The present invention relates to the scheduling of movement of plural units through a complex movement defining system, and in the embodiment disclosed, to the scheduling of the movement of freight trains over a railroad system, and specifically to the alternating routing of trains through congested areas.
Systems and methods for scheduling the movement of trains over a rail network have been described in U.S. Pat. Nos. 6,154,735, 5,794,172, and 5,623,413, the disclosure of which is hereby incorporated by reference.
As disclosed in the referenced patents and applications, the complete disclosure of which is hereby incorporated herein by reference, railroads consist of three primary components (1) a rail infrastructure, including track, switches, a communications system and a control system; (2) rolling stock, including locomotives and cars; and, (3) personnel (or crew) that operate and maintain the railway. Generally, each of these components are employed by the use of a high level schedule which assigns people, locomotives, and cars to the various sections of track and allows them to move over that track in a manner that avoids collisions and permits the railway system to deliver goods to various destinations.
As disclosed in the referenced applications, a precision control system includes the use of an optimizing scheduler that will schedule all aspects of the rail system, taking into account the laws of physics, the policies of the railroad, the work rules of the personnel, the actual contractual terms of the contracts to the various customers and any boundary conditions or constraints which govern the possible solution or schedule such as passenger traffic, hours of operation of some of the facilities, track maintenance, work rules, etc. The combination of boundary conditions together with a figure of merit for each activity will result in a schedule which maximizes some figure of merit such as overall system cost.
As disclosed in the referenced applications, and upon determining a schedule, a movement plan may be created using the very fine grain structure necessary to actually control the movement of the train. Such fine grain structure may include assignment of personnel by name as well as the assignment of specific locomotives by number, and may include the determination of the precise time or distance over time for the movement of the trains across the rail network and all the details of train handling, power levels, curves, grades, track topography, wind and weather conditions. This movement plan may be used to guide the manual dispatching of trains and controlling of track forces, or provided to the locomotives so that it can be implemented by the engineer or automatically by switchable actuation on the locomotive.
The planning system is hierarchical in nature in which the problem is abstracted to a relatively high level for the initial optimization process, and then the resulting course solution is mapped to a less abstract lower level for further optimization. Statistical processing is used at all levels to minimize the total computational load, making the overall process computationally feasible to implement. An expert system is used as a manager over these processes, and the expert system is also the tool by which various boundary conditions and constraints for the solution set are established. The use of an expert system in this capacity permits the user to supply the rules to be placed in the solution process.
Currently, a dispatcher's view of the controlled railroad territory can be considered myopic. Dispatchers view and processes information only within their own control territories and have little or no insight into the operation of adjoining territories, or the railroad network as a whole. Current dispatch systems simply implement controls as a result of the individual dispatcher's decisions on small portions of the railroad network and the dispatchers are expected to resolve conflicts between movements of objects on the track (e.g. trains, maintenance vehicles, survey vehicles, etc.) and the available track resource limitations (e.g. limited number of tracks, tracks out of service, consideration of safety of maintenance crews near active tracks) as they occur, with little advanced insight or warning.
Congestion inevitably occurs in the routing of trains and often occurs in the same areas. Congestion is a significant problem. The routing of trains into a congested area tends to exacerbate the congestion and may result in deadlock. Because the delay in the movement of trains is subject to cost constraints including contract penalties, the tendency of dispatchers is to continue to push trains through an area as rapidly as possible, advancing their movement along the line of road whenever possible, and treating the resulting congestion as a track availability problem to be solved through the assignment of track resources to create alternative routes through the congested area. The movement planners used by dispatchers in adjacent territories are often completely independent of each other and uninformed as to the status of the tracks in adjacent territories. As a result, dispatchers in uncongested areas may continue to send trains into a congested area in the adjacent territory.
The present invention relates to the anticipation and avoidance of congestion to maximize the throughput of trains in the overall system at the expense of the movement of trains over smaller sections of track.
Congestion generally is the after-the-fact result of acts set in motion by dispatchers assisted by train movement planners, i.e., by acts taken long prior to the development of actual congestion. By the time that congestion is actually detected, other trains are enroute through the congested area and in may cases have passed the point in the system where an alternative route may have been selected.
Typically, the routing of trains through areas of expected congestion is handled by dispatchers utilizing tribal knowledge, i.e., knowledge gained through the dispatcher's personal experience and the experience of other dispatchers passed to him.
It is accordingly an object of the present invention to reduce congestion and avoid deadlock by the management of the entry of trains into a congested area.
These and many other objects and advantages of the present invention will be readily apparent to one skilled in the art to which the invention pertains from a perusal of the claims, the appended drawings, and the following detailed description of the preferred embodiments.
As illustrated in
As described in the referenced applications, the automated dispatcher 140 can be implemented using computer usable medium having a computer readable code executed by special purpose or general purpose computers. The automated dispatcher 140 communicates with trains 102 on the network of track via a suitable communication link 150, such as a cellular telephone, satellite or wayside signaling.
The dispatcher issues and approves the issuance of movement authorities and track restrictions, schedule maintenance of way activities and communicates with train crews, yard managers and other railroad personnel consistent with an optimized operating plan for the railroad. While the dispatcher will rely on the movement planner to solve the complex problem of optimizing movement of trains, the dispatcher will be actively involved in entering the necessary data required to maintain an optimized plan and identify exceptions to the plan.
As disclosed in the referenced applications, enhanced planning is facilitated by automatically supplying the movement planner 120 with information from the railroad information support center 130 which associates train consist events (e.g., pickups, crew changes, engine destinations) with planned train activities that occupy track resources for the duration of a dwell time, so that maintenance of the traditional train sheet data (via electronic messaging and user data entry) is automatically reflected in the train trip specifications for use for movement planning.
From this information, and with the aid of suitable conventional traffic flow analysis algorithms desirably embedded in the movement planner 120, congestion in a particular geographic area can be identified and the dispatchers in other areas advised of the existence of the congestion and decline to push trains into the congested area. Thus, traffic flow analysis algorithms can detect and may also be used to predict the further occurrence of congestion.
The present application also is directed to the identification of areas that are prone to congestion and to take action sufficiently in advance of the predicted congestion to minimize or obviate avoid the congestion all together. In one embodiment, the maintenance of a historical data base of events that have resulted in congestion may be used in anticipating congestion. For example, analysis of a historical database may identify factors which are associated with congestion. Such factors may be temporal, e.g., between 3:00 and 5:00 p.m. or seasonal, e.g., during winter months, in nature. The factors may include environmental conditions, track topography, type of train, identification of crew, or other factors which may affect the likelihood of congestion. Each factor may be assigned a metric as a function of its contribution to the occurrence of congestion. The factors may also be weighted depending on the contribution of the factor. Through statistical analysis, it may be determined for a particular route, that the planned usage of the route by its scheduled trains may cause the cumulative metric for the route to exceed a predetermined threshold indicating the likely occurrence of congestion. The congestion metrics may be used by the movement plan to schedule the trains to alternative routes in order to reduce the metric for a given route to below the predetermined threshold.
In another embodiment, if the cumulative metrics for a route exceed a predetermined threshold, a further evaluation can be done to determine the contribution of each planned train to the predicted congestion and the train contributing the most can be selected for rescheduling to an alternate route.
These methods of scheduling may be implemented using computer usable medium having a computer readable code executed by special purpose or general purpose computers.
Other factors that may be considered to predict congestion include train density, type of train, the identity of the particular crew controlling a train, the type of load being carried by the train, physical constraints of the train, network topography including number of crossings, availability of sidings, zone restrictions or curfews. The weighting of the factors can be based upon historical statistics and can vary as a function of other factors. For example, the weight of the train may be a factor that is weighted more heavily in those areas where the track topography factor indicates a steep incline.
The combined metric for a route need not exceed a predetermined threshold to take steps to reduce the probability of congestion. The metric for a route can be compared against a metric for the same route with alternate planning to pick the planned movement over the route that results in the lowest congestion metric. Thus, a route metric evaluation can be performed for a number of different planned movements over the route to select the planned movement resulting in the lowest probability of congestion.
Departure times may be delayed and/or safe places can be found for trains en route along the line-of-road. Deadlocks may thus be prevented and the alternate routes may remain unblocked for use by the movement planner 120 in clearing the congestion.
While the delay of trains in uncongested areas may be costly, this cost may pale in comparison to the savings achieved as a result of the improvement of traffic flow through the system as a whole.
While preferred embodiments of the present invention have been described, it is understood that the embodiments described are illustrative only and the scope of the invention is to be defined solely by the appended claims when accorded a full range of equivalence, many variations and modifications naturally occurring to those of skill in the art from a perusal hereof.
This application is a continuation in part of application Ser. No. 10/785,059 filed Feb. 25, 2004, claiming the benefit of U.S. Provisional Application 60/449,849 filed on Feb. 27, 2003. This application is also one of the below listed applications being concurrently filed: GEH01 00166 application Ser. No. ______ entitled “Scheduler and Method for Managing Unpredictable Local Trains”; GEH01 00167 application Ser. No. ______ entitled “Method And Apparatus For Optimizing Maintenance Of Right Of Way”; GEH01 00168 application Ser. No. ______ entitled “Method and Apparatus for Coordinating Railway Line-Of-Road and Yard Planners”; GEH01 00169 application Ser. No. ______ entitled “Method and Apparatus for Selectively Disabling Train Location Reports”; GEH01 00170 application Ser. No. ______ entitled “Method And Apparatus For Automatic Selection Of Train Activity Locations”; GEH01 00171 application Ser. No. ______ entitled “Method And Apparatus For Congestion Management”; GEH01 00173 application Ser. No. ______ entitled “Method and Apparatus for Estimating Train Location”. The disclosure of each of the above referenced applications including those concurrently filed herewith is hereby incorporated herein by reference.
Number | Date | Country | |
---|---|---|---|
60449849 | Feb 2003 | US |
Number | Date | Country | |
---|---|---|---|
Parent | 10785059 | Feb 2004 | US |
Child | 11342857 | Jan 2006 | US |