This disclosure relates to an apparatus and method to avoid multiplexing of control and data for mobile users in a Long Term Evolution (LTE) reverse link. More particularly, this disclosure relates to a method and apparatus for coordinating the uplink and downlink scheduling assignments for power-limited users in the LTE reverse link.
While the disclosure is particularly directed to a particular telecommunications scheduling method to avoid multiplexing for power limited users, and thus will be described with specific reference thereto, it will be appreciated that this disclosure may have usefulness in other fields and applications. For example, this disclosure may be used in a variety of telecommunication networks where uplink and downlink scheduling assignments may be coordinated.
By way of background, 3rd Generation Partnership Project (3GPP) LTE has chosen Single Carrier Frequency Domain Multiple Access (SC-FDMA) for the reverse link. As a consequence, when control signaling is transmitted from the mobile terminal to the base station at the same time that there is data transmitted, then the control signaling must be multiplexed together with the data through appropriate rate matching of the data information. The rate matching results in puncturing of the coded data symbols in order to make space for the control channel signaling 17, 19, as shown in
Examples of control information which needs to be sent in the reverse link in LTE include ACK/NACK information to support Hybrid Automatic Repeat reQuest (HARQ) in the forward link and Channel Quality Indication (CQI) which provides information to the base station 13 on the quality of the channel in the forward link. These two main types of control signaling are sent in the uplink in order to support the downlink.
ACK/NACK for HARQ—For every packet sent to the mobile in the downlink that the mobile detects, the mobile will generate a positive acknowledgement (ACK) if the packet was decoded successfully. The mobile will generate a negative acknowledgement (NACK) if the packet could not be decoded successfully. The mobile will transmit the ACK or NACK at a fixed time after the base station 13 transmitted the packet to the mobile. As shown in
CQI—CQI is a measurement of the downlink channel quality as measured by the mobile 11. The mobile 11 makes such a measurement and transmits it in the uplink back to the base station 13. The transmission of CQI information 19 is controlled by the base station 13 through higher layer of signaling whereby the base station sets up a starting time and a periodic reporting cycle. As shown in
Puncturing the data symbols with control information increases the code rate on the data channel, which will reduce the Quality of Service (QoS) on the data channel. This, in turn, increases the error rate if no action is taken in order to compensate for the puncturing 21.
As shown in
There are commonly two types of scheduling supported in the 3GPP LTE. These types of scheduling grants include dynamic scheduling and persistent scheduling. In dynamic scheduling, every packet transmission from the base station 13 to the mobile 11 (downlink) and the mobile 11 to the base station 13 (uplink) are explicitly scheduled by the base station 13 through the use of a scheduling grant. There is a separate scheduling grant for downlink transmissions and uplink transmissions. The scheduling grant is issued through the base station scheduler 35. This scheduling grant may be sent on the Physical Downlink Control CHannel (PDCCH). Persistent scheduling is generally used in order to alleviate control channel bottlenecks in the LTE. With persistent scheduling, a higher layer message (layer 2 or layer 3) informs the mobile 11 that it is scheduled at predetermined time instances and at predetermined locations in frequency. Through persistent scheduling, a specific packet size and modulation scheme may be used.
There is a separate persistent scheduling message for the uplink and the downlink. For example, a mobile 11 may be assigned a persistent allocation which allows it to transmit in the uplink or receive in the downlink every 5 milliseconds using 360 kilohertz of bandwidth starting at a frequency location with a modulation scheme of QPSK and a packet size of 320 bits. This type of scheduling is especially useful for supporting a large number of users which have a traffic source with a predictable arrival rate. Voice over Internet Protocol (VoIP) is one prominent example that often uses persistent scheduling.
One common problem with multiplexing in the prior art is that a mobile may already be transmitting at a maximum power in order to maintain the QoS on the uplink data channel in the absence of uplink control information. Stated another way, when the control information is multiplexed with the uplink data information, the solution in the current art of increasing the mobile transmit power is not applicable. For example, adding delta control to an already maxed out power is not feasible because the mobile is already operating at maximum power. In instances such as these, the QoS suffers due to this multiplexing solution.
There is a need in the industry for a method that permits data and control to be scheduled in a way that multiplexing is not necessary. There is also a need in the industry for a method and a system that provides the solution where uplink and downlink scheduling assignments are coordinated in such a way to avoid multiplexing specifically for power limited mobile users. It would also be useful for this solution to be equally feasible regardless or uplink and downlink scheduling grants.
The present disclosure contemplates a new and improved method that resolves the above-referenced difficulties and others.
A method and system for coordinated scheduling of a mobile in order to avoid multiplexing of control signaling and data signaling for power limited mobiles is provided. This disclosure allows for control signaling transmissions and data signaling transmissions to be scheduled on the uplink and the downlink during different time subframes. This disclosure is particularly useful for power limited mobiles where multiplexing comes at the cost of quality of service.
In one aspect of the disclosure the method for coordinated scheduling of telecommunication devices comprises defining a round trip time for signaling transmissions, defining a round trip time for data signaling retransmissions and allocating the signaling transmission and signaling retransmission for uplink transmissions which are directed by a first scheduling mode and downlink transmissions which are directed by a second scheduling mode to take place in subframe time positions where control signaling transmissions are not being transmitted in subframes that data transmissions and retransmissions are being transmitted.
In accordance with another aspect of the present disclosure, the method includes identifying whether the telecommunication device is a power limited mobile prior to executing the coordinated scheduling.
In accordance with another aspect of the present disclosure, the telecommunication device is identified as a power limited mobile via head room reporting.
In accordance with another aspect of the present disclosure, the method includes that the first scheduling mode and second scheduling mode are both dynamic.
In accordance with another aspect of the present disclosure, the method includes that the first scheduling mode is dynamic and the second scheduling mode is persistent.
In accordance with another aspect of the present disclosure, the method includes that allocating the signaling transmissions and signaling retransmissions includes restricting downlink data transmissions in subframes that would delegate a response transmission in the uplink to subframes that have persistently scheduled data transmissions.
In accordance with another aspect of the present disclosure, the method includes that the first scheduling mode is persistent and the second scheduling mode is dynamic.
In accordance with another aspect of the present disclosure, the method includes that allocating the signaling transmission and signaling retransmission includes restricting uplink data transmissions in subframes that have response transmissions persistently scheduled in the uplink.
In accordance with another aspect of the present disclosure, the method includes that the first scheduling mode and second scheduling mode are both persistent.
In accordance with another aspect of the present disclosure, the method further comprises scheduling allocations for the transmissions to take place with a time offset in subframe time positions so that scheduled transmissions do not coincide.
In accordance with another aspect of the present disclosure, a system for avoiding multiplexing of control and data transmissions comprises a mobile station configured to transmit uplink controlled signaling transmissions, uplink control signaling responses and uplink data signaling transmissions and retransmission according to a first scheduled grant, a base station transmitter configured to transmit downlink data signaling transmissions which call for the control signal responses according to a second scheduled grant and a base station scheduler configured to schedule the mobile station and base station transmitter to transmit signaling transmissions during time frames where the control signaling transmissions, control signaling responses and data signaling transmissions and retransmissions are not allocated to the same time subframe.
In accordance with another aspect of the present disclosure, the system includes that the mobile station is a power limited mobile station.
In accordance with another aspect of the present disclosure, the system includes that the first and second schedule grants are dynamic scheduling.
In accordance with another aspect of the present disclosure, the system includes that the first scheduled grant is persistent scheduling and the second scheduled grant is dynamic scheduling and the base station scheduler prohibits the downlink data signaling transmissions during time frames that call for uplink control signal responses in time subframes where the uplink data signaling transmissions and retransmissions are persistently allocated.
In accordance with another aspect of the present disclosure, the system includes that the first scheduled grant is dynamic scheduling and the second scheduled grant is persistent scheduling and the base station scheduler prohibits the uplink data signal transmissions and retransmissions during time subframes where the uplink control signaling transmissions or uplink control signaling responses are persistently allocated.
In accordance with another aspect of the present disclosure, the system includes that the first and second schedule grants are persistent scheduling and the transmissions take place with a time offset in subframe time positions so that persistently scheduled data and control transmissions do not take place in the same time subframe.
In accordance with another aspect of the present disclosure, the system for coordinated scheduling of control and data transmissions comprises a first transmitter configured to communicate transmissions on the uplink, a second transmitter configured to communicate transmissions on the downlink and a scheduler configured to coordinate first and second transmitters to communicate the transmissions in order the data transmissions and control transmissions are not transmitted during common subframes.
In accordance with another aspect of the present disclosure, the system includes that the control transmissions includes retransmissions.
In accordance with another aspect of the present disclosure, the system includes that the control transmissions include ACK/NACK responses.
In accordance with another aspect of the present disclosure, the system includes that control transmissions include quality channel information transmissions.
The presently described embodiments exist in the construction, arrangement, and combination of the various parts of the device, and steps of the method, whereby the objects contemplated are attained as hereinafter more fully set forth, specifically pointed out in the claims, and illustrated in the accompanying drawings in which:
Referring now to the drawings wherein the showings are for purposes of illustrating the disclosed embodiments only and not for purposes of limiting the same,
The general idea of this disclosure is to coordinate a downlink scheduling and uplink scheduling in such a way as to avoid the case where control channel information (to support the downlink) needs to be transmitted on the uplink at the same time as data is transmitted on the uplink. This disclosure is especially useful for mobile devices that are identified to be power-limited in the uplink. A power-limited user in the uplink is defined as a user which cannot support the required additional power offset delta control 31,
3GPP LTE will support what is known as mobile power head room reporting. This is a report from the mobile 11 to the base station 13 indicating that the maximum mobile transmit power minus the current nominal power level setting P. With such a report the base station is able to determine if a mobile is classified as being power-limited. This described method is especially useful for power-limited mobiles so that these mobiles do not sacrifice QoS due to multiplexing. In some embodiments, the scheduler 35 houses the software that determines which transmissions receive priority. The details for some exemplary embodiment are outlined below.
Still referring to
Referring to
In one embodiment, the base station scheduler 35 does not schedule a power-limited mobile 11 to transmit data 15 in the uplink, either with a dynamic scheduling grant or persistent scheduling grant, at those subframes for which the mobile has been configured to transmit CQI 19. This should apply to both the first transmission of the mobile as well as any other retransmission that may be necessary when utilizing HARQ in the uplink.
Now referring to
This disclosure is also related to a method for avoiding multiplexing of ACK/NACK 17 together with uplink data transmission. Generally, uplink and downlink transmissions may take place through one of the two different scheduling modes. Therefore, this disclosure outlines the four different possible cases, separately. The four different cases are dynamic scheduling in both the uplink and downlink, persistent scheduling in the uplink and dynamic scheduling in the downlink, persistent scheduling in the downlink and dynamic scheduling in the uplink, and persistent scheduling in both the uplink and the downlink.
Case 1, Dynamic Scheduling in Both the Uplink and the Downlink
Given a downlink scheduling grant in a particular subframe, it is known precisely, in this embodiment, in which subframe the mobile will respond by transmitting an ACK or NACK 17. In this case, the base station scheduler 35,
Now referring to
Case 2, Persistent Scheduling in the Unlink and Dynamic Scheduling in the Downlink
In the case of persistent scheduling in the uplink, the mobile 11 is informed via higher layer signaling that it is permitted to transmit uplink data in predefined time instances (e.g. certain preferred subframes) and in certain locations and frequency. As far as multiplexing with control signaling is concerned, this disclosure is primarily involved with predefined subframes in which the mobile is configured to transmit uplink data 17. In this case of persistent scheduling for uplink data 17, the base station 13 does not schedule packet transmissions in the downlink to the mobile 11 in the subframes which would call for an ACK/NACK 17 to be transmitted by the mobile in the same subframes as it has been configured to transmit uplink data 15 by the persistent scheduling assignment.
Now referring to
This is of course but one embodiment and many of these factors could change and still fall within the scope of the claims. For example, the persistent scheduling may require uplink transmission every ten frames, or 13 frames, etc. Also, time between downlink transmissions and corresponding response ACK/NACKs may be any number of subframes. Furthermore, the amount of time that a subframe represents may vary according to different embodiments of this disclosure.
Case 3, Persistent Scheduling in Downlink and Dynamic Scheduling in the Uplink
In the case of persistent scheduling in the downlink, the mobile 11 is informed via higher layer signaling that there will potentially be data transmitted to it in the downlink in predefined time instances (e.g. certain predefined subframes). Note that it is not necessary for any data to be transmitted in the downlink and the persistently allocated subframes. In the case of persistent scheduling for downlink data, the base station 13 does not schedule uplink data packet transmissions 15 in the subframes in which an ACK/NACK 17 may need to be transmitted in response to a persistently allocated downlink transmission to the mobile 11. Note that similar to the previously discussed cases, this embodiment should also take into account any uplink synchronous retransmissions of the uplink data 15 that might be required.
Now referring to
In this embodiment, scheduling of uplink data is restricted for this user at subframe 3 and every 10 subframes afterwards. Furthermore, scheduling would be restricted of uplink data to this user in subframe 8 and every ten subframes afterwards. Given a persistent downlink scheduling allocation in subframe 0 and every ten frames afterwards, scheduling is restricted in uplink transmissions for this mobile in subframe 3 and every 10 subframes afterwards as those subframes would potentially call for an ACK/NACK 17 to be transmitted by the mobile 11 in the persistently allocated uplink subframes. Furthermore, in this embodiment, subframe 8 and every 6 subframes afterwards would also be restricted if the mobile 11 is configured to use HARQ retransmissions.
Case 4, Persistent Scheduling in Both Uplink and Downlink
In the case of persistent scheduling in both the uplink and the downlink, these persistent allocations should be offset in time in such a way that the persistent scheduled uplink transmissions do not coincide with those subframes in which the mobile would need to transmit an ACK/NACK 17 in response to a transmission in the downlink. Given an offset of X subframes between a downlink transmission and a transmission of the corresponding ACK/NACK 17 by the mobile 11 in the uplink (X=3 in the previous examples), then the configuration would be restricted of the uplink/downlink persistent allocation, such that the uplink persistent allocation occurs X subframes later than the downlink persistent scheduling allocation.
Now referring to
It should be noted that included in all four of the previous examples, scheduling should take the transmission of CQI 19 into account. One goal of this disclosure is to avoid multiplexing of all types of control and data signaling, including ACK/NACK and CQI 19.
It should be understood that the method may be implemented by a variety of software and/or hardware configurations. In one embodiment, the software implementing the above described method may reside in the variety of network elements throughout the telecommunication system. In another embodiment, the software and/or hardware implementing this method may be distributed on many appropriate network elements. In one form the software implementing the method is found in the base station scheduler 35.
The above description merely provides a disclosure of particular embodiments of the claimed invention and is not intended for the purposes of limiting the same thereto. As such, this disclosure is not limited to only the above-described embodiments. Rather, it is recognized that one skilled in the art could conceive alternative embodiments that fall within the scope of the invention.
Number | Name | Date | Kind |
---|---|---|---|
6999438 | Nounin et al. | Feb 2006 | B2 |
7069038 | Hakkinen et al. | Jun 2006 | B2 |
7751363 | Etemad et al. | Jul 2010 | B1 |
8014264 | Li et al. | Sep 2011 | B2 |
20050213575 | Shin et al. | Sep 2005 | A1 |
20060146762 | Kuroda et al. | Jul 2006 | A1 |
20070064708 | Usuda et al. | Mar 2007 | A1 |
20070223404 | Khan et al. | Sep 2007 | A1 |
20080080422 | Frederiksen et al. | Apr 2008 | A1 |
20080084845 | Kuchibhotla et al. | Apr 2008 | A1 |
20080102846 | Kim et al. | May 2008 | A1 |
20080247375 | Muharemovic et al. | Oct 2008 | A1 |
20080311919 | Whinnett et al. | Dec 2008 | A1 |
20080316959 | Bachl et al. | Dec 2008 | A1 |
20090010240 | Papasakellariou et al. | Jan 2009 | A1 |
20090047902 | Nory et al. | Feb 2009 | A1 |
20090196249 | Kawamura et al. | Aug 2009 | A1 |
20090201885 | Kuroda et al. | Aug 2009 | A1 |
20090217118 | Miki et al. | Aug 2009 | A1 |
20090316811 | Maeda et al. | Dec 2009 | A1 |
Number | Date | Country |
---|---|---|
2007-214823 | Aug 2007 | JP |
Entry |
---|
IEEE 100 The Authoritative Dictionary of IEEE Standards Terms, IEEE, 2000, pp. 1, 2 and 716. |
PCT/US2008/011077, International Search Report, Feb. 18, 2009, 3 pages. |
PCT/US2008/011077, Written Opinion of the International Searching Authority, Feb. 18, 2009, 7 pages. |
Lucent Technolgies: “Downlink Multiplexing” 3GPP TSG-RAN WG1 #46-bis, Oct. 9-13, 2006, Seoul, Korea, 8 pages. |
NTT Docomo, Fujitsu, Mitsubishi Electric, NEC, Sharp, Toshiba Corporation “L1/L2 Control Channel, Structure for E-UTRA Uplink”, 3GPP TSG RAN WG1 Meeting #45, Shanghai, China, May 8-12, 2006, 9 pages. |
Philips, NXP Semiconductors, “Control signaling for dynamically - and persistently-scheduled transmissions in E-UTRA”, 3GPP TSG RAN WG1 Meeting #49-bis, Orlando, USA, Jun. 25-29, 2007, 4 pages. |
Alcatel-Lucent, “Signaling Power Offsets in the Persistent Scheduling Assignment Message to Handle Data/Control Multiplexing in the E-UTRA UL”, 3GPP TSG-RAN WG2 #59, Athens Greece, Aug. 20-24, 2007, 2 pages. |
3GPPTS, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Layer procedures (release 8), Sep. 2009, 77 pages. |
3GPP TS 36.213 V2.0.0 (Sep. 2007), 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Layer procedures (Release 8); Sep. 24, 2007; 14 pages. |
English Bibliography for Japanese Patent Application Publication No. 2007-214823A, published Aug. 23, 2007, Printed from Thomson Innovation on Jun. 20, 2012 (3 pages). |
Number | Date | Country | |
---|---|---|---|
20090092103 A1 | Apr 2009 | US |