The present disclosure relates to the technical field of building construction, and particularly to a maritime green human settlement system and a modularized construction method thereof.
With the improvement of science and technology, maritime resources are more and more widely used, and the concept of maritime human settlement also becomes increasingly popular among people. As to the harsh and changeable marine environment, the safety, comfort and maximization of resource utilization are generally needed to be fully considered during the construction of an offshore house. However, an offshore house has lots of components, and the electromechanical system and the photovoltaic system thereof are relatively complicated with respect to a house on the land, thereby leading to lots of onsite component manufacturing, processing and assembly during the construction process, which not only significantly wastes the building construction time and prolongs the construction period, but also results in that the constructed offshore houses tend to be uniform in style with fixed layout and poor flexibility.
The technical problem to be solved by the present disclosure is to provide a maritime green human settlement system and a modularized construction method thereof, through which multiple indoor and outdoor spatial relationships can be provided with high flexibility, short construction period and low cost.
The present disclosure is implemented as follows: a maritime green human settlement system includes at least one storey unit, solar photovoltaic plates, and a deck. The at least one storey unit is mounted on the deck, the solar photovoltaic plates are mounted on a top surface of a highest one of the storey units, each storey unit includes at least one room and indoor furniture, the at least one room and the indoor furniture are formed by splicing at least three modules in a dislocation manner, and at least one recessed portion is formed at splicing positions.
Furthermore, one recessed portions is designed to be an entryway.
Furthermore, the recessed portion is in number of at least two, and one of the recessed portions is designed to be a gazebo for sea view.
Furthermore, the rooms is in number of at least three, and each room includes a kitchen, a bathroom and an equipment room, with the kitchen, the bathroom and the equipment room respectively located in different modules.
Furthermore, the bathroom is adjacent to the equipment room.
Furthermore, each storey unit is provided with a viewing side for sea view and a non-viewing side, and the bathroom, the equipment room and the kitchen are located at the non-viewing side of the storey unit.
Furthermore, each of the modules includes a frame, outer walls, inner partition walls, a suspended ceiling and a floor. The outer walls are made by a heat insulation technology, and the inner partition walls and the suspended ceiling are made by a light-gauge steel joist system.
Furthermore, the maritime green human settlement system also includes a rainwater collecting system for recycling rainwater. The rainwater collecting system includes a rainwater filtering device, a water storage device and a purification device.
Furthermore, the maritime green human settlement system also includes a reclaimed water treatment system for recycling domestic wastewater. The reclaimed water treatment system includes a grating, a regulating tank, a sedimentation tank, a lifting pump, a hair filter and sterilizing equipment.
Furthermore, the maritime green human settlement system includes a plurality of storey units and stairs. The stairs are mounted between two adjacent storey units.
Embodiments of the present disclosure further provide a modularized construction method for constructing the maritime green human settlement system. The method includes steps of:
Furthermore, in step C, the modules are connected through bolts, and a gypsum board and sealant are used to seal off splicing gaps, after the splicing of modules is done.
Furthermore, the method further includes a step between step C and step D:
Mounting, in a similar manner to step C, a second storey unit on a top surface of the first storey unit, and repeating the mounting until the remaining storey units are all mounted; and mounting a stair between two adjacent storey units.
Furthermore, the modularized construction method also includes step E of:
performing a dehumidification operation on the maritime human settlement system.
Compared with the prior art, the present disclosure has the following advantageous effects: for the maritime green human settlement system and the modularized construction method thereof provided by embodiments of the present disclosure, the maritime green human settlement system forms the room and indoor furniture of each storey unit by splicing at least three modules in a dislocation manner, forms at least one recessed portion at the splicing positions, and meanwhile can form multiple indoor-outdoor spatial relationships by providing a deck and solar photovoltaic plates, which enhances the flexibility, shortens construction period and reduces the cost.
In order to make the objects, technical solutions and advantages of the present disclosure more clear, the present disclosure is described in further detail with reference to the accompanying drawings and the embodiments. It should be understood that the embodiments described herein are only used to explain the present disclosure rather than limiting the same.
Specifically, the rooms are at three in number, including a kitchen, a bathroom and an equipment room each in a different module 4. The width of the deck 3 is the same as the width of the corresponding module 4, and one of the recessed portions H is designed to be an entryway H1. The maritime green human settlement system includes a plurality of storey units 1 and stairs (not shown in figures), each storey unit 1 is provided with a viewing side for sea view and a non-viewing side (as shown in
Furthermore, as equipment pipelines are concentrated in the bathroom and the equipment room, the bathroom is arranged to be adjacent to the equipment room so as to avoid wiring disorder. in order to ensure elegant appearance of the whole viewing side of the building, the bathroom, the equipment room and the kitchen are arranged at the non-viewing side of the storey unit 1. The bathroom is designed to be an integrated bathroom, and the individual components of the bathroom are assembled through dry construction, i.e., the components are flexed through bolts and adhesives (not shown in figures) without using sand or cement. The indoor furniture includes fixed furniture for storage use and partition-type furniture (not shown in figures), the fixed furniture is wholly designed according to the building modulus and the furniture modulus, and the basic modulus of the width size of the partition-type furniture is substantially consistent with the basic modulus of a bay of the maritime green human settlement system. In this embodiment, the maritime green human settlement system includes three storey units which have a construction modulus of 300 mm, the furniture modulus is 150 mm in the horizontal direction, 50 mm in the depth direction, and 32 mm in the height direction. Taking the building modulus as the basic modulus, the unit size of the furniture is 300 mm, 600 mm, 900 mm, 1200 mm or 1500 mm. The total width of the partition-type furniture is 2700 mm, 3000 mm, 3300 mm, etc. The basic modulus of the depth modulus of the partition-type furniture is set to be 50 mm, and the expansion modulus is composed of 300 mm, 350 mm, 400 mm, 500 mm, 600 mm, etc.
In order to fully utilize resources, save energy and protect environment, the maritime green human settlement system further includes a seawater desalination system (not shown in figures), a rainwater collecting system (not shown in figures) for recycling rainwater, and a reclaimed water treatment system (not shown in figures) for recycling the domestic wastewater. The rainwatercollecting system includes a rainwater filtering device, a water orage device and a purification device. The water storage device is a buried-type water storage module or a water storage tank. The reclaimed water treatment system is combined with a constructed wetland, and includes a grating, a regulating tank, a sedimentation tank, a filtering tank and sterilizing equipment. The working process is performed as following sequence raw wa e grating regulation—secondary biological treatment (i.e., constructed wetland)—sedimentation tank—filtering tank—sterilization—reclaimed wastewater, and the resultant reclaimed wastewater can be used for toilet flushing, green d irrigation, etc.
A preferred embodiment of the present disclosure illustrates a modularized construction method for constructing the maritime green human settlement system. The method includes the steps of:
For the maritime green human settlement system and the modularized construction method thereof provided by the embodiments of the present disclosure, the maritime green human settlement system forms the room and indoor furniture of each storey unit I by splicing at least three modules 4 in a dislocation manner, forms at least one recessed portion H at the splicing positions, and meanwhile can form multiple indoor-outdoor spatial relationships by providing a deck 3 and solar photovoltaic plates 2, which enhances the flexibility, shortens construction period and reduce the cost.
The descriptions above are only preferred embodiments of the present disclosure, which are not used to limit the present disclosure. Any modifications, equivalent substitutions, improvements etc. within the spirit and principle of the present disclosure shall all be included in the scope of protection of the present disclosure.
Number | Date | Country | Kind |
---|---|---|---|
201510663108.3 | Oct 2015 | CN | national |
This application is a 371 National Stage of International Application No. PCT/CN2016/090333 filed Jul. 18, 2016, which claims priority to Chinese Patent Application No. 201510663108.3 filed Oct. 14, 2015, the disclosures of which are herein incorporated by reference in their entirety.
Filing Document | Filing Date | Country | Kind |
---|---|---|---|
PCT/CN2016/090333 | 7/18/2016 | WO | 00 |