1. Technical Field
The present disclosure relates to a system for controlling the functioning of production lines, and particularly to a control method for a matrix production system.
2. Description of Related Art
Production lines add parts to a product in a sequential manner to create a finished product. In a factory, a plurality of substantially similar production lines may be set to produce the same products. A production line may include a plurality of stations to complete different procedures. However, when one of the stations of a production line is overburdened or malfunctioning, production speed of this production line may be slowed down. Additionally, at this time, the same stations of other production lines may be idle. Thus, overall production efficiency of the products is reduced.
Therefore, there is room for improvement in the art.
The components in the drawing are not drawn to scale, the emphasis instead being placed upon clearly illustrating the principles of at least one embodiment.
Reference will be made to the drawings to describe various embodiments.
In an exemplary embodiment, the matrix production system 1 includes a first processing unit 11, a second processing unit 12, a third processing unit 13, and a fourth processing unit 14. The first processing unit 11 works at a material feeding process of the production procedures. The second processing unit 12 works at a manufacturing process of the production procedures. The third processing unit 13 works at a testing process of the production procedures. The fourth processing unit 14 works at a process of delivering end-products of the production procedures.
The first processing unit 11 includes a first feeding station 112, a second feeding station 114, a third feeding station 116, and three first detectors 118. Each first detector 118 is located at and corresponds to one of the first, second, and third feeding stations 112, 114, and 116. The second processing unit 12 includes a first manufacture station 122, a second manufacture station 124, a third manufacture station 126, and three second detectors 128. Each second detector 128 is located at and corresponds to one of the first, second, and third manufacture stations 122, 124, and 126. The third processing unit 13 includes a first test station 132, a second test station 134, a third test station 136, and three detectors 138. Each third detector 138 is located at and corresponds to one of the first, second, and third test stations 132, 134, and 136. The fourth processing unit 14 includes a first delivery station 142, a second delivery station 144, a third delivery station 146, and three fourth detectors 148. Each fourth detector 148 is located at and corresponds to one of first, second, and third delivery stations 142, 144, and 146.
In the embodiment, each of the first detector 118, the second detector 128, the third detector 138, and the fourth detector 148 detect a current number of workpieces received by each station at regular intervals, and transmit detection data including the current number of the received workpieces to the controller 15.
The controller 15 sets a first manufacturing process in relation to the first feeding station 112, the first manufacture station 122, the first test station 132, and the first delivery station 142. The controller 15 sets a second manufacturing process in relation to the second feeding station 114, the second manufacture station 124, and the second delivery station 144. The controller 15 sets a third manufacturing process in relation to the third feeding station 116, the third manufacture station 126, and the third delivery station 146.
In the embodiment, the controller 15 sets the first reference capacity as seventy and the second reference capacity as eighty, but the disclosure is not limited thereto.
The second processing unit 12 is taken as an example in a manufacturing process. In operation, the controller 15 compares the current number of received workpieces detected by the second detector 128 with the first reference capacity to determine an overburdened station or not. When the received workpieces of a target manufacture station 122 exceeds the first reference capacity, the controller 15 detects a running state whether the target manufacture station 122 performs one operation on the production line normally by comparing the current number with the second reference capacity. In an example, it is assumed that the current number of workpieces received by the first manufacture station 122 is fifty, the current number of workpieces received by the second manufacture station 124 is seventy-five, the current number of workpieces received by the third manufacture station 126 is eighty-five, and the running state of the first manufacture station 122 and that of the second manufacture station 124 is normal. The running state of the third manufacture station 126 is malfunctioning. And then the controller 15 notifies a manager of the matrix production system 1 to repair the malfunction of the third manufacture station 126 via an email or sounding of an alarm. Then the controller 15 controls the workpieces from the third manufacture station 126 to instead flow to the first manufacture station 122. That is, the controller 15 switches the flow of workpieces from the third manufacture station 126 (the malfunctioning station) to the first manufacture station 122 (a free or idle station).
In step S201, the controller 15 sets a manufacturing process of a type of products during an industrial production process, and a first and second reference capacity of each station. In the embodiment, the second reference capacity is greater than the first reference capacity.
In step S203, each detector detects a current number of workpieces received by a station, and transmits a detection data including the detected current number to the controller 15.
In step S205, the controller 15 compares the current number detected by each detector with the first reference capacity for detecting an overburdened station. When the current number of received workpieces of one station exceeds the first reference capacity, the station is determined as the overburdened station, and step S207 is performed.
In step S207, the controller 15 analyzes whether the running state of the overburdened station which has an excessive number of workpieces is malfunctioning. In the embodiment, the controller 15 compares the current number of workpieces received by the overburdened station with the second reference capacity to obtain the running state of the overburdened station. If the number of received workpieces of the overburdened station is greater than the second reference capacity, the running state of the overburdened station is deemed to be malfunctioning. And then the controller 15 notifies a manager of the matrix production system 1 to repair the malfunction. Otherwise, if the number of received workpieces of the overburdened station is not greater than the second reference capacity, the running state of the overburdened station is deemed to be not malfunctioning.
In step S209, the controller 15 finds a station which has a free or idle capacity, in the event of there being more than one, the station which has a minimum number of workpieces from amongst all the other stations in the posterior processing unit which have the same function with the malfunctioning station.
In step S211, the controller 15 switches the flow of workpieces from the malfunctioning station to the station with free or idle capacity.
The matrix production system the switches the flow of workpieces from any malfunctioning or overburdened station to a station with available capacity, thus the overall production efficiency is improved.
It is to be understood that even though numerous characteristics and advantages of the present embodiments have been set forth in the foregoing description, together with details of the structures and functions of the embodiments, the disclosure is illustrative only; and changes may be made in detail, especially in the matters of arrangement of parts within the principles of the embodiments, to the full extent indicated by the broad general meaning of the terms in which the appended claims are expressed.
Number | Date | Country | Kind |
---|---|---|---|
201210202757X | Jun 2012 | CN | national |