Claims
- 1. A method of monitoring, analyzing and managing mechanical press usage, comprising the steps of:monitoring vibration severity, including vibration severity zone; monitoring tipping moment severity; monitoring press repair information, including die repair information; monitoring press maintenance information, including die maintenance information; monitoring press applied load; and analyzing the effect of vibration severity, tipping moment severity, press repair, press maintenance and applied load to determine necessary press modifications.
- 2. A mechanical device optimization system, for monitoring a mechanical device within a production facility having a plurality of device applications, said system comprising:a computation means; a vibration severity monitoring system generating vibration severity data regarding a least one mechanical device in a production facility and communicating said data to said computation means; a tipping moment severity monitoring system generating tipping moment data regarding at least one mechanical device in a production facility and communicating said data to said computation means; the computation means determining which device applications create the worst vibration severity, worst tipping moment severity, and calculating the relative risk of each application.
- 3. The system of claim 2 in which said devices are mechanical presses.
- 4. The system of claim 2 in which said applications are die sets for utilization with said devices.
- 5. The system of claim 2 utilized on at least two devices, said computation means calculating which of said at least two application should operate on which of said at least two devices.
- 6. The system of claim 5 in which said devices are mechanical presses.
- 7. The system of claim 5 in which said applications are die sets for utilization with said devices.
- 8. The system of claim 2 in which said computation means calculates the possible increase in device speed without a decrease in device lifetime or increase in relative risk.
- 9. The system of claim 8 in which said computation means again operates after the device speed has increased.
- 10. The system of claim 2 in which said tipping moment severity monitoring system is replaced with a die load monitoring system.
- 11. The system of claim 2 in which said tipping moment severity monitoring system is replaced with a die chipping monitoring system.
- 12. The system of claim 2 in which said tipping moment severity monitoring system is replaced with a dynamic parallelism monitoring system.
CROSS-REFERENCE TO RELATED APPLICATIONS
This application relates to and claims the benefit under 35 U.S.C. §119 of Provisional Application Serial No. 60/146,535 filed Jul. 30, 1999 by the same inventor.
US Referenced Citations (15)
Provisional Applications (1)
|
Number |
Date |
Country |
|
60/146535 |
Jul 1999 |
US |