During the operations involved with erecting a building, or other structure, there are a wide variety of tasks performed every day which utilize positioning information and positioning tools. This includes moving soil, pouring foundations and footers, erecting walls and roofs, and installing interior systems such as HVAC, plumbing, electrical, sprinklers, as well as interior walls and finishing. Typically, these are manually performed operations using tape measures, electronic layout tools (e.g., plumb lasers and digital levels), distance meters, and even survey-type instruments. These tools are used to layout the dimensions of the structures being built. Additionally, these layout tools are often operated by a single user who marks the position of a particular feature while another user installs or builds the feature at the marked position. For example, an operator of an electronic plumb laser marks positions on a wall where holes are to be drilled. Later, another worker actually drills the holes at the indicated positions.
When a project is completed, the final construction drawings are generated which are intended to show where features of a building are actually located. For example, during the course of erecting a building, pipes may have to be re-routed around a structural member. As a result, the actual building is not reflected in the original construction drawings. When this is not shown on the original construction drawings, the are amended on the fly so that they show the features of the building as built. Again, this is often performed manually so that the final construction drawings are an accurate representation of the building as completed.
A method for managing information at a construction site is disclosed. In one embodiment, task data is received from a handheld tool at a construction site. A database is populated with the task data such that the task data can be retrieved from the database. The task data is then used to generate at least one report.
The accompanying drawings, which are incorporated in and form a part of this application, illustrate embodiments of the subject matter, and together with the description of embodiments, serve to explain the principles of the embodiments of the subject matter. Unless noted, the drawings referred to in this brief description of drawings should be understood as not being drawn to scale.
Reference will now be made in detail to various embodiments, examples of which are illustrated in the accompanying drawings. While the subject matter will be described in conjunction with these embodiments, it will be understood that they are not intended to limit the subject matter to these embodiments. On the contrary, the subject matter described herein is intended to cover alternatives, modifications and equivalents, which may be included within the spirit and scope as defined by the appended claims. In some embodiments, all or portions of the electronic computing devices, units, and components described herein are implemented in hardware, a combination of hardware and firmware, a combination of hardware and computer-executable instructions, or the like. In one embodiment, the computer-executable instructions are stored in a non-transitory computer-readable storage medium. Furthermore, in the following description, numerous specific details are set forth in order to provide a thorough understanding of the subject matter. However, some embodiments may be practiced without these specific details. In other instances, well-known methods, procedures, objects, and circuits have not been described in detail as not to unnecessarily obscure aspects of the subject matter.
Unless specifically stated otherwise as apparent from the following discussions, it is appreciated that throughout the present Description of Embodiments, discussions utilizing terms such as “receiving,” “populating,” “using,” “conveying,” “displaying,” “determining,” “generating,” “updating,” “monitoring,” or the like, often (but not always) refer to the actions and processes of a computer system or similar electronic computing device such as, but not limited to, a display unit, a reporting unit, an information management system, a tool interface, or component thereof. The electronic computing device manipulates and transforms data represented as physical (electronic) quantities within the electronic computing device's processors, registers, and/or memories into other data similarly represented as physical quantities within the electronic computing device's memories, registers and/or other such information storage, processing, transmission, or/or display components of the electronic computing device or other electronic computing device(s).
The term “handheld tool” is used often herein. By “handheld tool” what is meant is a man-portable device that is used in the construction trade. Some non-limiting examples of handheld tools include manual tools, power tools (e.g., tools powered by electricity, an internal battery, compressed air, an internal combustion engine, or the like), and powder-actuated tools. Handheld tools are often utilized for tasks such as drilling, sawing, cutting, and installing various types of fasteners.
Example units, systems, and methods for construction site management and reporting are described herein. Discussion continues with a description of an information management network in accordance with various embodiments along with description of some example configurations of components of the information management network. An example positioning infrastructure is described. An example reporting source is described, as are an example tool position detector and an example tool user interface. Discussion concludes with description of an example global navigation satellite system (GNSS) receiver.
In accordance with one embodiment, database 103 can store and retrieve task data 131 and use that data to generate reports 150. The reports 150 can be used to convey details of a task to be performed such as the position where the task is to be performed, operating parameters when performing the task, alerts, updated scheduling information, or updated blueprints 105 based upon received task data 131, etc. For example, report 150 may comprise a data file (e.g., a computer-aided design (CAD) file), or other building information modeling data, which shows the location within a room where certain tasks, such as drilling holes, are to be performed. Using this information, positioning infrastructure 140 can generate cues which the operator of handheld tool 120 uses to properly place the working end (e.g., the drill bit) at the correct location to drill a hole. Positioning infrastructure 140 can also generate cues which direct the operator to change the alignment/orientation of handheld tool 120 so that the hole is drilled in the proper direction. As a result, separate steps of laying out and marking the positions where operations are to be performed, as well as performing the actual operation itself, can be performed by a single operator in one step. Positioning infrastructure 140 is also configured to determine how far handheld tool 120 has traveled while performing a task, such as drilling a hole, and can generate a message telling the operator of handheld tool 120 to stop drilling when the hole is sufficiently deep. Alternatively, the message from positioning infrastructure 140 can cause handheld tool 120 to automatically shut down when a task is completed. In another embodiment, this message can be generated by information management system 101. This is possible in part because handheld tool 120 is configured with a tool position detector 121. As will be discussed in greater detail below, tool position detector 121 is configured to determine the position of the working end of handheld tool 120 based upon a local, or global reference system. Additionally, tool position detector 121 can be configured to determine the alignment/orientation (e.g., azimuth and tilt) of handheld tool 120. Alternatively, tool position detector 121 is coupled with positioning infrastructure 140 rather than with handheld tool 120.
Upon completion of a task, task data 131 is sent from handheld tool 120 to a reporting source 110. Reporting source 110 then generates an asset report 111 to information management system 101 which facilitates tracking the progress of work at the construction site and automatically updating records such as blueprints 105 in real-time using record updater 107 so that they reflect the as-built configuration of the building. It is noted that the functions described which are attributed to positioning infrastructure 140, tool position detector 121, user interface 130 and reporting source 110 can be implemented in a variety of configurations. In one embodiment, all of these functions are integrated into a single device. This device can be coupled with, mounted upon, or integrated within handheld tool 120. In another embodiment, some of the above functions (e.g., reporting source 110, positioning infrastructure 140, and/or user interface 130 can be integrated into a handheld device such as a personal computer system, personal digital assistant (PDA), a “smart phone”, or a dedicated device. This device is in communication with handheld tool 120 which further comprises tool position detector 121 and, optionally, an additional user interface 130. It is noted that a plurality of handheld tools 120 can send task data to a reporting source 110 in accordance with one embodiment. Similarly, a plurality of handheld tools 120 can receive position data 141 from a single positioning infrastructure in accordance with one embodiment.
Additionally, information management system 101 can prevent inadvertent damage to structures within a building. As an example, blueprints 105 can contain information such as the location of mechanical, electrical, and plumbing features (e.g., pipes, electrical conduits, ventilation ducts, etc.) which have already been built, or will be later. Because asset report 111 provides real-time data on actions performed at a construction site, information management system 101 can determine whether an operator of handheld tool 120 is performing an action which may damage other structures or interfere with the installation of subsequent structures. Information management system 101 can generate a warning (e.g., report 150) to the operator of handheld tool 120 prior to beginning a task so that the operator is aware of the potential damage that could be caused. In one embodiment, positioning infrastructure 140, and information management system 101, can monitor the position of handheld tool 120 in real-time and generate a message which causes handheld tool 120 to automatically shut down to prevent damaging other structures. Additionally, user interface 130 can display, for example, a picture of a wall with the underlying structures overlaid to represent their positions, or a blueprint of the wall with the same information. Again, this means that separate steps of laying out and marking the locations of existing structures are not necessary as the operator of handheld tool 120 can be provided that information directly.
Furthermore, due to the asset management capabilities described herein a significant business management tool is realized. That is, because information management system 101 is useful at all levels of asset management, the information system 101 provides significant value added features. For example, the asset reports 111 can provide real-time reporting on the progress of a particular task to allow changing the workflow implemented at a construction site. Information management system 101 can also be used to track the maintenance schedule of handheld tool 120, monitor the performance of handheld tool 120, and to track the service life of “consumables” such as drill bits and saw blades. Furthermore, this can be linked with the material being worked upon. For example, knowing whether concrete or steel is being drilled can significantly change the parameters regarding the life of the consumables, safety, and operator performance, as well whether work is progressing at a satisfactory pace and/or whether to generate alerts.
As an example, if asset report 111 indicates that it is taking longer than expected to drill holes using handheld tool 120, information management system 101 can determine whether the drill bit being used by handheld tool 120 is in need of replacement, or if handheld tool 120 itself is in need of maintenance. Determination of how long it takes to perform a task can be used upon, for example, the start time and finish time for a task as reported by handheld tool 120, or the distance handheld tool 120 has moved in performing a task as reported by positioning infrastructure 140. Additionally, as the location of the consumables and handheld tools can be monitored by information management system 101, the process of locating them in order to implement needed repairs is facilitated. This may also include maintaining inventory of consumables so that sufficient stores are maintained at the construction site to prevent unnecessary delays. Alternatively, it may be that an operator of handheld tool 120 is not exerting enough force which causes the drilling of holes to take longer than expected. In one embodiment, information management system 101 can make this determination and generate a report 150 in real-time to the operator of handheld tool 120. Additionally, information management system 101 can ensure that the proper tools, personnel, and other assets are at the correct location at the correct time to perform a particular task. As an example, information management system 101 can ensure that a generator is at the construction site to provide power to handheld tool 120 as well as the correct fasteners for a particular task. This data can also be used to track the life of handheld tools, consumables, etc., from various providers to determine which provider provides a superior product. For example, if drill bits from one provider have a service live 20% lower than those from a second provider, it may indicate that the second provider sells a superior product.
In another embodiment, information management system 101 can monitor workplace safety in real-time. For example, database 103 can maintain a record of what handheld tools a particular operator is allowed to use. In one embodiment, for example user interface 130 can identifier an operator via manual login (such as by operator input of a personally identifying code), automatic electronic login (such as by sensing an personally identifying information provided wirelessly by an RFID badge worn by the employee), or combination thereof. Thus, if the operator has not been trained how to operate a particular handheld tool, workplace safety, or other relevant information, information management system 101 can generate a report 150 which indicates this to the operator. In one embodiment, report 150 may disable handheld tool 120 such that the operator cannot use handheld tool 120 until the required training has been recorded in database 103. Furthermore, information management system 101 can be used to monitor how quickly a particular operator is at performing a task. This information can be used to determine whether additional training and/or supervision is need for that particular operator.
Additionally, information management system 101 can be used to monitor the quality of work performed at a construction site. As will be discussed in greater detail below, various sensors can be used to send task data 131 which provide metrics (e.g., operating parameters of handheld tool 120 during the performance of a task) for determining how well various operations have been performed. For example, a sensor coupled with handheld tool 120 can determine how much torque was applied to a fastener. This information can be used by, for example, building inspectors at assist them in assessing whether a building is being built in accordance with the building codes. In another example, a camera coupled with handheld tool 120 can capture an image, images, or video showing the work before, during, and after it is performed. The captured media can verify that the hole was cleanly drilled, did not damage surrounding structures, and that excess material was removed. Furthermore, asset report 111 can not only report what actions have been performed at the construction site, but can also report what materials were used or applied to complete a particular task. Asset report 111 can also be used to notify in real-time whether materials, or consumables, are being used at a greater than expected rate. For example, an operator can generate an asset report via user interface 130 which states that a given material (e.g., an adhesive) is not in stock at the construction site.
With reference now to
Computer system 102 of
Referring still to
Referring still to
Similarly, reporting source 110 can also receive data from other sources such as operator(s) 310, consumables 320, materials 330, and other assets 340. Identification of these various data sources can be detected and reported automatically, or manually by operator 310 via user interface 130. In accordance with various embodiments, reporting source 110 can comprise a dedicated user interface 130, and other data sensing devices such as, but not limited to, radio-frequency identification (RFID) readers, magnetic card readers, barcode readers, or image capture devices which utilize image recognition software to identify objects. In accordance with one embodiment, assets 340 comprise devices such as air compressors, extension cords, batteries, equipment boxes, fire extinguishers, or other equipment which are used at the construction site. As a result, information management system 101 can integrate data from a variety of sources in order to facilitate workflow, monitor performance, update blueprints 105 on a real-time basis, and generate reports based upon the received information.
In operation 410 of
In operation 420 of
In operation 430 of
In accordance with one embodiment, operator device 510 is a stand-alone device coupled with a housing 520. In accordance with various embodiments, housing 520 is comprised of a rigid or semi rigid material or materials. In one embodiment, all or a portion of housing 520 is made of an injection molded material such as high impact strength polycarbonate. In one embodiment, housing 520 is transparent to global navigation satellite system (GNSS) satellite signals such as signals which can be received by tool position detector 121 and/or positioning infrastructure 140. In the embodiment of
In another embodiment, operator device 510 comprises an integral component of handheld tool 120. In this embodiment, housing 520 comprises the housing of handheld tool 120 itself. In one embodiment, operator device 510 can draw power directly from handheld tool 120.
In accordance with various embodiments, sensors 550 comprise devices which collect information for operator device 510. Examples of sensors 550 include, but are not limited to, an image capture device (or plurality thereof), a depth camera, a laser scanner, an ultrasonic ranging device, a laser range finder, a barcode scanner, an RFID reader, or the like. Sensors 550 may also identify an operator via wireless communication with an operator identification device (e.g., a badge with an RFID coded with operator unique information). A barcode scanner, or RFID reader, can be used to quickly identify objects, or consumables used by handheld tool 120. For example, each drill bit, saw blade, or other consumable can be configured with a barcode, or RFID tag, which provides a unique identifier of that object. Using this information, operator device 510 can access information which correlates that identifier with other characteristics of that object. As an example, a drill bit can be provided with an RFID tag providing a unique identifier to operator device 510. Operator device 510 then accesses a local, or remote, database and determines that the identified object is a ¾ inch drill bit which is 8 inches long. This information can be used by operator device 510 to facilitate properly performing a task as well as provide information which can be included in task data 131 which is forwarded to information management system 101. In one embodiment, operating parameters of operator device 510 can be configured, either manually or automatically, based upon information from report 150 from information management system 101. This information can be used by the operator of handheld tool 120 to verify that he is using the correct drill bit, as well as for later verification that the task was performed up to standard. Also, data can be sent from operator device 510 conveying its settings or operating parameters back to information management system 101. A user of information management system 101 can also use this information to track the use of that drill bit to determine whether it is time to replace it. In another example, sensors 550 can verify that the correct type of fire-proofing material was used by the operator of handheld tool 120. The use of a camera allows an operator of handheld tool 120 to capture an image of the work performed to verify that the task was performed correctly such as at the correct location and in a manner which complies with applicable standards. It is noted that a plurality of operator devices 510 can be communicatively coupled in a mesh network to permit communications between a plurality of handheld tools 120. Thus, in one embodiment, one handheld tool 120 can relay information to a second handheld tool 120. Operator device 510 can also determine and forward information regarding what materials were used to perform a task (e.g., what type of fastener was used), as well as parameters about the task which was performed such as the torque applied to a nut, or the force used to drive an anchor into a substrate. Operator device 510 can also provide real-time metrics during the course of the task being performed. This permits remote monitoring and/or control of the process from another location such as from information management system 101.
In
In accordance with various embodiments, building site device 530 is configured to receive report(s) 150 from information management system 101 and to relay some or all of this information to operator device 510. In accordance with various embodiments, building site device 530 can be precisely placed at a set of coordinates in the vicinity of the construction site. By determining the azimuth, direction, and elevation from building site device 530 to other points, building site device 530 can provide positioning cues to operator device to assist an operator in properly placing handheld tool 120 to perform a task. This is possible in part because building site device 530 receives instructions via report 150 such as blueprints 105. Building site device 530 can correlate the features shown in blueprints 105 with its current position to determine where those features are to be located at the building site. Furthermore, avoidance zones can be defined where certain actions are not permitted. For example, if rebar is embedded 6 inches deep within a concrete pillar, it may be permissible to drill down 2 inches into the pillar above the rebar, but no deeper to prevent inadvertently hitting the rebar. It may be necessary to use a certain type of adhesive for a task based upon the substances being glued. In accordance with embodiments of the present technology, this information can be sent to operator device 510 through information management network 100.
As an example, building site device 530 can be placed in a space of a building where a room is being built. Using, for example, a GNSS receiver, building site device 530 can precisely determine its own geographic position. Using the information from blueprints 105, building site device 530 can then determine where features of that room are to be located. For example, building site device 530 can determine the location and distance to the walls of the room being built, as well as other features such as pipes, conduits, structural members and the like which will be disposed in the space behind the wall. It is important for an operator of handheld tool 120 to know the location of these features as well in order to prevent inadvertent damage, or to perform tasks which are intended to tie in with these features. For example, it may be desired to drill through sheetrock into underlying studs in a wall. Building site device 530 can determine where these features are located relative to its own position by leveraging the knowledge of its own position and the data from blueprints 105.
In accordance with various embodiments, building site device 530 is also configured to detect the position and/or orientation of handheld tool 120 and to generate instructions which facilitate correctly positioning and orienting it to perform a task. For example, if a hole is to be drilled in a floor, building site device 530 can access blueprints 105 and determine the location, angle, and desired depth of that hole and correlate that information with the location and orientation of handheld tool 120. Building site device 530 then determines where that hole is to be located relative its own location. Building site device 530 then generates one or more messages to operator device 510 which provide positioning cues such that an operator of handheld tool 120 can correctly position the working end (e.g., the drill bit tip) at the location where the hole is to be drilled. It is noted that a series of communications between building site device 530 and operator device 510 may occur to correctly position the working end of handheld tool 120 at the correct location.
Additionally, building site device 530 may use position and/or orientation information generated by tool position detector 121 to facilitate the process of positioning and orienting handheld tool 120. In one embodiment, once the working end of handheld tool 120 is correctly positioned, building site device 530 can generate one or more messages to facilitate correctly orienting handheld tool 120. This is to facilitate drilling the hole at the correct angle as determined by blueprints 105. It is noted that these actions can be performed by operator device 510 of
In
There are a variety of instruments which can be configured to serve the function of building site device 530. One example instrument which can be configured to perform the functions of building site device 530 is a pseudolite which is used to provide localized position information, such as GNSS signal data to operator device 510. Another example instrument which can be configured to perform the functions of building site device 530 is a robotic total station. One example of a robotic total station is the S8 Total station which is commercially available from Trimble Navigation Limited of Sunnyvale, Calif. Another example of an instrument which can be configured to perform the functions of building site device 530 is a virtual reference station (VRS) rover which uses networked real-time kinematics corrections to determine its location more precisely. One example of a VRS rover is the R8 VRS which is commercially available from Trimble Navigation Limited of Sunnyvale, Calif.
In one embodiment, the location of cameras for photogrammetric processing can be determined by information management system 101 based upon what task is to be performed. For example, if a particular wall is to be drilled, information management system 101 can determine where to place cameras in order to capture images which facilitate photogrammetric processing to determine various parameters of the task being performed. Thus, the location where the working end of the drill bit, depth of drilling, angle of drilling, and other parameters can be determined using photogrammetric processing of images captures by sensors 610. Alternatively, a user can choose where to place the cameras in order to capture images to be used in photogrammetric processing. In another embodiment, cameras can be placed in each corner of a room to capture images of the entire area. In accordance with one embodiment, positioning infrastructure 140 can calculate the respective positions of cameras within a work space by detecting known points from a BIM model. For example, !-beams, or room corners, can be readily identified and, based on their known position, the position of the cameras which have captured those features can be determined. Again, this processing of images, as well as other photogrammetric processing, can be performed by information management system 101 and/or positioning infrastructure 140.
In accordance with one embodiment, when handheld tool 120 is brought into a workspace in which the cameras have been placed, it is captured by at least one camera and its position can be determined by image recognition and triangulation. The orientation of handheld tool 120 can be determined using multiple cameras to determine the roll, pitch, and yaw. Also, the position of the working end of handheld tool 120 can be processed in a similar manner. In accordance with one embodiment, this information can be conveyed to handheld tool 120 to provide real-time feedback to an operator of the position and orientation of handheld tool 120. In one embodiment, the cameras comprising sensors 610 can view multiple handheld tools 120 simultaneously and provide real-time position and orientation information to respective operators of those handheld tools. Additionally, new cameras can be added to adjacent or next work areas and integrated into existing area camera networks to facilitate moving handheld tool 120 to other areas, or to extend coverage of positioning infrastructure 140 in large areas where camera angle and/or range is not adequate.
Data receiver 620 comprises a computer system similar to that described above with reference to
Communication transceivers 630 comprise one or more wireless radio transceivers coupled with an antenna 640 and configured to operate on any suitable wireless communication protocol including, but not limited to, WiFi, WiMAX, WWAN, implementations of the IEEE 802.11 specification, cellular, two-way radio, satellite-based cellular (e.g., via the Inmarsat or Iridium communication networks), mesh networking, implementations of the IEEE 802.15.4 specification for personal area networks, and implementations of the Bluetooth® standard. Personal area network refer to short-range, and often low-data rate, wireless communications networks. In accordance with various embodiments, communication transceiver(s) 630 are configured to automatic detection of other components (e.g., communication transceiver(s) 720, 820, and 920 of
Reporting source 110 further comprises communication transceiver(s) 720 which are coupled with antenna 730 and a power source 740. Again, for the purposes of brevity, the discussion of communication transceiver(s) 630, antenna 640, and power source 650 of
Again, for the purposes of brevity, the discussion of communication transceiver(s) 630 and antenna 640 of
A filter/LNA (Low Noise Amplifier) 1034 performs filtering and low noise amplification of both L1 and L2 signals. The noise figure of GNSS receiver 1000 is dictated by the performance of the filter/LNA combination. The downconvertor 1036 mixes both L1 and L2 signals in frequency down to approximately 175 MHz and outputs the analogue L1 and L2 signals into an IF (intermediate frequency) processor 1050. IF processor 1050 takes the analog L1 and L2 signals at approximately 175 MHz and converts them into digitally sampled L1 and L2 inphase (L1 I and L2 I) and quadrature signals (L1 Q and L2 Q) at carrier frequencies 420 KHz for L1 and at 2.6 MHz for L2 signals respectively. At least one digital channel processor 1052 inputs the digitally sampled L1 and L2 inphase and quadrature signals. All digital channel processors 1052 are typically are identical by design and typically operate on identical input samples. Each digital channel processor 1052 is designed to digitally track the L1 and L2 signals produced by one satellite by tracking code and carrier signals and to from code and carrier phase measurements in conjunction with the microprocessor system 1054. One digital channel processor 1052 is capable of tracking one satellite in both L1 and L2 channels. Microprocessor system 1054 is a general purpose computing device which facilitates tracking and measurements processes, providing pseudorange and carrier phase measurements for a navigation processor 1058. In one embodiment, microprocessor system 1054 provides signals to control the operation of one or more digital channel processors 1052. Navigation processor 1058 performs the higher level function of combining measurements in such a way as to produce position, velocity and time information for the differential and surveying functions. Storage 1060 is coupled with navigation processor 1058 and microprocessor system 1054. It is appreciated that storage 1060 may comprise a volatile or non-volatile storage such as a RAM or ROM, or some other computer-readable memory device or media. In one rover receiver embodiment, navigation processor 1058 performs one or more of the methods of position correction.
In some embodiments, microprocessor 1054 and/or navigation processor 1058 receive additional inputs for use in refining position information determined by GNSS receiver 1000. In some embodiments, for example, corrections information is received and utilized. Such corrections information can include differential GPS corrections, RTK corrections, and wide area augmentation system (WAAS) corrections.
Embodiments of the present technology are thus described. While the present technology has been described in particular embodiments, it should be appreciated that the present technology should not be construed as limited to these embodiments alone, but rather construed according to the following claims.
This Application claims priority to U.S. Provisional Application No. 61/564,541, filed Nov. 29, 2011, titled “Managing Information at a Construction Site,” by Kent Kahle et al., assigned to the assignee of the present application, and hereby incorporated by reference in its entirety. This Application is related to U.S. patent application Ser. No. 13/689,529 by Kent Kahle et al., filed on Nov. 29, 2012, titled “Reference Based Positioning of Handheld Tools,” and assigned to the assignee of the present patent application. This Application is related to U.S. patent application Ser. No. 13/689,548 by Kent Kahle et al., filed on Nov. 29, 2012, titled “Integration of as Built Data of a Project,” and assigned to the assignee of the present patent application. This Application is related to U.S. patent application Ser. No. 13/689,556 by Kent Kahle et al., filed on Nov. 29, 2012, titled “Integrating Position Information into a Handheld Tool,” and assigned to the assignee of the present patent application. This Application is related to U.S. patent application Ser. No. 13/689,575 by Kent Kahle et al., filed on Nov. 29, 2012, titled “Application Information for Power Tools,” and assigned to the assignee of the present patent application. This Application is related to U.S. patent application Ser. No. 13/689,595 by Kent Kahle et al., filed on Nov. 29, 2012, titled “Automated Hand Tool Task Verification,” and assigned to the assignee of the present patent application.
Number | Name | Date | Kind |
---|---|---|---|
5903462 | Wagner et al. | May 1999 | A |
5918219 | Isherwood | Jun 1999 | A |
6433689 | Hovind et al. | Aug 2002 | B1 |
6435286 | Stump et al. | Aug 2002 | B1 |
6484818 | Alft et al. | Nov 2002 | B2 |
6544041 | Damadian | Apr 2003 | B1 |
6857879 | Sawada et al. | Feb 2005 | B2 |
6981311 | Seith et al. | Jan 2006 | B2 |
7245999 | Dietsch et al. | Jul 2007 | B2 |
7301536 | Ellenby et al. | Nov 2007 | B2 |
7319395 | Puzio et al. | Jan 2008 | B2 |
7613590 | Brown | Nov 2009 | B2 |
7681192 | Dietsch et al. | Mar 2010 | B2 |
7788317 | Chraiet et al. | Aug 2010 | B2 |
8004664 | Etter et al. | Aug 2011 | B2 |
8041650 | Gaffey et al. | Oct 2011 | B2 |
8316741 | Wallgren | Nov 2012 | B2 |
8362973 | Cernasov et al. | Jan 2013 | B2 |
8532342 | Nielsen et al. | Sep 2013 | B2 |
8619022 | Hart | Dec 2013 | B1 |
8620587 | Nielsen et al. | Dec 2013 | B2 |
8626384 | Newman et al. | Jan 2014 | B2 |
8647124 | Bardsley et al. | Feb 2014 | B2 |
8657482 | Malackowski et al. | Feb 2014 | B2 |
8749239 | Nielsen et al. | Jun 2014 | B2 |
20030000355 | Butler | Jan 2003 | A1 |
20040172800 | Seith | Sep 2004 | A1 |
20040210370 | Gudat et al. | Oct 2004 | A1 |
20040248586 | Patel et al. | Dec 2004 | A1 |
20050110639 | Puzio | May 2005 | A1 |
20060155582 | Brown | Jul 2006 | A1 |
20060173600 | Dietsch et al. | Aug 2006 | A1 |
20060193262 | McSheffrey | Aug 2006 | A1 |
20070010925 | Yokoyama et al. | Jan 2007 | A1 |
20070011285 | Chraiet et al. | Jan 2007 | A1 |
20070027732 | Hudgens | Feb 2007 | A1 |
20070210929 | Sabata et al. | Sep 2007 | A1 |
20080125942 | Tucker et al. | May 2008 | A1 |
20080133128 | Koch | Jun 2008 | A1 |
20090204466 | Nielsen et al. | Aug 2009 | A1 |
20090327024 | Nielsen et al. | Dec 2009 | A1 |
20100010882 | Nielsen et al. | Jan 2010 | A1 |
20100061181 | Malackowski | Mar 2010 | A1 |
20100167250 | Ryan et al. | Jul 2010 | A1 |
20100173582 | Han | Jul 2010 | A1 |
20100174656 | Nolan | Jul 2010 | A1 |
20100275747 | Wallgren | Nov 2010 | A1 |
20100295754 | Cernasov et al. | Nov 2010 | A1 |
20110249122 | Tricoukes et al. | Oct 2011 | A1 |
20120015665 | Farley et al. | Jan 2012 | A1 |
20120109455 | Newman | May 2012 | A1 |
20120130279 | Stone | May 2012 | A1 |
20120270197 | Brost et al. | Oct 2012 | A1 |
20130109375 | Zeiler | May 2013 | A1 |
20130137079 | Kahle et al. | May 2013 | A1 |
20130137468 | Kahle et al. | May 2013 | A1 |
20130138465 | Kahle et al. | May 2013 | A1 |
20130138466 | Kahle et al. | May 2013 | A1 |
20130138606 | Kahle et al. | May 2013 | A1 |
20130203032 | Bardsley et al. | Aug 2013 | A1 |
20140365259 | Delplace et al. | Dec 2014 | A1 |
Number | Date | Country |
---|---|---|
202006014606 | Jan 2007 | DE |
202006016830 | Jan 2007 | DE |
202011004847 | Jun 2011 | DE |
2010-039907 | Feb 2010 | JP |
10-2009-0015354 | Feb 2009 | KR |
Entry |
---|
“International Search Report PCT/2012/066906”, 22 Pages, dated Sep. 12, 2013. |
“12853817.0 Extended Supplementary Search Report”, dated May 29, 2015, pp. 1-8. |
Number | Date | Country | |
---|---|---|---|
20130138606 A1 | May 2013 | US |
Number | Date | Country | |
---|---|---|---|
61564541 | Nov 2011 | US |