The invention relates to methods and systems for coupling communication systems to power line.
The ability to interconnect computers and other intelligent devices is a common requirement wherever people live and work today. The electrical connection required to form this local area network (LAN) has traditionally been accomplished by installing dedicated data wiring both inside buildings and between clusters of buildings. A number of wireless (i.e. radio) methods have also been developed and deployed to address this need.
More recently, technology to allow electric power wiring infrastructure to simultaneously transport data at high rates has been realized. This Power Line Carrier (PLC) technology typically uses modulated radio frequency (RF) signals below 50 MHz conducted on the power wiring to transport the data.
There are significant practical advantages offered by PLC technology—namely that electrical wiring, of necessity, must be installed and that data connectivity can therefore be immediately added at little (or no) additional cost, particularly in existing buildings. Similarly, electrical outlets are ubiquitous within modem buildings and significant operating convenience is realized when data is simultaneously available at every outlet.
Another advantage of PLC technology is that the range that can be achieved is significantly greater than wireless methods, particularly in commercial buildings constructed of heavier materials that severely attenuate wireless signals. Yet another advantage of PLC technology over wireless methods is that the data is inherently more secure since a physical connection is required to join the network.
Most contemporary LANs are configured in a “hub and spoke” topology where a central server device supports a number of users and also provides a gateway to the Wide Area Network (WAN) and/or the Internet. Maximum utility for a PLC network is obtained when its' physical configuration mirrors the logical topology of the LAN, i.e. when the PLC gateway is effectively located at the “electrical center” of the space such that every outlet is served with the best possible PLC signal. This point is often a rarely accessed electrical panel in a service closet or the basement and is almost never co-located with other data processing equipment.
Another important issue, particularly in commercial buildings, is that 3-phase electrical power/wiring is commonly used and adequate coverage of a PLC network within the building is achieved only when all three phases are excited with the PLC signal.
Yet another related issue arises during the installation of PLC networks in environments that have natural barriers to the signals (or block them entirely). A common situation is where a building has been modified and all sections no longer share a common source of electrical power. Another common situation is where power is supplied from a central point and then distributed to sections of the space via transformers, often for purposes of distribution efficiency or electrical isolation. In view of the above, new methods and systems are desirable to better utilize power lines for communication purposes.
In one aspect, a device for interfacing a communication signal with an electrical power network in a building having at least one service panel includes a coupling device configured to couple a modulated communication signal to a power-line network; and one or more resettable breakers each configured to allow for manual disconnect and configured to provide over-current protection, the one or more resettable breakers each being electrically coupled to the coupling device and configured to be electrically coupled to the electrical power network. Such a device eliminates the need of separate fusing and cut-off mechanisms and providing enhanced integration and economy.
In another aspect, a device for interfacing a communication signal with an electrical power network in a building having at least one service panel includes a coupling device configured to couple a modulated communication signal to a power-line network, and an electrical breaking means coupled to the coupling device for providing manual disconnect and over-current protection. Such a device also eliminates the need of separate fusing and cut-off mechanisms and providing enhanced integration and economy.
In yet another aspect, a device for interfacing a communication signal with an electrical power network in a building having at least one service panel includes a coupling means for coupling a modulated communication signal to a power-line network and an electrical breaking means coupled to the coupling device for providing manual disconnect and over-current protection. Such a device again eliminates the need of separate fusing and cut-off mechanisms and providing enhanced integration and economy.
In still another aspect, a method for interfacing a communication signal with an electrical power network in a building having at least one service panel includes providing communication coupling between a communication device and a power-line network via modulated communication signals and using a coupler located in a first box, and providing a manual electrical cut-off capacity in the first box.
There has thus been outlined, rather broadly, certain embodiments of the invention in order that the detailed description thereof herein may be better understood, and in order that the present contribution to the art may be better appreciated. There are, of course, additional embodiments of the invention that will be described or referred to below and which will form the subject matter of the claims appended hereto.
In this respect, before explaining at least one embodiment of the invention in detail, it is to be understood that the invention is not limited in its application to the details of construction and to the arrangements of the components set forth in the following description or illustrated in the drawings. The invention is capable of embodiments in addition to those described and of being practiced and carried out in various ways. Also, it is to be understood that the phraseology and terminology employed herein, as well as the abstract, are for the purpose of description and should not be regarded as limiting.
As such, those skilled in the art will appreciate that the conception upon which this disclosure is based may readily be utilized as a basis for the designing of other structures, methods and systems for carrying out the several purposes of the present invention. It is important, therefore, that the claims be regarded as including such equivalent constructions insofar as they do not depart from the spirit and scope of the present invention.
Embodiments of the current invention are directed to improving data connectivity afforded by PLC technology. While the carrier current coupler apparatus described here provides the means to effect the physical connection to the building power wiring, much of the improvement derives from identifying the appropriate point(s) at which to inject the PLC signal.
One common objective is to inject the PLC signal from a single, centralized device (often called a “gateway”) into the building wiring in such a way that all receptacles in the building receive adequate signal for a second device (often called a “terminal”) plugged in there to function properly. The attenuation of PLC signals along arbitrary runs of wiring is difficult to predict and highly variable so it is generally not possible to supply all receptacles with equal signal levels. A more achievable objective is to have the building and all of its' receptacles taken together as a system be well-behaved, i.e. where no single receptacle is completely cut off from the PLC signal and where the signal amplitude decreases in a reasonably predictable fashion with distance from the signal injection point.
An optimized system which maximizes use of the passive coupler arrangement is to connect the carrier current coupler (20) to service panel (30), inject the PLC signal from gateway (40) into the building at that point and measure the data throughput performance at a number of receptacles by any commonly available means.
Referring to
An additional dimension to be considered is the common use of 3-phase power in commercial buildings. In this case, service panel (30) contains 3 hot wires (often referred to as “L1”, “L2” and “L3”), a neutral and a ground wire. The object of the original building wiring plan was to balance the load across all 3 phases so roughly {fraction (1/3 )}of the receptacles (35) downstream will ultimately be connected to each of L1, L2 and U. Therefore, to provide PLC signals to all receptacles, the signal must be split and fed to all 3 phases simultaneously.
The resettable circuit-breaker 30 can provide all the functionality of a fuse in that it can provide protection from over-current situations with the extra advantage of being easily reset, as opposed to replaced. Still further, using a circuit-breaker fulfils the manual cut-off switching requirement of the national electric code as well as the fused disconnect requirement. Accordingly, use of a resettable circuit-breaker in the present circumstances can negate the need for a separate cut-off switch, such as the cut-off switch shown in
In order to couple the communications signal to all receptacles (35) in a Delta network, it is necessary to provide a signal voltage differential across all combinations of phases: A and B, B and C, & C and A. This can be accomplished with the circuit 20″ of
If installation is completed as discussed previously and acceptable data throughput results are obtained, no further work is necessary. On the other hand, one may find (referring once again to
The exemplary resettable circuit-breaker 50 of both
The foregoing disclosure has been set forth merely to illustrate the invention and is not intended to be limiting. Since modifications of the disclosed embodiments incorporating the spirit and substance of the invention may occur to persons skilled in the art, the invention should be construed to include everything within the scope of the appended claims and equivalents thereof
This continuation-in-part application claims priority to U.S. patent application Ser. No. 10/823,551 filed on Apr. 14, 2004, which is a continuation-in-part of pending prior U.S. patent application Ser. No. 10/219,811, filed Aug. 16, 2002, which claims the benefit of U.S. Provisional Patent Application No. 60/326,205, filed Oct. 2, 2001 entitled “Method and Apparatus for Attaching Powerline Communications to Customer Premises” the contents of which are incorporated by reference in their entirety.
Number | Date | Country | |
---|---|---|---|
60326205 | Oct 2001 | US | |
60326204 | Oct 2001 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 10823551 | Apr 2004 | US |
Child | 10898930 | Jul 2004 | US |
Parent | 10219811 | Aug 2002 | US |
Child | 10823551 | Apr 2004 | US |