is stopped. In this case, the pressure change amount ΔP


1


is measured again, and the ECU


10


determines whether the measured pressure change amount ΔP


1


is less than a predetermined level. At this time, the pressure in the fuel tank


1


must be increased to atmospheric pressure. Therefore, the block valve


27




a


and the bypass valve


71


are opened while the purge control valve


11


is kept closed. Accordingly, atmospheric air is drawn into the canister


2


and the fuel tank


1


through the introducing passage


27


.




When the block valve


27




a


is opened, the negative pressure Pn


1


in the purge line


8


and the canister


2


is equal to the negative pressure Pn


2


in the negative pressure chamber


13




b


. The force based on the negative pressure Pn


2


is greater than the force of the spring


13




c


, which greatly displaces the diaphragm


13




a


. In other words, the introducing passage


27


is widely opened. Thus, a great amount of air flows into the passage


27


, which rapidly increases the pressure in the purge line


8


toward the atmospheric pressure. However, the buffer valve


73


delays the increase of the pressure in the negative pressure chamber


13




b


. Therefore, the control valve


13


is maintained open for a long period, which reduces the time required for the pressure in the purge line


8


to reach atmospheric pressure. In other words, the purging time is extended.




It should be apparent to those skilled in the art that the present invention may be embodied in many other specific forms without departing from the spirit or scope of the invention. Particularly, it should be understood that the invention may be embodied in the following forms.




In the sixth embodiment, the buffer valve


73


may be replaced by the control valve


48


of the second embodiment. In this case, the same advantages as the sixth embodiment are obtained.




In the illustrated embodiment, the pressure sensor la is located in the fuel tank


1


. However, the pressure sensor


1




a


may be located any place as long as the sensor


1




a


detects the pressure in the purge system. For example, the sensor


1




a


may be located in the canister


2


.




Therefore, the present examples and embodiments are to be considered as illustrative and not restrictive and the invention is not to be limited to the details given herein, but may be modified within the scope and equivalence of the appended claims.



Claims
  • 1. A malfunction test apparatus for a fuel vapor purge system, comprising:a purge system, wherein the purge system connects a fuel tank with a canister and collects fuel vapor generated in the fuel tank in the canister, wherein the purge system purges the collected fuel vapor to an intake passage of an internal combustion engine through a purge passage, the purge passage including the fuel tank; and testing means, wherein the testing means seals the purge passage and measures a change of pressure due to fuel vapor generation in the fuel tank, wherein the testing means measures a rate of change of the pressure in the purge passage after differentiating the pressure in the purge passage from the pressure outside the purge passage and after sealing the purge passage, and wherein the testing means determines whether there is a leak in the purge passage based on the change of pressure due to fuel vapor generation and on the measured rate of change of the pressure in the purge passage, wherein, after measuring the change of pressure due to fuel vapor generation, the testing means determines that there is a leak in the purge passage only if the change of pressure due to fuel vapor generation satisfies a predetermined condition.
  • 2. A malfunction test apparatus for a fuel vapor purge system, comprising:a purge system, wherein the purge system connects a fuel tank with a canister and collects fuel vapor generated in the fuel tank in the canister, wherein the purge system purges the collected fuel to an intake passage of an internal combustion engine through a purge passage, the purge passage including the fuel tank; and testing means, wherein the testing means seals the purge passage and measures a change of pressure due to fuel vapor generation in the fuel tank, wherein the testing means measures a rate of change of the pressure in the purge passage after differentiating the pressure in the purge passage from the pressure outside the purge passage and after sealing the purge passage, and wherein the testing means determines whether there is a leak in the purge passage based on the change of pressure due to the fuel vapor generation and on the measured rate of change of the pressure in the purge passage, wherein the testing means measures the change of pressure due to the fuel vapor generation after measuring the rate of change of pressure in the purge passage.
  • 3. The malfunction test apparatus according to claim 2, wherein the testing means measures the change of pressure due to the fuel vapor generation only when the testing means indicates that there may be leakage in the purge passage.
  • 4. A malfunction test apparatus for a fuel vapor purge apparatus, comprising:a purge apparatus, wherein the purge apparatus collects fuel vapor generated in a fuel tank in a canister, wherein the purge apparatus purges the collected fuel to an intake passage of an internal combustion engine through a purge passage, the purge passage including the fuel tank; testing means, wherein the testing means seals the purge passage and measures a change of pressure due to fuel vapor generation in the fuel tank, wherein the testing means measures a rate of change of the pressure in the purge passage after differentiating the pressure in the purge passage from the pressure outside the purge passage and after sealing the purge passage, and wherein the testing means determines whether there is a leak in the purge passage based on the change of pressure due to the fuel vapor generation and on the measured rate of change of the pressure in the purge passage, wherein the testing means determines whether there is a leak in the purge system based on a change of the pressure in the purge passage while maintaining negative pressure in the purge passage, and wherein the testing means measures the change of pressure due to the fuel vapor generation based on the rate of change of the pressure in the purge passage after the pressure in the purge passage is equalized with the atmospheric pressure; and pressure returning means for accelerating an increase of the pressure in the purge passage to the atmospheric pressure after the leakage test is completed or after the leakage test is discontinued.
  • 5. The malfunction test apparatus according to claim 4, wherein the pressure returning means includes an atmosphere introducing control valve located in a passage that introduces atmospheric air into the purge passage, and wherein the pressure returning means delays movement of the atmosphere introducing control valve from an opened state to a closed state.
  • 6. The malfunction test apparatus according to claim 5, further including bypass means, which bypasses the atmosphere introducing control valve, wherein the bypass means introduces the atmospheric air into the purge passage when the pressure in the purge passage is lowered by an amount that is more than a predetermined value.
  • 7. A method for determining whether a malfunction has occurred in a fuel vapor purge system, wherein the purge system connects a fuel tank with a canister and collects fuel vapor generated in the fuel tank by the canister, wherein the purge system purges the collected fuel vapor to an intake passage of an internal combustion engine through a purge passage, wherein the purge passage includes the fuel tank, the method comprising:measuring a change of pressure due to fuel vapor generation in the fuel tank while sealing the purge passage; measuring a rate of change of the pressure in the purge passage after differentiating the pressure in the purge passage from the pressure outside the purge passage and after sealing the purge passage; determining whether there is a leak in the purge passage based on the change of pressure due to fuel vapor generation and on the measured rate of change of the pressure in the purge passage; and determining that there is a leak in the purge passage only if the change of pressure due to fuel vapor generation satisfies a predetermined condition.
  • 8. A method for testing whether a malfunction has occurred in a fuel vapor purge system, wherein the purge system connects a fuel tank with a canister and collects fuel vapor generated in the fuel tank by the canister, wherein the purge system purges the collected fuel vapor to an intake passage of an internal combustion engine through a purge passage, the purge passage including the fuel tank, the method comprising:measuring a rate of pressure change in the purge passage after differentiating the pressure in the purge passage from the pressure outside the purge passage and after sealing the purge passage; measuring a change of pressure due to fuel vapor generation in the fuel tank while sealing the purge passage; and determining whether there is a leak in the purge passage based on the measured change of pressure due to fuel vapor generation and the rate of pressure change in the purge passage.
  • 9. The method according to claim 8, wherein the amount of generated fuel vapor is measured only when there is an indication that the purge passage may have a leak.
  • 10. A method for determining whether a malfunction has occurred in a fuel vapor purge system, wherein the purge system collects fuel vapor generated in a fuel tank by a canister, wherein the purge system purges the collected fuel vapor to an intake passage of an internal combustion engine through a purge passage, the purge passage including the fuel tank, the method comprising:measuring a change of pressure due to fuel vapor generation in the fuel tank while sealing the purge passage; measuring a rate of the pressure in the purge passage after differentiating the pressure in the purge passage from the pressure outside the purge passage and after sealing the purge passage; testing for a leak in the purge passage based on the measured pressure change due to fuel vapor generation and the rate of change of the pressure in the purge passage, wherein leakage is detected based on the rate of change of the pressure in the purge passage while maintaining negative pressure in the purge passage, and wherein the pressure change due to the fuel vapor generation is measured based on the rate of change of the pressure in the purge passage after the pressure in the purge passage is equalized with the atmospheric pressure; and accelerating an increase of the pressure in the purge passage to atmospheric pressure after the leakage test.
  • 11. The method according to claim 10, wherein the increase of the pressure in the purge passage is accelerated by delaying movement of an atmosphere introducing control valve located in a passage that exposes the purge passage to atmospheric pressure from an opened state to a closed state.
  • 12. The method according to claim 11 further including introducing atmospheric air into the purge passage when the pressure in the purge passage is lowered by an amount that is more than a predetermined value.
Priority Claims (1)
Number Date Country Kind
11-218012 Jul 1999 JP
US Referenced Citations (6)
Number Name Date Kind
5191870 Cook Mar 1993 A
5261379 Lipinski et al. Nov 1993 A
5671718 Curran et al. Sep 1997 A
6105556 Takaku et al. Aug 2000 A
6148803 Majima et al. Nov 2000 A
6283098 Corkill Sep 2001 B1
Foreign Referenced Citations (1)
Number Date Country
A 6-74104 Mar 1994 JP