1. Field of the Invention
The present invention relates generally to power delivery, and more particularly, to the control and monitoring of backup power delivered to one or more loads.
2. Background Art
Office building tenants are increasingly sensitive to the quality and reliability of their electric power. Many are expanding their investment in and reliance upon sophisticated computer and telecommunications equipment and networks that are increasingly vulnerable to grid-related power fluctuations and outages. To retain existing tenants and to attract new ones, office building owners need to establish a new standard of service that delivers power with reliability and quality that effectively addresses these growing concerns.
One approach for providing such a standard of service involves installing onsite power generation equipment for backup power. When power is lost from the electric utility that normally provides power, the onsite power generation equipment can be activated as a backup system to provide power to the office tenants during the outage. Such systems can provide an efficient way for office property owners to provide the power, reliability, and quality that will keep their facilities state-of-the-art and a step ahead of their competition.
However, onsite power generators have limited power generation capability as compared to electric utilities, and can fail when suddenly having to supply a heavy current load, such as when being powered up after the loss of the primary power source. Such limitations increase a difficulty in managing the delivery of power from backup sources during loss of primary power.
Thus, what is needed are improved ways of managing the loss of a primary power supply, including improved ways of managing the delivery of backup power from a relatively limited backup resource, and of avoiding failure of the backup power generators during power up and other situations.
Methods, systems, and apparatuses for alternate power delivery are provided. A metering assembly is used to enable delivery of alternate power to an electrical circuit load during a primary power outage. Primary power and alternate (e.g., backup) power are received at a transfer switch at respective inputs. An output of the transfer switch is coupled to the electrical circuit load. During normal operation, the transfer switch supplies the primary power to the load. The metering assembly is coupled to the transfer switch, and enables the transfer switch to provide the alternate power to the load during a loss of the primary power.
In an example implementation, the metering assembly includes a power meter module. The power meter module includes a power control module and a power monitor. The power control module is coupled to the transfer switch. The power control module is configured to receive a request from the transfer switch for the alternate power to be supplied through the transfer switch to the electrical circuit load. The power control module is configured to enable the transfer switch to supply the alternate power to the electrical circuit load in response to the request.
In a further aspect, the power monitor is configured to determine an amount of the alternate power provided to the electrical circuit load through the transfer switch. The power control module is configured to enable the alternate power to be decoupled from the electrical circuit load if the determined amount of the alternate power provided to the electrical circuit load is greater than a power trip setpoint.
The metering assembly may include a user interface. The user interface may be configured to enable an operator of the metering assembly to input the power trip setpoint.
The metering assembly may include a communication interface configured to communicate with a supervisory entity. The supervisory entity may receive status and/or other information from the metering assembly. The supervisory entity may provide instructions and/or parameters to the metering assembly, such as the power trip setpoint.
In a further aspect, the supervisory entity may be communicatively coupled to a plurality of metering assemblies. Each metering assembly may be coupled to a transfer switch or a plurality of transfer switches. Each transfer switch receives the primary power and the alternate power at respective inputs. Each transfer switch has an output coupled to a corresponding electrical circuit load.
In an example aspect, the supervisory entity is configured to determine an order in which to enable the plurality of transfer switches to supply the alternate power to the plurality of electrical circuit loads in the event of loss of the primary power. The supervisory entity generates and provides timing information to each metering assembly. The power control module of each metering assembly transmits a signal to the respective transfer switch based on the received timing information to enable the alternate power to be supplied to the corresponding electrical circuit load according to the determined order.
In a further aspect, a customer load panel includes a plurality of circuit breakers coupled between a corresponding transfer switch and a source of the alternate power. Each metering assembly is coupled to a corresponding circuit breaker. Each metering assembly can cause the corresponding circuit breaker to open, to withhold the alternate power from the corresponding transfer switch and corresponding electrical circuit load.
In an example aspect, each electrical circuit load is distributed through a corresponding portion of a building or other structure. The source of the first power may be an electric utility or other primary power provider. The source of the alternate power may be located in the structure or other location suitable for alternate power. The metering assemblies may be positioned in any location, including being stored in one or more cabinets. The customer load panel may be positioned adjacent to the cabinet(s) or in any other location.
These and other objects, advantages and features will become readily apparent in view of the following detailed description of the invention. Note that the Summary and Abstract sections may set forth one or more, but not all exemplary embodiments of the present invention as contemplated by the inventor(s).
The accompanying drawings, which are incorporated herein and form a part of the specification, illustrate the present invention and, together with the description, further serve to explain the principles of the invention and to enable a person skilled in the pertinent art to make and use the invention.
The present invention will now be described with reference to the accompanying drawings. In the drawings, like reference numbers indicate identical or functionally similar elements. Additionally, the left-most digit(s) of a reference number identifies the drawing in which the reference number first appears.
The present specification discloses one or more embodiments that incorporate the features of the invention. The disclosed embodiment(s) merely exemplify the invention. The scope of the invention is not limited to the disclosed embodiment(s). The invention is defined by the claims appended hereto.
References in the specification to “one embodiment,” “an embodiment,” “an example embodiment,” etc., indicate that the embodiment described may include a particular feature, structure, or characteristic, but every embodiment may not necessarily include the particular feature, structure, or characteristic. Moreover, such phrases are not necessarily referring to the same embodiment. Further, when a particular feature, structure, or characteristic is described in connection with an embodiment, it is submitted that it is within the knowledge of one skilled in the art to effect such feature, structure, or characteristic in connection with other embodiments whether or not explicitly described.
Furthermore, it should be understood that spatial descriptions (e.g., “above,” “below,” “up,” “left,” “right,” “down,” “top,” “bottom,” “vertical,” “horizontal,” etc.) used herein are for purposes of illustration only, and that practical implementations of the structures described herein can be spatially arranged in any orientation or manner.
Methods, systems, and apparatuses are provided for power delivery in environments where a main power source and an alternate power source are available. For example, the alternate power source may be a backup power source to the main power source. Embodiments enable power to be supplied by the alternate power source to electrical circuit loads when desired, such as during a failure of the main power source. Furthermore, embodiments enable monitoring of supplied alternate power, sequencing of loads to receive alternate power, shedding of loads from alternate power, and/or other functions.
The example embodiments described herein are provided for illustrative purposes, and are not limiting. Further structural and operational embodiments, including modifications and/or alterations, will become apparent to persons skilled in the relevant art(s) from the teachings herein.
First power source 128 generates a first power signal 114. First power signal 114 may be any type of power signal having any voltage level, as would be known to persons skilled in the relevant art(s). For example, first power signal 114 may be a 120 V, 208 V, 480 V, or other voltage level signal, and may be a direct current (DC) signal or an alternating current (AC) signal, such as a single phase, dual phase, or three phase power signal. During normal operation, first power signal 114 is received by electrical circuit loads 112 to provide power to electrical circuit loads 112.
When activated, alternate power source 104 generates an alternate power signal 118. Alternate power signal 118 is generated by alternate power source 104 to substantially match first power signal 114 in voltage, phase, and/or other attribute(s), to be acceptable for powering electrical circuit loads 112. Alternate power source 104 may include any number of one or more power generating elements to generate alternate power signal 118. For example, alternate power source 104 may include one or more power generating elements that use a fuel (e.g., natural gas, propane, diesel or kerosene) to generate energy (e.g., gas powered generators, etc.), that use solar radiation to generate energy (e.g., solar cells), and/or that generate energy in any other manner. In an embodiment, alternate power source 104 may include one or more (e.g., an array) microturbines that consume a fuel to generate power and/or heat. For example, microturbines distributed by Capstone Turbine Corporation, Chatsworth, Calif., such as C60 iCHP MicroTurbines, microturbines distributed by Elliott Energy Systems, Stuart, Fla., such as TA100-CHP microturbines, and/or other types of microturbines may be included in alternate power source 104 to generate power, in an embodiment.
Alternate power source 104 may be configured to generate enough electricity to meet any demand by electrical circuit loads 112, including 100% of the peak demand, or a percentage of the building's peak electrical demand, such as in the range of 25%-40% of the peak demand, or any other percentage.
As mentioned above, alternate power delivery system 134 manages delivery of power from alternate power source 104 as an alternative to first power source 128. As shown in
Transfer switches 110 switch power between sources 128 and 104 to electrical circuit loads 112. Any number of transfer switches 110 and corresponding electrical circuit loads 112 may be present. For example,
Transfer switch 110a may be any type of switch suitable for switching between input power sources, such as an automatic transfer switch (ATS). Transfer switches 110 each include a first input terminal coupled to first power source 128, a second input terminal coupled to alternate power source 104 (through load panel 108), and an output terminal coupled to a corresponding electrical circuit load 112. Transfer switch 110a is shown in
Transfer switch 110a includes one or more communication terminals coupled to alternate power delivery control interface 106 by communication link 124. Transfer switch 110a includes a sensing circuit to detect when a failure of first power source 128 occurs. When such a failure is detected, an emergency mode may be entered, and logic of transfer switch 110a may transmit a request over communication link 124 to alternate power delivery control interface 106 for backup power. Alternate power delivery control interface 106 may transmit a signal on communication link 124a to transfer switch 110a to enable transfer switch 110a to switch from first power source 128 to alternate power source 104. Once enabled, the output terminal of transfer switch 110a is coupled to the second input terminal of transfer switch 110a, to supply alternate power branch signal 120 to electrical circuit load 112 on selected power signal 126a.
In an embodiment, transfer switch 110a is a “break before make” switch, breaking contact with one input terminal before making contact with the other, so that first power signal 114 and alternate power branch signal 120 are not coupled together at any time in transfer switch 110a. Any type and number of electrical connection mechanisms may be used to transmit power signals, such as first power signal 128, alternate power signal 118, alternate power branch signal(s) 120, and selected power signal(s) 126, including any type, gauge, and number of electrical wires/cabling, as would be known to persons skilled in the relevant art(s).
Alternate power delivery control interface 106 is coupled to transfer switches 110a-110n. Alternate power delivery control interface 106 is configured to perform various control functions, as well as various monitoring functions. For example, alternate power delivery control interface 106 is configured to perform some control functions with regard to transfer switches 110 and load panel 108. Furthermore, as described in detail further below, alternate power delivery control interface 106 may perform power monitoring functions, as well as status monitoring functions in some embodiments.
Alternate power delivery control interface 106 is coupled to each transfer switch 110 by a corresponding communication link 124. For example, as shown in
For example,
Each of first-nth circuit breakers 204a-204n (also referred to as “branch breakers”) of load panel 108 receives alternate power signal 118 through main circuit breaker 202. Each of first-nth circuit breakers 204a-204n enables passage of alternate power signal 118 as a respective one of alternate power branch signal 120a-120n according to control signals received on communication links 122a-122n from alternate power delivery control interface 106. Circuit breakers 204a-204n also provide for overcurrent protection to wires/cable of the respective one of alternate power branch signal 120a-120n.
Supervisory entity 130 may be present to perform a supervisory function for system 134. In an embodiment, supervisory entity 130 communicates with alternate power delivery control interface 106 over a communication link 116. Embodiments for supervisory entity 130 are described in further detail below.
Alternate power delivery control interface 106 may be configured in any way to perform its functions. For instance,
First enclosure 304 may be one or more cabinets or other type of enclosure(s). Any number of metering assemblies 302 may be present, depending on the particular implementation. First-nth metering assemblies 302a-302n are shown in
In
In an embodiment, first enclosure 304 and second enclosure 306 may be cabinets that are positioned side by side in an electrical room of a structure, such as a building. A manager/owner of first and second enclosures 304 and 306 may use metering assemblies 302 to distribute alternate power signal 118 to tenants and/or other occupants of the structure. For instance, metering assemblies 302 of first enclosure 304 monitor and control delivery of alternate power signal 118 passing through circuit breakers 202/204 of second enclosure 306. In an embodiment, each electrical circuit load 112 corresponds to a particular tenant of the structure. Each tenant may compensate the manager/owner of first and second enclosures 304 and 306 for the supplied alternate power, and may pay for a transfer switch 110, circuit breaker 204, metering assembly 302, and/or other component used to manage delivery of power to an electrical circuit load 112 of the tenant.
In the example embodiment of
A metering assembly 302 may be configured in any manner to perform its functions within alternate power delivery system 134 of
Flowchart 400 begins with step 402. In step 402, a first power is supplied to an electrical circuit load through a transfer switch that has a first input terminal coupled to a source of the first power and a second input terminal coupled to a source of an alternate power. For example, during normal operation, transfer switch 110n supplies first power signal 114, received at a first input terminal of transfer switch 110n, to nth electrical circuit load 112n. Transfer switch 110n receives alternate power signal 118 at a second input terminal from alternate power source 104 (through load panel 108) as alternate power branch signal 120n.
In step 404, a request is received for the alternate power to be supplied through the transfer switch to the electrical circuit load. Referring to
In step 406, the alternate power is generated at the second source. Alternate power source 104 may already be activated and generating alternate power signal 118, or may be offline, and may thus need to be activated. In an embodiment, supervisory 130 may transmit an activation request signal to alternate power source 104 over a communication link (not shown in
In step 408, the alternate power is enabled to be received by the electrical circuit load through the transfer switch. In an embodiment, after alternate power source 104 is activated, and is sufficiently ready to support a new electrical load, alternate power signal 118 is enabled to be received by electrical circuit load 112n through transfer switch 110n. For example, alternate power source 104 may communicate its readiness to supervisory entity 130 and/or metering assembly 302n. Metering assembly 302n may transmit an enable signal over communication link 124n to transfer switch 110n to enable the second input terminal of transfer switch 110n to be coupled to the output terminal of transfer switch 110n, to provide alternate power signal 118 to nth electrical circuit load 112n as selected power signal 126n.
Note that flowchart 400 is described above with respect to metering assembly 302n, for illustrative purposes, and that further metering assemblies 302 (e.g., metering assembly 302a, etc.) may be used to perform flowchart 400 with regard to their respective transfer switches 110 and electrical circuit loads 112. For example, multiple metering assemblies 302 may perform one or more steps of flowchart 400 in parallel due to a loss of first power signal 114. In embodiments, step 408 may be performed by the multiple metering assemblies 302 such that transfer switches 110 are enabled to provide power from alternate power source 104 in a serial manner or in parallel.
If power is enabled to be supplied through multiple transfer switches 110 simultaneously, this may potentially cause alternate power source 104 to fault off-line (e.g., due to a surge in required current). In an embodiment, step 408 may be performed according to a step 502 shown in
In step 602 of flowchart 600, the request for alternate power is received from a transfer switch at a supervisory entity. For example, transfer switch 110a may detect a loss of power on first power signal 114, and may transmit the request for alternate power. In an embodiment, the request for alternate power is received by a metering assembly 302a from transfer switch 110a on communication link 124a. Metering assembly 302a may forward the request to supervisory entity 130 on communication link 116. In another embodiment, supervisory entity 130 receives the request directly from transfer switch 110a.
In step 604, the supervisory entity determines an order in which to enable the transfer switches. Because first power signal 114 is lost, each electrical circuit load 112a-112n relying on first power signal 114 for power will need backup power. In an embodiment, supervisory entity 130 may store electrical starting requirements for each of electrical circuit loads 112a-112n, and may store power supply specification information of alternate power source 104, including a maximum power capability, and information indicating a capability of alternate power source 104 to respond to load increases. Supervisory entity 130 may determine a sequence for enabling electrical circuit loads 112a-112n, and time intervals between such enabling, based on the electrical starting requirements and specification information.
In step 606, timing information is transmitted to each of the plurality of metering assemblies for enabling a corresponding transfer switch. For example, in an embodiment, supervisory entity 130 may transmit timing information to each of metering assemblies 302a-302n that includes timing for each metering assembly 302 to enable the corresponding transfer switch 110.
In step 608, signals are transmitted from the plurality of metering assemblies to the transfer switches to enable supply of the alternate power according to the determined order. In an embodiment, metering assemblies 302a-302n each enable their corresponding one of transfer switches 110a-110n according to the timing information received from supervisory entity 130. For example, each metering assembly 302a-302n may receive a corresponding timing delay after which to enable a respective one of transfer switches 110a-110n.
Metering assemblies 302 can be configured in any manner to perform their functions. For instance,
In the embodiment of
Power monitor 714 performs monitoring functions for metering assembly 302. For example, power monitor 714 may monitor a power supplied by alternate power source 104 through the corresponding transfer switch 110. In some embodiments, power monitor 714 may perform status monitoring with regard to a corresponding transfer switch 110 and circuit breaker 204 using communication links 718 and 720, respectively.
Power control module 712 and power monitor 714 may be implemented in hardware, software, firmware, or any combination thereof Storage 708 includes one or more storage devices (e.g., memory chips, hard disc drives, etc.) for storing information, including control data, status data, power data, and/or further types of information. In an embodiment, power meter module 706 may be a power meter or similar device.
Communication interface 702 provides a interface for metering assembly 302 to communicate with supervisory entity 130 over communication link 116. Communication link 116 can include any type of communication link, including a network such as a local area network (LAN), wide area network (WAN), or combination of networks such as the Internet. Communication link 116 can be a proprietary or industry standard communication link that is wired or wireless, and can support serial or parallel communications. Communication interface 702 may be configured for communications over communication link 116 according to any protocol, including Ethernet, a Wi-Fi protocol (e.g., IEEE WLAN 802.11), or other protocol as desired for a particular application. For example, in an embodiment, communication interface 702 may be configured to communicate with supervisory entity 130 according to the Modbus serial communications protocol, which is an industry standard, over communication link 116, which may be configured for RS-485 communications.
Supervisory entity 130 may be any type of entity capable of performing command and control functions over metering assemblies 302. Supervisory entity 130 may be implemented in hardware, software, firmware, or any combination thereof For example, in an embodiment, supervisory entity 130 may be implemented in a computer system having one or more processors that execute code that implements logic of supervisory entity 130. For example,
Referring back to
Storage 708 may be used to store any desired information for metering assembly 302. For example, in an embodiment, storage 708 may store information, including control parameters, received from supervisory entity 130 and/or user interface 704, and to store power consumption and/or other status and historical information collected/generated by power monitor 714. Storage 702 may provide a buffer for the stored data to enable continued operation of metering assembly 302 if communication with supervisory entity 130 is lost.
For example,
In step 1202 of flowchart 1200, a status of a transfer switch is monitored. For instance, as shown in
In step 1204, a status of a circuit breaker is monitored. For instance, as shown in
In step 1206, an amount of the alternate power provided to the electrical circuit load is monitored. Power monitor 714 may determine an amount of power provided to electrical circuit load 112 through transfer switch 110 in any manner. For example, in an embodiment, power monitor 714 may perform step 1206 according to a flowchart 1300 shown in
In step 1302, a voltage received from the alternate power source is measured. For example, as shown in
In step 1304, a current provided through the transfer switch to the electrical circuit load by the alternate power source is measured. For example, as shown in
In step 1306, a power provided to the electrical circuit load by the alternate power source is calculated. Power monitor 714 may calculate the power provided to electrical circuit load 112 through transfer switch 110 in any manner, such as in a digital or analog form. Power monitor 714 may calculate the provided power according to P=V×I×PF (for single phase loads) and P=V×I×PF×1.732 (for three phase loads), where P is the calculated power, V is the measured voltage of step 1302, and I is the measured current of step 1304, PF is the power factor calculated from V and I phase angles. Power monitor 714 may calculate the apparent, reactive and/or active power supplied by alternate power source 104 through transfer switch 110. An indication of the calculated power may be stored by power monitor 714 in storage 708 as power data 1006 shown in
As indicated above, alternate power source 104 may provide DC, single phase, dual phase, three phase, or other configurations of power. In a multi-phase power embodiment, power meter module 706 may have multiple voltage inputs for coupling multiple voltage signals 1108 between power monitor 714 and the various phases of alternate power branch signal 120. Furthermore, current monitor 1102 may have multiple current measuring elements to measure the current of the various phases of alternate power branch signal 120. For example,
In an embodiment, metering assembly 302 monitors a power provided to an electrical load 112 through a corresponding transfer switch 110 to determine whether an amount of power in excess of an allowable amount is being consumed by the electrical load 112. For example, an electrical circuit load 112 may be a load provided by a particular tenant residing in a portion 132 of structure 102 (shown in
In step 1502 of flowchart 1500, an entity is enabled to input a power trip setpoint defining an allowable amount of power to be provided to the electrical circuit load by the alternate power source. For example, in an embodiment, an operator of user interface 704 may input a power trip setpoint (e.g., 400 KiloWatts) into metering assembly 302. The power trip setpoint may be a maximum allowable amount of power to be provided to electrical circuit load 112, or may be another power level intended to cause action (e.g., a notification, etc.). Any number of power trip setpoints may be entered into user interface 704 corresponding to various power levels where action is desired. Alternatively, the power trip setpoint(s) may be received from supervisory entity 130. A power trip setpoint may be stored in storage 708 as power trip setpoint 1002, as shown in
In step 1504, whether an amount of the alternate power provided to the electrical circuit load is greater than the power trip setpoint is determined For example,
In step 1506, a reduction in the power provided to the electrical circuit load by the alternate power source is enabled. If power control module 712 determines in step 1504 that the amount of power provided to electrical circuit load 112 by alternate power source 104 is greater than power trip setpoint 1002, power control module 712 may enable a reduction (e.g., a partial or complete cutoff) of power from alternate power source 104 to the electrical circuit load 112.
In embodiments, power control module 712 may enable the reduction of power supplied to the electrical circuit load 112 in a various ways. As shown in
In some situations, a total power supplied to electrical circuit loads 112a-112n may approach or begin to exceed a maximum power supply capability of alternate power supply 104. Such as situation could lead to an undesired failure of alternate power supply 104. In an embodiment, supervisory entity 130 may be configured to enable the shedding of one or more of electrical circuit loads 112a-112n to reduce the total load on alternate power supply 104. For example, in an embodiment, supervisory entity 130 may be configured to determine a sum of the amounts of alternate power provided to electrical circuit loads 112a-112n through transfer switches 110a-110n. Supervisory entity 130 may request power data 1006 to be transmitted to supervisory entity 130 from each of metering assemblies 302a-302n. Supervisory entity 106 may sum the entries for power data 1006 received from metering assemblies 302a-302n. If supervisory entity 130 determines that the sum is greater than a maximum allowable output power of alternate power source 104, supervisory entity 130 may select one or more of electrical circuit loads 112a-112n to be shed to reduce power consumption. Supervisory entity 130 may transmit an instruction to one or more metering assemblies 302 corresponding to the selected electrical circuit loads 112 to decouple the selected electrical circuit loads 112 from alternate power source 104. Power control modules 712 corresponding to the selected electrical circuit loads 112 may open circuit breaker 204 or transfer switch 110, in a similar fashion as described above with regard to
Note that communications links 122, 124, 718, and 720, and communication links that carry signals 1106 and 1108, may be any type of communication links. The communication links may carry communications in analog or digital form. For example, the communication links may each include one or more wires/cables that can supply a voltage (e.g., 5 V, 24 V, etc.) to indicate a particular signal state. A metering assembly 302 may include one or more relays used to make communications by changing signal states (e.g., 5 V, 24 V) on one or more of the communication links.
In an embodiment, a metering assembly may include a power meter module that includes a power control module, wherein the power control module is communicatively coupled to a transfer switch, wherein the transfer switch has a first input terminal coupled to a source of a first power, a second input terminal coupled to a source of an alternate power, and an output terminal coupled to an electrical circuit load. The power control module is configured to receive a request from the transfer switch for the alternate power to be supplied through the transfer switch to the electrical circuit load. The power control module is configured to enable the transfer switch to supply the alternate power to the electrical circuit load in response to the request.
The transfer switch may be a break before make type switch configured to switch the output terminal from the first input terminal to the second input terminal in the event of a loss of the first power when enabled by the power control module.
The metering assembly may further include a communication interface configured to communicate with a supervisory entity, wherein the communication interface is coupled to the power meter module.
The supervisory entity may be communicatively coupled to a plurality of power meter modules of corresponding metering assemblies. The power meter modules may be communicatively coupled to a plurality of transfer switches. The transfer switches may be coupled to a plurality of electrical circuit loads.
The supervisory entity may be configured to determine an order in which to enable the plurality of transfer switches to supply the alternate power to the plurality of electrical circuit loads in the event of loss of the first power. The power control module may receive timing information from the supervisory entity through the communication interface. The power control module may transmit a signal to the transfer switch based on the received timing information to enable the alternate power to be supplied to the electrical circuit load according to the determined order.
Each of the plurality of electrical circuit loads may be distributed through a corresponding portion of a building, wherein the source of the first power is an electric utility, and wherein the source of the alternate power is located in the building
The power meter module may further comprise a power monitor coupled to the power control module. The power monitor may be configured to determine an amount of the alternate power provided to the electrical circuit load. The power control module may be configured to compare the determined amount of alternate power provided to the electrical circuit load to a power trip setpoint. The power control module may be configured to enable the alternate power to be decoupled from the electrical circuit load if the power monitor determines that the amount of the alternate power provided to the electrical circuit load is greater than the power trip setpoint.
The power control module may be configured to transmit a signal to a circuit breaker coupled between the transfer switch and the source of the alternate power to open the circuit breaker to decouple the alternate power from the electrical circuit load.
The power control module may be configured to transmit a signal to the transfer switch to inhibit the alternate power from being supplied to the electrical circuit load to decouple the alternate power from the electrical circuit load.
The power monitor may be configured to measure a voltage received from the alternate power source, to measure a current provided through the transfer switch to the electrical circuit load, and to calculate the amount of power provided to the electrical circuit load based on the measured voltage and the measured current.
The power monitor may be configured to calculate the amount of power provided to the electrical circuit load for single and three phases of power supplied by the alternate power source.
The supervisory entity may be configured to determine a sum of the amounts of alternate power provided to the plurality of electrical circuit loads through the transfer switches. The power control module may be configured to enable the alternate power to be decoupled from the electrical circuit load according to a received instruction from the supervisory entity if the supervisory entity determines that the sum is greater than a maximum allowable output power of the alternate power source.
The metering assembly may further include a user interface configured to enable an operator of the metering assembly to determine the power trip setpoint, and a storage device. The storage device may be configured to store the determined power trip setpoint.
The metering assembly may further include a display coupled to the power meter module, a keypad coupled to the power meter module, a storage device coupled to the power meter module, and a housing that contains the power meter module, the storage device, and the communication interface, and that mounts the display and the keypad.
While various embodiments of the present invention have been described above, it should be understood that they have been presented by way of example only, and not limitation. It will be apparent to persons skilled in the relevant art that various changes in form and detail can be made therein without departing from the spirit and scope of the invention. Thus, the breadth and scope of the present invention should not be limited by any of the above-described exemplary embodiments, but should be defined only in accordance with the following claims and their equivalents.
This application is a divisional of pending U.S. application Ser. No. 11/950,601, filed on Dec. 5, 2007, now allowed, which is incorporated by reference herein in its entirety.
Number | Date | Country | |
---|---|---|---|
Parent | 11950601 | Dec 2007 | US |
Child | 13469328 | US |